CN112081378A - Construction device and construction method of filler wall constructional column for building construction - Google Patents

Construction device and construction method of filler wall constructional column for building construction Download PDF

Info

Publication number
CN112081378A
CN112081378A CN202011017127.6A CN202011017127A CN112081378A CN 112081378 A CN112081378 A CN 112081378A CN 202011017127 A CN202011017127 A CN 202011017127A CN 112081378 A CN112081378 A CN 112081378A
Authority
CN
China
Prior art keywords
construction
wall
building
wall body
building template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011017127.6A
Other languages
Chinese (zh)
Inventor
杨麦利
江蓉翠
赵明
杨康
侯兰蕙
翟雪松
刘明
孙美红
辛续
周新创
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Construction Industry First Construction Group Co ltd
Original Assignee
Xi'an Construction Industry First Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Construction Industry First Construction Group Co ltd filed Critical Xi'an Construction Industry First Construction Group Co ltd
Priority to CN202011017127.6A priority Critical patent/CN112081378A/en
Publication of CN112081378A publication Critical patent/CN112081378A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a construction device and a construction method of a filler wall constructional column for building construction, and relates to the field of buildings. A construction device of a filler wall constructional column for building construction is provided, wherein a cutting line is sleeved between two first wheel discs. According to the invention, the rotary motor and the driving part drive the cutting line to strip the building template, so that the whole stripping process is more convenient and simpler, the operation is simpler, the use of labor cost can be greatly reduced, and the practicability is greatly improved. In addition, the invention also provides a construction method of the construction device of the filler wall constructional column for building construction, the rotary motor is started, the positioning plate is moved towards the bottom, the cutting line performs gap cutting, and the frosted belts sleeved on the two second wheel discs can polish the wall surface of the wall body after cutting. According to the invention, the building template is peeled off by the method, so that efficient cutting operation can be realized, and the glass integrity of the building template and the wall surface of the wall body can be ensured not to be damaged.

Description

Construction device and construction method of filler wall constructional column for building construction
Technical Field
The invention relates to the field of buildings, in particular to a construction device and a construction method of a filler wall constructional column for building construction.
Background
Building templates are often used on building sites to allow cement concrete materials to solidify according to a predetermined shape, so as to build different building models.
At present, at the in-process of infilled wall constructional column at the construction, need be to the inside pouring cement concrete of constructional column, after cement concrete solidifies, need artifically dismantle the building templates, and because cement concrete's adhesion is stronger, it is hard when consequently artifical dismantlement building templates, when connecting higher department to the building templates, has certain potential safety hazard during artifical dismantlement, causes the damage of template simultaneously easily, and then causes the waste of resource.
Disclosure of Invention
The invention aims to provide a construction device of a filler wall constructional column for building construction, which can improve the stripping efficiency of a building template, reduce the use of manpower and further reduce the potential safety hazard.
Another object of the present invention is to provide a method for constructing a infilled wall structural column for building construction, which can cut and strip a building template more efficiently and with less effort.
The embodiment of the invention is realized by the following steps:
in a first aspect, the embodiment of the application provides a construction equipment of infilled wall constructional column for construction, including the base with set up in the first support and the second support of base both sides, sliding connection has the locating plate between first support and the second support, is located the locating plate of first support one end is provided with the rotating electrical machines towards the lateral wall of wall body, is located the locating plate of second support one end has cup jointed rotatable shaft through fixed base member in towards the lateral wall of wall body, the spindle nose of rotating electrical machines with the shaft extends first rim plate, two have all been cup jointed to the one end of fixed base member between the first rim plate the line of cut has been cup jointed.
In some embodiments of the present invention, a second wheel disc is further sleeved on one end of the shaft head of the rotating electrical machine and one end of the axle extending out of the fixing base member, the second wheel disc is located above the first wheel disc, and a sanding belt is sleeved between the two second wheel discs.
In some embodiments of the present invention, the first bracket and the second bracket are both provided with a strip-shaped sliding groove along a wall surface facing the wall body, and a sliding rod sleeved in the sliding groove is arranged on a side wall of the positioning plate.
In some embodiments of the present invention, two opposite ends of the positioning plate are hinged with driving rods, and the end of the driving rod away from the end hinged with the positioning plate is provided with a triangular spreading member.
In some embodiments of the present invention, a separation mechanism for fixing the building formwork is further disposed between the first bracket and the second bracket.
In some embodiments of the present invention, the separating mechanism includes a beam connected to the first support and the second support, a through hole is formed in the beam, a movable rod is sleeved in the through hole, and a suction cup is disposed at one end of the movable rod, which is attached to the building template.
In some embodiments of the present invention, the through holes are multiple, and the movable rods are sleeved in the multiple through holes.
In some embodiments of the present invention, a handle is disposed at an end of the movable rod away from the suction cup.
In some embodiments of the present invention, the bottom of the base is provided with a plurality of lockable universal wheels.
In a second aspect, an embodiment of the present application provides a construction method of a construction device of a packed wall constructional column for building construction according to the above, including the steps of:
when the two templates on the outer side of the constructional column wall body need to be disassembled after the constructional column wall body is formed, the bottom plate is pushed to the building templates through the universal wheels, and the positioning plates and the building templates are placed in parallel;
lifting the positioning plate along the extending direction of the sliding grooves in the first support and the second support through the sliding rod, wherein the cutting line is right opposite to the position of a gap for connecting the building template and the top of the wall body;
starting the rotating motor, moving the positioning plate to the bottom for a certain distance, and at the moment, enabling the cutting lines sleeved on the two first wheel discs to rotate at a high speed and cut and separate the building template from the top of the wall body under the driving of the rotating motor and the wheel shaft in the fixing base piece;
stopping rotating the motor, clamping the tip end of the strut member connected with the driving rod into a part cut by the building template and the wall body, and screwing the driving rod tightly;
the rotating motor is started again, the positioning plate is moved continuously towards the bottom, the cutting line performs gap cutting, the frosted belts sleeved on the two second wheel discs can polish the wall surface after cutting, and the building template and the wall body are stripped by the strutting piece;
when the positioning plate moves towards the bottom and passes through the cross beam, the movable rods in the through holes are extruded towards the wall surface of the building template, so that the suction disc fixes the building template;
and after the cutting line cuts off the gap between the building template and the wall body, the building template is completely peeled off by pulling the handle on the movable rod.
Compared with the prior art, the embodiment of the invention has at least the following advantages or beneficial effects:
first aspect, the embodiment of the application provides a construction equipment of infilled wall constructional column for construction, include the base and set up in first support and the second support of base both sides, sliding connection has the locating plate between first support and the second support, the locating plate that is located first support one end is provided with the rotating electrical machines towards the lateral wall of wall body, the locating plate that is located second support one end has cup jointed rotatable shaft through fixed base member in towards the lateral wall of wall body, first rim plate has all been cup jointed to the one end that fixed base member was extended to the spindle nose and the shaft axle of rotating electrical machines, the line of cut has been cup jointed between two first rim plates. The positioning plate can be lifted or lowered along the length direction of the first support and the second support, the positioning plate is fixedly provided with a cutting mechanism for separating the building template from the wall body, the cutting mechanism is composed of a cutting line and an auxiliary component, the cutting line is driven by a rotating motor to rotate at a high speed, so that a gap between the building template and the wall body can be cut off, the progress of the cutting line is controlled by the positioning plate, the cutting line enters the gap position between the building template and the top of the wall body to perform cutting operation towards the bottom of the wall body, the arrangement can eliminate complicated processes during manual disassembly and can ensure the tidiness of the cut surface, and the labor cost can be effectively reduced; according to the invention, the rotary motor and the driving part drive the cutting line to strip the building template, so that the whole stripping process is more convenient and simpler, the operation is simpler, the use of labor cost can be greatly reduced, and the practicability is greatly improved.
