CN112073690A - Building construction engineering construction site integrated monitoring system - Google Patents

Building construction engineering construction site integrated monitoring system Download PDF

Info

Publication number
CN112073690A
CN112073690A CN202010937915.0A CN202010937915A CN112073690A CN 112073690 A CN112073690 A CN 112073690A CN 202010937915 A CN202010937915 A CN 202010937915A CN 112073690 A CN112073690 A CN 112073690A
Authority
CN
China
Prior art keywords
monitoring system
water
construction site
water tank
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010937915.0A
Other languages
Chinese (zh)
Inventor
高洪锋
陈思豪
汪浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202010937915.0A priority Critical patent/CN112073690A/en
Publication of CN112073690A publication Critical patent/CN112073690A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • H04N7/183Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a single remote source
    • H04N7/185Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a single remote source from a mobile camera, e.g. for remote control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/04Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand
    • F16M11/043Allowing translations
    • F16M11/046Allowing translations adapted to upward-downward translation movement
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/04Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand
    • F16M11/06Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand allowing pivoting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/18Heads with mechanism for moving the apparatus relatively to the stand
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/42Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters with arrangement for propelling the support stands on wheels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N23/00Cameras or camera modules comprising electronic image sensors; Control thereof
    • H04N23/60Control of cameras or camera modules
    • H04N23/695Control of camera direction for changing a field of view, e.g. pan, tilt or based on tracking of objects
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/80Services using short range communication, e.g. near-field communication [NFC], radio-frequency identification [RFID] or low energy communication
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Signal Processing (AREA)
  • Multimedia (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a comprehensive monitoring system for a construction site of building construction engineering, and relates to the technical field of monitoring systems. This house building engineering job site integrated monitoring system includes base, water tank and atomizer, there is the water tank base upper end middle part through bolted connection, the shaping of water tank upper end one side has the water inlet, be provided with the water pump in the water tank, the water pump delivery end is connected with the water pipe through the ferrule. Has the advantages that: through setting up the water tank, the water pump, a water pipe, connecting plate and atomizer, can spray the dust fall to the job site, guarantee job site environment's cleanliness factor, avoid the dust to float inside equipment of invading in the air, the while also be convenient for equipment better control job site, through setting up solar cell panel, the battery, solar control ware and dc-to-ac converter, can utilize solar energy, and turn into the electric energy with solar energy, supply power for the device, reduce job site power consumption burden, energy-concerving and environment-protective nature is good.

Description

Building construction engineering construction site integrated monitoring system
Technical Field
The invention relates to the technical field of monitoring systems, in particular to a comprehensive monitoring system for a construction site of building construction engineering.
Background
The building refers to an asset formed by artificial construction, belongs to the category of fixed assets, and comprises two categories of houses and structures, wherein each house refers to an engineering building for people to live, work, study, production, management, entertainment, store articles and perform other social activities, the building is different from the building, and each structure refers to an engineering building except the house, such as an enclosing wall, a road, a dam, a water well, a tunnel, a water tower, a bridge, a chimney and the like.
The house building construction engineering cycle is long, and the job site area is big, and the building material of stacking is also more, in order to guarantee job site safety, all can set up monitored control system at the scene for observe the site operation situation, be convenient for in time discover the problem, reduce dangerous accident incidence.
And current comprehensive monitored control system of job site can install when using and place in the job site, and the dust of job site is more, invade inside the equipment easily, influence equipment practical life, can influence the control picture simultaneously, the leak takes place easily, reduce the monitoring effect, secondly, current comprehensive monitored control system of on-the-spot need use the construction power supply when using, can increase the job site power consumption burden, energy-concerving and environment-protective nature is poor, current comprehensive monitored control system of on-the-spot function simple structure in addition, can not in time send out the police dispatch newspaper when monitoring dangerous accident and remind other people, and lack the locate function, can not find the control position fast to unfamiliar people, the practicality is poor.
Disclosure of Invention
The invention aims to solve the problems and provide a comprehensive monitoring system for a construction site of building construction engineering.
The invention realizes the purpose through the following technical scheme:
a comprehensive monitoring system for a construction site of building construction engineering comprises a base, a water tank and an atomizing spray head, wherein the middle part of the upper end of the base is connected with the water tank through a bolt, a water inlet is formed in one side of the upper end of the water tank, a water pump is arranged in the water tank, the water delivery end of the water pump is connected with a water pipe through a pipe hoop, the upper end of the water pipe is connected with a connecting plate through the pipe hoop, one side of the connecting plate is connected with the atomizing spray head through a thread, supporting seats are arranged on two sides of the water tank and are connected with the base through bolts, the upper end of each supporting seat is connected with a first electric push rod through a bolt, the top end of each electric push rod is connected with a supporting plate through a bolt, the connecting plate is connected with, the camera is provided with two, camera support bottom articulates there is electric putter two, electric putter two with the backup pad is articulated.
Further, the water pipe is a water hose, and the connecting plate is internally hollow.
Through adopting above-mentioned technical scheme, can pass through the water inlet to water injection in the water tank, and pass through the water pump will water in the water tank passes through the water pipe pump-feed arrives in the connecting plate, through the connecting plate shunts, makes the even flow direction of water atomizer, then passes through atomizer blowout atomizer atomizing liquid sprays the dust fall to the job site, guarantees the cleanliness factor of job site, avoids inside the dust floats the invasion equipment, also is convenient for better control job site simultaneously, through electric putter promotes the backup pad goes up and down to can adjust the equipment height, electric putter two can adjust in a flexible way the inclination of camera is convenient for better control job site, improves the controllability of device.
Furthermore, the middle part of the upper end of the supporting plate is connected with a solar cell panel through a bolt.
By adopting the technical scheme, the solar panel can absorb solar energy and convert the solar energy into electric energy.
Furthermore, a loudspeaker is arranged on one side of the solar cell panel and connected with the supporting plate through a bolt.
By adopting the technical scheme, the loudspeaker can give out alarm sound to remind others in time, so that the safety risk is reduced.
Furthermore, a lighting lamp is arranged on one side of the camera and connected with the supporting plate through a bolt.
Through adopting above-mentioned technical scheme, can throw light on to the job site, improve the practicality of device.
Furthermore, the bottom end of the base is rotatably connected with wheels.
By adopting the technical scheme, the mobility of the device can be improved.
Furthermore, an electric appliance cabinet is arranged in the base, a main controller is arranged in the electric appliance cabinet, one side of the main controller is electrically connected with a solar controller, and one side of the solar controller is electrically connected with a storage battery.
By adopting the technical scheme, the electric appliance cabinet provides an electric appliance control place to protect the electric appliance, and the main controller can control the whole system of the device to stably operate.
Further, an inverter is electrically connected above the solar controller, and the inverter is electrically connected with the storage battery.
By adopting the technical scheme, the photovoltaic system can be ensured to operate stably, electric energy is provided for the device, and the energy conservation and environmental protection performance of the device is improved.
Furthermore, a Bluetooth module is electrically connected above the main controller,
through adopting three above-mentioned technical scheme, can carry out bluetooth with user's mobile device and be connected.
Furthermore, one side of the lower part of the main controller is electrically connected with a GPS module, and the other side of the lower part of the main controller is electrically connected with a GPRS communication module.
Through adopting above-mentioned technical scheme, can network equipment and terminal, be convenient for better control patrols and examines the job site.
The specific working principle is as follows: when the device is used, the device is moved to a position needing to be monitored through the wheels, then the device is fixed, the GPRS communication module is in signal connection with a terminal, meanwhile, the Bluetooth module can transmit data and can also be in Bluetooth connection with a user moving end, so that the inspection construction site can be better monitored, the main controller is used for controlling the whole monitoring system to run, the solar cell panel can absorb solar energy and convert the solar energy into electric energy to be stored in the storage battery, the solar controller is used for controlling the charging and discharging processes of the storage battery to maintain the stable power supply of the system, the inverter can convert direct current into alternating current to supply power to equipment, the energy is saved, the environment is protected, water is injected into the water tank through the water inlet, and water in the water tank is pumped into the connecting plate through the water pump, the water is divided by the connecting plate to uniformly flow to the atomizing nozzles, and then the atomized liquid is sprayed out by the atomizing nozzles, spraying and dedusting are carried out on a construction site, the cleanliness of the construction site is ensured, dust is prevented from floating and invading the inside of the equipment, the first electric push rod can push the support plate to lift, thereby adjusting the height of the camera, and the second electric push rod can push the camera bracket to rotate along the support plate in an inclined way, the inclination angle of the camera is further adjusted, so that the construction site can be better monitored, the illuminating lamp can provide illumination at night, the loudspeaker can be used for monitoring the traffic accident, control in time to send out the police dispatch newspaper through the terminal, guide people evacuation, the GPS module can be accurate, provide the position fast, and the maintenance personal of being convenient for reachs the accident site fast, and the practicality is good.
The invention has the beneficial effects that:
1. by arranging the water tank, the water pump, the water pipe, the connecting plate and the atomizing nozzle, spraying and dust falling can be carried out on a construction site, the cleanliness of the environment of the construction site is ensured, dust is prevented from floating in the air and invading into the equipment, and meanwhile, the equipment is convenient to better monitor the construction site;
2. by arranging the solar panel, the storage battery, the solar controller and the inverter, solar energy can be utilized and converted into electric energy to supply power to the device, so that the power consumption burden of a construction site is reduced, and the energy-saving and environment-friendly effects are good;
3. through setting up light, speaker and GPS module, can improve the functional effect of device, in time send out the police dispatch newspaper, guide people sparse to can be accurate, provide the position fast, the maintenance personal of being convenient for reachs the accident site fast, the practicality is good.
Drawings
FIG. 1 is a front view of a comprehensive monitoring system for a construction site of a building construction project according to the present invention;
FIG. 2 is a diagram showing the connection relationship among a water tank, a water pump, a water pipe, a connection plate and an atomizer in the comprehensive monitoring system for the construction site of the building construction engineering according to the present invention;
FIG. 3 is a schematic diagram of the internal structure of an electrical cabinet in the comprehensive monitoring system for the construction site of the building construction engineering according to the present invention;
fig. 4 is a circuit block diagram of a comprehensive monitoring system for a construction site of a building construction project according to the invention.
The reference numerals are explained below:
1. a solar panel; 2. a support plate; 3. a speaker; 4. a camera; 5. a camera head bracket; 6. a second electric push rod; 7. a connecting plate; 8. an atomizing spray head; 9. a water pipe; 10. a water tank; 11. an electric appliance cabinet; 12. a main controller; 13. a solar controller; 14. a storage battery; 15. an inverter; 16. a Bluetooth module; 17. a GPS module; 18. a GPRS communication module; 19. a wheel; 20. an electric push rod I; 21. a supporting seat; 22. an illuminating lamp; 23. a base; 24. a water inlet; 25. and (4) a water pump.
Detailed Description
The invention will be further described with reference to the accompanying drawings in which:
as shown in fig. 1-4, a comprehensive monitoring system for a construction site of a house building engineering comprises a base 23, a water tank 10 and an atomizer 8, wherein the middle part of the upper end of the base 23 is connected with the water tank 10 through a bolt, a water inlet 24 is formed on one side of the upper end of the water tank 10, a water pump 25 is arranged in the water tank 10, a water pipe 9 is connected with the water delivery end of the water pump 25 through a pipe hoop, a connecting plate 7 is connected with the upper end of the water pipe 9 through a pipe hoop, the atomizer 8 is connected with one side of the connecting plate 7 through a thread, the water pipe 9 is a soft water pipe 9, the connecting plate 7 is internally hollow, water can be injected into the water tank 10 through the water inlet 24, the water in the water tank 10 is pumped into the connecting plate 7 through the water pipe 9 through the water pump 25, and is divided through the connecting plate 7, then, atomized liquid is sprayed out through the atomizing nozzle 8, dust is reduced by spraying on a construction site, cleanliness of the construction site is guaranteed, dust is prevented from floating and invading the inside of equipment, and meanwhile, the construction site is better monitored, the supporting seat 21 is arranged on two sides of the water tank 10, the supporting seat 21 is connected with the base 23 through a bolt, the upper end of the supporting seat 21 is connected with a first electric push rod 20 through a bolt, the top end of the first electric push rod 20 is connected with a supporting plate 2 through a bolt, the connecting plate 7 is connected with the supporting plate 2 through a bolt, the supporting plate 2 can be pushed to lift through the first electric push rod 20, so that the height of the equipment can be adjusted, the adjustability of the device is improved, a camera support 5 is rotatably connected on one side wall of the supporting plate 2, a camera 4 is connected on the camera support 5, the bottom of the camera support 5 is hinged with a second electric push rod 6, the second electric push rod 6 is hinged with the support plate 2, the inclination angle of the camera 4 can be flexibly adjusted, and the construction site can be better monitored conveniently.
In this embodiment, there is solar cell panel 1 in backup pad 2 upper end middle part through bolted connection, solar cell panel 1 can absorb solar energy and change the electric energy.
In this embodiment, 1 one side of solar cell panel is provided with speaker 3, speaker 3 with backup pad 2 passes through bolted connection, speaker 3 can send out alarm sound, in time reminds other people, reduces the safety risk.
In this embodiment, camera 4 one side is provided with light 22, light 22 with backup pad 2 passes through bolted connection, can throw light on the job site, improves the practicality of device.
In this embodiment, the bottom end of the base 23 is rotatably connected with the wheels 19, so that the mobility of the device can be improved.
In this embodiment, be provided with electric appliance cabinet 11 in the base 23, be provided with main controller 12 in the electric appliance cabinet 11, main controller 12 one side electricity is connected with solar control unit 13, solar control unit 13 one side electricity is connected with battery 14, electric appliance cabinet 11 provides electrical equipment control place, protects electrical equipment, main controller 12 can the control device entire system operation stability.
In this embodiment, an inverter 15 is electrically connected above the solar controller 13, and can convert direct current into alternating current, the inverter 15 is electrically connected with the storage battery 14, so that the photovoltaic system can be ensured to operate stably, electric energy is provided for the device, and the energy saving and environmental protection performance of the device is improved.
In this embodiment, a bluetooth module 16 is electrically connected to the upper portion of the main controller 12, and can be connected to a user mobile device via bluetooth.
In this embodiment one side electricity in main control unit 12 below is connected with GPS module 17, main control unit 12 below opposite side electricity is connected with GPRS communication module 18, can network equipment and terminal, is convenient for better control patrols and examines the job site.
The specific working principle is as follows: when the solar energy water tank is used, the device is firstly moved to a position needing to be monitored through the wheels 19 and then fixed, the GPRS communication module 18 is in signal connection with a terminal, meanwhile, the Bluetooth module 16 can transmit data and can also be in Bluetooth connection with a user moving end, so that the inspection construction site can be better monitored, the main controller 12 controls the whole monitoring system to operate, the solar cell panel 1 can absorb solar energy and convert the solar energy into electric energy to be stored in the storage battery 14, the solar controller 13 controls the charging and discharging process of the storage battery 14 to maintain the stable power supply of the system, the inverter 15 can convert the direct current into alternating current to supply power to equipment, the energy is saved, the environment is protected, then water is injected into the water tank 10 through the water inlet 24, and water in the water tank 10 is pumped into the connecting plate 7 through the water pipe 9 through the water pump 25, the water is uniformly distributed to the atomizing nozzles 8 through the connecting plate 7, atomized liquid is sprayed out through the atomizing nozzles 8, the construction site is sprayed for dust reduction, the cleanliness of the construction site is guaranteed, dust is prevented from floating and invading the inside of the equipment, the first electric push rod 20 can push the support plate 2 to lift, so that the height of the camera 4 is adjusted, the second electric push rod 6 can push the camera support 5 to obliquely rotate along the support plate 2, the inclination angle of the camera 4 is further adjusted, the construction site is better monitored, the illuminating lamp 22 can provide illumination at night, the loudspeaker 3 can be controlled by a terminal to timely send out an alarm to guide people to evacuate when an accident occurs, the GPS module 17 can accurately and quickly provide a position, and maintenance personnel can conveniently and quickly arrive at the accident site, the practicability is good.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides a house building engineering job site integrated monitoring system which characterized in that: comprises a base (23), a water tank (10) and an atomizing spray head (8), wherein the middle part of the upper end of the base (23) is connected with the water tank (10) through a bolt, a water inlet (24) is formed in one side of the upper end of the water tank (10), a water pump (25) is arranged in the water tank (10), a water delivery end of the water pump (25) is connected with a water pipe (9) through a pipe hoop, the upper end of the water pipe (9) is connected with a connecting plate (7) through a pipe hoop, one side of the connecting plate (7) is connected with the atomizing spray head (8) through threads, supporting seats (21) are arranged on two sides of the water tank (10), the supporting seats (21) are connected with the base (23) through bolts, the upper end of the supporting seat (21) is connected with a first electric push rod (20) through a bolt, the top end of the first electric push, the camera support is connected with camera support (5) on backup pad (2) one side wall in a rotating manner, there are camera (4) through bolted connection on camera support (5), camera (4) are provided with two, camera support (5) bottom articulates there is two electric putter (6), two electric putter (6) with backup pad (2) are articulated.
2. The comprehensive monitoring system for the construction site of the house building engineering according to claim 1, characterized in that: the water pipe (9) is a water hose (9), and the connecting plate (7) is internally of a hollow structure.
3. The comprehensive monitoring system for the construction site of the house building engineering according to claim 1, characterized in that: the middle part of the upper end of the supporting plate (2) is connected with a solar cell panel (1) through a bolt.
4. The comprehensive monitoring system for the construction site of the house building engineering according to claim 3, characterized in that: a loudspeaker (3) is arranged on one side of the solar cell panel (1), and the loudspeaker (3) is connected with the supporting plate (2) through a bolt.
5. The comprehensive monitoring system for the construction site of the house building engineering according to claim 1, characterized in that: camera (4) one side is provided with light (22), light (22) with backup pad (2) pass through bolted connection.
6. The comprehensive monitoring system for the construction site of the house building engineering according to claim 1, characterized in that: the bottom end of the base (23) is rotatably connected with wheels (19).
7. The comprehensive monitoring system for the construction site of the house building engineering according to claim 1, characterized in that: the solar energy electric heating cabinet is characterized in that an electric appliance cabinet (11) is arranged in the base (23), a main controller (12) is arranged in the electric appliance cabinet (11), one side of the main controller (12) is electrically connected with a solar controller (13), and one side of the solar controller (13) is electrically connected with a storage battery (14).
8. The comprehensive monitoring system for the construction site of the house building engineering according to claim 7, characterized in that: an inverter (15) is electrically connected above the solar controller (13), and the inverter (15) is electrically connected with the storage battery (14).
9. The comprehensive monitoring system for the construction site of the house building engineering according to claim 7, characterized in that: and a Bluetooth module (16) is electrically connected above the main controller (12).
10. The comprehensive monitoring system for the construction site of the house building engineering according to claim 7, characterized in that: one side of the lower part of the main controller (12) is electrically connected with a GPS module (17), and the other side of the lower part of the main controller (12) is electrically connected with a GPRS communication module (18).
CN202010937915.0A 2020-09-09 2020-09-09 Building construction engineering construction site integrated monitoring system Pending CN112073690A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010937915.0A CN112073690A (en) 2020-09-09 2020-09-09 Building construction engineering construction site integrated monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010937915.0A CN112073690A (en) 2020-09-09 2020-09-09 Building construction engineering construction site integrated monitoring system

Publications (1)

Publication Number Publication Date
CN112073690A true CN112073690A (en) 2020-12-11

Family

ID=73662803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010937915.0A Pending CN112073690A (en) 2020-09-09 2020-09-09 Building construction engineering construction site integrated monitoring system

Country Status (1)

Country Link
CN (1) CN112073690A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113566065A (en) * 2021-07-28 2021-10-29 中国十七冶集团有限公司 Building construction monitoring device based on BIM technique
CN114580942A (en) * 2022-03-11 2022-06-03 嘉兴确实物联网科技有限公司 Engineering Internet of things information management system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120079219A (en) * 2011-01-04 2012-07-12 (주)디. 앤. 엠 Water cannon for fire protection
KR20150012751A (en) * 2013-07-26 2015-02-04 (주)모나드아이엔씨 Dome camera device comprising of cleaning means
CN206272766U (en) * 2016-12-15 2017-06-20 吉林工程技术师范学院 A kind of Long-Range Surveillance Unit
CN107564229A (en) * 2017-10-24 2018-01-09 威海云睿信息科技有限公司 It is a kind of can remote monitoring electronic information alarm
CN207083184U (en) * 2017-06-23 2018-03-09 云南临运建设工程有限公司 A kind of building engineering job site mobile comprehensive monitoring device
CN107796442A (en) * 2017-10-30 2018-03-13 成都敏硅科技有限公司 A kind of natural forest protection device
CN208386787U (en) * 2018-02-22 2019-01-15 刘学永 A kind of building engineering construction site integrated monitoring apparatus
CN209369861U (en) * 2018-12-16 2019-09-10 允能科技产业有限公司 A kind of safety for tunnel engineering monitoring device
CN211330455U (en) * 2019-11-11 2020-08-25 霍州煤电集团有限责任公司 Monitoring camera cleaning device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120079219A (en) * 2011-01-04 2012-07-12 (주)디. 앤. 엠 Water cannon for fire protection
KR20150012751A (en) * 2013-07-26 2015-02-04 (주)모나드아이엔씨 Dome camera device comprising of cleaning means
CN206272766U (en) * 2016-12-15 2017-06-20 吉林工程技术师范学院 A kind of Long-Range Surveillance Unit
CN207083184U (en) * 2017-06-23 2018-03-09 云南临运建设工程有限公司 A kind of building engineering job site mobile comprehensive monitoring device
CN107564229A (en) * 2017-10-24 2018-01-09 威海云睿信息科技有限公司 It is a kind of can remote monitoring electronic information alarm
CN107796442A (en) * 2017-10-30 2018-03-13 成都敏硅科技有限公司 A kind of natural forest protection device
CN208386787U (en) * 2018-02-22 2019-01-15 刘学永 A kind of building engineering construction site integrated monitoring apparatus
CN209369861U (en) * 2018-12-16 2019-09-10 允能科技产业有限公司 A kind of safety for tunnel engineering monitoring device
CN211330455U (en) * 2019-11-11 2020-08-25 霍州煤电集团有限责任公司 Monitoring camera cleaning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113566065A (en) * 2021-07-28 2021-10-29 中国十七冶集团有限公司 Building construction monitoring device based on BIM technique
CN114580942A (en) * 2022-03-11 2022-06-03 嘉兴确实物联网科技有限公司 Engineering Internet of things information management system

Similar Documents

Publication Publication Date Title
CN102641636A (en) High-rise water spray dust-setting device for controlling PM2.5 air quality from exceeding standard
CN112073690A (en) Building construction engineering construction site integrated monitoring system
CN203834981U (en) Spraying illumination system for solar bus stop
CN205351173U (en) Solar environment -friendly street lamp
CN104776384A (en) Electrostatic spraying streetlamp device capable of eliminating PM2.5 (Particulate Matter 2.5)
CN205069055U (en) Novel engineering management warning sign
CN206563239U (en) It is a kind of have concurrently greening function except haze street lamp and intelligence remove haze system
CN208025366U (en) A kind of multifunctional solar energy streetlight
CN204656234U (en) For administering the device of Public Open Space atmosphere pollution and haze
CN206330062U (en) A kind of solar energy wisdom street lamp
CN209693114U (en) A kind of band topples over the controller for road lamp of monitoring function
CN202762248U (en) Pylon type water mist dust falling device for controlling standard exceeding of PM2.5 air quality
CN209013975U (en) A kind of communication iron tower inclination monitoring system
CN214194340U (en) Building construction working face sprays dust fall heat sink
CN202555123U (en) High-rise water mist dust-suppression device for controlling over-standard PM2.5 air quality
CN212456611U (en) Integral type solar street lamp with fire control function
CN108227662A (en) A kind of monitoring system of internet of things
CN211317407U (en) Locate environment monitoring device on wisdom light pole
CN209752468U (en) Piezoelectric atomization cooling dust collector based on photovoltaic power supply
CN208157923U (en) A kind of construction site outdoor distributing box
CN212081072U (en) Green intelligent chemical ground dust fall lighting system
CN207907109U (en) A kind of wind and light complementary road lamp
CN210298852U (en) Energy-saving municipal afforestation frame
CN202569871U (en) Water fog dust fall device for preventing air quality from exceeding standard
CN212348124U (en) Tower crane sprays dust fall heat sink to working face for construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201211