CN112083713B - 一种时序修正校验控制方法 - Google Patents

一种时序修正校验控制方法 Download PDF

Info

Publication number
CN112083713B
CN112083713B CN202011016796.1A CN202011016796A CN112083713B CN 112083713 B CN112083713 B CN 112083713B CN 202011016796 A CN202011016796 A CN 202011016796A CN 112083713 B CN112083713 B CN 112083713B
Authority
CN
China
Prior art keywords
instruction
curve
time
equipment
issued
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011016796.1A
Other languages
English (en)
Other versions
CN112083713A (zh
Inventor
王顺江
胡博
赵琰
郭凯
周桂平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Liaoning Electric Power Co Ltd
Shenyang Institute of Engineering
Original Assignee
State Grid Liaoning Electric Power Co Ltd
Shenyang Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Liaoning Electric Power Co Ltd, Shenyang Institute of Engineering filed Critical State Grid Liaoning Electric Power Co Ltd
Priority to CN202011016796.1A priority Critical patent/CN112083713B/zh
Publication of CN112083713A publication Critical patent/CN112083713A/zh
Application granted granted Critical
Publication of CN112083713B publication Critical patent/CN112083713B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0286Modifications to the monitored process, e.g. stopping operation or adapting control
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24065Real time diagnostics

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Feedback Control In General (AREA)

Abstract

一种时序修正校验控制方法,属于工业控制技术领域,包括如下步骤:步骤1:获取一条设备最新的指令后的运行指令曲线;步骤2:获取下一时间段设备运行曲线;步骤3:对设备新的设备运行曲线进行检验;步骤4:计算运行设备下一个连续时间段设备调节曲线,步骤5:计算调节后的设备运行曲线;步骤6:根据设备调节曲线对运行设备下达设备调节指令等。本发明可提高低速、不稳定通道的控制预指令下达的准确性,避免人工下达指令时因通道原因使指令延迟或不能下达的问题,解决了对设备控制失败的问题,增加了对系统设备控制的准确性。

Description

一种时序修正校验控制方法
技术领域
本发明属于工业控制技术领域,具体涉及一种时序修正校验控制方法。
背景技术
现有的远程控制是基于稳定连接的高速通道的人工调节技术,随着各类业务不断的拓展,不稳定通道使用率逐渐上升。但在人工调节过程中由于通道的低速、不稳定可能会造成远程控制指令延时下达甚至不能准确下达指令,是远程控制指令准确性变差,使用低速、不稳定通道进行人工直接控制可能会导致大范围控制失败。
随着各类业务不断的拓展,各设备对远程控制的要求越来越高,低速、不稳定通道已经不能满足生产要求,现正将人工控制逐渐升级为自动控制。如今根据预先设计好点的指令系统对设备自动下达指令,但在低速、不稳定通道下达指令时应如何保证设备准确的时间、地点按照正确的方式运行时亟需解决的问题。
发明内容
为了解决上述技术问题,本发明提出一种时序修正校验控制方法,首先获取一条设备根据预指令调整后的运行曲线,然后在固定时间段获取设备预测运行曲线,经系统验证通过后计算设备运行调节曲线,最后对设备下达运行调整曲线,每经过相同时间间隔重复上述过程。通过该方法可提高低速、不稳定通道的控制预指令下达的准确性,避免人工下达指令时因通道原因使指令延迟或不能下达的问题,解决了对设备控制失败的问题,增加了对系统设备控制的准确性。
本发明采用如下技术方案:
步骤1:获取一条设备最新的指令后的运行指令曲线fc(t),该曲线最大预测时间为tn,最小预测时间为t1
步骤2:获取下一时间段设备运行曲线fx(t),曲线运行时间序列t=(t1,t2,t3,……,tn),t1,t2,t3,……,tn为预测数据距离指令下达时间的时间间隔长度。
步骤3:根据指标A1,A2,A3,……,Am对设备新的设备运行曲线fx(t)进行检验,检验其是否满足系统运行要求,如果不满足则不执行新的调节命令;若满足则执行步骤4。
步骤4:计算运行设备下一个连续时间段设备调节曲线fT(t),其中fT(t1)=fx(t1)-fc(t2),fT(t2)=fx(t2)-fc(t3),fT(t3)=fx(t3)-fc(t4),......,fT(tn-1)=fx(tn-1)-fc(tn),fT(tn)=fx(tn)。
步骤5:计算调节后的设备运行曲线,即fc(t)=fx(t)。
步骤6:根据设备调节曲线fT(t)对运行设备下达设备调节指令fT(t)。
步骤7:当下达下一次指令时重复步骤2至步骤6进行操作。
步骤8:根据系统预测数据判断设备投运或退出时间及需要下达的指令,设备投运指令为1,设备退出指令为0。
步骤9:根据指标B1,B2,B3,……,Bl对指令进行评估,判断系统运行状态是否允许状态切换,若不满足运行状态则放弃此次自动下达指令。
步骤10:若判定通过则下达设备状态切换指令1或0,其运行时间为
步骤11:下达下一次指令前重复步骤8至步骤10。
步骤12:设备状态切换前最后一次指令的执行时间若Tmin=Tmax,则此时间即为执行时间;若Tmin≠Tmax,则此设备状态切换指令执行时间为
本发明的优点与效果为:
本发明以修订控制指令准确性及减小指令延时性为目标,提高自动控制控制指令准确性,使被控制设备能够实时准确的执行控制指令。
本发明可使基于低速、不稳定通道的控制预指令能够随着预测数据准确性而提升,改善了现有基于低速、不稳定通道的人工控制所产生控制指令控制失败的问题。本发明在电力、供暖等工业生产领域具有应用价值和现实意义。
附图说明
图1设备调整指令下达流程;
图2设备投退指令下达流程;
图3设备执行最新调整指令后运行曲线;
图4系统预测的设备运行曲线;
图5根据预测曲线设备调整出力曲线;
图6四次预测后设备历史及预测出力曲线。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面将结合具体事例及相应的附图对本发明的技术方案进行清楚、完整的描述。显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。以电力系统发电机一段时间内运行控制指令为例对本发明的具体实施做进一步说明。
步骤1:获取一条设备最新的指令后的运行指令曲线fc(t),该曲线设备运行时间为00:00:00至6:00:00,如图3所示。
步骤2:获取下一时间段设备运行曲线fx(t),如图4所示。
步骤3:根据频率、设备工况、网损等因素对设备新的运行曲线fx(t)进行检验,检验其是否满足系统运行要求,如果不满足则不执行新的调节命令;若满足则执行步骤4。
步骤4:计算运行设备下一个连续时间段设备调节曲线fT(t),其中fT(t1)=fx(t1)-fc(t2),fT(t2)=fx(t2)-fc(t3),fT(t3)=fx(t3)-fc(t4),......,fT(tn-1)=fx(tn-1)-fc(tn),fT(tn)=fx(tn)。
步骤5:计算调节后的设备运行曲线,即fc(t)=fx(t)。
步骤6:根据设备调节曲线fT(t)对运行设备下达设备调节指令fT(t),如图5所示。
步骤7:根据步骤2至步骤6重复获取设备预测运行曲线并对所获取的曲线进行验证,验证通过后根据上一条正确设备运行曲线计算新的指令曲线并对设备下达下一时间段的运行调整指令,设备预测运行曲线如图4所示,设备运行调整指令曲线如图5所示,经过四次预测对设备出力曲线进行修正后效果如图6所示。

Claims (1)

1.一种时序修正校验控制方法,其特征在于:包括如下步骤:
步骤1:获取一条设备最新的指令后的运行指令曲线fc(t),该曲线最大预测时间为tn,最小预测时间为t1
步骤2:获取下一时间段设备运行曲线fx(t),曲线运行时间序列t=(t1,t2,t3,……,tn),t1,t2,t3,……,tn为预测数据距离指令下达时间的时间间隔长度;
步骤3:根据指标A1,A2,A3,……,Am对设备新的设备运行曲线fx(t)进行检验,检验其是否满足系统运行要求,如果不满足则不执行新的调节命令;若满足则执行步骤4;
步骤4:计算运行设备下一个连续时间段设备调节曲线fT(t),其中fT(t1)=fx(t1)-fc(t2),fT(t2)=fx(t2)-fc(t3),fT(t3)=fx(t3)-fc(t4),......,fT(tn-1)=fx(tn-1)-fc(tn),fT(tn)=fx(tn);
步骤5:计算调节后的设备运行曲线,即fc(t)=fx(t);
步骤6:根据设备调节曲线fT(t)对运行设备下达设备调节指令fT(t);
步骤7:当下达下一次指令时重复步骤2至步骤6进行操作;
步骤8:根据系统预测数据判断设备投运或退出时间及需要下达的指令,设备投运指令为1,设备退出指令为0;
步骤9:根据指标B1,B2,B3,……,Bl对指令进行评估,判断系统运行状态是否允许状态切换,若不满足运行状态则放弃此次自动下达指令;
步骤10:若判定通过则下达设备状态切换指令1或0,其运行时间为
步骤11:下达下一次指令前重复步骤8至步骤10;
步骤12:设备状态切换前最后一次指令的执行时间若Tmin=Tmax,则此时间即为执行时间;若Tmin≠Tmax,则此设备状态切换指令执行时间为
CN202011016796.1A 2020-09-24 2020-09-24 一种时序修正校验控制方法 Active CN112083713B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011016796.1A CN112083713B (zh) 2020-09-24 2020-09-24 一种时序修正校验控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011016796.1A CN112083713B (zh) 2020-09-24 2020-09-24 一种时序修正校验控制方法

Publications (2)

Publication Number Publication Date
CN112083713A CN112083713A (zh) 2020-12-15
CN112083713B true CN112083713B (zh) 2023-12-15

Family

ID=73738812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011016796.1A Active CN112083713B (zh) 2020-09-24 2020-09-24 一种时序修正校验控制方法

Country Status (1)

Country Link
CN (1) CN112083713B (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0836593A (ja) * 1994-07-25 1996-02-06 Mitsubishi Electric Corp タイミング検証方法及びタイミング検証装置
JP2002270694A (ja) * 2001-03-08 2002-09-20 Matsushita Electric Ind Co Ltd 半導体装置の設計方法および製造方法
JP2003022133A (ja) * 2001-07-09 2003-01-24 Yaskawa Electric Corp サンプリング処理方法、速度指令補正方法、および処理手段
CN108110806A (zh) * 2018-01-26 2018-06-01 国网辽宁省电力有限公司 一种新能源电力系统在异常调控域运行方式下的调度方法
CN108224398A (zh) * 2016-12-15 2018-06-29 中电华创电力技术研究有限公司 一种火电机组动态前馈协调控制方法
CN109031014A (zh) * 2017-12-28 2018-12-18 国网湖北省电力公司宜昌供电公司 一种基于运行数据的变压器综合可靠性评估及预测方法
CN110865610A (zh) * 2019-10-18 2020-03-06 中国工程物理研究院机械制造工艺研究所 一种基于机床振动抑制的刀具轨迹插值和速度规划方法
CN111314006A (zh) * 2019-12-05 2020-06-19 国网辽宁省电力有限公司锦州供电公司 基于无时标越限数据传送的时间延时曲线拟合方法
CN111463834A (zh) * 2020-04-08 2020-07-28 合肥阳光新能源科技有限公司 虚拟电厂的运行控制方法及虚拟电厂

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0836593A (ja) * 1994-07-25 1996-02-06 Mitsubishi Electric Corp タイミング検証方法及びタイミング検証装置
JP2002270694A (ja) * 2001-03-08 2002-09-20 Matsushita Electric Ind Co Ltd 半導体装置の設計方法および製造方法
JP2003022133A (ja) * 2001-07-09 2003-01-24 Yaskawa Electric Corp サンプリング処理方法、速度指令補正方法、および処理手段
CN108224398A (zh) * 2016-12-15 2018-06-29 中电华创电力技术研究有限公司 一种火电机组动态前馈协调控制方法
CN109031014A (zh) * 2017-12-28 2018-12-18 国网湖北省电力公司宜昌供电公司 一种基于运行数据的变压器综合可靠性评估及预测方法
CN108110806A (zh) * 2018-01-26 2018-06-01 国网辽宁省电力有限公司 一种新能源电力系统在异常调控域运行方式下的调度方法
CN110865610A (zh) * 2019-10-18 2020-03-06 中国工程物理研究院机械制造工艺研究所 一种基于机床振动抑制的刀具轨迹插值和速度规划方法
CN111314006A (zh) * 2019-12-05 2020-06-19 国网辽宁省电力有限公司锦州供电公司 基于无时标越限数据传送的时间延时曲线拟合方法
CN111463834A (zh) * 2020-04-08 2020-07-28 合肥阳光新能源科技有限公司 虚拟电厂的运行控制方法及虚拟电厂

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
一种考虑设备运行状况的变压器可靠性模型研究;王泉;姚俊伟;付豪;杨星磊;;电力学报(第04期);42-50 *
考虑电网潮流分布的输电线路动态参数估计方法;高正男;孙辉;王顺江;葛维春;薛丽敏;;电气应用(第06期);18-23 *

Also Published As

Publication number Publication date
CN112083713A (zh) 2020-12-15

Similar Documents

Publication Publication Date Title
CN108317670B (zh) 一种基于机器学习的制冷系统节能控制方法及系统
CN108054789A (zh) 一种内嵌无功和电压的安全约束经济调度方法
CN110059345B (zh) 一种抽水蓄能机组相继甩负荷关机规律优化方法与系统
CN113138552B (zh) 基于阶跃响应数据和临界比例度法的pid参数整定方法
CN108092322B (zh) 一种基于调频市场环境的agc控制方法
CN104597845A (zh) 一种用于高质量加工的样条曲线插补算法
KR101250809B1 (ko) 원자로 냉각재평균온도 및 출력분포 제어를 위한 자동원자로제어계통
CN111665712A (zh) 一种抗饱和及抑制超调的控制方法及pi调节器
CN112083713B (zh) 一种时序修正校验控制方法
CN110417031B (zh) 一种自动发电控制系统频率偏差系数分段整定方法
Bao et al. Control parameter optimization of thermostatically controlled loads using a modified state-queuing model
CN113625573B (zh) 受非对称死区输入影响的分数阶系统反步滑模控制方法
CN105184474A (zh) 一种考虑不规则限制运行区的水电站厂内经济调度方法
CN111694275B (zh) 一种设备控制方法、装置及电子设备
CN112343763A (zh) 一种逼近式水电站功率脉冲调节方法及调节系统
US11262713B2 (en) Method for calculating control parameters of heating supply power of heating network
CN111009919B (zh) 基于有功控制的光伏爬坡率控制方法和设备
CN111798060A (zh) 一种基于机组爬坡率估计的功率指令优化分配方法
CN110556823A (zh) 基于模型降维的安全约束机组组合快速计算方法及系统
Van den Broeck et al. Model predictive control for time-optimal point-to-point motion control
CN115081763A (zh) 一种数控车床车削过程能耗预测系统
CN102953966B (zh) 泵站群变频泵的自适应迭代控制方法
CN107425546B (zh) 精确调整逆变器母线电压从而提高并网效率的方法
CN111046525A (zh) 基于“s”型曲线的隔膜泵启动过程设定值计算方法
KR102595200B1 (ko) 시뮬레이션 제어 장치 및 시뮬레이션 제어 방법

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210917

Address after: 125099 No. 1, Longwan South Street, Longgang District, Huludao City, Liaoning Province

Applicant after: HULUDAO POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Applicant after: SHENYANG INSTITUTE OF ENGINEERING

Address before: 125000 No.1 Longwan South Street, Longgang District, Huludao City, Liaoning Province

Applicant before: HULUDAO POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Applicant before: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Applicant before: STATE GRID CORPORATION OF CHINA

Applicant before: SHENYANG INSTITUTE OF ENGINEERING

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant