CN112095750A - Prevent accumulational drainage inspection shaft of mud - Google Patents

Prevent accumulational drainage inspection shaft of mud Download PDF

Info

Publication number
CN112095750A
CN112095750A CN202011002888.4A CN202011002888A CN112095750A CN 112095750 A CN112095750 A CN 112095750A CN 202011002888 A CN202011002888 A CN 202011002888A CN 112095750 A CN112095750 A CN 112095750A
Authority
CN
China
Prior art keywords
well body
pipeline
well
rotating shaft
fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011002888.4A
Other languages
Chinese (zh)
Inventor
吴俊仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengyang Tongtong Pipe Industry Co ltd
Original Assignee
Hengyang Tongtong Pipe Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengyang Tongtong Pipe Industry Co ltd filed Critical Hengyang Tongtong Pipe Industry Co ltd
Priority to CN202011002888.4A priority Critical patent/CN112095750A/en
Publication of CN112095750A publication Critical patent/CN112095750A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a drainage inspection well capable of preventing sludge accumulation, which comprises a well body, a pipeline installation opening, a rotating shaft and a turnover sheet, wherein a stirring paddle is arranged at the lower end of the rotating shaft, fluid in a pipeline generates impact force on the turnover sheet after entering the well body, so that the turnover sheet drives the rotating shaft to rotate, the stirring paddle is arranged at the lower end of the rotating shaft, and when the rotating shaft rotates, a plurality of stirring paddles are driven to stir sludge deposited at the bottom in the well body. The invention has the following beneficial effects: when fluid in the pipeline is internal at the influent well, produce the impact to the upset piece, and then make the upset piece rotate, it rotates to drive the pivot, the rotation of pivot, the synchronous drive stirring rake stirs the mud of siltation bottom in the well body, make mud arrange into the pipeline along with the fluid, avoid the mud siltation in the well body, just so need not to damming the pipeline, also need not artifical mode to discharge mud simultaneously, consequently, the influence to pipeline flow efficiency has been reduced, and workman's intensity of labour has been reduced, and the work efficiency is improved.

Description

Prevent accumulational drainage inspection shaft of mud
Technical Field
The invention relates to the field of drainage inspection wells, in particular to a drainage inspection well capable of preventing sludge accumulation.
Background
The drainage inspection well is an important underground structure in an urban underground pipeline system, is mostly a clay brick masonry structure built under the ground surface, and is generally built and used for a period of time, the defects of corrosion points, cracks and the like can appear on the inner side wall of the drainage inspection well, and the defects can cause water leakage of the drainage inspection well, so that the ground subsides and the safety requirement of road driving is seriously influenced; for this reason, the drainage inspection shaft must be subjected to routine maintenance work.
The drainage inspection well is used for communicating at least one group of pipelines, and when fluid in the pipelines circulates, impurities in the fluid can be brought into the drainage inspection well, and the impurities can be accumulated at the inner bottom of the drainage inspection well to form silted sludge. When clearing up the operation to the mud that silts up, generally need start the control valve of pipeline, make the control valve cut off the pipeline, and then block fluidic circulation, the fluid in the evacuation drainage inspection shaft again, just can go into the well by the workman at last, the mud that silts up in the well body is cleared away, this kind of mode, need stop the circulation of pipeline on the one hand, just can operate, and then just lead to the pipeline and cut off produced influence, on the other hand, need the workman at first to empty the fluid in the drainage inspection shaft, and then just can clear up mud, cause workman's intensity of labour great, cause work efficiency to be lower, consequently, how to discharge the clearance to the mud in the drainage inspection shaft, the problem that technical staff in the field waited for urgent solution.
To solve the above problems, we propose a drainage manhole that prevents sludge from accumulating.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a drainage inspection well for preventing sludge accumulation, and in order to solve the technical problems, the invention provides the following technical scheme:
the invention provides a drainage inspection well for preventing sludge accumulation, which comprises a well body of the drainage inspection well, wherein two pipeline mounting ports which are communicated with the interior of the well body and are oppositely arranged are arranged on the outer wall of the well body, the two pipeline mounting ports are connected with a pipeline of external fluid, a rotating shaft is coaxially and rotatably connected in the well body, a plurality of turnover plates are arranged on the rotating shaft in an array manner along the axial direction of the rotating shaft, the positions of the turnover plates correspond to the positions of the pipeline mounting ports, so that the fluid in the pipeline mounted on the pipeline mounting ports enters the well body, impact force is generated on the turnover plates, the turnover plates further drive the rotating shaft to rotate, the lower end of the rotating shaft extends into the lower end part of the well body, a plurality of stirring paddles are arranged in the array manner, when the rotating shaft rotates, the stirring paddles are driven to stir sludge deposited at the bottom in the well body, so that the sludge is stirred and flows to the upper, when the sludge flows to the pipeline mounting opening, the fluid in the pipeline mounted on the pipeline mounting opening flushes the sludge into the other pipeline and discharges the sludge.
Preferably, the outer contour of the turning sheet is approximately arc-shaped.
Preferably, a reinforcing plate is connected between two adjacent turning pieces.
Preferably, the bottom surface of the turnover sheet is located above the axis of the pipeline installation opening, so that the turnover sheet cannot block the flow of fluid in the pipeline installation opening.
Preferably, well body oral area articulates there is the well lid, just the well lid passes through its upset of following with the articulated department of well body of drive arrangement drive, the well lid top is equipped with run through its, and with the internal portion of well observation mouth that communicates.
Preferably, the well lid is hinged on the well body through a mounting hinge.
Preferably, drive arrangement is including locating the mount on the well body outer wall, it has the mount pad to articulate on the mount pad, install telescopic cylinder on the mount pad, the last drive of telescopic cylinder is connected with the movable block, the well lid is close to its one side with the articulated department of well body and is equipped with the roll-over stand, the roll-over stand is articulated with the movable block.
Preferably, be equipped with the protection casing that is used for protecting drive arrangement on the well body outer wall, the protection casing oral area is opened and is suitable for the screw connection on the well body outer wall.
Compared with the prior art, the invention has the following beneficial effects: when fluid in the pipeline flows into the well body, impact is generated on the turnover sheet, the turnover sheet is further made to rotate, the rotating shaft is driven to rotate, the rotating shaft rotates, the synchronously driven stirring paddle stirs sludge deposited at the bottom in the well body, the sludge is discharged into the pipeline along with the fluid, the sludge is prevented from being deposited in the well body, the pipeline does not need to be cut off, meanwhile, workers are not required to discharge the sludge in a manual mode, the influence on the circulation efficiency of the pipeline is reduced, the labor intensity of workers is reduced, the working efficiency is improved, the observation port in the well cover is arranged, the workers can conveniently see through the observation port, the circulation state of the fluid in the well body is observed and monitored in time, the driving device is arranged to drive the well cover to turn over, manual workers are not needed to turn over the well cover, and the labor intensity of the workers is further reduced.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic perspective view of an assembly of a drainage inspection well for preventing sludge accumulation according to the present invention;
FIG. 2 is an exploded view of the three-dimensional structure of FIG. 1;
FIG. 3 is a schematic front view of the three-dimensional structure of FIG. 1;
FIG. 4 is a schematic partial cross-sectional view of the three-dimensional structure of FIG. 3;
in the figure: 1-pipeline installation opening, 2-protective cover, 3-installation seat, 4-telescopic cylinder, 5-movable block, 6-hinge, 7-well body, 8-installation frame, 9-turnover frame, 10-well cover, 11-observation opening, 12-turnover piece, 13-reinforcing plate, 14-rotating shaft, 15-stirring paddle and 16-fixing frame.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Examples
As shown in fig. 1-4, a drainage inspection well for preventing sludge accumulation comprises a well body 7 of the drainage inspection well, two pipeline installation ports 1 which are communicated with the inside of the well body 7 and are oppositely arranged are arranged on the outer wall of the well body 7, two pipelines of external fluid are hermetically connected on the pipeline installation ports 1, a rotating shaft 14 is coaxially and rotatably connected in the well body 7, specifically, a hollow installation frame 8 is installed on the inner wall of the well body 7, the rotating shaft 14 is rotatably connected on the installation frame 8 through an installation bearing and keeps a coaxial state with the well body 7, a plurality of turnover pieces 12 are arranged on the rotating shaft 14 along the axial array of the rotating shaft, the positions of the turnover pieces 12 correspond to the positions of the pipeline installation ports 1, so that after fluid in the pipelines installed on the pipeline installation ports 1 enters the well body 7, impact force is generated on the turnover pieces 12, and the rotating shaft 14 is driven by the turnover pieces 12 to rotate, 14 lower extreme of pivot extends to in the tip of the well body 7 lower extreme and the array is equipped with a plurality of stirring paddles 15, when pivot 14 rotates, the drive is a plurality of stirring paddles 15 stirs the mud of siltation bottom in the well body 7, makes mud stir and toward the upper end of the well body 7 flows, flows extremely during 1 department of tube-line erection mouth, fluid in the pipeline of installation on 1 of tube-line erection mouth washes mud into another pipeline and walks away side by side.
In this embodiment, the outer contour of the turning piece 12 is preferably substantially arc-shaped, so that when the fluid impacts the turning piece 12, the turning piece 12 can be better driven to rotate, and the rotating shaft is further driven to rotate.
In this embodiment, it is preferable that a reinforcing plate 13 is commonly connected between two adjacent flip pieces 12, and since the flip pieces 12 receive the impact force of the fluid for a long time, the reinforcing plate 13 is provided to increase the impact strength of the flip pieces 12 in order to prevent the flip pieces 12 from being deformed due to impact bending.
In this embodiment, as preferred, upset piece 12 bottom surface is located pipeline installation mouth 1 axle center top, makes upset piece 12 can not block the flow of fluid in pipeline installation mouth 1, if upset piece 12 blocks pipeline installation mouth 1, the fluid in the pipeline will unable rapid circulation like this, lead to influencing the conveying efficiency of pipeline, consequently in order to avoid influencing the circulation efficiency of pipeline, set up upset piece 12 bottom surface and be located the top of pipeline installation mouth 1 axle center, the fluid in pipeline installation mouth 1 can pass through and can produce the impact to upset piece 12 like this, and then under the circumstances of guaranteeing to produce the impact to upset piece 12, compromise the circulation of fluid, and then improved the practicality.
In this embodiment, as preferred, the well body 7 oral area articulates there is well lid 10, just well lid 10 passes through its upset along the articulated department with the well body 7 of drive arrangement drive, well lid 10 top be equipped with run through it and with the inside viewing aperture 11 that communicates of the well body 7, the operation in-process, need the workman in time to observe the fluid flow state in the well body 7, consequently set up viewing aperture 11 on well lid 10 for can see through viewing aperture 11 and in time observe fluidic circulation state.
In this embodiment, preferably, the manhole cover 10 is hinged to the manhole body 7 through the installation hinges 6, and the installation manner of the hinges 6 is used, so that the operation steps of installing the manhole cover 10 are relatively simple and more humanized.
In this embodiment, preferably, the driving device includes a fixed frame 16 disposed on an outer wall of the well body 7, the fixed frame 16 is hinged to a mounting base 3, a telescopic cylinder 4 is mounted on the mounting base 3, a movable block 5 is drivingly connected to the telescopic cylinder 4, a roll-over stand 9 is disposed on a side of the well lid 10 adjacent to a hinged portion of the well lid 10 with the well body 7, the roll-over stand 9 is hinged to the movable block 5, when the well lid 10 needs to be opened, the telescopic cylinder 4 is directly started, a cylinder rod of the telescopic cylinder 4 is shortened, the movable block 5 pulls the roll-over stand 9 to turn over downwards, the well lid 10 is further turned over along the hinged portion with the well body 7, an opening of the well body 7 is in an open state, when the well lid 10 needs to be closed, the telescopic cylinder 4 is started again, the cylinder rod of the telescopic cylinder 4 is extended, the well lid 10 is driven to turn over reversely, and, the driving device is arranged to open and close the well lid 10, so that a worker is not required to manually open/close the well lid 10, the labor intensity of workers is reduced, and certainly, the telescopic cylinder 4 can be replaced by a driving element such as an electric push rod or an oil cylinder, and the implementation is not affected, so that the type of the driving element for driving the movable block 5 to move can be expanded to a certain degree.
In this embodiment, as preferred, be equipped with the protection casing 2 that is used for protecting drive arrangement on the 7 outer walls of well body, the 2 oral area of protection casing opens and is suitable for the screw connection on 7 outer walls of well body, because the well body 10 is generally installed below the earth's surface, consequently need protect parts such as telescopic cylinder 4 among the drive arrangement, avoid influencing telescopic cylinder 4's normal use and life, 2 oral areas of protection casing are preferably located above the earth's surface, avoid in the material such as earth gets into protection casing 2, can inject the material of protection casing 2 for corrosion-resistant metal material in addition, for example stainless steel or the sheet metal of surface galvanization do, can avoid moisture to influence the corrosion of protection casing 2 like this.
The principle and the advantages of the invention are as follows: after the fluid in the pipeline flows into the well body 7, because the fluid has certain flow velocity, impact will be produced to the turning sheet 12, the turning sheet 12 that receives the impact will produce the rotation around 14 axial of pivot, and then make the pivot 14 also produce and rotate, when the pivot 14 rotates, the stirring rake 15 of its lower extreme installation will produce the stirring effect to the mud that deposits on the bottom in the well body 7, the mud that receives after stirring will be flipped to the mouth part direction of the well body 7, when flipping to the position department of pipeline installation mouth 1, will be driven by the fluid and flow into next pipeline, make mud can empty voluntarily, avoid depositing in the well body 7.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a prevent accumulational drainage inspection shaft of mud, well body (7) including the drainage inspection shaft, be equipped with its inside and relative pipeline installing port (1) that set up of two intercommunications on well body (7) outer wall, two be connected with the pipeline of outside fluid on pipeline installing port (1), its characterized in that: a rotating shaft (14) is coaxially and rotatably connected in the well body (7), a plurality of turning pieces (12) are arranged on the rotating shaft (14) along the axial direction thereof in an array manner, the position of the turnover sheet (12) corresponds to the position of the pipeline mounting opening (1), after the fluid in the pipeline mounted on the pipeline mounting opening (1) enters the well body (7), impact force is generated on the turnover sheet (12), so that the turnover sheet (12) drives the rotating shaft (14) to rotate, the lower end of the rotating shaft (14) extends into the lower end part of the well body (7) and is provided with a plurality of stirring paddles (15) in an array manner, when the rotating shaft (14) rotates, the stirring paddles (15) are driven to stir the sludge deposited at the bottom in the well body (7), so that the sludge is stirred and flows to the upper end of the well body (7) and flows to the pipeline mounting opening (1), the fluid in the pipeline arranged on the pipeline mounting port (1) flushes the sludge into the other pipeline and discharges the sludge.
2. The drain manhole according to claim 1, wherein: the outer contour of the turnover sheet (12) is approximately arc-shaped.
3. The drain manhole according to claim 1, wherein: and a reinforcing plate (13) is connected between every two adjacent turnover sheets (12).
4. The drain manhole according to claim 1, wherein: the bottom surface of the turnover sheet (12) is positioned above the axis of the pipeline mounting port (1), so that the turnover sheet (12) cannot block the flow of fluid in the pipeline mounting port (1).
5. The drain manhole according to claim 1, wherein: well body (7) oral area articulates there is well lid (10), just well lid (10) pass through its edge of drive arrangement drive and overturn with the articulated department of well body (7), well lid (10) top is equipped with run through its, and with observation opening (11) of the inside intercommunication of well body (7).
6. The drain manhole according to claim 5, wherein: the well cover (10) is hinged on the well body (7) through a mounting hinge (6).
7. The drain manhole according to claim 5, wherein: drive arrangement is including locating mount (16) on well body (7) outer wall, it has mount pad (3) to articulate on mount pad (16), install telescopic cylinder (4) on mount pad (3), the drive is connected with movable block (5) on telescopic cylinder (4), well lid (10) are close to its one side with the articulated department of well body (7) and are equipped with roll-over stand (9), roll-over stand (9) are articulated with movable block (5).
8. The drain manhole according to claim 7, wherein: be equipped with on the well body (7) outer wall and be used for carrying out protection casing (2) that protect drive arrangement, protection casing (2) oral area is opened and is suitable for the screw connection on well body (7) outer wall.
CN202011002888.4A 2020-09-22 2020-09-22 Prevent accumulational drainage inspection shaft of mud Pending CN112095750A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011002888.4A CN112095750A (en) 2020-09-22 2020-09-22 Prevent accumulational drainage inspection shaft of mud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011002888.4A CN112095750A (en) 2020-09-22 2020-09-22 Prevent accumulational drainage inspection shaft of mud

Publications (1)

Publication Number Publication Date
CN112095750A true CN112095750A (en) 2020-12-18

Family

ID=73755851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011002888.4A Pending CN112095750A (en) 2020-09-22 2020-09-22 Prevent accumulational drainage inspection shaft of mud

Country Status (1)

Country Link
CN (1) CN112095750A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064323A (en) * 1998-08-19 2000-02-29 Yokohama Yoshikura:Kk Opening and closing mechanism for common ditch inspection opening
CN207063002U (en) * 2017-08-22 2018-03-02 江苏金坛市政建设有限公司 A kind of inspection shaft
CN207121934U (en) * 2017-09-01 2018-03-20 曹建强 Intelligent hydraulic well lid
CN208055795U (en) * 2017-11-16 2018-11-06 广州隆盛景观建设有限公司 A kind of town road
CN210917686U (en) * 2019-10-29 2020-07-03 吴瑞骐 Sponge urban road holds drainage system
CN111549886A (en) * 2020-05-13 2020-08-18 广东中立建设有限公司 Novel prefabricated assembly type rainwater and sewage inspection well chute

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064323A (en) * 1998-08-19 2000-02-29 Yokohama Yoshikura:Kk Opening and closing mechanism for common ditch inspection opening
CN207063002U (en) * 2017-08-22 2018-03-02 江苏金坛市政建设有限公司 A kind of inspection shaft
CN207121934U (en) * 2017-09-01 2018-03-20 曹建强 Intelligent hydraulic well lid
CN208055795U (en) * 2017-11-16 2018-11-06 广州隆盛景观建设有限公司 A kind of town road
CN210917686U (en) * 2019-10-29 2020-07-03 吴瑞骐 Sponge urban road holds drainage system
CN111549886A (en) * 2020-05-13 2020-08-18 广东中立建设有限公司 Novel prefabricated assembly type rainwater and sewage inspection well chute

Similar Documents

Publication Publication Date Title
CN108380429B (en) A kind of bridge construction Reinforced Concrete in Bridge spraying equipment
CN112095750A (en) Prevent accumulational drainage inspection shaft of mud
CN110541360A (en) Drainage device for building bridge
CN211816096U (en) Three-station rotary dredging gate
CN206071593U (en) Quarrying apparatus and development machine
CN109530100B (en) Operation and maintenance method of closed-up type slurry centrifugal equipment
CN111112285B (en) Fermentation cylinder for organic solid waste recovery processing
CN106996141B (en) Silt cleaning assembly
CN212866282U (en) Novel optimize prefabricated pump station
CN220741706U (en) Anti-splash device for collecting hopper of concrete mixing plant
CN111074894A (en) Municipal administration well lid is changed and is used concrete guiding device
CN215888537U (en) Rainwater recovery device
CN211080358U (en) Shovel hopper, desilting mechanism and desilting equipment
CN117599502B (en) Drainage pipeline filtering and impurity removing device
CN219023450U (en) Wastewater treatment filter
CN217537280U (en) Stifled desilting system is prevented to town road
CN220890195U (en) Slurry tank for slurry balance shield machine
CN111014003B (en) Integral rotary screening device
CN214320992U (en) Water sluicegate moss remove device
CN216224677U (en) Debris cutting device for double-water-cooling sewage pump
CN219990106U (en) Waste water storage device
CN212316709U (en) Maintenance device of bridge for highway
CN217325580U (en) Base structure of scraper bowl system that bearing nature is strong
JP2563974Y2 (en) Agitator device for tunnel machine
CN220099598U (en) Municipal works road maintenance device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201218