When the construction device is used practically, a constructor can push the construction device to one side of a building template to be stripped, the positioning plate and the building template are placed just right, the positioning plate is moved to the top, a cutting line is aligned to a gap between the building template and a wall body, the rotating motor is started, the constructor controls the positioning plate to move towards the bottom of the wall body, and the cutting line cuts the gap until the building template is stripped.
In a second aspect, an embodiment of the present application provides a construction method of a construction device of a packed wall construction column for building construction according to the above, including the steps of: when the two templates on the outer side of the constructional column wall body need to be disassembled after the constructional column wall body is formed, the bottom plate is pushed to the building templates through the universal wheels, and the positioning plates and the building templates are placed in parallel; lifting the positioning plate along the extending direction of the sliding grooves in the first support and the second support through the sliding rod, wherein the cutting line is right opposite to the position of a gap for connecting the building template and the top of the wall body; starting the rotating motor, moving the positioning plate to the bottom for a certain distance, and at the moment, enabling the cutting lines sleeved on the two first wheel discs to rotate at a high speed and cut and separate the building template from the top of the wall body under the driving of the rotating motor and the wheel shaft in the fixing base piece; stopping rotating the motor, clamping the tip end of the strut member connected with the driving rod into a part cut by the building template and the wall body, and screwing the driving rod tightly; the rotating motor is started again, the positioning plate is moved continuously towards the bottom, the cutting line performs gap cutting, the frosted belts sleeved on the two second wheel discs can polish the wall surface after cutting, and the building template and the wall body are stripped by the strutting piece; when the positioning plate moves towards the bottom and passes through the cross beam, the movable rods in the through holes are extruded towards the wall surface of the building template, so that the suction disc fixes the building template; and after the cutting line cuts off the gap between the building template and the wall body, the building template is completely peeled off by pulling the handle on the movable rod. According to the invention, the building template is peeled off by the method, so that efficient cutting operation can be realized, and the glass integrity of the building template and the wall surface of the wall body can be ensured not to be damaged.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a schematic front structural view of a construction apparatus according to an embodiment of the present invention;
FIG. 2 is a schematic view of a back structure of a construction apparatus according to an embodiment of the present invention;
FIG. 3 is a schematic structural diagram of a first wheel disc according to an embodiment of the present invention;
FIG. 4 is a schematic view of the driving rod and the spreader according to the embodiment of the present invention;
fig. 5 is a schematic structural diagram of a separating mechanism according to an embodiment of the present invention.
Icon: 1-a base; 101-universal wheels; 2-a first scaffold; 3-a second scaffold; 4, positioning a plate; 401-a rotating electrical machine; 402-a fixing base member; 4021-an axle; 403-a slide bar; 404-a drive rod; 4041-spreader; 5-a first wheel disc; 501-cutting line; 6-a second wheel disc; 601-grinding the abrasive belt; 7-a chute; 8-a cross beam; 801-through holes; 8011-moving arm; 8012-suction cup; 8013-handle.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the embodiments of the present invention, it should be noted that, if the terms "center", "upper", "lower", "inner", "outer", etc. are used for indicating the orientation or positional relationship based on the orientation or positional relationship shown in the drawings or the orientation or positional relationship which is usually arranged when the product of the present invention is used, the description is only for convenience and simplicity, but the indication or suggestion that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, cannot be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
In the description of the embodiments of the present invention, "a plurality" represents at least 2.
In the description of the embodiments of the present invention, it should be further noted that unless otherwise explicitly stated or limited, the terms "disposed" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
Examples
Referring to fig. 1, fig. 1 is a schematic front structure diagram of a construction apparatus according to an embodiment of the present invention; FIG. 2 is a schematic view of a rear structure of a construction apparatus according to an embodiment of the present invention; fig. 3 is a schematic structural view of the first disk 5 according to the embodiment of the present invention.
The embodiment provides a construction equipment of infilled wall constructional column for construction, including base 1 with set up in first support 2 and the second support 3 of 1 both sides of base, sliding connection has locating plate 4 between first support 2 and the second support 3, the lateral wall that is located the locating plate 4 of first support 2 one end towards the wall body is provided with rotating electrical machines 401, the lateral wall that is located the locating plate 4 of 3 one end of second support towards the wall body has cup jointed rotatable shaft 4021 in through fixed base 402, first rim plate 5 has all been cup jointed to the one end that fixed base 402 was extended to the spindle nose and the shaft 4021 of rotating electrical machines 401, the line of cut 501 has been cup jointed between two first rim plates 5. The positioning plate 4 can be lifted or lowered along the length direction of the first support 2 and the second support 3, the positioning plate 4 is fixedly provided with a cutting mechanism for separating the building template from the wall body, the cutting mechanism is composed of a cutting line 501 and an auxiliary component, the cutting line 501 is driven by the rotating motor 401 to rotate at a high speed, so that a gap between the building template and the wall body can be cut off, the progress of the cutting line 501 is controlled by the positioning plate 4, and the cutting line 501 enters the gap between the building template and the top of the wall body to cut the bottom of the wall body, so that the complicated process in manual disassembly can be omitted, the tidiness of a cut surface can be guaranteed, and the labor cost can be effectively reduced; according to the invention, the cutting line 501 is driven by the rotating motor 401 and the driving part to carry out the stripping operation of the building template, so that the whole stripping process is more convenient and simpler to operate, the use of labor cost can be greatly reduced, and the practicability is greatly improved.
During practical use, a constructor can push the construction device to one side of a building template to be stripped, the positioning plate 4 and the building template are placed just right, the positioning plate 4 is moved to the top, the cutting line 501 is aligned to a gap between the building template and a wall body, the rotating motor 401 is started, the constructor controls the positioning plate 4 to move towards the bottom of the wall body, and the cutting line 501 cuts the gap until the building template is stripped.
In some embodiments of the present invention, as shown in fig. 1, a second wheel disc 6 is further sleeved on one end of the shaft head and the axle 4021 of the rotating motor 401, which extend out of the fixing base 402, the second wheel disc 6 is located above the first wheel disc 5, and a sanding belt 601 is sleeved between the two second wheel discs 6. The second wheel disc 6 is coaxial with the rotating motor 401 and is the same as the inner diameter of the first wheel disc 5, the sanding belt 601 is driven by the rotating motor 401 to rotate rapidly to work, when cutting operation is carried out, the building template penetrates through the sanding belt 601, the sanding belt 601 attached to one surface of the wall body conducts sanding operation on the wall body wall surface, and the wall body can be sanded while being cut.
In some embodiments of the present invention, as shown in fig. 1 and fig. 2, the first bracket 2 and the second bracket 3 are both provided with a strip-shaped sliding groove 7 along the wall surface facing the wall, and the side wall of the positioning plate 4 is provided with a sliding rod 403 which is sleeved in the sliding groove 7. The constructor can adjust the position of the positioning plate 4 by pushing the slide bar 403 to control the height and perform the cutting operation.
In some embodiments of the present invention, as shown in fig. 1 and fig. 2, two opposite ends of the positioning plate 4 are hinged with driving rods 404, and the end of the driving rod 404 away from the hinged positioning plate 4 is provided with a triangular spreader 4041. Constructor is through cutting out the inserted hole between building templates and the wall body to insert wherein with the pointed end of strutting piece 4041, with the drive rod 404 rigid through the bolt, when locating plate 4 moves down, building templates can be peeled off from the top to the outside under the effect of strutting piece 4041.
In some embodiments of the present invention, as shown in fig. 2, a separate mechanism for fixing the building formwork is further provided between the first bracket 2 and the second bracket 3.
In some embodiments of the present invention, as shown in fig. 2 and fig. 5, the separating mechanism includes a cross beam 8 connected to the first support 2 and the second support 3, a through hole 801 is formed in the cross beam 8, a movable rod 8011 is sleeved in the through hole 801, and a suction cup 8012 is disposed at one end of the movable rod 8011, which is attached to the building template. The cross beam 8 can provide a supporting force for the movable rod 8011, and the sucking discs 8012 arranged at the end parts of the movable rods 8011 can fix and adsorb the stripped building templates, so that the building templates are prevented from falling to cause damage to human bodies when the building templates are carried.
In some embodiments of the present invention, as shown in fig. 2, there are a plurality of through holes 801, and each of the plurality of through holes 801 is sleeved with a movable rod 8011.
The number of the through holes 801 is three, the movable rods 8011 are arranged in the three through holes 801, and the building template can be more firmly adsorbed by the aid of the plurality of movable rods 8011.
In some embodiments of the invention, as shown in fig. 5, a handle 8013 is provided at an end of the movable bar 8011 remote from the suction cup 8012. The handle 8013 facilitates the construction personnel to pull out the stripped building templates and carry the building templates in a coordinated manner.
In some embodiments of the invention, as shown in fig. 1 and 2, the bottom of the base 1 is provided with a plurality of lockable universal wheels 101.
The number of the universal wheels 101 is four, the four universal wheels 101 are respectively arranged at the four corners of the bottom of the rectangular base 1, a constructor can push the building template to the building template through the universal wheels 101, the cost waste of manual carrying can be further reduced, and the lockable universal wheels 101 can enable the building template to be more stable and not to deviate from a cutting position during working.
The construction method of the construction device of the infilled wall constructional column for building construction is characterized by comprising the following steps of:
when the two templates on the outer side of the constructional column wall body need to be disassembled after the constructional column wall body is formed, the bottom plate is pushed to the building templates through the universal wheels 101, and the positioning plates 4 and the building templates are arranged in parallel;
lifting the positioning plate 4 along the extending direction of the sliding chutes 7 in the first bracket 2 and the second bracket 3 through the sliding rods 403, wherein the cutting line 501 is aligned with the position of a gap connecting the building template and the top of the wall body;
starting the rotating motor 401, moving the positioning plate 4 to the bottom for a certain distance, and at the moment, enabling the cutting lines 501 sleeved on the two first wheel discs 5 to rotate at a high speed and cut and separate the building templates and the top of the wall body under the driving of the rotating motor 401 and the wheel shaft 4021 in the fixing base piece 402;
stopping rotating the motor 401, clamping the tip end of the supporting piece 4041 connected with the driving rod 404 into the cut part of the building template and the wall body, and screwing the driving rod 404 tightly;
the rotating motor 401 is started again, the positioning plate 4 is moved continuously towards the bottom, the cutting line 501 cuts a gap, the frosted strips 601 sleeved on the two second wheel discs 6 can polish the wall surface of the cut wall, and the opening pieces 4041 are used for stripping the building template from the wall;
when the positioning plate 4 moves towards the bottom and passes through the cross beam 8, the movable rod 8011 in the through hole 801 is pressed towards the wall surface of the building template, so that the sucking disc 8012 fixes the building template;
after the cutting line 501 cuts off the gap between the building template and the wall, the building template is completely peeled off by pulling the handle 8013 on the movable rod 8011. According to the invention, the building template is peeled off by the method, so that efficient cutting operation can be realized, and the glass integrity of the building template and the wall surface of the wall body can be ensured not to be damaged.
In summary, embodiments of the present invention provide a construction apparatus and a construction method for a infilled wall constructional column for building construction; first aspect, a construction equipment of infilled wall constructional column for construction, including base 1 with set up in first support 2 and the second support 3 of base 1 both sides, sliding connection has locating plate 4 between first support 2 and the second support 3, the lateral wall that is located the locating plate 4 of first support 2 one end towards the wall body is provided with rotating electrical machines 401, the lateral wall that is located the locating plate 4 of second support 3 one end towards the wall body has cup jointed rotatable shaft 4021 in through fixed base 402, first rim plate 5 has all been cup jointed to the one end that fixed base 402 was extended to the spindle nose and the shaft 4021 of rotating electrical machines 401, the line of cut 501 has been cup jointed between two first rim plates 5. The positioning plate 4 can be lifted or lowered along the length direction of the first support 2 and the second support 3, the positioning plate 4 is fixedly provided with a cutting mechanism for separating the building template from the wall body, the cutting mechanism is composed of a cutting line 501 and an auxiliary component, the cutting line 501 is driven by the rotating motor 401 to rotate at a high speed, so that a gap between the building template and the wall body can be cut off, the progress of the cutting line 501 is controlled by the positioning plate 4, and the cutting line 501 enters the gap between the building template and the top of the wall body to cut the bottom of the wall body, so that the complicated process in manual disassembly can be omitted, the tidiness of a cut surface can be guaranteed, and the labor cost can be effectively reduced; according to the invention, the cutting line 501 is driven by the rotating motor 401 and the driving part to carry out the stripping operation of the building template, so that the whole stripping process is more convenient and simpler to operate, the use of labor cost can be greatly reduced, and the practicability is greatly improved.
During practical use, a constructor can push the construction device to one side of a building template to be stripped, the positioning plate 4 and the building template are placed just right, the positioning plate 4 is moved to the top, the cutting line 501 is aligned to a gap between the building template and a wall body, the rotating motor 401 is started, the constructor controls the positioning plate 4 to move towards the bottom of the wall body, and the cutting line 501 cuts the gap until the building template is stripped.
In a second aspect, a method for constructing a filler wall constructional column for building construction includes the steps of: when the two templates on the outer side of the constructional column wall body need to be disassembled after the constructional column wall body is formed, the bottom plate is pushed to the building templates through the universal wheels 101, and the positioning plates 4 and the building templates are arranged in parallel; lifting the positioning plate 4 along the extending direction of the sliding chutes 7 in the first bracket 2 and the second bracket 3 through the sliding rods 403, wherein the cutting line 501 is aligned with the position of a gap connecting the building template and the top of the wall body; starting the rotating motor 401, moving the positioning plate 4 to the bottom for a certain distance, and at the moment, enabling the cutting lines 501 sleeved on the two first wheel discs 5 to rotate at a high speed and cut and separate the building templates and the top of the wall body under the driving of the rotating motor 401 and the wheel shaft 4021 in the fixing base piece 402; stopping rotating the motor 401, clamping the tip end of the supporting piece 4041 connected with the driving rod 404 into the cut part of the building template and the wall body, and screwing the driving rod 404 tightly; the rotating motor 401 is started again, the positioning plate 4 is moved continuously towards the bottom, the cutting line 501 cuts a gap, the frosted strips 601 sleeved on the two second wheel discs 6 can polish the wall surface of the cut wall, and the opening pieces 4041 are used for stripping the building template from the wall; when the positioning plate 4 moves towards the bottom and passes through the cross beam 8, the movable rod 8011 in the through hole 801 is pressed towards the wall surface of the building template, so that the sucking disc 8012 fixes the building template; after the cutting line 501 cuts off the gap between the building template and the wall, the building template is completely peeled off by pulling the handle 8013 on the movable rod 8011. According to the invention, the building template is peeled off by the method, so that efficient cutting operation can be realized, and the glass integrity of the building template and the wall surface of the wall body can be ensured not to be damaged.
The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and various modifications and changes will occur to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The utility model provides a construction equipment of infilled wall constructional column for construction, its characterized in that, including the base with set up in first support and the second support of base both sides, sliding connection has the locating plate between first support and the second support, is located the locating plate of first support one end is provided with the rotating electrical machines towards the lateral wall of wall body, is located the locating plate of second support one end has cup jointed rotatable shaft through fixed base member in towards the lateral wall of wall body, the spindle nose of rotating electrical machines with the shaft extends the first rim plate has all been cup jointed to the one end of fixed base member, two the line of cut has been cup jointed between the first rim plate.
2. The apparatus as claimed in claim 1, wherein a second wheel disc is further coupled to an end of the shaft head of the rotating electrical machine and an end of the axle extending out of the fixing base member, the second wheel disc is located above the first wheel disc, and a sanding belt is coupled between the second wheel discs.
3. The construction device of the filler wall constructional column for building construction as claimed in claim 1, wherein the first support and the second support are provided with strip-shaped sliding grooves along the wall surfaces facing the wall body, and the side walls of the positioning plates are provided with sliding rods sleeved in the sliding grooves.
4. The apparatus as claimed in claim 1, wherein the positioning plate has driving rods hinged to opposite ends thereof, and triangular struts are provided at ends of the driving rods remote from the ends hinged to the positioning plate.
5. The apparatus for constructing a packed wall constructional column for building construction as claimed in claim 1, wherein a separation mechanism for fixing a construction formwork is further provided between the first bracket and the second bracket.
6. The apparatus of claim 5, wherein the separation mechanism comprises a beam connected to the first and second supports, the beam having a through hole therein, the through hole having a movable rod therein, and a suction cup disposed at an end of the movable rod contacting the building formwork.
7. The apparatus as claimed in claim 6, wherein the through-holes are formed in a plurality of numbers, and the movable rods are inserted into the through-holes.
8. The apparatus for constructing a packed wall constructional column as claimed in claim 6, wherein a handle is provided at an end of the movable bar remote from the suction cup.
9. The apparatus for constructing a packed wall constructional column as claimed in claim 1, wherein a plurality of lockable universal wheels are provided on a bottom of the base.
10. The construction method of a construction apparatus for a packed wall construction column for construction according to any one of claims 1 to 9, comprising the steps of:
when the two templates on the outer side of the constructional column wall body need to be disassembled after the constructional column wall body is formed, the bottom plate is pushed to the building templates through the universal wheels, and the positioning plates and the building templates are placed in parallel;
lifting the positioning plate along the extending direction of the sliding grooves in the first support and the second support through the sliding rod, wherein the cutting line is right opposite to the position of a gap for connecting the building template and the top of the wall body;
starting the rotating motor, moving the positioning plate to the bottom for a certain distance, and at the moment, enabling the cutting lines sleeved on the two first wheel discs to rotate at a high speed and cut and separate the building template from the top of the wall body under the driving of the rotating motor and the wheel shaft in the fixing base piece;
stopping rotating the motor, clamping the tip end of the strut member connected with the driving rod into a part cut by the building template and the wall body, and screwing the driving rod tightly;
the rotating motor is started again, the positioning plate is moved continuously towards the bottom, the cutting line performs gap cutting, the frosted belts sleeved on the two second wheel discs can polish the wall surface after cutting, and the building template and the wall body are stripped by the strutting piece;
when the positioning plate moves towards the bottom and passes through the cross beam, the movable rods in the through holes are extruded towards the wall surface of the building template, so that the suction disc fixes the building template;
and after the cutting line cuts off the gap between the building template and the wall body, the building template is completely peeled off by pulling the handle on the movable rod.
CN202011017127.6A 2020-09-24 2020-09-24 Construction device and construction method of filler wall constructional column for building construction Pending CN112081378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011017127.6A CN112081378A (en) 2020-09-24 2020-09-24 Construction device and construction method of filler wall constructional column for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011017127.6A CN112081378A (en) 2020-09-24 2020-09-24 Construction device and construction method of filler wall constructional column for building construction

Publications (1)

Publication Number Publication Date
CN112081378A true CN112081378A (en) 2020-12-15

Family

ID=73738936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011017127.6A Pending CN112081378A (en) 2020-09-24 2020-09-24 Construction device and construction method of filler wall constructional column for building construction

Country Status (1)

Country Link
CN (1) CN112081378A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431332A (en) * 2021-06-30 2021-09-24 中建华帆建筑设计院有限公司 Filling device for wall constructional column and design construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AR055312A1 (en) * 2005-02-22 2007-08-15 Gen Mills Inc LAYER CUTTING DEVICE
CN108660929A (en) * 2018-04-26 2018-10-16 李福� Based on the bridge construction small-sized plane form removable device for preventing concrete damaged surfaces
CN109779257A (en) * 2018-12-25 2019-05-21 浙江华临建设集团有限公司 A kind of constructing device and construction method of building construction filling wall construction column
CN110388092A (en) * 2019-07-31 2019-10-29 上海建工集团股份有限公司 A kind of construction method of historical building wall reparation
CN110842987A (en) * 2019-09-30 2020-02-28 中航成飞民用飞机有限责任公司 Method for removing sealing adhesive bonding part on airplane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AR055312A1 (en) * 2005-02-22 2007-08-15 Gen Mills Inc LAYER CUTTING DEVICE
CN108660929A (en) * 2018-04-26 2018-10-16 李福� Based on the bridge construction small-sized plane form removable device for preventing concrete damaged surfaces
CN109779257A (en) * 2018-12-25 2019-05-21 浙江华临建设集团有限公司 A kind of constructing device and construction method of building construction filling wall construction column
CN110388092A (en) * 2019-07-31 2019-10-29 上海建工集团股份有限公司 A kind of construction method of historical building wall reparation
CN110842987A (en) * 2019-09-30 2020-02-28 中航成飞民用飞机有限责任公司 Method for removing sealing adhesive bonding part on airplane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431332A (en) * 2021-06-30 2021-09-24 中建华帆建筑设计院有限公司 Filling device for wall constructional column and design construction method

Similar Documents

Publication Publication Date Title
CN206263125U (en) Punching machine waste material cleaning plant
CN112081378A (en) Construction device and construction method of filler wall constructional column for building construction
CN108817976A (en) A kind of equipment that terminal is packed into shell
CN111347568B (en) Building dust collecting equipment that punches
CN211736269U (en) Building engineering scaffold reinforcing apparatus
CN115816254B (en) Mutual inductor spare part processing equipment
CN109779257B (en) Novel construction device and construction method for filler wall constructional column for building construction
CN217018782U (en) Automatic steel construction cutting device of unloading
CN106181679B (en) One kind is used for hinge core full-automatic sanding production equipment
CN104928903B (en) A kind of equipment of cloth cutting
CN213950028U (en) Printing material device of taking
CN209697810U (en) A kind of Multifunctional punching machine
CN114161565A (en) Demoulding equipment is used in production of cement foaming board
CN208729154U (en) A kind of equipment that terminal is packed into shell
CN208811721U (en) A kind of frock clamp for cutting polishing suitable for hardware knife
CN219426474U (en) Polishing device convenient to remove for machining
CN219095268U (en) Rim charge excision equipment
CN219726485U (en) Panel cutting device
CN217669272U (en) Electronic equipment maintains auxiliary device for computer lab convenient to use
CN215700289U (en) Grinding device for diamond machining
CN214393633U (en) Part blank processing equipment for precision manufacturing
CN219986472U (en) Special frock of flux-cored wire arc welding build-up welding
CN212315125U (en) Adhesive tape distribution device
CN220905037U (en) Material moving device for civil engineering
CN108838735A (en) A kind of robot polishing clast automatic recovery processing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201215