CN111982454B - 一种用于颤振风洞试验的阻拦网防护系统及其防护方法 - Google Patents
一种用于颤振风洞试验的阻拦网防护系统及其防护方法 Download PDFInfo
- Publication number
- CN111982454B CN111982454B CN202010881898.3A CN202010881898A CN111982454B CN 111982454 B CN111982454 B CN 111982454B CN 202010881898 A CN202010881898 A CN 202010881898A CN 111982454 B CN111982454 B CN 111982454B
- Authority
- CN
- China
- Prior art keywords
- barrier net
- wind tunnel
- net
- test
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M9/00—Aerodynamic testing; Arrangements in or on wind tunnels
- G01M9/02—Wind tunnels
- G01M9/04—Details
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M9/00—Aerodynamic testing; Arrangements in or on wind tunnels
- G01M9/06—Measuring arrangements specially adapted for aerodynamic testing
Landscapes
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- General Physics & Mathematics (AREA)
- Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
Abstract
本发明公开了一种用于颤振风洞试验的阻拦网防护系统及其防护方法。该保护系统包括分布在试验段后部沿风洞轴线前后排列的阻拦网Ⅰ和阻拦网Ⅱ;阻拦网Ⅰ的网格为均匀分布的边长为L的正方形网格,阻拦网Ⅰ通过框架固定在试验段后部;阻拦网Ⅱ具有与阻拦网Ⅰ的网格相同的正方形网格,阻拦网Ⅱ的顶边与阻拦网Ⅰ的顶边平齐,阻拦网Ⅱ的底边悬空,阻拦网Ⅱ的最下方网格高度为0.5L,阻拦网Ⅱ的两侧边安装在竖直滑轨上,阻拦网Ⅱ与竖直滑轨之间装卡有插销,阻拦网Ⅱ沿滑轨的竖直滑动距离为0.5L,插销的做动机构与风洞测控系统连接。该保护方法中,插销接收触发信号马上弹出,阻拦网Ⅱ下落,竖直方向加密网格,阻挡试验模型的飞落部件,保护风洞。
Description
技术领域
本发明属于风洞试验领域,具体涉及一种用于颤振风洞试验的阻拦网防护系统及其防护方法。
背景技术
颤振风洞试验是一种风险系数较高的非定常试验,试验模型通常为动力学相似的复合材料试验模型,在颤振风洞试验中,试验模型很可能发生颤振或者疲劳损坏,损坏的试验模型部件在高速气流的带动下产生巨大的动能,飞落部件撞击风洞,很可能会损坏风洞设备。
当前,亟需发展一种用于颤振风洞试验的阻拦网防护系统及其防护方法。
发明内容
本发明所要解决的一个技术问题是提供一种用于颤振风洞试验的阻拦网防护系统,本发明所要解决的另一个技术问题是提供一种用于颤振风洞试验的阻拦网防护方法。
本发明的用于颤振风洞试验的阻拦网防护系统,其特点是,所述的阻拦网防护系统包括分布在试验段后部沿风洞轴线前后排列的阻拦网Ⅰ和阻拦网Ⅱ;阻拦网Ⅰ的网格为均匀分布的边长为L的正方形网格,阻拦网Ⅰ通过框架固定在试验段后部;阻拦网Ⅱ具有与阻拦网Ⅰ的网格相同的正方形网格,阻拦网Ⅱ的顶边与阻拦网Ⅰ的顶边平齐,阻拦网Ⅱ的底边悬空,阻拦网Ⅱ的最下方网格高度为0.5L,阻拦网Ⅱ的两侧边安装在竖直滑轨上,阻拦网Ⅱ与竖直滑轨之间装卡有插销,阻拦网Ⅱ沿滑轨的竖直滑动距离为0.5L,插销的做动机构与风洞测控系统连接。
进一步地,所述的阻拦网Ⅰ和阻拦网Ⅱ的材质为不锈钢。
进一步地,所述的正方形网格的边长L与试验段高度H之比为(0.05~0.1):1。
本发明的用于颤振风洞试验的阻拦网防护方法包括以下步骤:
a.试验模型安装在试验段中,通过插销固定阻拦网Ⅱ,阻拦网Ⅱ的底边悬空,悬空高度为0.5L,插销的做动机构与风洞测控系统连接;
b.开启风洞,进行颤振风洞试验;
c.颤振风洞试验过程中,风洞测控系统实时采集试验模型内部的加速度计信号和应变计信号,监控试验模型的振动情况,当加速度计信号和应变计信号显示试验模型达到了颤振状态,则风洞测控系统同时发送触发信号给插销的做动机构和风洞关车系统,插销的做动机构收到触发信号后马上弹出插销,阻拦网Ⅱ在重力的作用下沿竖直滑轨下落0.5L,在竖直方向加密网格,阻拦可能发散损坏的试验模型部件,风洞关车系统随后关车;
d.颤振风洞试验完成,阻拦网Ⅰ和阻拦网Ⅱ复位。
本发明的用于颤振风洞试验的阻拦网防护系统结构简单,防护方法便捷可靠,响应时间短,能够方便回收颤振风洞试验的试验模型运动发散后的飞落部件,对于暂冲式风洞能够保护风洞洞壁,对于连续式风洞还能够保护风洞的核心部件压缩机等风洞设备。
附图说明
图1为本发明的用于颤振风洞试验的阻拦网防护系统中的阻拦网Ⅰ;
图2为本发明的用于颤振风洞试验的阻拦网防护系统中的阻拦网Ⅱ;
图3为本发明的用于颤振风洞试验的阻拦网防护系统的备用状态;
图4为本发明的用于颤振风洞试验的阻拦网防护系统的保护状态。
具体实施方式
下面结合附图和实施例详细说明本发明。
本发明的用于颤振风洞试验的阻拦网防护系统包括分布在试验段后部沿风洞轴线前后排列的阻拦网Ⅰ和阻拦网Ⅱ;如图1所示,阻拦网Ⅰ的网格为均匀分布的边长为L的正方形网格,阻拦网Ⅰ通过框架固定在试验段后部;如图2所示,阻拦网Ⅱ具有与阻拦网Ⅰ的网格相同的正方形网格,阻拦网Ⅱ的顶边与阻拦网Ⅰ的顶边平齐,阻拦网Ⅱ的底边悬空,阻拦网Ⅱ的最下方网格高度为0.5L,阻拦网Ⅱ的两侧边安装在竖直滑轨上,阻拦网Ⅱ与竖直滑轨之间装卡有插销,阻拦网Ⅱ沿滑轨的竖直滑动距离为0.5L,插销的做动机构与风洞测控系统连接。
进一步地,所述的阻拦网Ⅰ和阻拦网Ⅱ的材质为不锈钢。
进一步地,所述的正方形网格的边长L与试验段高度H之比为(0.05~0.1):1。
本发明的用于颤振风洞试验的阻拦网防护方法包括以下步骤:
a.试验模型安装在试验段中,通过插销固定阻拦网Ⅱ,阻拦网Ⅱ的底边悬空,悬空高度为0.5L,插销的做动机构与风洞测控系统连接,备用状态见图3;
b.开启风洞,进行颤振风洞试验;
c.颤振风洞试验过程中,风洞测控系统实时采集试验模型内部的加速度计信号和应变计信号,监控试验模型的振动情况,当加速度计信号和应变计信号显示试验模型达到了颤振状态,则风洞测控系统同时发送触发信号给插销的做动机构和风洞关车系统,插销的做动机构收到触发信号后马上弹出插销,阻拦网Ⅱ在重力的作用下沿竖直滑轨下落0.5L,在竖直方向加密网格,阻拦可能发散损坏的试验模型部件,风洞关车系统随后关车;
d.颤振风洞试验完成,阻拦网Ⅰ和阻拦网Ⅱ复位。
Claims (2)
1.一种用于颤振风洞试验的阻拦网防护系统,其特征在于,所述的阻拦网防护系统包括分布在试验段后部沿风洞轴线前后排列的阻拦网Ⅰ和阻拦网Ⅱ;阻拦网Ⅰ的网格为均匀分布的边长为L的正方形网格,阻拦网Ⅰ通过框架固定在试验段后部;阻拦网Ⅱ具有与阻拦网Ⅰ的网格相同的正方形网格,阻拦网Ⅱ的顶边与阻拦网Ⅰ的顶边平齐,阻拦网Ⅱ的底边悬空,阻拦网Ⅱ的最下方网格高度为0.5L,阻拦网Ⅱ的两侧边安装在竖直滑轨上,阻拦网Ⅱ与竖直滑轨之间装卡有插销,阻拦网Ⅱ沿滑轨的竖直滑动距离为0.5L,插销的做动机构与风洞测控系统连接;
所述的正方形网格的边长L与试验段高度H之比为(0.05~0.1):1;
用于颤振风洞试验的阻拦网防护系统的防护方法,包括以下步骤:
a.试验模型安装在试验段中,通过插销固定阻拦网Ⅱ,阻拦网Ⅱ的底边悬空,悬空高度为0.5L,插销的做动机构与风洞测控系统连接;
b.开启风洞,进行颤振风洞试验;
c.颤振风洞试验过程中,风洞测控系统实时采集试验模型内部的加速度计信号和应变计信号,监控试验模型的振动情况,当加速度计信号和应变计信号显示试验模型达到了颤振状态,则风洞测控系统同时发送触发信号给插销的做动机构和风洞关车系统,插销的做动机构收到触发信号后马上弹出插销,阻拦网Ⅱ在重力的作用下沿竖直滑轨下落0.5L,在竖直方向加密网格,阻拦可能发散损坏的试验模型部件,风洞关车系统随后关车;
d.颤振风洞试验完成,阻拦网Ⅰ和阻拦网Ⅱ复位。
2.根据权利要求1所述的用于颤振风洞试验的阻拦网防护系统,其特征在于,所述的阻拦网Ⅰ和阻拦网Ⅱ的材质为不锈钢。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010881898.3A CN111982454B (zh) | 2020-08-28 | 2020-08-28 | 一种用于颤振风洞试验的阻拦网防护系统及其防护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010881898.3A CN111982454B (zh) | 2020-08-28 | 2020-08-28 | 一种用于颤振风洞试验的阻拦网防护系统及其防护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111982454A CN111982454A (zh) | 2020-11-24 |
CN111982454B true CN111982454B (zh) | 2022-12-23 |
Family
ID=73440759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010881898.3A Active CN111982454B (zh) | 2020-08-28 | 2020-08-28 | 一种用于颤振风洞试验的阻拦网防护系统及其防护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111982454B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115791070B (zh) * | 2023-02-08 | 2023-04-11 | 中国航空工业集团公司沈阳空气动力研究所 | 一种连续式风洞颤振试验安全防护装置 |
CN117782510B (zh) * | 2024-02-28 | 2024-05-14 | 中国航空工业集团公司沈阳空气动力研究所 | 一种连续式风洞模型投放试验的风洞防护装置及防护方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208261249U (zh) * | 2018-04-11 | 2018-12-21 | 山东棉花研究中心 | 一种孔距可调式筛子 |
CN110126875A (zh) * | 2019-06-19 | 2019-08-16 | 安飞 | 阻拦网设备及其煤矿副斜井辅助运输防跑车系统 |
CN110686856A (zh) * | 2019-09-30 | 2020-01-14 | 中国空气动力研究与发展中心低速空气动力研究所 | 直升机2米直径旋翼风洞试验台振动监视、预警及安全保护系统 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4190453B2 (ja) * | 2004-04-19 | 2008-12-03 | 富士重工業株式会社 | 模型・天秤支持装置 |
CN205209727U (zh) * | 2015-11-26 | 2016-05-04 | 中国航空工业集团公司沈阳飞机设计研究所 | 一种防护绳及具有其的风洞颤振试验系统 |
CN108195543A (zh) * | 2017-11-29 | 2018-06-22 | 中国航空工业集团公司沈阳飞机设计研究所 | 一种飞机风洞模型颤振吹风试验系统 |
CN111323199A (zh) * | 2020-03-31 | 2020-06-23 | 杭州佐格通信设备有限公司 | 风洞的碎片拦截机构以及风洞 |
-
2020
- 2020-08-28 CN CN202010881898.3A patent/CN111982454B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208261249U (zh) * | 2018-04-11 | 2018-12-21 | 山东棉花研究中心 | 一种孔距可调式筛子 |
CN110126875A (zh) * | 2019-06-19 | 2019-08-16 | 安飞 | 阻拦网设备及其煤矿副斜井辅助运输防跑车系统 |
CN110686856A (zh) * | 2019-09-30 | 2020-01-14 | 中国空气动力研究与发展中心低速空气动力研究所 | 直升机2米直径旋翼风洞试验台振动监视、预警及安全保护系统 |
Also Published As
Publication number | Publication date |
---|---|
CN111982454A (zh) | 2020-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111982454B (zh) | 一种用于颤振风洞试验的阻拦网防护系统及其防护方法 | |
CN105444975B (zh) | 一种多功能落锤冲击试验装置 | |
Himoto et al. | Transport of disk-shaped firebrands in a turbulent boundary layer | |
CN105133672B (zh) | 一种柔性防护系统动态冲击试验平台 | |
CN106441778B (zh) | 一种记录器碰撞冲击试验系统及试验方法 | |
CN111414659A (zh) | 一种煤矿冲击地压巷道三级吸能支护设计方法 | |
CN112818532A (zh) | 崩塌落石地质灾害中钢筋混凝土桩板墙的动态工程响应测算方法 | |
CN109436371A (zh) | 运输类飞机货舱地板下部结构垂直坠撞试验装置及方法 | |
CN112344811A (zh) | 一种高速飞行体软回收装置 | |
CN104880331A (zh) | 起重机风载模拟测试使用方法 | |
CN209211924U (zh) | 一种建筑施工用安全通道 | |
CN114021248B (zh) | 一种空天飞行器空间碎片撞击风险确定方法 | |
CN108622427A (zh) | 一种无人机防撞保护装置 | |
CN210479068U (zh) | 一种飞机抗冲击测试装置 | |
CN112924305A (zh) | 获取被动桩板拦石墙在崩塌落石地质灾害中动态响应数据的方法 | |
CN209293460U (zh) | 一种绿色高强度安全通道 | |
Bruce et al. | Violent wave overtopping: discharge throw velocities, trajectories and resulting crown deck loading | |
CN202788938U (zh) | 一种矿井防爆门充气式临时替换装置 | |
CN111959811A (zh) | 无人机回收装置 | |
CN218076031U (zh) | 一种高处电力安装防坠装置 | |
CN217203660U (zh) | 一种用于桥梁连续梁挂篮施工底部兜板防护的装置 | |
CN210177958U (zh) | 一种带有自动预警功能的预制装配式建筑防护网 | |
CN209211923U (zh) | 一种建筑施工用电梯口防护装置 | |
CN219821762U (zh) | 一种飞行数据记录器防护装置 | |
CN211596924U (zh) | 一种消防用防撞消防栓 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |