CN112049650A - 一种大盾构扩挖既有小盾构隧道的方法 - Google Patents
一种大盾构扩挖既有小盾构隧道的方法 Download PDFInfo
- Publication number
- CN112049650A CN112049650A CN202010976422.8A CN202010976422A CN112049650A CN 112049650 A CN112049650 A CN 112049650A CN 202010976422 A CN202010976422 A CN 202010976422A CN 112049650 A CN112049650 A CN 112049650A
- Authority
- CN
- China
- Prior art keywords
- shield
- small
- tunnel
- excavating
- expanding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 claims abstract description 30
- 230000005641 tunneling Effects 0.000 claims abstract description 21
- 238000009412 basement excavation Methods 0.000 claims abstract description 14
- 239000000463 material Substances 0.000 claims abstract description 9
- 239000002689 soil Substances 0.000 claims abstract description 7
- 230000002093 peripheral effect Effects 0.000 claims abstract description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 12
- 239000003365 glass fiber Substances 0.000 claims description 9
- 230000002787 reinforcement Effects 0.000 claims description 6
- 230000035515 penetration Effects 0.000 claims description 4
- 239000011347 resin Substances 0.000 claims description 4
- 229920005989 resin Polymers 0.000 claims description 4
- 239000011083 cement mortar Substances 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 230000000903 blocking effect Effects 0.000 description 3
- 230000003111 delayed effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 238000005299 abrasion Methods 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/01—Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0642—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
- E21D9/0671—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end with means for consolidating the rock in front of the shield by injection of consolidating substances through boreholes
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010976422.8A CN112049650B (zh) | 2020-09-16 | 2020-09-16 | 一种大盾构扩挖既有小盾构隧道的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010976422.8A CN112049650B (zh) | 2020-09-16 | 2020-09-16 | 一种大盾构扩挖既有小盾构隧道的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112049650A true CN112049650A (zh) | 2020-12-08 |
CN112049650B CN112049650B (zh) | 2022-07-15 |
Family
ID=73603131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010976422.8A Active CN112049650B (zh) | 2020-09-16 | 2020-09-16 | 一种大盾构扩挖既有小盾构隧道的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112049650B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113187491A (zh) * | 2021-05-17 | 2021-07-30 | 中铁十二局集团第四工程有限公司 | 一种地铁隧道横通道小盾构施工工艺 |
CN114961739A (zh) * | 2022-05-16 | 2022-08-30 | 中铁五局集团有限公司 | 一种废弃隧道重挖扩挖的施工方法 |
CN115492126A (zh) * | 2022-10-26 | 2022-12-20 | 中国电建集团西北勘测设计研究院有限公司 | 一种钢板桩与竖井组合的基坑支护结构及方法 |
CN116906085A (zh) * | 2023-09-13 | 2023-10-20 | 湖南大学 | 一种深层大型地下结构建造方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061777A (zh) * | 2013-01-18 | 2013-04-24 | 中铁隧道集团有限公司 | 预设加固桩群建立城市地下隧道盾构刀盘修复空间的方法 |
CN104632235A (zh) * | 2015-02-04 | 2015-05-20 | 北京市政建设集团有限责任公司 | 一种用桩拱墙支撑扩挖大直径盾构隧道建地铁车站的方法 |
CN105003272A (zh) * | 2015-07-26 | 2015-10-28 | 北京工业大学 | 一种在地铁区间盾构隧道基础上扩挖车站的逆作施工方法 |
CN107664035A (zh) * | 2017-10-20 | 2018-02-06 | 中国建筑第八工程局有限公司 | 盾构管廊先盾后井的施工方法 |
CN108661655A (zh) * | 2018-05-11 | 2018-10-16 | 中铁四局集团有限公司 | 一种基于马蹄形盾构机的大断面马蹄形土压平衡盾构隧道施工方法 |
CN109026030A (zh) * | 2018-09-10 | 2018-12-18 | 中山大学 | 隧道环向扩挖方法 |
CN110005442A (zh) * | 2019-04-26 | 2019-07-12 | 中铁二十三局集团第六工程有限公司 | 下穿既有建筑城市地下暗挖区间围岩加固工艺 |
CN211038701U (zh) * | 2019-08-16 | 2020-07-17 | 中铁西安勘察设计研究院有限责任公司 | 一种“先盾后井”的矿山法地铁区间风井 |
CN211397646U (zh) * | 2020-01-18 | 2020-09-01 | 王东升 | 一种煤矿采掘过程风水联动喷雾装置 |
-
2020
- 2020-09-16 CN CN202010976422.8A patent/CN112049650B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061777A (zh) * | 2013-01-18 | 2013-04-24 | 中铁隧道集团有限公司 | 预设加固桩群建立城市地下隧道盾构刀盘修复空间的方法 |
CN104632235A (zh) * | 2015-02-04 | 2015-05-20 | 北京市政建设集团有限责任公司 | 一种用桩拱墙支撑扩挖大直径盾构隧道建地铁车站的方法 |
CN105003272A (zh) * | 2015-07-26 | 2015-10-28 | 北京工业大学 | 一种在地铁区间盾构隧道基础上扩挖车站的逆作施工方法 |
CN107664035A (zh) * | 2017-10-20 | 2018-02-06 | 中国建筑第八工程局有限公司 | 盾构管廊先盾后井的施工方法 |
CN108661655A (zh) * | 2018-05-11 | 2018-10-16 | 中铁四局集团有限公司 | 一种基于马蹄形盾构机的大断面马蹄形土压平衡盾构隧道施工方法 |
CN109026030A (zh) * | 2018-09-10 | 2018-12-18 | 中山大学 | 隧道环向扩挖方法 |
CN110005442A (zh) * | 2019-04-26 | 2019-07-12 | 中铁二十三局集团第六工程有限公司 | 下穿既有建筑城市地下暗挖区间围岩加固工艺 |
CN211038701U (zh) * | 2019-08-16 | 2020-07-17 | 中铁西安勘察设计研究院有限责任公司 | 一种“先盾后井”的矿山法地铁区间风井 |
CN211397646U (zh) * | 2020-01-18 | 2020-09-01 | 王东升 | 一种煤矿采掘过程风水联动喷雾装置 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113187491A (zh) * | 2021-05-17 | 2021-07-30 | 中铁十二局集团第四工程有限公司 | 一种地铁隧道横通道小盾构施工工艺 |
CN114961739A (zh) * | 2022-05-16 | 2022-08-30 | 中铁五局集团有限公司 | 一种废弃隧道重挖扩挖的施工方法 |
CN115492126A (zh) * | 2022-10-26 | 2022-12-20 | 中国电建集团西北勘测设计研究院有限公司 | 一种钢板桩与竖井组合的基坑支护结构及方法 |
CN115492126B (zh) * | 2022-10-26 | 2024-07-05 | 中国电建集团西北勘测设计研究院有限公司 | 一种钢板桩与竖井组合的基坑支护结构及方法 |
CN116906085A (zh) * | 2023-09-13 | 2023-10-20 | 湖南大学 | 一种深层大型地下结构建造方法 |
CN116906085B (zh) * | 2023-09-13 | 2023-12-08 | 湖南大学 | 一种深层大型地下结构建造方法 |
Also Published As
Publication number | Publication date |
---|---|
CN112049650B (zh) | 2022-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112049650B (zh) | 一种大盾构扩挖既有小盾构隧道的方法 | |
Cao et al. | Subway station construction using combined shield and shallow tunnelling method: case study of Gaojiayuan station in Beijing | |
CN108868778B (zh) | 一种大型地下结构非开挖修建方法 | |
CN102606167B (zh) | 浅埋暗挖隧道横向注浆导管沉降控制施工方法 | |
CN102606162B (zh) | 隧道软弱围岩浅埋易坍塌区快速施工方法 | |
CN102536273B (zh) | 26m大跨度空间一次成型建造工法 | |
CN102182472B (zh) | 隧道塌方空腔的回填修复方法 | |
CN105525619B (zh) | 一种富水地层暗挖隧道咬合管幕 | |
CN109736827B (zh) | 城市地铁硬岩地层联络通道高压气体膨胀致裂开挖的方法 | |
CN102606168B (zh) | 防止浅埋暗挖隧道开挖时沉降变形的施工方法 | |
CN104763433A (zh) | 上软下硬地层大跨地铁车站暗挖施工方法 | |
CN102071947A (zh) | 大跨度隧道洞口软弱围岩段施工方法 | |
CN106522989A (zh) | 风井结构和盾构掘进平行施工的方法 | |
CN103758123A (zh) | 人工挖孔灌注桩护壁衬的施工方法 | |
CN107190752A (zh) | 一种柔性复合防渗装配式可回收矩形截面排桩支护结构的设计施工方法 | |
CN107401161A (zh) | 管幕法和mjs法联合加固的下穿高铁盾构隧道施工方法 | |
CN113803074A (zh) | 富水砂层人工机械组合清障的隧道结构的施工方法 | |
CN110905536A (zh) | 复杂地层土压盾构在暗挖隧道内接收的施工方法 | |
CN108360528A (zh) | 一种在软土地区超大深基坑施工的支护方法 | |
Qiu et al. | First application of mechanized method using earth pressure balance TBM with large horseshoe-shaped cross section to loess mountain tunnel: A case study of Baicheng tunnel | |
CN104863613B (zh) | 岩质地层暗挖地下结构高边墙锚拉初支结构及施工方法 | |
Guo | A review of metro tunnel construction methods | |
CN205036388U (zh) | 一种四联拱pba暗挖地铁车站的扣拱施工结构 | |
CN215860200U (zh) | 一种分岔隧道全断面注浆开挖支护结构 | |
CN104389609A (zh) | 一种无爆破机械开挖法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211108 Address after: No. 109, East 7th Road, pilot free trade zone (Airport Economic Zone), Binhai New Area, Tianjin Applicant after: CHINA RAILWAY DESIGN Corp. Applicant after: Shenzhen Metro Construction Group Co.,Ltd. Address before: No. 109, East 7th Road, pilot free trade zone (Airport Economic Zone), Binhai New Area, Tianjin Applicant before: CHINA RAILWAY DESIGN Corp. |
|
TA01 | Transfer of patent application right | ||
CB03 | Change of inventor or designer information |
Inventor after: Pan Ye Inventor after: Lv Baowei Inventor after: Zeng Jialiang Inventor after: Gao Xiang Inventor after: Huang Rongji Inventor after: Luo Renbin Inventor after: Li Zhe Inventor after: Li Bo Inventor after: Liu Yunliang Inventor after: Chen Peng Inventor after: Li Hongxia Inventor after: Jia Ke Inventor after: Li Aidong Inventor after: Zhang Jiqing Inventor after: Zhang Zhongan Inventor after: Yu Deyong Inventor after: Sun Zhang Inventor after: Zhang Jian Inventor after: Guo Xianzhao Inventor before: Pan Ye Inventor before: Li Hongxia Inventor before: Zhang Jiqing Inventor before: Li Aidong Inventor before: Guo Xianzhao Inventor before: Lv Baowei Inventor before: Zeng Jialiang Inventor before: Gao Xiang Inventor before: Li Zhe Inventor before: Chen Peng |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |