CN112116278A CN202011081539.6A CN202011081539A CN112116278A CN 112116278 A CN112116278 A CN 112116278A CN 202011081539 A CN202011081539 A CN 202011081539A CN 112116278 A CN112116278 A CN 112116278A
Authority
CN
China
Prior art keywords
information
construction
construction progress
building
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011081539.6A
Other languages
Chinese (zh)
Inventor
梁成敏
梁福基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liang Chengmin
Original Assignee
Guangzhou Yunbo Internet Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yunbo Internet Technology Co ltd filed Critical Guangzhou Yunbo Internet Technology Co ltd
Priority to CN202011081539.6A priority Critical patent/CN112116278A/en
Publication of CN112116278A publication Critical patent/CN112116278A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of intelligent monitoring and assembly type buildings, in particular to an assembly type building construction safety monitoring method, an assembly type building construction safety monitoring system and a cloud platform. In this method, first, the status information of the construction site can be grasped in real time from the construction progress information. Secondly, the first target construction progress information can be timely determined based on the obtained construction information and prefabricated part information in each piece of construction progress information, after the first target construction progress information is determined, each piece of construction link information is collected in the first target construction progress information, so that the progress of a construction site and the construction condition of the construction site can be intuitively and accurately reflected to supervision workers, each piece of collected construction link information is subjected to safety monitoring analysis, the problem that the supervision standards of each piece of construction link information are inconsistent is avoided, the analysis result obtained by each piece of construction link information through safety monitoring analysis is compared with the preset result, and the safety state of the construction site can be timely monitored.

Description

Assembly type building construction safety monitoring method and system and cloud platform
Technical Field
The invention relates to the technical field of intelligent monitoring and assembly type buildings, in particular to a method and a system for monitoring construction safety of an assembly type building and a cloud platform.
Background
The prefabricated building refers to a building formed by processing and manufacturing building components and accessories (such as floor slabs, wall slabs, stairs, balconies and the like) in a factory, transporting the manufactured building components and accessories to a building construction site and connecting the building components and accessories together in an assembling mode.
Along with the popularization of the national aspect to the fabricated building, the control difficulty of the safety risk of the fabricated building is also improved. At present, monitoring of safety risks of an assembly type building is performed by monitoring staff corresponding to each link in the building construction, so that monitoring standards of each link are inconsistent, and potential safety hazards appear.
Disclosure of Invention
In order to solve the technical problems in the related art, the invention provides an assembly type building construction safety monitoring method, an assembly type building construction safety monitoring system and a cloud platform.
The invention provides an assembly type building construction safety monitoring method, which is applied to a safety monitoring center, wherein the safety monitoring center is communicated with an information database, the information database is used for storing assembly type building information, and the method comprises the following steps:
acquiring construction information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information; wherein the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information;
determining first target construction progress information from the set of construction progress information based on construction information of the first assembly type construction information in the construction progress information and prefabricated part information of the first assembly type construction information in the construction progress information; wherein the prefabricated part information is used to indicate each piece information in the first fabricated building information;
collecting information of each construction link in the first target construction progress information, and carrying out safety monitoring analysis on the information of each construction link to obtain an analysis result;
comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
In an alternative embodiment, obtaining the construction information of the first fabricated building information in each construction progress information included in the set of construction progress information includes: acquiring prefabricated part information of the first fabricated building information in each piece of construction progress information included in a set of construction progress information;
acquiring prefabricated part information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information, specifically including:
for any one of the set of construction progress information, performing the following operations to acquire prefabricated part information of the first fabricated building information in each of the construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly duration of the first assembly type building information in the first construction progress information;
determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and part type information; wherein the component type information is used to indicate component type information corresponding to the first fabricated building information and the plurality of types of component distribution information, respectively, in the first construction progress information, in a case where the first construction progress information includes a plurality of types of component distribution information.
In an alternative embodiment, determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and part type information includes: determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and the member type information of the first construction progress information and other construction progress information;
determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and the member type information of the first construction progress information and other construction progress information, specifically comprising:
in the case where it is determined that the first fabricated building information is at a first progress node corresponding to construction progress information of the first construction progress information based on the assembly duration, determining prefabricated part information of the first fabricated building information in the first construction progress information as information indicating that the first fabricated building information is at construction progress incompletion;
determining prefabricated part information of the first assembly type building information in the first construction progress information as information for indicating that the first assembly type building information is in construction progress unfinished under the condition that it is determined that the first assembly type building information is at a second progress node corresponding to construction progress information of the first construction progress information based on the assembly duration time and the first assembly type building information is crossed with preset dynamic assembly type information existence information;
determining prefabricated component information of the first assembly type building information in the first construction progress information as information for indicating that the first assembly type building information is in a safe construction state under the condition that the first assembly type building information is determined to be in a second progress node corresponding to construction progress information based on the assembly duration time, and the various component distribution information does not exist or the first assembly type building information is not crossed with preset dynamic assembly type information; the first progress node corresponding to the construction progress information is a node which is pre-divided, is located in an information list corresponding to the first construction progress information and cannot mark the first assembly type building information in parallel, and the second progress node corresponding to the construction progress information is a node which is included in the first construction progress information and is except the first progress node corresponding to the construction progress information.
In an alternative embodiment, obtaining the construction information of the first fabricated building information in each construction progress information included in the set of construction progress information includes: acquiring building state information of the first fabricated building information in each piece of construction progress information included in a set of construction progress information;
acquiring building state information of the first fabricated building information in each construction progress information included in the set of construction progress information, including:
for any construction progress information in the set of construction progress information, performing the following operations to obtain the building state information of the first fabricated building information in each construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly process information of the first assembly type building information in the first construction progress information;
determining building state information of the first fabricated building information in the first construction progress information based on the assembly process information; the assembly process information is a fusion value of the number of assembly process nodes of the first assembly type building information in the first construction progress information and the number of assembly process nodes of the first assembly type building information in the second construction progress information, and the second construction progress information is the construction progress information which is included in the set of construction progress information and is located at the previous section of the first construction progress information.
In an alternative embodiment, determining the building status information of the first fabricated building information in the first construction progress information based on the fabrication process information includes:
under the condition that a first process parameter in the assembly process information is matched with a preset parameter, determining that the building state information of the first assembly type building information in the first construction progress information is first building state information used for indicating the first assembly type building information in the first construction progress information;
determining that the building state information of the first assembly type building information in the first construction progress information is second building state information used for indicating that the first assembly type building information is in the first construction progress information under the condition that a second process parameter in the assembly process information is matched with a preset parameter and a first process parameter is not matched with the preset parameter;
and under the condition that the second process parameter in the assembly process information is matched with a preset parameter and the first process parameter is matched with the preset parameter, determining that the building state information of the first assembly type building information in the first construction progress information is third building state information used for indicating that the first assembly type building information is in the first construction progress information.
In an alternative embodiment, obtaining the construction information of the first fabricated building information in each construction progress information included in the set of construction progress information includes: acquiring assembly building coordinate information of the first assembly building information in each piece of construction progress information included in a set of construction progress information;
acquiring assembly building coordinate information of the first assembly building information in each piece of construction progress information included in the set of construction progress information, including:
for any construction progress information in the set of construction progress information, performing the following operation to obtain assembly building coordinate information of the first assembly building information in each piece of construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly safety information of the first assembly type building information in the first construction progress information;
determining assembly building coordinate information of the first assembly building information in the first construction progress information based on the assembly safety information; the assembly safety information is safety information corresponding to the construction process of the first assembly type building information in the first construction progress information and the first construction progress information.
In an alternative embodiment, determining the assembly building coordinate information of the first assembly building information in the first construction progress information based on the assembly safety information includes:
under the condition that the assembly safety information is used for indicating that the progress value of the first assembly type building information in the first construction progress information and the first construction progress information is larger than a preset value, determining that the assembly type building coordinate information of the first assembly type building information in the first construction progress information is a first building coordinate node used for indicating the first assembly type building information in the first construction progress information;
when it is determined that the assembly safety information is used for indicating that the weight value of the first assembly building information in the first construction progress information and the weight value of the safety information corresponding to the construction process of the first construction progress information are greater than a preset first weight value and less than or equal to a preset second weight value, determining that the assembly building coordinate information of the first assembly building information in the first construction progress information is a second building coordinate node used for indicating the first assembly building information in the first construction progress information;
and under the condition that the assembly safety information is used for indicating that the weight value of the first assembly building information in the first construction progress information and the weight value of the safety information corresponding to the construction process of the first construction progress information are larger than a preset second weight value, determining that the assembly building coordinate information of the first assembly building information in the first construction progress information is a third building coordinate node used for indicating the first assembly building information in the first construction progress information.
In an alternative embodiment, determining the first target construction progress information from the set of construction progress information based on the construction information of the first fabricated building information in the construction progress information and the prefabricated part information of the first fabricated building information in the construction progress information includes:
determining information lists corresponding to the prefabricated part information, the building state information and the assembly type building coordinate information respectively;
determining an information list set of the first assembly type building information in each piece of construction progress information according to the prefabricated part information and an information list corresponding to the prefabricated part information, the building state information and an information list corresponding to the assembly type building coordinate information in each piece of construction progress information of the first assembly type building information;
and determining the first target construction progress information based on the information list set of the first assembly type building information in each construction progress information and the prefabricated part information of the first assembly type building information in each construction progress information.
In an alternative embodiment of the method of the invention,
collecting each construction link information in the first target construction progress information, and carrying out safety monitoring analysis on each construction link information to obtain an analysis result, wherein the method specifically comprises the following steps: periodically collecting information of each construction link in the first target construction progress information; acquiring the building architecture information of each construction link information in a construction site monitored by target monitoring equipment; carrying out safety analysis on the building architecture information to obtain an analysis result;
comparing the analysis result with a preset result; if the analysis result is consistent with the preset result, determining that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, determining that the construction state corresponding to the first target construction progress information is a non-safe state, specifically including: comparing the analysis result with a preset result; and if the analysis result is consistent with the preset result and the construction position information corresponding to the first target construction progress information is matched with the historical position information, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result and the construction position information corresponding to the first target construction progress information is not matched with the historical position information, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
The invention also provides an assembly type building construction safety monitoring system, which comprises a safety monitoring center and an information database, wherein the safety monitoring center and the information database are communicated with each other;
the safety monitoring center is used for:
acquiring construction information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information; wherein the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information;
determining first target construction progress information from the set of construction progress information based on construction information of the first assembly type construction information in the construction progress information and prefabricated part information of the first assembly type construction information in the construction progress information; wherein the prefabricated part information is used to indicate each piece information in the first fabricated building information;
collecting information of each construction link in the first target construction progress information, and carrying out safety monitoring analysis on the information of each construction link to obtain an analysis result;
comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
The invention also provides an assembly type building construction safety monitoring cloud platform, which is applied to a safety monitoring center, the safety monitoring center is communicated with an information database, the information database is used for storing assembly type building information, and the cloud platform comprises:
the construction information acquisition module is used for acquiring construction information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information; wherein the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information;
a construction progress information determining module, configured to determine first target construction progress information from the set of construction progress information based on construction information of the first assembly type building information in the respective construction progress information and prefabricated part information of the first assembly type building information in the respective construction progress information; wherein the prefabricated part information is used to indicate each piece information in the first fabricated building information;
the construction link information monitoring module is used for acquiring construction link information in the first target construction progress information and carrying out safety monitoring analysis on the construction link information to obtain an analysis result;
the construction state judgment module is used for comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
The invention also provides a readable storage medium on which a program is stored which, when executed by a processor, implements the method described above.
The technical scheme provided by the embodiment of the invention can have the following beneficial effects.
The invention provides an assembly type building construction safety monitoring method, an assembly type building construction safety monitoring system and a cloud platform.
In this way, the state information of the construction site can be grasped in real time by the construction progress information. Secondly, the first target construction progress information can be determined in time based on the obtained construction information and prefabricated part information in each construction progress information, after the first target construction progress information is determined, collecting each construction link information in the first target construction progress information, thus, the progress of the construction site and the construction condition of the construction site can be intuitively and accurately reflected to the supervision staff, the collected information of each construction link is further monitored and analyzed, therefore, the information of each construction link can be monitored simultaneously, the problem that the supervision standards of the information of each construction link are inconsistent due to the fact that one piece of construction link information corresponds to one supervision worker is avoided, furthermore, the analysis result obtained by carrying out safety monitoring analysis on the information of each construction link is compared with the preset result, and the safety state of a construction site can be monitored timely.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and together with the description, serve to explain the principles of the invention.
Fig. 1 is a schematic view of a communication architecture of a fabricated building construction safety monitoring system according to an embodiment of the present invention.
Fig. 2 is a flowchart of a method for monitoring the construction safety of an assembly type building according to an embodiment of the present invention.
Fig. 3 is a block diagram of an assembly type building construction safety monitoring cloud platform provided by an embodiment of the invention.
Fig. 4 is a schematic diagram of a hardware structure of a security monitoring center according to an embodiment of the present invention.
Detailed Description
Reference will now be made in detail to the exemplary embodiments, examples of which are illustrated in the accompanying drawings. When the following description refers to the accompanying drawings, like numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present application. Rather, they are merely examples of cloud platforms and methods consistent with certain aspects of the present application, as detailed in the appended claims.
The problem that potential safety hazards occur due to inconsistent monitoring standards of all links when monitoring is performed by corresponding monitoring workers of all links in a building construction in the prior art is solved.
To achieve the above object, firstly, a schematic diagram of a communication architecture of a fabricated building construction safety monitoring system as shown in fig. 1 is provided. The assembly type construction safety monitoring system 100 may include a safety monitoring center 200 and an information database 300. Wherein the security monitoring center 200 is in communication with the information database 300. In this embodiment, the security monitoring center 200 may be a desktop computer, a tablet computer, or the like, and the information database may be a mysql database, a hive database, or the like, which is not limited herein.
On the basis, please refer to fig. 2 in combination, a flow diagram of an assembly type building construction safety monitoring method is provided, the method may be applied to the safety monitoring center 200 in fig. 1, and the safety monitoring center 200 specifically executes the contents described in the following steps S210 to S240 when implementing the method.
Step S210, acquiring construction information of the first fabricated building information in each construction progress information included in the set of construction progress information.
In this embodiment, the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information, and the construction progress information is used to represent a construction progress situation of a construction site.
Step S220, determining first target construction progress information from the set of construction progress information based on the construction information of the first assembly type construction information in the construction progress information and the prefabricated part information of the first assembly type construction information in the construction progress information.
In this embodiment, the prefabricated part information is used to indicate each piece of part information in the first fabricated building information, and the first target construction progress information may be construction progress information to be monitored.
Step S230, collecting information of each construction link from the first target construction progress information, and performing security monitoring analysis on the information of each construction link to obtain an analysis result.
In this embodiment, the construction link information is used to represent information corresponding to each construction stage in the construction site, and the analysis result is a result obtained by performing safety monitoring analysis on each construction stage.
Step S240, comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
In this embodiment, the preset result may be used for comparison with the analysis result, and the construction state may be a condition occurring during the construction process.
The following advantageous effects can be achieved when the method described in the above steps S210 to S240 is executed:
the construction method comprises the steps of firstly obtaining construction information, secondly determining first target construction progress information, then collecting all construction link information in the first target construction progress information, carrying out safety monitoring analysis on all construction link information to obtain an analysis result, further comparing the analysis result with a preset result, and judging whether a construction state corresponding to the first target construction progress information is a safety state or not.
In this way, the state information of the construction site can be grasped in real time by the construction progress information. Secondly, the first target construction progress information can be determined in time based on the obtained construction information and prefabricated part information in each construction progress information, after the first target construction progress information is determined, collecting each construction link information in the first target construction progress information, thus, the progress of the construction site and the construction condition of the construction site can be intuitively and accurately reflected to the supervision staff, the collected information of each construction link is further monitored and analyzed, therefore, the information of each construction link can be monitored simultaneously, the problem that the supervision standards of the information of each construction link are inconsistent due to the fact that one piece of construction link information corresponds to one supervision worker is avoided, furthermore, the analysis result obtained by carrying out safety monitoring analysis on the information of each construction link is compared with the preset result, and the safety state of a construction site can be monitored timely.
In practical implementation, in order to determine the basic use state of the prefabricated part in time, the acquiring of the construction information of the first prefabricated building information in each piece of construction progress information included in the set of construction progress information described in step S210 may specifically include: prefabricated part information of the first fabricated building information among the construction progress information included in the set of construction progress information is acquired.
It can be understood that, further, acquiring prefabricated part information of the first fabricated building information in each construction progress information included in the set of construction progress information specifically includes:
for any one of the set of construction progress information, performing the following operations to acquire prefabricated part information of the first fabricated building information in each of the construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly duration of the first assembly type building information in the first construction progress information;
determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and part type information;
in this embodiment, the component type information is used to indicate component type information to which the first fabricated building information and the plurality of kinds of component distribution information respectively correspond in the first construction progress information in a case where the first construction progress information includes a plurality of kinds of component distribution information.
The method comprises the steps of firstly obtaining the assembly duration of first assembly type building information in first construction progress information, so that the construction progress can be known in real time, meanwhile, the progress details of each prefabricated component in the construction stage can be conveniently and remotely checked, and after the assembly duration is obtained, the prefabricated component information in the first construction progress information is determined based on the assembly duration and the component type information, so that the basic use state of the prefabricated component can be timely determined.
Further, determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and the part type information specifically includes:
determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and the member type information of the first construction progress information and other construction progress information;
determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and the member type information of the first construction progress information and other construction progress information, specifically comprising:
in the case where it is determined that the first fabricated building information is at a first progress node corresponding to construction progress information of the first construction progress information based on the assembly duration, determining prefabricated part information of the first fabricated building information in the first construction progress information as information indicating that the first fabricated building information is at construction progress incompletion;
determining prefabricated part information of the first assembly type building information in the first construction progress information as information for indicating that the first assembly type building information is in construction progress unfinished under the condition that it is determined that the first assembly type building information is at a second progress node corresponding to construction progress information of the first construction progress information based on the assembly duration time and the first assembly type building information is crossed with preset dynamic assembly type information existence information;
determining prefabricated component information of the first assembly type building information in the first construction progress information as information for indicating that the first assembly type building information is in a safe construction state under the condition that the first assembly type building information is determined to be in a second progress node corresponding to construction progress information based on the assembly duration time, and the various component distribution information does not exist or the first assembly type building information is not crossed with preset dynamic assembly type information; the first progress node corresponding to the construction progress information is a node which is pre-divided, is located in an information list corresponding to the first construction progress information and cannot mark the first assembly type building information in parallel, and the second progress node corresponding to the construction progress information is a node which is included in the first construction progress information and is except the first progress node corresponding to the construction progress information.
In specific implementation, in order to significantly improve the corresponding assembly efficiency of the assembly process and avoid adverse effects on the whole assembly type building caused by no local abnormality found in the assembly process of the building, the obtaining of the construction information of the first assembly type building information in each piece of construction progress information included in the set of construction progress information described in step S210 may further include: acquiring building state information of the first fabricated building information in each piece of construction progress information included in a set of construction progress information;
wherein, obtaining the building state information of the first fabricated building information in each construction progress information included in the set of construction progress information includes:
for any construction progress information in the set of construction progress information, performing the following operations to obtain the building state information of the first fabricated building information in each construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly process information of the first assembly type building information in the first construction progress information;
building state information of the first fabricated building information in the first construction progress information is determined based on the assembly process information.
In this embodiment, the assembly process information is a fusion value of the number of assembly process nodes of the first assembly building information in the first construction progress information and the number of assembly process nodes of the first assembly building information in second construction progress information, and the second construction progress information is the construction progress information included in the set of construction progress information and located at a previous stage of the first construction progress information.
The method comprises the steps of executing the content, obtaining the assembly process information of the first assembly type building information in the first construction progress information, and further determining the building state information based on the assembly process information, so that the corresponding assembly efficiency of the assembly process can be remarkably improved, and further the adverse effect on the whole assembly type building caused by the fact that no local abnormity is found in the assembly process of the building is avoided.
Further, determining building state information of the first fabricated building information in the first construction progress information based on the fabrication process information includes:
under the condition that a first process parameter in the assembly process information is matched with a preset parameter, determining that the building state information of the first assembly type building information in the first construction progress information is first building state information used for indicating the first assembly type building information in the first construction progress information;
determining that the building state information of the first assembly type building information in the first construction progress information is second building state information used for indicating that the first assembly type building information is in the first construction progress information under the condition that a second process parameter in the assembly process information is matched with a preset parameter and a first process parameter is not matched with the preset parameter;
and under the condition that the second process parameter in the assembly process information is matched with a preset parameter and the first process parameter is matched with the preset parameter, determining that the building state information of the first assembly type building information in the first construction progress information is third building state information used for indicating that the first assembly type building information is in the first construction progress information.
In specific implementation, in order to intuitively grasp the construction details of the prefabricated building under the condition of ensuring safe construction, the step S210 of obtaining the construction information of the first prefabricated building information in each piece of construction progress information included in the set of construction progress information includes: acquiring assembly building coordinate information of the first assembly building information in each piece of construction progress information included in a set of construction progress information;
further, acquiring assembly building coordinate information of the first assembly building information in each piece of construction progress information included in the set of construction progress information, includes:
for any construction progress information in the set of construction progress information, performing the following operation to obtain assembly building coordinate information of the first assembly building information in each piece of construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly safety information of the first assembly type building information in the first construction progress information;
and determining the assembly building coordinate information of the first assembly building information in the first construction progress information based on the assembly safety information.
In this embodiment, the assembly safety information is safety information corresponding to a construction process of the first assembly type building information in the first construction progress information.
The method and the device can reduce safety accidents of the assembly type building in the construction process by acquiring the assembly safety information, and further acquire the coordinate information of the assembly type building based on the assembly safety information, so that the construction detail condition of the assembly type building can be intuitively mastered under the condition of ensuring safe construction.
Further, determining the assembly building coordinate information of the first assembly building information in the first construction progress information based on the assembly safety information includes:
under the condition that the assembly safety information is used for indicating that the progress value of the first assembly type building information in the first construction progress information and the first construction progress information is larger than a preset value, determining that the assembly type building coordinate information of the first assembly type building information in the first construction progress information is a first building coordinate node used for indicating the first assembly type building information in the first construction progress information;
when it is determined that the assembly safety information is used for indicating that the weight value of the first assembly building information in the first construction progress information and the weight value of the safety information corresponding to the construction process of the first construction progress information are greater than a preset first weight value and less than or equal to a preset second weight value, determining that the assembly building coordinate information of the first assembly building information in the first construction progress information is a second building coordinate node used for indicating the first assembly building information in the first construction progress information;
and under the condition that the assembly safety information is used for indicating that the weight value of the first assembly building information in the first construction progress information and the weight value of the safety information corresponding to the construction process of the first construction progress information are larger than a preset second weight value, determining that the assembly building coordinate information of the first assembly building information in the first construction progress information is a third building coordinate node used for indicating the first assembly building information in the first construction progress information.
In a specific implementation, in order to accurately and timely determine the first target construction progress information, the determining, by the step S220, the first target construction progress information from the set of construction progress information based on the construction information of the first assembly type building information in each piece of construction progress information and the prefabricated part information of the first assembly type building information in each piece of construction progress information may specifically include the following contents described in sub-steps S2201 to S2203:
substep S2201, determining information lists corresponding to the prefabricated part information, the building state information and the assembly type building coordinate information respectively;
a substep S2202, determining an information list set of the first assembly type building information in each construction progress information according to the prefabricated part information and the corresponding information list thereof, the building state information and the corresponding information list thereof, and the information list corresponding to the assembly type building coordinate information in each construction progress information of the first assembly type building information;
the sub-step S2203 determines the first target construction progress information based on the information list set of the first assembly type construction information in each construction progress information and the prefabricated part information of the first assembly type construction information in each construction progress information.
Performing the above-described operation of substep S2201-substep S2203, determining the first target construction progress information by the information list set of the determined first assembly building information in each construction progress information and the prefabricated part information of the first assembly building information in each construction progress information. Therefore, the accuracy of determining the first target construction progress information can be improved by determining the information list set. And then, the first target construction progress information can be determined in time based on the obtained construction information and the prefabricated part information in each piece of construction progress information.
In specific implementation, in order to monitor the specific construction condition of the construction site in real time and further realize synchronous monitoring of each construction link in the construction process so as to ensure the safety problem in the construction process, thereby performing safety analysis on the acquired building architecture information in the construction site and ensuring that whether the construction state of the construction site is a safety state can be accurately judged subsequently, the step S230 of collecting information of each construction link in the first target construction progress information and performing safety monitoring analysis on the information of each construction link to obtain an analysis result specifically includes: periodically collecting information of each construction link in the first target construction progress information; acquiring the building architecture information of each construction link information in a construction site monitored by target monitoring equipment; and carrying out safety analysis on the building architecture information to obtain an analysis result.
By executing the above contents, the specific construction condition of the construction site can be monitored in real time by periodically acquiring the information of each construction link, and then each construction link in the construction process can be synchronously monitored, so that the safety problem in the construction process is ensured, the obtained building framework information in the construction site is further subjected to safety analysis, and whether the subsequent construction state of the construction site is a safe state or not can be accurately judged.
In specific implementation, in order to timely determine the safety problem of the construction state corresponding to the first target construction progress information, the analysis result is compared with a preset result in step S240; if the analysis result is consistent with the preset result, determining that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, determining that the construction state corresponding to the first target construction progress information is a non-safe state, specifically including: comparing the analysis result with a preset result; and if the analysis result is consistent with the preset result and the construction position information corresponding to the first target construction progress information is matched with the historical position information, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result and the construction position information corresponding to the first target construction progress information is not matched with the historical position information, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
And executing the description content, and comparing the analysis result with a preset result to judge the safety problem of the construction state corresponding to the first target construction progress information in time.
Based on the same inventive concept, the invention also provides an assembly type building construction safety monitoring system, which comprises a safety monitoring center and an information database, wherein the safety monitoring center is communicated with the information database;
wherein, the safety monitoring center is used for:
acquiring construction information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information; wherein the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information;
determining first target construction progress information from the set of construction progress information based on construction information of the first assembly type construction information in the construction progress information and prefabricated part information of the first assembly type construction information in the construction progress information; wherein the prefabricated part information is used to indicate each piece information in the first fabricated building information;
collecting information of each construction link in the first target construction progress information, and carrying out safety monitoring analysis on the information of each construction link to obtain an analysis result;
comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
On the basis, please refer to fig. 3, the present invention further provides an assembly type building construction safety monitoring cloud platform 400, which is applied to a safety monitoring center, wherein the safety monitoring center is in communication with an information database, the information database is used for storing assembly type building information, and the cloud platform includes:
a construction information obtaining module 410 for obtaining construction information of the first fabricated building information among the construction progress information included in the set of construction progress information; wherein the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information;
a construction progress information determining module 420, configured to determine first target construction progress information from the set of construction progress information based on construction information of the first assembly building information in the respective construction progress information and prefabricated part information of the first assembly building information in the respective construction progress information; wherein the prefabricated part information is used to indicate each piece information in the first fabricated building information;
the construction link information monitoring module 430 is configured to collect construction link information in the first target construction progress information, and perform security monitoring analysis on the construction link information to obtain an analysis result;
the construction state judgment module 440 is used for comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
On the basis, please refer to fig. 4 in combination, which provides a security monitoring center 200, including a processor 210, and a memory 220 and a bus 230 connected to the processor 210; wherein, the processor 210 and the memory 220 complete communication with each other through the bus 230; the processor 210 is used to call the program instructions in the memory 220 to execute the above-mentioned method.
Further, a readable storage medium is provided, on which a program is stored, which when executed by a processor implements the method described above.
It will be understood that the invention is not limited to the precise arrangements described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the invention is limited only by the appended claims.

Claims (10)

1. The assembly type building construction safety monitoring method is applied to a safety monitoring center, the safety monitoring center is communicated with an information database, the information database is used for storing assembly type building information, and the method comprises the following steps:
acquiring construction information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information; wherein the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information;
determining first target construction progress information from the set of construction progress information based on construction information of the first assembly type construction information in the construction progress information and prefabricated part information of the first assembly type construction information in the construction progress information; wherein the prefabricated part information is used to indicate each piece information in the first fabricated building information;
collecting information of each construction link in the first target construction progress information, and carrying out safety monitoring analysis on the information of each construction link to obtain an analysis result;
comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
2. The method of claim 1, wherein acquiring the construction information of the first fabricated construction information in each construction progress information included in the set of construction progress information comprises: acquiring prefabricated part information of the first fabricated building information in each piece of construction progress information included in a set of construction progress information;
acquiring prefabricated part information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information, specifically including:
for any one of the set of construction progress information, performing the following operations to acquire prefabricated part information of the first fabricated building information in each of the construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly duration of the first assembly type building information in the first construction progress information;
determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and part type information; wherein the component type information is used to indicate component type information corresponding to the first fabricated building information and the plurality of types of component distribution information, respectively, in the first construction progress information, in a case where the first construction progress information includes a plurality of types of component distribution information.
3. The method of claim 2, wherein determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and part type information comprises: determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and the member type information of the first construction progress information and other construction progress information;
determining prefabricated part information of the first fabricated building information in the first construction progress information based on the assembly duration and the member type information of the first construction progress information and other construction progress information, specifically comprising:
in the case where it is determined that the first fabricated building information is at a first progress node corresponding to construction progress information of the first construction progress information based on the assembly duration, determining prefabricated part information of the first fabricated building information in the first construction progress information as information indicating that the first fabricated building information is at construction progress incompletion;
determining prefabricated part information of the first assembly type building information in the first construction progress information as information for indicating that the first assembly type building information is in construction progress unfinished under the condition that it is determined that the first assembly type building information is at a second progress node corresponding to construction progress information of the first construction progress information based on the assembly duration time and the first assembly type building information is crossed with preset dynamic assembly type information existence information;
determining prefabricated component information of the first assembly type building information in the first construction progress information as information for indicating that the first assembly type building information is in a safe construction state under the condition that the first assembly type building information is determined to be in a second progress node corresponding to construction progress information based on the assembly duration time, and the various component distribution information does not exist or the first assembly type building information is not crossed with preset dynamic assembly type information; the first progress node corresponding to the construction progress information is a node which is pre-divided, is located in an information list corresponding to the first construction progress information and cannot mark the first assembly type building information in parallel, and the second progress node corresponding to the construction progress information is a node which is included in the first construction progress information and is except the first progress node corresponding to the construction progress information.
4. The method of claim 1, wherein acquiring the construction information of the first fabricated construction information in each construction progress information included in the set of construction progress information comprises: acquiring building state information of the first fabricated building information in each piece of construction progress information included in a set of construction progress information;
acquiring building state information of the first fabricated building information in each construction progress information included in the set of construction progress information, including:
for any construction progress information in the set of construction progress information, performing the following operations to obtain the building state information of the first fabricated building information in each construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly process information of the first assembly type building information in the first construction progress information;
determining building state information of the first fabricated building information in the first construction progress information based on the assembly process information; the assembly process information is a fusion value of the number of assembly process nodes of the first assembly type building information in the first construction progress information and the number of assembly process nodes of the first assembly type building information in the second construction progress information, and the second construction progress information is the construction progress information which is included in the set of construction progress information and is located at the previous section of the first construction progress information.
5. The method of claim 4, wherein determining the building status information of the first fabricated building information in the first construction progress information based on the fabrication process information comprises:
under the condition that a first process parameter in the assembly process information is matched with a preset parameter, determining that the building state information of the first assembly type building information in the first construction progress information is first building state information used for indicating the first assembly type building information in the first construction progress information;
determining that the building state information of the first assembly type building information in the first construction progress information is second building state information used for indicating that the first assembly type building information is in the first construction progress information under the condition that a second process parameter in the assembly process information is matched with a preset parameter and a first process parameter is not matched with the preset parameter;
and under the condition that the second process parameter in the assembly process information is matched with a preset parameter and the first process parameter is matched with the preset parameter, determining that the building state information of the first assembly type building information in the first construction progress information is third building state information used for indicating that the first assembly type building information is in the first construction progress information.
6. The method of claim 1, wherein acquiring the construction information of the first fabricated construction information in each construction progress information included in the set of construction progress information comprises: acquiring assembly building coordinate information of the first assembly building information in each piece of construction progress information included in a set of construction progress information;
acquiring assembly building coordinate information of the first assembly building information in each piece of construction progress information included in the set of construction progress information, including:
for any construction progress information in the set of construction progress information, performing the following operation to obtain assembly building coordinate information of the first assembly building information in each piece of construction progress information included in the set of construction progress information: under the condition that it is determined that first construction progress information included in the group of construction progress information includes the first assembly type building information, acquiring assembly safety information of the first assembly type building information in the first construction progress information;
determining assembly building coordinate information of the first assembly building information in the first construction progress information based on the assembly safety information; the assembly safety information is safety information corresponding to the construction process of the first assembly type building information in the first construction progress information and the first construction progress information;
determining assembly building coordinate information of the first assembly building information in the first construction progress information based on the assembly safety information, including:
under the condition that the assembly safety information is used for indicating that the progress value of the first assembly type building information in the first construction progress information and the first construction progress information is larger than a preset value, determining that the assembly type building coordinate information of the first assembly type building information in the first construction progress information is a first building coordinate node used for indicating the first assembly type building information in the first construction progress information;
when it is determined that the assembly safety information is used for indicating that the weight value of the first assembly building information in the first construction progress information and the weight value of the safety information corresponding to the construction process of the first construction progress information are greater than a preset first weight value and less than or equal to a preset second weight value, determining that the assembly building coordinate information of the first assembly building information in the first construction progress information is a second building coordinate node used for indicating the first assembly building information in the first construction progress information;
and under the condition that the assembly safety information is used for indicating that the weight value of the first assembly building information in the first construction progress information and the weight value of the safety information corresponding to the construction process of the first construction progress information are larger than a preset second weight value, determining that the assembly building coordinate information of the first assembly building information in the first construction progress information is a third building coordinate node used for indicating the first assembly building information in the first construction progress information.
7. The method of claim 1,
determining first target construction progress information from the set of construction progress information based on construction information of the first assembly type construction information in the construction progress information and prefabricated part information of the first assembly type construction information in the construction progress information, including: determining information lists corresponding to the prefabricated part information, the building state information and the assembly type building coordinate information respectively; determining an information list set of the first assembly type building information in each piece of construction progress information according to the prefabricated part information and an information list corresponding to the prefabricated part information, the building state information and an information list corresponding to the assembly type building coordinate information in each piece of construction progress information of the first assembly type building information; determining the first target construction progress information based on an information list set of the first assembly type building information in each construction progress information and prefabricated part information of the first assembly type building information in each construction progress information;
collecting each construction link information in the first target construction progress information, and carrying out safety monitoring analysis on each construction link information to obtain an analysis result, wherein the method specifically comprises the following steps: periodically collecting information of each construction link in the first target construction progress information; acquiring the building architecture information of each construction link information in a construction site monitored by target monitoring equipment; carrying out safety analysis on the building architecture information to obtain an analysis result;
comparing the analysis result with a preset result; if the analysis result is consistent with the preset result, determining that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, determining that the construction state corresponding to the first target construction progress information is a non-safe state, specifically including: comparing the analysis result with a preset result; and if the analysis result is consistent with the preset result and the construction position information corresponding to the first target construction progress information is matched with the historical position information, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result and the construction position information corresponding to the first target construction progress information is not matched with the historical position information, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
8. An assembly type building construction safety monitoring system is characterized in that the system comprises a safety monitoring center and an information database, wherein the safety monitoring center is communicated with the information database;
the safety monitoring center is used for:
acquiring construction information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information; wherein the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information;
determining first target construction progress information from the set of construction progress information based on construction information of the first assembly type construction information in the construction progress information and prefabricated part information of the first assembly type construction information in the construction progress information; wherein the prefabricated part information is used to indicate each piece information in the first fabricated building information;
collecting information of each construction link in the first target construction progress information, and carrying out safety monitoring analysis on the information of each construction link to obtain an analysis result;
comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
9. The utility model provides an assembly type structure construction safety monitoring cloud platform which characterized in that is applied to the safety monitoring center, the safety monitoring center communicates with the information database, the information database is used for saving assembly type structure information, the cloud platform includes:
the construction information acquisition module is used for acquiring construction information of the first fabricated building information in each piece of construction progress information included in the set of construction progress information; wherein the construction information includes prefabricated part information, building state information, and assembly building coordinate information of the first assembly building information;
a construction progress information determining module, configured to determine first target construction progress information from the set of construction progress information based on construction information of the first assembly type building information in the respective construction progress information and prefabricated part information of the first assembly type building information in the respective construction progress information; wherein the prefabricated part information is used to indicate each piece information in the first fabricated building information;
the construction link information monitoring module is used for acquiring construction link information in the first target construction progress information and carrying out safety monitoring analysis on the construction link information to obtain an analysis result;
the construction state judgment module is used for comparing the analysis result with a preset result; and if the analysis result is consistent with a preset result, judging that the construction state corresponding to the first target construction progress information is a safe state, and if the analysis result is inconsistent with the preset result, judging that the construction state corresponding to the first target construction progress information is a non-safe state.
10. A readable storage medium, characterized in that a program is stored thereon, which program, when being executed by a processor, carries out the method of claims 1-7.
CN202011081539.6A 2020-10-12 2020-10-12 Assembly type building construction safety monitoring method and system and cloud platform Withdrawn CN112116278A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011081539.6A CN112116278A (en) 2020-10-12 2020-10-12 Assembly type building construction safety monitoring method and system and cloud platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011081539.6A CN112116278A (en) 2020-10-12 2020-10-12 Assembly type building construction safety monitoring method and system and cloud platform

Publications (1)

Publication Number Publication Date
CN112116278A true CN112116278A (en) 2020-12-22

Family

ID=73798053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011081539.6A Withdrawn CN112116278A (en) 2020-10-12 2020-10-12 Assembly type building construction safety monitoring method and system and cloud platform

Country Status (1)

Country Link
CN (1) CN112116278A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115879643A (en) * 2023-01-06 2023-03-31 中交路桥检测养护有限公司 Intelligent macroscopic safety control method and system for building Shi Gongshu

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115879643A (en) * 2023-01-06 2023-03-31 中交路桥检测养护有限公司 Intelligent macroscopic safety control method and system for building Shi Gongshu

Similar Documents

Publication Publication Date Title
CN105224458B (en) A kind of data library test method and system
CN110807580B (en) Method for analyzing key safety risk of super high-rise construction machinery based on complex network
CN106294969B (en) A kind of method of the steel structure net rack hydraulic pressure lift precision controlling based on BIM
CN109470946B (en) Power generation equipment fault detection method and system
CN113340344B (en) Hydraulic climbing mould intelligent monitoring control early warning system based on digital twin technology
CN108363880A (en) It is a kind of to be applied to construction, operation, the D-BIM methods for safeguarding integrated management
CN108897969A (en) A method of the facility maintenance Automatic dispatching based on BIM
CN113852083A (en) Automatic searching and early warning method, device and equipment for power grid cascading failure
CN112116278A (en) Assembly type building construction safety monitoring method and system and cloud platform
CN114564851B (en) Method and system for selecting monitoring points of large-span truss sensor and computer equipment
CN112037327A (en) Method, device, equipment and storage medium for monitoring construction progress of building at arrangement point
CN116030210A (en) Carbon emission data statistics method, electronic device and storage medium
CN106779404B (en) Flow early warning method and device
CN113848303A (en) Steel structure building safety monitoring system and method based on big data
CN115344920B (en) Calculation method of construction unloading platform model
CN112053077A (en) Substation equipment monitoring and inspection system and method
CN117575847A (en) Intelligent box girder construction method
CN115619358A (en) Building engineering progress management system and method based on BIM technology
CN108345994A (en) A kind of acquisition of work progress security knowledge, expression and the course monitoring method of structuring
CN111476922A (en) Method and device for judging arrival of power transmission line inspection personnel
CN114301805A (en) Method and device for determining number of devices and electronic device
CN116414086A (en) Device for integrating safety control system based on FMEDA failure prediction technology
CN105460793B (en) The apparatus and method of test moment limiter
CN112434079A (en) Secondary equipment abnormity discrimination decision method and device based on big data
CN117196321B (en) Nuclear power plant planning task probability risk calculation method and calculation device thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210519

Address after: 510000 self made b048, 5th floor, 2-2 Chengmen street, Huangpu District, Guangzhou City, Guangdong Province

Applicant after: Liang Chengmin

Address before: 5 / F, 2-2, Chengmen street, Huangpu District, Guangzhou City, Guangdong Province

Applicant before: Guangzhou Yunbo Internet Technology Co.,Ltd.

TA01 Transfer of patent application right
WW01 Invention patent application withdrawn after publication

Application publication date: 20201222