CN112001013A - Intelligent management system based on BIM model resources - Google Patents

Intelligent management system based on BIM model resources Download PDF

Info

Publication number
CN112001013A
CN112001013A CN202010825167.7A CN202010825167A CN112001013A CN 112001013 A CN112001013 A CN 112001013A CN 202010825167 A CN202010825167 A CN 202010825167A CN 112001013 A CN112001013 A CN 112001013A
Authority
CN
China
Prior art keywords
data
bim model
bim
management system
intelligent management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010825167.7A
Other languages
Chinese (zh)
Inventor
胡权胤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yugou Technology Shanghai Co ltd
Original Assignee
Yugou Technology Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yugou Technology Shanghai Co ltd filed Critical Yugou Technology Shanghai Co ltd
Priority to CN202010825167.7A priority Critical patent/CN112001013A/en
Publication of CN112001013A publication Critical patent/CN112001013A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/254Extract, transform and load [ETL] procedures, e.g. ETL data flows in data warehouses
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/80Information retrieval; Database structures therefor; File system structures therefor of semi-structured data, e.g. markup language structured data such as SGML, XML or HTML
    • G06F16/81Indexing, e.g. XML tags; Data structures therefor; Storage structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Geometry (AREA)
  • Computer Hardware Design (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Computational Mathematics (AREA)
  • Structural Engineering (AREA)
  • Software Systems (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an intelligent management system based on BIM model resources, which relates to the technical field of resource management and is constructed based on a Revit platform, and the system comprises: the data import module is used for acquiring BIM data of the building facilities and operation and maintenance data of the building facilities and generating structural data and semi-structural data of the BIM model; the data processing module is used for analyzing, processing and early warning the structured data and the semi-structured data of the BIM model; and the data application module is used for regulating, planning and managing the BIM model and meeting the requirements on the construction design of the building facilities. According to the intelligent management system based on the BIM model resources, the structured data and the semi-structured data are analyzed and managed, data cooperation and data sharing are carried out on all modules, timely adjustment of a real-time project scheme is facilitated, communication among all parties of the project is facilitated in a data sharing state, and the BIM model can be effectively managed.

Description

Intelligent management system based on BIM model resources
Technical Field
The invention relates to the technical field of resource management, in particular to an intelligent management system based on BIM model resources.
Background
BIM is an abbreviation of Building Information Modeling, which is generally translated into a Building Information model in China, the Building Information model (Building Information Modeling) is established by taking various relevant Information data of a Building engineering project as a model basis, real Information of a Building is simulated through digital Information simulation, the Building Information model has five characteristics of visualization, harmony, simulation, optimization and graphing, data Information of various stages of planning, design, construction, operation and the like is completely contained in a 3D model, so that a worker at any stage in the whole life cycle of the Building can make effective and correct decisions according to accurate and complete data when using the model, specific methods and practical contents of implementation standards of a design enterprise are given from three basic dimensions of resources, behaviors and delivery in the BIM design process, and the BIM (Building Information model) is not simple to integrate digital Information, but a digital information application, and can be used for a digital method for designing, building and managing, the method supports the integrated management environment of the construction engineering, can obviously improve the efficiency of the construction engineering in the whole process and greatly reduce the risk
In the prior art, an intelligent management system of BIM model resources lacks automatic planning and optimization processing functions, is inconvenient for communication among all parties, and causes low management and use efficiency of the intelligent management system, so that an intelligent management system based on BIM model resources is provided to solve the problems.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides an intelligent management system based on BIM model resources, which aims to solve the problems in the background art.
In order to achieve the purpose, the invention provides the following technical scheme: an intelligent management system based on BIM model resources, which is based on a Revit platform for architecture, the system comprises:
the data import module is used for acquiring BIM data of the building facilities and operation and maintenance data of the building facilities and generating structural data and semi-structural data of the BIM model;
the data processing module is used for analyzing, processing and early warning the structured data and the semi-structured data of the BIM model;
the data application module is used for regulating, planning and managing the BIM model and requiring the construction design of building facilities;
the data management module is used for updating the BIM according to the construction progress information of the building facilities and analyzing information to be constructed of the building facilities according to the parameter information derived by the BIM;
the data docking module is used for docking the parameter information derived by the BIM with a platform application layer of an intelligent management system of BIM model resources to realize real-time input and output of information;
and the data storage module is used for uploading the BIM model parameters of the building facilities to the cloud server and storing the BIM model parameters for the construction management party, the purchasing department and the project department to call and use.
Further optimizing the technical scheme, the analysis of the data processing module on the structured data and the semi-structured data comprises providing background support for the building facilities, and performing data cooperation and data sharing on each module.
Further optimizing the technical scheme, the processing of the data processing module on the structured data and the semi-structured data comprises model optimization on a building facility model, so that the design optimization is carried out on the whole project, and the project quantity of the project is calculated based on the BIM model of the project.
Further optimizing the technical scheme, the early warning of the data processing module on the structured data and the semi-structured data comprises the steps of carrying out collision check on members and nodes in the model of the building facility, optimizing and early warning the project, and reminding a manager of knowing about the possibility of errors and rework existing in the construction stage of the building.
Further optimizing the technical scheme, the data application module carries out macroscopic regulation and planning on the cost budget and market resource statistics of the building facilities, and manages and monitors the budget and the construction period of the current construction stage in real time.
Further optimize this technical scheme, data synchronization is carried out with the platform application layer to data butt joint module, carries out notice, dynamic information, information inquiry, overhaul and maintenance, equipment are patrolled and examined, daily management, early warning are reminded, the database to the constructor, realizes that the instruction is uploaded and issues.
Further optimizing the technical scheme, the BIM model parameters comprise the structure composition, the material composition, the progress data and the schedule relation data of the building facilities, and are used for generating a project schedule plan for the project according to the schedule relation, and purchasing equipment according to the progress data and the structure composition of the building facilities, wherein the material composition is purchased and recorded into the system.
Compared with the prior art, the invention provides an intelligent management system based on BIM model resources, which has the following beneficial effects:
according to the intelligent management system based on the BIM model resources, the structured data and the semi-structured data are analyzed and managed, data cooperation and data sharing are carried out on all modules, timely adjustment of a real-time project scheme is facilitated, communication among all parties of the project is facilitated in the data sharing state, the BIM model can be effectively managed, and the pipeline and the use efficiency of the intelligent management system based on the BIM model resources are improved.
Drawings
Fig. 1 is a schematic structural diagram of an intelligent management system based on BIM model resources according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1, an intelligent management system based on BIM model resources is configured based on a Revit platform, and includes:
the data import module is used for acquiring BIM data of the building facilities and operation and maintenance data of the building facilities and generating structural data and semi-structural data of the BIM model;
the data processing module is used for analyzing, processing and early warning the structured data and the semi-structured data of the BIM model;
the data application module is used for regulating, planning and managing the BIM model and requiring the construction design of building facilities;
the data management module is used for updating the BIM according to the construction progress information of the building facilities and analyzing information to be constructed of the building facilities according to the parameter information derived by the BIM;
the data docking module is used for docking the parameter information derived by the BIM with a platform application layer of an intelligent management system of BIM model resources to realize real-time input and output of information;
and the data storage module is used for uploading the BIM model parameters of the building facilities to the cloud server and storing the BIM model parameters for the construction management party, the purchasing department and the project department to call and use.
The intelligent management system needs to be designed by combining with hardware configured as follows, wherein the hardware configuration needs a CPU processor of Intel i 77700K or more, an 8G double-channel DDR4 memory or more, an Intel HM65 mainboard chip or more, a 500G SATA 3.0 hard disk or more and an integrated graphics card carried in the CPU.
As an implementation manner of this embodiment, the analyzing of the structured data and the semi-structured data by the data processing module includes providing a background support for the building facility, and performing data collaboration and data sharing on each module.
As an implementation manner of this embodiment, the processing of the structured data and the semi-structured data by the data processing module includes performing model optimization on a building facility model, so as to perform design optimization on the whole project, and calculating the project amount of the project based on the BIM model of the project.
As an implementation manner of this embodiment, the early warning of the structured data and the semi-structured data by the data processing module includes performing collision check on members and nodes in a model of a building facility, optimizing and early warning a project, and reminding a manager of knowing the possibility of errors and rework existing in the building construction stage.
As an implementation manner of this embodiment, the data application module performs macroscopic regulation and planning on the cost budget and market resource statistics of the building facility, and manages and monitors the budget and the construction period of the current construction stage in real time.
As an implementation manner of this embodiment, the data docking module performs data synchronization with the platform application layer, and performs notification, dynamic information, information query, overhaul and maintenance, equipment inspection, daily management, early warning and reminding, and a database to the constructor, thereby implementing instruction uploading and issuing.
As an implementation manner of this embodiment, the model parameters of the BIM include a structure composition, a material composition, progress data, and schedule relationship data of the building facility, and are used to generate a project schedule plan for the project according to the schedule relationship, and perform equipment purchase for the purchase according to the progress data and the structure composition of the building facility, and the material composition is entered into the system.
Example two:
an intelligent management system based on BIM model resources, which is based on a Revit platform for architecture, the system comprises:
the data import module is used for acquiring BIM data of the building facilities and operation and maintenance data of the building facilities and generating structural data and semi-structural data of the BIM model;
the data processing module is used for analyzing, processing and early warning the structured data and the semi-structured data of the BIM model;
the data application module is used for regulating, planning and managing the BIM model and requiring the construction design of building facilities;
the data management module is used for updating the BIM according to the construction progress information of the building facilities and analyzing information to be constructed of the building facilities according to the parameter information derived by the BIM;
the data docking module is used for docking the parameter information derived by the BIM with a platform application layer of an intelligent management system of BIM model resources to realize real-time input and output of information;
and the data storage module is used for uploading the BIM model parameters of the building facilities to the cloud server and storing the BIM model parameters for the construction management party, the purchasing department and the project department to call and use.
The intelligent management system is designed by combining the following configured hardware, and the hardware configuration needs a CPU processor of Intel i 59400F or more, a 4G DDR4 memory or more, an Intel HM65 mainboard chip or more, a 500G SATA 3.0 hard disk or more and an integrated graphics card carried by the CPU.
As an implementation manner of this embodiment, the analyzing of the structured data and the semi-structured data by the data processing module includes providing a background support for the building facility, and performing data collaboration and data sharing on each module.
As an implementation manner of this embodiment, the processing of the structured data and the semi-structured data by the data processing module includes performing model optimization on a building facility model, so as to perform design optimization on the whole project, and calculating the project amount of the project based on the BIM model of the project.
As an implementation manner of this embodiment, the early warning of the structured data and the semi-structured data by the data processing module includes performing collision check on members and nodes in a model of a building facility, optimizing and early warning a project, and reminding a manager of knowing the possibility of errors and rework existing in the building construction stage.
As an implementation manner of this embodiment, the data application module performs macroscopic regulation and planning on the cost budget and market resource statistics of the building facility, and manages and monitors the budget and the construction period of the current construction stage in real time.
As an implementation manner of this embodiment, the data docking module performs data synchronization with the platform application layer, and performs notification, dynamic information, information query, overhaul and maintenance, equipment inspection, daily management, early warning and reminding, and a database to the constructor, thereby implementing instruction uploading and issuing.
As an implementation manner of this embodiment, the model parameters of the BIM include a structure composition, a material composition, progress data, and schedule relationship data of the building facility, and are used to generate a project schedule plan for the project according to the schedule relationship, and perform equipment purchase for the purchase according to the progress data and the structure composition of the building facility, and the material composition is entered into the system.
The invention has the beneficial effects that: according to the intelligent management system based on the BIM model resources, the structured data and the semi-structured data are analyzed and managed, data cooperation and data sharing are carried out on all modules, timely adjustment of a real-time project scheme is facilitated, communication among all parties of the project is facilitated in the data sharing state, the BIM model can be effectively managed, and the pipeline and the use efficiency of the intelligent management system based on the BIM model resources are improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. An intelligent management system based on BIM model resources, which is based on a Revit platform for architecture, is characterized in that the system comprises:
the data import module is used for acquiring BIM data of the building facilities and operation and maintenance data of the building facilities and generating structural data and semi-structural data of the BIM model;
the data processing module is used for analyzing, processing and early warning the structured data and the semi-structured data of the BIM model;
the data application module is used for regulating, planning and managing the BIM model and requiring the construction design of building facilities;
the data management module is used for updating the BIM according to the construction progress information of the building facilities and analyzing information to be constructed of the building facilities according to the parameter information derived by the BIM;
the data docking module is used for docking the parameter information derived by the BIM with a platform application layer of an intelligent management system of BIM model resources to realize real-time input and output of information;
and the data storage module is used for uploading the BIM model parameters of the building facilities to the cloud server and storing the BIM model parameters for the construction management party, the purchasing department and the project department to call and use.
2. The BIM model resource-based intelligent management system of claim 1, wherein the analysis of the structured data and the semi-structured data by the data processing module comprises providing a background support for the building facility, and performing data collaboration and data sharing on the modules.
3. The intelligent management system based on BIM model resources of claim 1, wherein the processing of the structured data and the semi-structured data by the data processing module comprises model optimization of a construction facility model, so as to design and optimize the whole project, and calculate the project amount of the project based on the BIM model of the project.
4. The BIM model resource-based intelligent management system of claim 1, wherein the pre-warning of the structured data and the semi-structured data by the data processing module comprises collision check of members and nodes in the model of the building facilities, optimization and pre-warning of projects, and reminding a manager of the possibility of errors and rework existing in the construction stage of the building.
5. The intelligent management system based on BIM model resources as claimed in claim 1, wherein the data application module macroscopically regulates, controls and plans the cost budget of the building facilities and the market resource statistics, and manages and monitors the budget and the construction period of the current construction stage in real time.
6. The BIM model resource-based intelligent management system of claim 1, wherein the data docking module synchronizes data with the platform application layer, and performs notification, dynamic information, information query, overhaul and maintenance, equipment inspection, daily management, early warning and reminding, and data base on a constructor, thereby realizing instruction uploading and issuing.
7. The intelligent management system based on BIM model resources of claim 1, wherein the BIM model parameters include structure composition, material composition, progress data and schedule relation data of the building facilities, and are used for generating project schedule plan according to schedule relation for project, and purchasing equipment according to the progress data and the structure composition of the building facilities, and the material composition is purchased and recorded into the system.
CN202010825167.7A 2020-08-17 2020-08-17 Intelligent management system based on BIM model resources Pending CN112001013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010825167.7A CN112001013A (en) 2020-08-17 2020-08-17 Intelligent management system based on BIM model resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010825167.7A CN112001013A (en) 2020-08-17 2020-08-17 Intelligent management system based on BIM model resources

Publications (1)

Publication Number Publication Date
CN112001013A true CN112001013A (en) 2020-11-27

Family

ID=73473898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010825167.7A Pending CN112001013A (en) 2020-08-17 2020-08-17 Intelligent management system based on BIM model resources

Country Status (1)

Country Link
CN (1) CN112001013A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114037403A (en) * 2021-10-15 2022-02-11 中邮通建设咨询有限公司 Method for efficiently sharing and managing light BIM data
WO2022222432A1 (en) * 2021-04-22 2022-10-27 中交第四公路工程局有限公司 Bim-based dynamic and intelligent building lifecycle management system and method
CN116069834A (en) * 2023-03-07 2023-05-05 武汉东方赛思软件股份有限公司 BIM technology-based enterprise data visual management method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203784A (en) * 2016-06-29 2016-12-07 江苏三棱智慧物联发展股份有限公司 A kind of wisdom building system based on BIM and management method thereof
CN108280578A (en) * 2018-01-23 2018-07-13 十九冶成都建设有限公司 A kind of construction project administration system and method
CN108876287A (en) * 2018-05-29 2018-11-23 杭州众软信息技术有限公司 data management system based on BIM
CN111192093A (en) * 2020-01-04 2020-05-22 重庆西恒工程咨询有限公司 Engineering cost management system based on BIM

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203784A (en) * 2016-06-29 2016-12-07 江苏三棱智慧物联发展股份有限公司 A kind of wisdom building system based on BIM and management method thereof
CN108280578A (en) * 2018-01-23 2018-07-13 十九冶成都建设有限公司 A kind of construction project administration system and method
CN108876287A (en) * 2018-05-29 2018-11-23 杭州众软信息技术有限公司 data management system based on BIM
CN111192093A (en) * 2020-01-04 2020-05-22 重庆西恒工程咨询有限公司 Engineering cost management system based on BIM

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022222432A1 (en) * 2021-04-22 2022-10-27 中交第四公路工程局有限公司 Bim-based dynamic and intelligent building lifecycle management system and method
CN114037403A (en) * 2021-10-15 2022-02-11 中邮通建设咨询有限公司 Method for efficiently sharing and managing light BIM data
CN116069834A (en) * 2023-03-07 2023-05-05 武汉东方赛思软件股份有限公司 BIM technology-based enterprise data visual management method

Similar Documents

Publication Publication Date Title
Zhuang et al. Digital twin-based assembly data management and process traceability for complex products
CN112001013A (en) Intelligent management system based on BIM model resources
Aleksandrova et al. Digital technology and quality management
CN111369158A (en) BIM-based informatization quality management method and system
CN105447627A (en) Design review process management and control mode research method
CN102903063A (en) Integral electricity market operation system
CN112488654B (en) Electric power material design integrated intelligent cooperation method and device
Syreyshchikova et al. Automation of Production Activities of an Industrial Enterprise based on the ERP System
CN111651818A (en) BIM model rapid change method
CN113822585A (en) Intelligent smelting factory informatization management system
Ahmed et al. A comparison of three simulation methodologies for a Lean Six Sigma manufacturing project–a business case study
Gramelsberger et al. Enabling informed sustainability decisions: sustainability assessment in iterative system modeling
CN202795451U (en) Asset entire life-cycle management process control application system based on topic base
Pan et al. Manufacturing Execution System present situation and development trend analysis
Ildarkhanova et al. The development of the innovative component in the project design and technological preparation of production in instrument engineering
CN108763805B (en) BIM-based plan management system and method
Šitova et al. A concept of simulation-based SC performance analysis using SCOR metrics
Lédée et al. EcoDynElec: Open Python package to create historical profiles of environmental impacts from regional electricity mixes
Marchuk et al. Integrated logistics support for the life cycle of building objects
CN106169118A (en) Power marketing industry expands negative inventory management application process
Cui et al. Application research of intelligent system based on BIM and sensors monitoring technology in construction management
Yi et al. Architecture of digital integrated R & D platform for military research institutes
CN110689263A (en) River channel quality management and control system based on BIM technology
CN117391623A (en) Modularized intelligent construction management system
Larionov Aspects of digitalization of the management system in the course of implementation of housing investment and housing projects

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201127

RJ01 Rejection of invention patent application after publication