CN112053140A - Based on municipal works construction project wisdom building site management system - Google Patents

Based on municipal works construction project wisdom building site management system Download PDF

Info

Publication number
CN112053140A
CN112053140A CN202011031823.2A CN202011031823A CN112053140A CN 112053140 A CN112053140 A CN 112053140A CN 202011031823 A CN202011031823 A CN 202011031823A CN 112053140 A CN112053140 A CN 112053140A
Authority
CN
China
Prior art keywords
module
distress
information processing
vital sign
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011031823.2A
Other languages
Chinese (zh)
Inventor
宋鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011031823.2A priority Critical patent/CN112053140A/en
Publication of CN112053140A publication Critical patent/CN112053140A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a municipal engineering construction project-based intelligent construction site management system which comprises a distress card, wherein an information processing module is connected in the distress card, the input end of the information processing module is respectively connected with a vital sign detection module, a GPS positioning module, a distress alarm module, an identity recognition module and a distress signal receiving module, the output end of the information processing module is respectively connected with a wireless transmission module and a direction recognition module, the output end of the wireless transmission module is remotely connected with a data receiving module in a control room, the output end of the data receiving module is connected with a central control module, the output end of the central control module is connected with a main voice alarm module, and the input end of the central control module is connected with a monitoring module. Through the vital sign detection module, the GPS positioning module, the distress alarm module, the identity recognition module and the distress signal receiving module on the distress board, the rapid rescue with high efficiency can be carried out on the constructors who have accidents in time.

Description

Based on municipal works construction project wisdom building site management system
Technical Field
The invention belongs to the technical field of construction site management, and particularly relates to an intelligent construction site management system based on municipal engineering construction projects.
Background
In China, municipal infrastructure refers to various buildings, structures, equipment and the like which are arranged in the planning and construction range of urban areas and towns and provide paid or unpaid public products and services for residents based on government responsibilities and obligations. Various public infrastructure construction matched with urban life belongs to the municipal engineering category, such as common projects of urban roads, bridges, subways, underground pipelines, tunnels, riverways, rail transit, sewage treatment, garbage treatment and disposal and the like.
With the continuous development and the change of the modern construction of our country, at present, the urban construction strategy becomes a popular development industry, and gradually marches to the urbanization of rural areas, the strength of large-batch municipal construction engineering is continuously increased, but most of construction sites are not strictly managed like company, the construction management of the existing construction sites in China is scattered, a unified management mechanism is not used for restraining the construction sites, and the internal personnel of the construction party usually play a role in management. In the existing municipal engineering construction, along with the intelligent development of the engineering construction in China, the single manpower mode is adopted to manage the construction site, which obviously cannot keep pace with the progress of times, the current increasing of the human cost is faced with, the life value of people is more and more emphasized, the country also puts forward the life protection measure proposal of related personnel for engineering constructors, some safety accidents are easy to happen due to the uncertainty of the construction site environment, in most accidents, the construction site manager basically learns after the accidents happen for a period of time, the monitoring of the construction site personnel cannot be timely and efficient, and the problems of too fast safety management and insufficient intelligence exist.
Disclosure of Invention
The invention aims to provide an intelligent construction site management system based on a municipal engineering construction project, and aims to solve the problem that municipal engineering construction safety management in the prior art is not intelligent enough.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a based on municipal works construction project wisdom building site management system, includes the tablet of seeking help, the tablet in-connection of seeking help has information processing module, the information processing module input is connected with vital sign detection module, GPS orientation module, alarm module, identity identification module and distress signal receiving module respectively, the information processing module output is connected with wireless transmission module and direction identification module respectively, wireless transmission module output remote connection has the data receiving module in the control room, the data receiving module output is connected with central control module, the central control module output is connected with main voice alarm module, the central control module input is connected with monitoring module.
Preferably, the distress card is provided with a fixed pin, and the distress card is provided with a storage battery.
Preferably, the wireless transmission module output is connected on the distress signal receiving module in near distress tablet of accident place, the direction identification module output is connected with vice voice alarm module, the in-connection of vital sign detection module has the vital sign to detect the bracelet.
Preferably, the information processing module, the vital sign detection module, the GPS positioning module, the distress alarm module, the identity recognition module, the distress signal receiving module, the wireless transmission module, the direction recognition module and the auxiliary voice alarm module are connected with the power supply end of the storage battery.
Compared with the prior art, the invention has the beneficial effects that:
the invention provides a municipal engineering construction project-based intelligent building site management system, wherein a storage battery and a vital sign detection bracelet are respectively arranged on a distress card, the storage battery provides power for a module component in the distress card, the vital sign detection bracelet monitors the physical state of a constructor in real time, when the constructor presses a distress alarm module or the vital sign of the constructor changes abnormally, an information processing module transmits the position information, the identity information and the vital sign condition information of the constructor to a data receiving module in a remote control room of a building site through a wireless transmission module at the output end of the information processing module at the first time when the constructor has accidents and the like, the data receiving module transmits the received data to a central control module, the central control module acquires accident site monitoring through a monitoring module, and at the same time, the central control module controls a main voice alarm module to alarm, the position information, vital signs, ID and the like of accident personnel in the accident site are broadcasted, meanwhile, the wireless transmission module transmits distress signals to a distress signal receiving module in a distress signal plate on the body of nearby accident personnel, a direction identification module in the distress signal plate on the body of nearby accident personnel positions the accident site, and an alarm indication route is made for the accident personnel through an auxiliary voice alarm module, so that timely and efficient rescue is provided for the accident personnel.
Drawings
FIG. 1 is a schematic structural diagram of an intelligent site management system based on municipal engineering construction projects according to the present invention;
FIG. 2 is a schematic view of a partial cut-away of the SOS tablet of the present invention;
fig. 3 is a schematic front view of the vital sign detection bracelet of the present invention.
In the figure: 1 distress card, 2 fixed safety pin, 3 batteries, 4 vital sign detect bracelet.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1 and 2, a municipal engineering construction project-based intelligent site management system comprises a distress card 1, wherein a fixing pin 2 is connected to the distress card 1 in a buckling manner, the fixing pin 2 enables the distress card 1 to be installed and fixed on a jacket of a constructor, a storage battery 3 is connected to the distress card 1 in an adhering manner, an information processing module is connected to an inner lead of the distress card 1, an input end of the information processing module is respectively connected with a vital sign detection module, a GPS positioning module, a distress alarm module, an identity recognition module and a distress signal receiving module through leads, the vital sign detection module monitors vital signs of the constructor in real time, the GPS positioning module positions the position of the constructor in real time, the distress alarm module can give an alarm actively when the constructor encounters a dangerous situation, the construction site manager can know the dangerous situation at the first time, the identity recognition module records identity information of workers, the condition of each constructor is known to the managers of being convenient for, wireless transmission module output wire is connected on the distress signal receiving module in near the accident ground distress tablet 1, direction identification module output wire is connected with vice voice alarm module, this setting makes when taking place the dangerous situation, near constructor also can carry out quick help rescue to the accident ground through the information that vice voice alarm module was reported the very first time, has improved the safety protection consciousness between the constructor.
Please refer to fig. 1, fig. 2 and fig. 3, a vital sign detection bracelet 4 is connected to the inner lead of the vital sign detection module, the model of the vital sign detection bracelet 4 is SKY-K870, the vital sign detection bracelet 4 is wirelessly connected with the vital sign detection module in the distress card 1, the vital sign detection bracelet 4 monitors the vital signs of the wearing person in real time and transmits the monitoring data to the information processing module, the output end of the information processing module is respectively connected with a wireless transmission module and a direction identification module through leads, the constructor information collected on the wireless transmission module is transmitted to a remote control room, the direction identification module is used for indicating the direction when nearby constructors rescue the constructors, the information processing module, the vital sign detection module, the GPS positioning module, the distress alarm module, the identity identification module, the distress signal receiving module, the wireless transmission module, The direction recognition module is connected on the output of storage battery 3 with vice voice alarm module power end wire, wireless transmission module output remote connection has the data receiving module in the control room, data receiving module output end wire is connected with central control module, central control module projects constructor's data information and observes on the display screen in the monitor, central control module output end wire is connected with main voice alarm module, main voice alarm module carries out the police dispatch, report the personnel information condition on accident place, be convenient for managers makes emergency measure the very first time, central control module input/output end wire is connected with monitoring module, monitoring module carries out the video of the very first time to the accident place and transfers, be convenient for managers have solved the accident place condition.
When a constructor has a dangerous situation and presses down a distress alarm module on a distress card 1 or a vital sign detection bracelet 4 on a vital sign detection module of the distress alarm module, the information processing module in the distress card 1 transmits vital sign information of a wearer, position information and identity information respectively displayed by a GPS positioning module and an identity recognition module to a data receiving module in a remote control room through a wireless transmission module, the data receiving module transmits the data to a central control module for data analysis and interpretation, and simultaneously, the information of the wearer is timely projected onto a display screen, so that a manager in the control room can know the condition of the constructor at the first time, and meanwhile, the central control module can quickly call image data of a trouble place through a monitoring module and control a main voice alarm module to broadcast the accident place, so that the constructor can know the accident place at the first time, The condition etc, it is further, wireless transmission module on the distress card 1 transmits distress signal for on the constructor of near on one's body distress card 1, after distress signal receiving module on the distress card received distress signal, signal processing module advances line location to the accident personnel through direction identification module, and report accident site and constructor's positional relation through vice voice alarm module, conveniently carry out quick rescue to it, safety protection to building site constructor, have in time, high efficiency and intelligent characteristics.

Claims (4)

1. The utility model provides a based on municipal works construction project wisdom building site management system, includes distress card (1), its characterized in that: the SOS tablet (1) is built-in to be equipped with information processing module, the information processing module input is connected with vital sign detection module, GPS orientation module, SOS alarm module, identity identification module and SOS signal receiving module respectively, the information processing module output is connected with wireless transmission module and direction identification module respectively, wireless transmission module output remote connection has the data receiving module in the control room, the data receiving module output is connected with central control module, the central control module output is connected with main voice alarm module, the central control module input is connected with monitoring module.
2. The municipal engineering construction project based intelligent site management system according to claim 1, wherein: the SOS card (1) is provided with a fixed pin (2), and the SOS card (1) is provided with a storage battery (3).
3. The municipal engineering construction project based intelligent site management system according to claim 1, wherein: the wireless transmission module output is connected on the distress signal receiving module in near accident place distress tablet (1), the direction identification module output is connected with vice voice alarm module, vital sign detects the module in-connection and has vital sign and detect bracelet (4).
4. The municipal engineering construction project based intelligent site management system according to claim 1, wherein: the information processing module, the vital sign detection module, the GPS positioning module, the distress alarm module, the identity recognition module, the distress signal receiving module, the wireless transmission module, the direction recognition module and the auxiliary voice alarm module are connected with the power end of the storage battery (3).
CN202011031823.2A 2020-09-27 2020-09-27 Based on municipal works construction project wisdom building site management system Pending CN112053140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011031823.2A CN112053140A (en) 2020-09-27 2020-09-27 Based on municipal works construction project wisdom building site management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011031823.2A CN112053140A (en) 2020-09-27 2020-09-27 Based on municipal works construction project wisdom building site management system

Publications (1)

Publication Number Publication Date
CN112053140A true CN112053140A (en) 2020-12-08

Family

ID=73605134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011031823.2A Pending CN112053140A (en) 2020-09-27 2020-09-27 Based on municipal works construction project wisdom building site management system

Country Status (1)

Country Link
CN (1) CN112053140A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113593185A (en) * 2021-07-30 2021-11-02 上海交通大学宁波人工智能研究院 Non-contact office worker fatigue detection system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327797A (en) * 2015-06-24 2017-01-11 王佑夫 Life monitoring alarm system
CN107748945A (en) * 2017-09-01 2018-03-02 郭亚晋 A kind of wisdom site staff management system
CN107874749A (en) * 2017-11-16 2018-04-06 贵州大学 A kind of workmen's life sign monitor system and its monitoring method
CN111242574A (en) * 2020-01-08 2020-06-05 中国建筑第二工程局有限公司西南分公司 Intelligent site inspection management system and method based on GPS technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327797A (en) * 2015-06-24 2017-01-11 王佑夫 Life monitoring alarm system
CN107748945A (en) * 2017-09-01 2018-03-02 郭亚晋 A kind of wisdom site staff management system
CN107874749A (en) * 2017-11-16 2018-04-06 贵州大学 A kind of workmen's life sign monitor system and its monitoring method
CN111242574A (en) * 2020-01-08 2020-06-05 中国建筑第二工程局有限公司西南分公司 Intelligent site inspection management system and method based on GPS technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113593185A (en) * 2021-07-30 2021-11-02 上海交通大学宁波人工智能研究院 Non-contact office worker fatigue detection system and method
CN113593185B (en) * 2021-07-30 2022-11-15 上海交通大学宁波人工智能研究院 Non-contact office worker fatigue detection system and method

Similar Documents

Publication Publication Date Title
CN111615059A (en) Positioning equipment and system for monitoring information of building site personnel in real time
JP3234013U (en) Intelligent computerized transportation regulation system for orbital transportation
CN113027530A (en) Coal mine safety monitoring system and monitoring method based on internet data interaction
CN202818621U (en) Underground positioning system using TOF technology principle based on Zigbee
CN112435451A (en) Urban resident emergency life channel opening system and working process thereof
CN112053140A (en) Based on municipal works construction project wisdom building site management system
CN103821564B (en) A kind of mine personnel positioning and wireless voice communication multifunction system
CN108205694B (en) Construction site operation personnel positioning system based on chromatographic beacon
CN214410059U (en) Intelligent building site management system based on BIM model
CN112485809A (en) Accurate positioning terminal of workman based on electric power transformer substation engineering construction project
CN111179602A (en) Computer monitoring system for tunnel road section traffic management
CN109100961B (en) Expressway Mechanical & Electrical Project system
CN216450181U (en) Active prevention and control system for road-involved construction
CN103332154A (en) Tourist guide system of solar tourist guide vehicle
CN213442573U (en) Railway line construction safety protection system
CN206618513U (en) A kind of intelligent prior-warning device of transmission line of electricity temperature measurement on-line shooting
CN102685668B (en) Wireless positioning and safety management system for engineering constructors
CN214955057U (en) Wisdom tunnel system
CN211032934U (en) Multifunctional navigation mark and monitoring network system composed of same
CN210068244U (en) Gas remote monitoring and alarm system in tunnel construction process
CN107453789A (en) A kind of constructing tunnel personnel positioning managing device
CN201703392U (en) Electronic speed limiting signal sign applicable to passenger special line
CN217562108U (en) Intelligent protection and monitoring system for railway business line construction
CN207750106U (en) A kind of multifunctional intellectual sensor
CN206480131U (en) One kind is outgoing to escort intelligent management apapratus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201208

RJ01 Rejection of invention patent application after publication