CN112051079A - 一种架桥机荷载试验方法 - Google Patents

一种架桥机荷载试验方法 Download PDF

Info

Publication number
CN112051079A
CN112051079A CN202010764232.XA CN202010764232A CN112051079A CN 112051079 A CN112051079 A CN 112051079A CN 202010764232 A CN202010764232 A CN 202010764232A CN 112051079 A CN112051079 A CN 112051079A
Authority
CN
China
Prior art keywords
bridge girder
girder erection
erection machine
force
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010764232.XA
Other languages
English (en)
Other versions
CN112051079B (zh
Inventor
林鹏
段成钢
孙开达
邹侍
王楠
孙志飞
闫明波
王志刚
程伟平
卢磊
王瑞鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co ltd
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co ltd
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co ltd, CCCC Fourth Highway Engineering Co Ltd filed Critical Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co ltd
Priority to CN202010764232.XA priority Critical patent/CN112051079B/zh
Publication of CN112051079A publication Critical patent/CN112051079A/zh
Application granted granted Critical
Publication of CN112051079B publication Critical patent/CN112051079B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/007Subject matter not provided for in other groups of this subclass by applying a load, e.g. for resistance or wear testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/008Subject matter not provided for in other groups of this subclass by doing functionality tests

Abstract

本发明涉及一种架桥机荷载试验方法,选择3个连续的桥墩,将架桥机的前后支腿支撑在前后两个桥墩上,架桥机天车移动到中间桥墩上方;在中间桥墩的盖梁顶部和底部分别顺桥向设一上反力梁和一下反力梁并通过拉杆拉紧;在上反力梁上设一扁担梁,扁担梁上设一穿心式千斤顶,在上反力梁、扁担梁、千斤顶间竖向穿设一锚固杆;架桥机的天车通过两根钢丝绳连接扁担梁的两端并向上提拉扁担梁,观察千斤顶油表的读数,当达到设计载荷时,如架桥机无异常,则完成架桥机载荷试验。本发明加载力值可以从千斤顶的油表读数中直接观测,试验数据准确,试验过程安全性高。

Description

一种架桥机荷载试验方法
技术领域
本发明属于桥梁施工技术领域,涉及一种架桥机采用架桥机进行预制T梁架设前,对架桥机的载荷进行检验方法。
背景技术
架桥机是提吊预制T梁并将T梁架设在桥墩上的架桥设备。为保证施工安全,架桥机用于实际施工前,要对其荷载能力进行检验。常规的架桥机荷载检验方法是进行提梁试验,即通过提吊一个实际施工所要架设的梁段来检验架桥机的载荷,该方法能达到试验载荷与实际施工载荷一致,但也存在以下不足:
1、必须在T梁已经预制完成且运至施工现场后才可进行试验,载荷试验和T梁预制不能同步进行,影响施工进度;
2、由于T梁的重量是固定的,所以试验过程中加载重量不能进行调整,导致试验数据不完整;且一旦梁体重量超出架桥机载荷能力,会造成较大安全风险。
发明内容
本发明的目的是针对现有架桥机载荷试验方法存在的问题,提供一种不依赖于T梁的架桥机荷载试验方法,有利于保证施工进度,提高检验精度,并降低施工风险。
本发明的技术方案如下:
一种架桥机荷载试验方法,其特征在于,包括以下步骤:
(1)选择3个连续的桥墩,将架桥机的前后支腿支撑在前后两个桥墩上,架桥机的一天车移动到中间桥墩上方;
(2)在中间桥墩的盖梁顶部和底部分别顺桥向设一上反力梁和一下反力梁,其中上反力梁的两端底部分别设一垫梁,使上反力梁的中间与盖梁顶面有一定间距,将上、下反力梁的端部通过拉杆拉紧;
(3)在上反力梁上横桥向设置一扁担梁,扁担梁上设置一穿心式千斤顶,在上反力梁、扁担梁、千斤顶间竖向穿设一锚固杆,将锚固杆的下端通过螺母固定在上反力梁的底部,锚固杆的上端通过螺母固定在千斤顶的活塞顶部;
(4)架桥机的天车上连接两根环形的钢丝绳,将两钢丝绳的下端分别套接在扁担梁的两端;
(5)启动天车向上提拉扁担梁,同时开启千斤顶,并观察千斤顶油表的读数,当达到设计载荷时,稳定一段时间,观察架桥机是否正常,如无异常,则天车卸载加载力,完成架桥机载荷试验。
本发明由架桥机天车提供加载力,扁担梁、千斤顶、锚固杆、上反力梁、拉杆、下反力梁组成加载力传递系统,将天车的加载力传递到盖梁,由盖梁提供反力;同现有的提梁加载方法相比,本发明载荷试验可与T梁预制同步进行,有利于保证工期;加载力值可以从千斤顶的油表读数中直接观测,加载试验数据精确,试验载荷大小可控,有利于保证试验安全性。
附图说明
图1是架桥机载荷试验系统顺桥向的结构示意图;
图2是架桥机载荷试验系统在中间桥墩处的横桥向结构示意图。
具体实施方式
如图1、图2所示,本发明的具体实现方式如下:
(1)选择3个连续的桥墩1,通过吊机将架桥机2吊至前后两个桥墩上,架桥机的前后支腿支撑在前后两个桥墩的盖梁上,架桥机的一个天车3移动到中间桥墩上方;
(2)在中间桥墩的盖梁4顶部和底部分别顺桥向设一上反力梁5和一下反力梁6,其中上反力梁5的两端底部分别设一垫梁7,使上反力梁5的中间与盖梁4顶面有一定间距,便于穿设锚固杆;将上、下反力梁的端部通过拉杆8拉紧;
(3)在上反力梁上横桥向设置一扁担梁9,扁担梁上设置一穿心式千斤顶10,在上反力梁、扁担梁、千斤顶间竖向穿设一锚固杆11,将锚固杆11的下端通过螺母固定在上反力梁5的底部,锚固杆11的上端通过螺母固定在千斤顶10的活塞顶部;
(4)架桥机的天车上连接两根环形的钢丝绳12,将两钢丝绳12的下端分别套接在扁担梁9的两端;
(5)启动天车3向上提拉扁担梁9,同时开启千斤顶,天车的提升力依次通过扁担梁9、千斤顶10、锚固杆11、上反力梁5、拉杆8、下反力梁6传递到盖梁4,由盖梁提供反力;观察千斤顶油表的读数;加载过程中架桥机如有异常应及时停止加载,当达到设计载荷时,稳定一段时间,观察架桥机是否正常,如无异常,则天车卸载加载力,完成架桥机载荷试验。

Claims (1)

1.一种架桥机荷载试验方法,其特征在于,包括以下步骤:
(1)选择3个连续的桥墩,将架桥机的前后支腿支撑在前后两个桥墩上,架桥机的一天车移动到中间桥墩上方;
(2)在中间桥墩的盖梁顶部和底部分别顺桥向设一上反力梁和一下反力梁,其中上反力梁的两端底部分别设一垫梁,使上反力梁的中间与盖梁顶面有一定间距,将上、下反力梁的端部通过拉杆拉紧;
(3)在上反力梁上横桥向设置一扁担梁,扁担梁上设置一穿心式千斤顶,在上反力梁、扁担梁、千斤顶间竖向穿设一锚固杆,将锚固杆的下端通过螺母固定在上反力梁的底部,锚固杆的上端通过螺母固定在千斤顶的活塞顶部;
(4)架桥机的天车上连接两根环形的钢丝绳,将两钢丝绳的下端分别套接在扁担梁的两端;
(5)启动天车向上提拉扁担梁,同时开启千斤顶,并观察千斤顶油表的读数,当达到设计载荷时,稳定一段时间,观察架桥机是否正常,如无异常,则天车卸载加载力,完成架桥机载荷试验。
CN202010764232.XA 2020-08-02 2020-08-02 一种架桥机荷载试验方法 Active CN112051079B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010764232.XA CN112051079B (zh) 2020-08-02 2020-08-02 一种架桥机荷载试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010764232.XA CN112051079B (zh) 2020-08-02 2020-08-02 一种架桥机荷载试验方法

Publications (2)

Publication Number Publication Date
CN112051079A true CN112051079A (zh) 2020-12-08
CN112051079B CN112051079B (zh) 2022-09-09

Family

ID=73602070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010764232.XA Active CN112051079B (zh) 2020-08-02 2020-08-02 一种架桥机荷载试验方法

Country Status (1)

Country Link
CN (1) CN112051079B (zh)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2902381B1 (de) * 1979-01-23 1980-03-13 Wayss & Freytag Ag Verfahren zum Bau einer Bruecke aus Stahl- oder Spannbeton und Hilfstraeger zum Durchfuehren des Verfahrens
JP2001193016A (ja) * 2000-01-17 2001-07-17 Sumitomo Heavy Ind Ltd 橋梁架設用手延機
CN201772875U (zh) * 2010-07-08 2011-03-23 邯郸中铁桥梁机械有限公司 架桥机机臂水平检测装置
CN102493353A (zh) * 2011-12-23 2012-06-13 中铁大桥局股份有限公司 桥梁施工中大型设备的起吊方法及墩顶提升吊架
JP2014174113A (ja) * 2013-03-12 2014-09-22 Tokyo Electric Power Co Inc:The 自然風により架渉線機材に生じる繰り返し荷重の確率密度分布を予測する方法
CN204718822U (zh) * 2014-12-11 2015-10-21 中南大学 铁路斜拉桥试验模型
CN105424396A (zh) * 2015-12-21 2016-03-23 孙金更 一种现浇简支梁静载试验装置
CN205691411U (zh) * 2016-06-21 2016-11-16 中铁第五勘察设计院集团有限公司 一种铁路混凝土简支梁静载试验反力架
CN206146751U (zh) * 2016-10-21 2017-05-03 山西省交通科学研究院 一种用于单梁静载试验的加载装置
CN109024308A (zh) * 2018-06-21 2018-12-18 上海建工集团股份有限公司 架桥机的恒载控制装置与方法
CN109632535A (zh) * 2018-12-21 2019-04-16 长安大学 一种反映激励作用特性的拟静力试验方法

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2902381B1 (de) * 1979-01-23 1980-03-13 Wayss & Freytag Ag Verfahren zum Bau einer Bruecke aus Stahl- oder Spannbeton und Hilfstraeger zum Durchfuehren des Verfahrens
JP2001193016A (ja) * 2000-01-17 2001-07-17 Sumitomo Heavy Ind Ltd 橋梁架設用手延機
CN201772875U (zh) * 2010-07-08 2011-03-23 邯郸中铁桥梁机械有限公司 架桥机机臂水平检测装置
CN102493353A (zh) * 2011-12-23 2012-06-13 中铁大桥局股份有限公司 桥梁施工中大型设备的起吊方法及墩顶提升吊架
JP2014174113A (ja) * 2013-03-12 2014-09-22 Tokyo Electric Power Co Inc:The 自然風により架渉線機材に生じる繰り返し荷重の確率密度分布を予測する方法
CN204718822U (zh) * 2014-12-11 2015-10-21 中南大学 铁路斜拉桥试验模型
CN105424396A (zh) * 2015-12-21 2016-03-23 孙金更 一种现浇简支梁静载试验装置
CN205691411U (zh) * 2016-06-21 2016-11-16 中铁第五勘察设计院集团有限公司 一种铁路混凝土简支梁静载试验反力架
CN206146751U (zh) * 2016-10-21 2017-05-03 山西省交通科学研究院 一种用于单梁静载试验的加载装置
CN109024308A (zh) * 2018-06-21 2018-12-18 上海建工集团股份有限公司 架桥机的恒载控制装置与方法
CN109632535A (zh) * 2018-12-21 2019-04-16 长安大学 一种反映激励作用特性的拟静力试验方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘泽军: "客运专线32m大吨位双线整孔箱梁运架施工工艺及关键技术", 《铁道建筑技术》 *
李海伟: "特殊工况下TLJ900型架桥机架设城际铁路预制箱梁施工工艺", 《国防交通工程与技术》 *

Also Published As

Publication number Publication date
CN112051079B (zh) 2022-09-09

Similar Documents

Publication Publication Date Title
CN103243663B (zh) 利用架桥机拆除t型悬臂连续刚构箱梁的施工工艺
CN101537976B (zh) 双塔桅巨型自升降起重设备及其跟携吊装方法
CN106193618B (zh) 一种大跨径空中钢结构桁架施工工法
CN102080357B (zh) 钢管墩贝雷梁现浇支架整体落梁装置及方法
CN111335187B (zh) 一种空腹式刚构桥三角区施工工艺
CN201376848Y (zh) 双塔桅巨型自升降起重设备
CN107060105A (zh) 一种塔楼间多个钢连廊的提升施工方法
CN208088097U (zh) 一种三塔悬索桥主梁安装施工结构
CN109835826A (zh) 一种自爬式重型提升机
CN104989111B (zh) 钢结构高层吊装施工方法
CN109868750A (zh) 一种简支钢桁梁四点支撑顶推系统及顶推方法
CN105060125B (zh) 高塔架缆机结构及其拆除方法
CN206095814U (zh) 一种单梁静载试验加载系统
CN112051079B (zh) 一种架桥机荷载试验方法
CN109024308B (zh) 架桥机的恒载控制装置与方法
CN206143824U (zh) 一种桩基静载试验加载系统
CN102877657B (zh) 大跨度h型钢平面组合结构张弦梁高空换索施工方法
CN205676784U (zh) 托架反拉加载预压装置
CN213121143U (zh) 一种架桥机荷载试验系统
CN102381438A (zh) 大型半潜船艏楼上建总段整体提拉安装方法
CN109629450A (zh) 钢箱梁悬臂拼装横向线形匹配调整装置、系统及方法
CN207244425U (zh) 部分地锚式悬索桥
CN109704215A (zh) 一种烟囱内钢平台吊装系统及方法
CN211034860U (zh) 钢结构网架液压提升施工作业装置
CN215164726U (zh) 一种用于现浇梁钢管桩支架快速拆除的整体卸落结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant