CN111962497A CN202010821187.7A CN202010821187A CN111962497A CN 111962497 A CN111962497 A CN 111962497A CN 202010821187 A CN202010821187 A CN 202010821187A CN 111962497 A CN111962497 A CN 111962497A
Authority
CN
China
Prior art keywords
sand
hose
sand bag
rope
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010821187.7A
Other languages
Chinese (zh)
Other versions
CN111962497B (en
Inventor
陈元雄
陈振春
谢宝坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Xinshuo Landscape Greening Co Ltd
Original Assignee
Fujian Xinshuo Landscape Greening Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Xinshuo Landscape Greening Co Ltd filed Critical Fujian Xinshuo Landscape Greening Co Ltd
Priority to CN202010821187.7A priority Critical patent/CN111962497B/en
Publication of CN111962497A publication Critical patent/CN111962497A/en
Application granted granted Critical
Publication of CN111962497B publication Critical patent/CN111962497B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/106Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by forming sand drains containing only loose aggregates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/103Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by installing wick drains or sand bags

Abstract

The application discloses a foundation reinforcing structure and a reinforcing structure installation method, and relates to the technical field of foundations, wherein the foundation reinforcing structure comprises a sand well arranged in a foundation and a sand bag arranged in the sand well, a cotton rope is sewn at an opening at one end of the sand bag, and the sand bag is tightened by the cotton rope to form a tightening part; the sand bag is characterized by further comprising a hose arranged in the sand well bag, the tightening part is positioned in one end of the hose, and the other end of the hose extends out of the sand bag along the length direction of the sand bag; the pull rope is arranged in the hose, two ends of the pull rope respectively extend out of two ends of the hose, one end of the pull rope penetrates through the tightening part, and a cutter used for cutting the rope is connected with the pull rope; the sand bag cutting device is characterized by further comprising an installation cylinder for installing the cutter, one end, close to the sand bag, of the installation cylinder is clamped with the inner wall of the hose, one end, close to the installation cylinder, of the cotton rope is arranged, and a gap is reserved between the blade and the cotton rope. The application improves the problem of post-construction settlement.

Description

Foundation reinforcing structure and reinforcing structure installation method
Technical Field
The application relates to the technical field of foundations, in particular to a foundation reinforcing structure and a reinforcing structure installation method.
Background
The foundation refers to the portion of the soil body that is subjected to the load of the superstructure. The treatment of the foundation is very important in architecture, the foundation of the building is not good enough, and the superstructure is likely to collapse. The foundation can be consolidated by many methods, such as rolling compaction, dynamic compaction and bagged sand wells. The bagged sand well has the advantages of simple construction, low manufacturing cost and the like.
The prior bagged sand well is shown in figure 7 and comprises a sand well 2 arranged in a foundation 1 and a sand bag 3 vertically arranged in the sand well 2, wherein the sand bag 3 is filled with sand; the upper end part of the sand bag 3 extends out of the sand well 2. When the sand bag 3 is installed in the sand well 2, the sand bag 3 filled with sand is a vertical channel through which free moisture in the sludge permeates and rises to the ground 11, and the soil in the foundation 1 is consolidated after the water in the foundation 1 is continuously discharged, so that the foundation 1 is firmer.
In view of the above-mentioned related technologies, the inventor believes that after the reinforcement treatment of the foundation 1, the sand bag 3 is left in the foundation 1 for about ten meters, so that the difficulty of pulling out the sand bag 3 from the sand well 2 is relatively large. If the sand bags 3 are left in the foundation 1, the drainage consolidation can be continued, and the situation of post-construction settlement exists.
Disclosure of Invention
In order to improve the problem of post-construction settlement, the application provides a foundation reinforcement structure and a reinforcement structure installation method.
In a first aspect, the present application provides a foundation reinforcement structure, which adopts the following technical scheme:
a foundation reinforcing structure comprises a sand well arranged in a foundation and a sand bag arranged in the sand well, wherein sand is filled in the sand bag, a cotton rope is sewn at an opening at one end of the sand bag, and the sand bag is fastened and gathered through the cotton rope to form a fastening part; the sand bag is characterized by further comprising a hose arranged in the sand well bag, the hose is of a hollow structure, the tightening part is located in one end of the hose, and the other end of the hose extends out of the sand bag along the length direction of the sand bag;
the pull rope is arranged in the hose, two ends of the pull rope respectively extend out of two ends of the hose, one end of the pull rope penetrates through the tightening part, and a cutter used for cutting the rope is connected with the pull rope; the sand bag cutting device is characterized by further comprising an installation cylinder for installing the cutter, one end, close to the sand bag, of the installation cylinder is clamped with the inner wall of the hose, one end, close to the installation cylinder, of the cotton rope is arranged, and a gap is reserved between the blade and the cotton rope.
By adopting the technical scheme, when the hose is arranged in the sand bag, the tightening part of the sand bag is positioned in one end of the hose, and the other end of the hose extends out of the sand bag, so that the hose occupies partial space in the sand bag; when the sand bags are installed in the sand well, water in the foundation can be discharged out of the foundation through the vertical channels formed by the sand bags;
after the drainage of the foundation is finished, firstly pulling the pull rope in the hose, driving the cutter in the mounting cylinder to move upwards by the pull rope, and cutting the cotton rope close to the mounting cylinder by the cutter in the upward movement process, so that the bottom of the sand bag is not tied together because of the cotton rope; pulling out a part of the hose with force to separate the hose from the mounting cylinder, enabling sand in the sand bag to flow out from the gap released at the bottom of the sand bag, and pulling out the hose and the pull rope together from the sand bag; when the hose leaves the sand bag, increased the space that the grit was filled, the grit in making the sand bag is in more loose state, the laminating degree between the outer wall of sand bag and the inner wall of sand well reduces, pulling the sand bag this moment, can make the sand bag more smoothly pulled out, when the sand bag is whole pulled out, the sand well in the ground can receive the extrusion and the fault-failure under the effect of soil pressure, vertical drainage channel in the ground is no longer continuous, thereby make drainage function disappear, the problem of having improved post-construction settlement.
Preferably, the cutter includes installation department and two blades of fixed mounting on the installation department, stay cord and installation department fixed connection are and lie in between two blades, set up in the installation section of thick bamboo and be used for supplying the gliding spout of installation department, the opening part of spout is provided with and is used for restricting the outer dog of installation department roll-off spout, when installation department and dog butt, the blade is located outside the installation section of thick bamboo.
Through adopting above-mentioned technical scheme, the stay cord passes through the installation department and stimulates the cutter, and the installation section of thick bamboo leaves the installation section of thick bamboo through dog restriction installation department, and when the pulling stay cord was taken the cutter from the sand pit, the installation section of thick bamboo also can leave together, makes installation section of thick bamboo and cutter can both carry out reuse.
Preferably, one side of the stop block close to the mounting part is fixedly connected with a spring, one end of the spring is abutted to the mounting part, and when the blade is located outside the mounting barrel, the spring is in a compressed state.
Through adopting above-mentioned technical scheme, when upwards dragging the stay cord, need overcome the elasticity of spring, need apply bigger pulling force to the stay cord, when the stay cord that exposes outside the sand pit is not dragged or is slightly dragged, the cutter can keep the distance with the cotton rope betterly.
Preferably, a binding rope is bound between one end of the sand bag far away from the tightening part and the peripheral side of the hose.
By adopting the technical scheme, after the sand bag is filled with sand, the sand bag is bound with the hose through the binding rope, so that a person can conveniently pull the hose out of the sand well.
Preferably, one end of the pull rope, which is far away from the cutter, is connected with a pull ring, the pull ring is sleeved with the outer peripheral side of the hose, the outer peripheral side of the hose is connected with a limit ring, and when the pull ring is abutted against the limit ring, a gap is reserved between the cutter and the wire rope.
Through adopting above-mentioned technical scheme, the stay cord that exposes outside the sand pit passes through the pull ring and is in the same place with the hose cup joint, can play the fixed action to the stay cord, makes the stay cord can be located outside the sand pit all the time, after pull ring and spacing ring butt, leaves the distance between cutter and the cotton rope, only with the pull ring roll-off from the hose and when constantly dragging the pull rope, just can order about the cutter and cut the cotton rope, can prevent to a certain extent that the people from carrying out the maloperation to the pull rope.
Preferably, one side of the limit ring abutted to the pull ring is provided with a threaded hole, the limit ring is in threaded connection with a bolt, and the pull ring is provided with a through hole for the bolt to pass through.
Through adopting above-mentioned technical scheme, after the hose left the installation section of thick bamboo, the breach of sand bag bottom was released just, passes through bolt fixed connection with pull ring and spacing ring together, makes the people just can be with the stay cord outwards pulling together when the pulling hose.
Preferably, a covering cloth for covering the sand bag is arranged on the outer peripheral side of the pull ring.
Through adopting above-mentioned technical scheme, install on the ground when the sand bag, the sand bag has partly to expose ground, needs the people to carry out sun-proof to the sand bag to avoid the sand bag because the ageing that leads to of shining of sunshine, cover cloth and cover the sand bag through installing on the pull ring, can play sun-proof effect to the sand bag better.
In a second aspect, the present application provides a foundation reinforcement structure installation method, comprising the steps of,
s1, penetrating a pull rope into the hose, extending two ends of the pull rope out of two ends of the hose, fixedly connecting one end of the pull rope with a pull ring, and sleeving the pull ring on the hose and abutting against a limiting ring on the hose;
s2, penetrating one end of the hose, far away from the limiting ring, into the hollow sand bag, pulling one end of the pull rope, far away from the pull ring, out of the sand bag, sewing one end of the sand bag by using a thread rope, gathering and tightening, and then inserting the tightened part of the sand bag into the hose;
s3, after the pull rope extending out of the sand bag is fixedly connected with the cutter, the cutter is installed in the installation cylinder, and then the installation cylinder is sleeved in the hose, so that a gap is reserved between the cutter and the thread rope on the sand bag;
s4, filling the sand into the sand bag to ensure that the sand is uniformly filled between the sand bag and the hose;
s5, after the sand filling is finished, binding the opening of the sand bag and the peripheral side of the hose together by using a binding rope, and exposing the limiting ring of the hose out of the sand bag;
s6, after the guide pipe is connected with the precast pile head, the guide pipe is driven into the foundation through a pile driver, and the guide pipe in the foundation forms a sand well after reaching the designed depth;
s7, placing one end of the sand bag mounting cutter into a guide pipe, slowly feeding the sand bag into the guide pipe, slowly pulling out the guide pipe, mounting the sand bag in a sand well to be attached to the inner wall of the sand well to form a vertical drainage channel, and enabling the part of the sand bag bound with the hose to exceed the ground;
s8, after foundation reinforcement is completed, firstly, the pull ring slides out of the hose and pulls the pull rope upwards, and the pull rope drives the cutter to move upwards and cut the pull rope, so that a notch appears at one end of the sand bag;
s9, when the thread rope is cut, pulling out the hose part, when the mounting cylinder is separated from the hose, releasing the gap of the sand bag, and pulling out the hose and the pull rope together, wherein the cutter is pulled out;
s10, after the hose leaves the sand bag, the sand bag has increased accommodating space for sand, so that the sand is in a loose state, and the sand bag is pulled out from the sand well.
By adopting the technical scheme, the pull rope and the hose are arranged in the sand bag, and the hose occupies partial space in the sand bag; when the tightening part is positioned in the hose, the mounting cylinder is sleeved with the inner wall of the hose, the tightening part is fixed in the hose, the thread rope of the tightening part is close to the mounting cylinder, and sand and stone can be filled between the sand bag and the hose; when the sand bag is installed in the sand well, a vertical drainage channel is formed for drainage;
after the foundation reinforcement is handled and is accomplished, pull earlier the stay cord, the stay cord drives the cutter, the cutter can cut the cotton rope, the breach has been formed after the restriction that makes the one end of sand bag do not have the cotton rope, then pull the hose again, make the hose separate with the installation section of thick bamboo, the breach of sand bag also is released, the grit in the sand bag flows out outside the sand bag through the breach part, continue to stimulate hose and stay cord and leave the sand bag, after the sand bag does not have the hose, the accommodation space increase of grit in the sand bag, make the sand bag no longer laminate on the inner wall of sand well, thereby make the sand bag can be pulled out outside the sand well better, after the sand bag left the sand well, the grit in sand well and the sand well received the pressure of ground soil, thereby make vertical drainage channel destroyed, lead to drainage channel's drainage function disappearance, thereby improve the problem of subsiding after the industry.
In summary, the present application includes at least one of the following benefits:
1. the hose occupies partial space in the sand bag, when the hose leaves from the sand bag, the outer wall of the sand bag is not easy to be tightly attached to the sand well, and sand can flow out of the sand bag due to the fact that a notch is formed in one end, located at the bottom of the sand well, of the sand bag, so that people can conveniently pull out the sand bag from the sand well, a drainage structure in a foundation is damaged, and the problem of foundation settlement after construction is solved;
2. through cup jointing of an installation section of thick bamboo and hose together, a certain guard action can be played to the cutter that is located the sand bag to the installation section of thick bamboo, can also fix the portion of tightening of sand bag in the hose, when the cutter was carried to the stay cord, the cutter can cut the cotton rope, makes the bottom of sand bag can form the breach, and the people of being convenient for extracts the sand bag from the sand well.
Drawings
FIG. 1 is a schematic view showing a state where the structure for reinforcing a foundation according to the present embodiment is installed on a foundation;
FIG. 2 is a schematic view showing the structure of the thread of the sand bag according to the embodiment;
FIG. 3 is a schematic view of the entire foundation-reinforcing structure according to the present embodiment;
FIG. 4 is an enlarged schematic view at A of FIG. 3;
FIG. 5 is a schematic view showing the installation structure of the cutter in the embodiment;
FIG. 6 is a schematic structural view of the foundation reinforcement structure of the present embodiment, which is exposed to the outside of the ground;
fig. 7 is a schematic view of a foundation reinforcing structure in the related art.
Description of reference numerals: 1. a foundation; 11. a ground surface; 2. a sand well; 3. a sand bag; 31. a cord; 32. a tightening part; 33. bundling the ropes; 4. a hose; 41. a limiting ring; 5. pulling a rope; 6. a cutter; 61. an installation part; 62. a blade; 7. mounting the cylinder; 71. a chute; 72. a stopper; 73. a spring; 8. a pull ring; 9. a bolt; 10. a covering cloth.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses a foundation reinforcing structure. Referring to fig. 1, the sand bag type sand-filled foundation comprises a sand well 2 arranged on a foundation 1 and a sand bag 3 vertically arranged in the sand well 2, wherein sand is filled in the sand bag 3. When the sand bag 3 is installed in the sand well 2, the sand bag 3 extends partially out of the sand well 2.
Referring to fig. 2, the sand bag 3 is an elongated bag made of a water permeable geotextile. A thread rope 31 is sewn at an opening at one end of the sand bag 3, the thread rope 31 can be made of cotton threads, and one end of the sand bag 3 is fastened and gathered through the thread rope 31 to form a fastening part 32.
Referring to fig. 3, the sand bag further comprises a hose 4 installed in the sand bag 3, wherein the hose 4 is of a hollow structure. The hose 4 may be of plastics material. The tightening part 32 of the sand bag 3 is positioned in one end of the hose 4, and the other end of the hose 4 extends out of the sand bag 3 along the length direction of the sand bag 3. A binding rope 33 is bound between one end of the sand bag 3 away from the binding part 32 and the peripheral side of the hose 4. When the sand bag 3 is filled with sand, the sand is uniformly filled between the hose 4 and the sand bag.
Referring to fig. 3 and 4, the hose further includes a pulling rope 5 installed in the hose 4, the pulling rope 5 may be made of a steel wire rope, and two ends of the pulling rope 5 respectively extend out of two ends of the hose 4. One end of the pull rope 5 passes through the tightening part 32 and is connected with a cutting knife 6 for cutting the wire rope 31, and the pull rope further comprises an installation cylinder 7 for installing the cutting knife 6. One end of the installation cylinder 7 close to the outer wall of the bottom of the sand bag 3 is clamped with the inner wall of the hose 4, so that the tightening part 32 of the sand bag 3 is fixed between the installation cylinder 7 and the hose 4.
Referring to fig. 4, when the mounting tube 7 is snapped into the hose 4, the cord 31 of the binding portion 32 is adjacent to the end of the mounting tube 7. The cutter 6 is located installation section of thick bamboo 7 and leaves the clearance with cotton rope 31, after 3 drainage of sand bag, upwards pulls stay cord 5, can order to drive 6 partial roll-off installation sections of thick bamboo of cutter outside 7 to cut cotton rope 31, thereby the breach appears in the one end that makes sand bag 3.
Referring to fig. 4 and 5, the cutter 6 includes a mounting portion 61 and two blades 62 mounted on the mounting portion 61, and one end of the pull cord 5 is fixedly bound to the mounting portion 61 and positioned between the two blades 62. A sliding groove 71 for sliding the mounting part 61 is formed in the mounting cylinder 7, the cross section of the mounting cylinder 7 is circular, and the cross section of the sliding groove 71 is rectangular. A stopper 72 for limiting the mounting portion 61 from sliding out of the mounting cylinder 7 is provided at the opening of the slide groove 71. A spring 73 is fixedly bonded to the stopper 72 on a side close to the mounting portion 61, and one end of the spring 73 abuts against the mounting portion 61. The spring 73 urges the blade 62 away from the cord 31 by its own elastic force so that the blade 62 does not easily contact the cord 31. When the cord 5 is pulled and the attachment portion 61 is slid into abutment with the stopper 72, the blade 62 contacts the cord 31 and cuts the cord 31.
Referring to fig. 6, one end of the pull rope 5 extending out of the sand well 2 is connected with a pull ring 8, and the inner wall of the pull ring 8 is sleeved with the outer periphery of the hose 4. The hose 4 is fixedly bonded with a limiting ring 41, and the pull ring 8 is sleeved on the hose 4 and is abutted against the limiting ring 41.
Referring to fig. 4 and 6, when the pull ring 8 is sleeved on the hose 4 and abuts against the limiting ring 41, the cutter 6 and the sand bag 3 leave a gap. After the pull ring 8 slides out of the hose 4, the pull rope 5 is pulled continuously, and the pull rope 5 can drive the cutter 6 to slide out of the installation cylinder 7 against the elasticity of the spring 73 to cut the wire rope 31.
Referring to fig. 6, a threaded hole is formed in one side of the limiting ring 41 abutted to the pull ring 8, a bolt 9 is connected to the threaded hole in a threaded manner, and a through hole for the bolt 9 to penetrate through is formed in the pull ring 8. When the bolt 9 penetrates through the pull ring 8 to be in threaded connection with the threaded hole, and the pull ring 8 is fixed on the limiting ring 41, the hose 4 can be pulled out of the sand bag 3, and the pull rope 5 can be taken to leave the sand bag 3 together.
Referring to fig. 6, a covering cloth 10 for covering the sandbag 3 is bonded to the pull ring 8 in the circumferential direction thereof. When the pull ring 8 is sleeved on the hose 4, the sand bag 3 exposed on the ground 11 can be covered by the covering cloth 10, so that the sand bag 3 is prevented from being aged due to direct sunlight.
The implementation principle of a foundation reinforcing structure in the embodiment of the application is as follows:
after the foundation 1 is reinforced, firstly pulling the pull rope 5 to enable the blade 62 to slide out of the mounting cylinder 7 against the elastic force of the spring 73, enabling the blade 62 to be in contact with the line 31 and cutting the line 31, enabling the sand bag 3 to have a gap after the line 31 is cut by the blade 62, pulling the hose 4 upwards, when the hose 4 is separated from the mounting cylinder 7, thereby the gap of the sand bag 3 is released, the sand in the sand bag 3 can flow out from the sand bag 3, after the hose 4 leaves the sand bag 3, the space for accommodating sand and stones in the sand bag 3 is enlarged, so that the sand and stones in the sand bag 3 are in a loose state, the sand bag 3 is not easy to cling to the inner wall of the sand well 2, the sand bag 3 is easy to pull out from the sand well 2, after the sand bag 3 leaves the sand well 2, the sand in the sand well 2 is not easy to form a vertical drainage channel, so that the drainage function of the sand well 2 disappears, and the problem of post-construction settlement is solved.
The embodiment also discloses a foundation reinforcing structure installation method: comprises the following steps of (a) carrying out,
s1, penetrating the pull rope 5 into the hose 4, extending two ends of the pull rope 5 out of two ends of the hose 4, fixedly connecting one end of the pull rope 5 with the pull ring 8, and sleeving the pull ring 8 on the hose 4 and abutting against the limiting ring 41 on the hose 4;
s2, penetrating one end of the hose 4, far away from the limiting ring 41, into the empty sand bag 3, pulling one end of the pull rope 5, far away from the pull ring 8, out of the sand bag 3, sewing and gathering and tightening one end of the sand bag 3 by using the thread rope 31, and then stuffing the tightened part of the sand bag 3 into the hose 4;
s3, fixedly connecting the pull rope 5 extending out of the sand bag 3 with the cutter 6, installing the cutter 6 in the installation cylinder 7, and then sleeving the installation cylinder 7 into the hose 4 to enable a gap to be reserved between the cutter 6 and the thread rope 31 on the sand bag 3;
s4, filling sand into the sand bag 3 to uniformly fill the sand between the sand bag 3 and the hose 4;
s5, after the sand filling is finished, the opening of the sand bag 3 and the peripheral side of the hose 4 are bound together by the binding rope 33, so that the limiting ring 41 of the hose 4 is exposed out of the sand bag 3;
s6, after the guide pipe is connected with the precast pile head, the guide pipe is driven into the foundation 1 through a pile driver, and the guide pipe in the foundation 1 forms a sand well 2 after reaching the designed depth;
s7, placing one end, provided with the cutter 6, of the sand bag 3 into a guide pipe, slowly feeding the sand bag 3 into the guide pipe, and then slowly pulling out the guide pipe, wherein the sand bag 3 is arranged in the sand well 2 and is attached to the inner wall of the sand well 2 to form a vertical drainage channel, and the part, bound by the sand bag 3 and the hose 4, exceeds the ground 11;
s8, after the foundation 1 is reinforced, firstly, the pull ring 8 slides out of the hose 4 and pulls the pull rope 5 upwards, the pull rope 5 drives the cutter 6 to move upwards and cut the line rope 31, and a notch is formed in one end of the sand bag 3;
s9, when the thread rope 31 is cut, pulling out the hose 4, when the installation cylinder 7 is separated from the hose 4, releasing the gap of the sand bag 3, and pulling out the hose 4 and the pull rope 5 together from the sand bag 3, wherein the cutter 6 is also pulled out;
s10, after the hose 4 leaves the sand bag 3, the sand containing space in the sand bag 3 is enlarged, so that the sand is in a loose state, and then the sand bag 3 is pulled out from the sand well 2.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. A foundation stabilization structure, including the sand well (2) of seting up in ground (1) and install sand bag (3) in sand well (2), sand bag (3) intussuseption is filled with sand, characterized in that: a thread rope (31) is sewn at an opening at one end of the sand bag (3), and the sand bag (3) is tightened and gathered through the thread rope (31) to form a tightening part (32); the sand well sand bag further comprises a hose (4) arranged in the sand well (2) bag, the hose (4) is of a hollow structure, the tightening part (32) is positioned in one end of the hose (4), and the other end of the hose (4) extends out of the sand bag (3) along the length direction of the sand bag (3);
the pull rope type wire cutting machine is characterized by further comprising a pull rope (5) arranged in the hose (4), wherein two ends of the pull rope (5) respectively extend out of two ends of the hose (4), one end of the pull rope (5) penetrates through the tightening part (32), and is connected with a cutter (6) used for cutting a wire rope (31); the sand bag cutting device is characterized by further comprising an installation cylinder (7) used for installing the cutter (6), one end, close to the sand bag (3), of the installation cylinder (7) is clamped with the inner wall of the hose (4), the thread rope (31) is arranged at one end, close to the installation cylinder (7), of the thread rope (31), and a gap is reserved between the blade (62) and the thread rope (31).
2. A foundation reinforcement structure as claimed in claim 1, wherein: cutter (6) include installation department (61) and two blades (62) of fixed mounting on installation department (61), stay cord (5) and installation department (61) fixed connection and lie in between two blades (62), set up in installation section of thick bamboo (7) and be used for supplying gliding spout (71) of installation department (61), the opening part of spout (71) is provided with and is used for restricting outside dog (72) of installation department (61) roll-off spout (71), when installation department (61) and dog (72) butt, blade (62) are located outside installation section of thick bamboo (7).
3. A foundation reinforcement structure as claimed in claim 2, wherein: one side fixedly connected with spring (73) that dog (72) are close to installation department (61), the one end and the installation department (61) butt of spring (73), when blade (62) are located installation section of thick bamboo (7) outside, spring (73) are in compression state.
4. A foundation reinforcement structure as claimed in claim 1, wherein: a binding rope (33) is bound between one end of the sand bag (3) far away from the binding part (32) and the peripheral side of the hose (4).
5. A foundation reinforcement structure according to claim 4, characterized in that: one end, far away from the cutter (6), of the pull rope (5) is connected with a pull ring (8), the pull ring (8) is sleeved with the outer peripheral side of the hose (4), a limiting ring (41) is connected to the outer peripheral side of the hose (4), and when the pull ring (8) is abutted to the limiting ring (41), a gap is reserved between the cutter (6) and the wire rope (31).
6. A foundation reinforcement structure as claimed in claim 5, wherein: one side of the limit ring (41) abutted against the pull ring (8) is provided with a threaded hole, the limit ring (41) is in threaded connection with a bolt (9), and the pull ring (8) is provided with a through hole for the bolt (9) to pass through.
7. A foundation reinforcement structure as claimed in claim 6, wherein: and the outer peripheral side of the pull ring (8) is provided with a covering cloth (10) for covering the sand bag (3).
8. A method for installing a foundation reinforcing structure is characterized by comprising the following steps,
s1, penetrating the pull rope (5) into the hose (4), extending two ends of the pull rope (5) out of two ends of the hose (4), fixedly connecting one end of the pull rope (5) with the pull ring (8), sleeving the pull ring (8) on the hose (4) and abutting against the limiting ring (41) on the hose (4);
s2, penetrating one end, far away from the limiting ring (41), of the hose (4) into the empty sand bag (3), pulling one end, far away from the pull ring (8), of the pull rope (5) to the outside of the sand bag (3), sewing one end of the sand bag (3) by using the thread rope (31), gathering and tightening, and then stuffing the tightened part of the sand bag (3) into the hose (4);
s3, fixedly connecting the pull rope (5) extending out of the sand bag (3) with the cutter (6), installing the cutter (6) in the installation cylinder (7), and then sleeving the installation cylinder (7) into the hose (4) to enable a gap to be reserved between the cutter (6) and the wire rope (31) on the sand bag (3);
s4, filling sand into the sand bag (3) to uniformly fill the sand between the sand bag (3) and the hose (4);
s5, after the sand filling is finished, the opening of the sand bag (3) and the peripheral side of the hose (4) are bound together by a binding rope (33), so that the limiting ring (41) of the hose (4) is exposed out of the sand bag (3);
s6, after the guide pipe is connected with the precast pile head, the guide pipe is driven into the foundation (1) through a pile driver, and the guide pipe in the foundation (1) forms a sand well (2) after reaching the designed depth;
s7, placing one end, provided with the cutter (6), of the sand bag (3) into a guide pipe, slowly feeding the sand bag (3) into the guide pipe, slowly pulling out the guide pipe, installing the sand bag (3) in the sand well (2) to be attached to the inner wall of the sand well (2) to form a vertical drainage channel, and enabling the part, bound with the hose (4), of the sand bag (3) to exceed the ground (11);
s8, after the foundation (1) is reinforced, firstly, the pull ring (8) slides out of the hose (4) and pulls the pull rope (5) upwards, the pull rope (5) drives the cutter (6) to move upwards and cut the rope (31), and a notch is formed in one end of the sand bag (3);
s9, when the thread rope (31) is cut, pulling out the hose (4) partially, when the mounting cylinder (7) is separated from the hose (4), releasing the notch of the sand bag (3), pulling the hose (4) and the pull rope (5) out of the sand bag (3) together, and pulling out the cutter (6);
s10, after the hose (4) leaves the sand bag (3), the sand-stone containing space in the sand bag (3) is enlarged, so that the sand-stone is in a loose state, and then the sand bag (3) is pulled out from the sand well (2).
CN202010821187.7A 2020-08-14 2020-08-14 Foundation reinforcing structure and reinforcing structure installation method Active CN111962497B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010821187.7A CN111962497B (en) 2020-08-14 2020-08-14 Foundation reinforcing structure and reinforcing structure installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010821187.7A CN111962497B (en) 2020-08-14 2020-08-14 Foundation reinforcing structure and reinforcing structure installation method

Publications (2)

Publication Number Publication Date
CN111962497A true CN111962497A (en) 2020-11-20
CN111962497B CN111962497B (en) 2021-07-27

Family

ID=73388963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010821187.7A Active CN111962497B (en) 2020-08-14 2020-08-14 Foundation reinforcing structure and reinforcing structure installation method

Country Status (1)

Country Link
CN (1) CN111962497B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4451175A (en) * 1982-02-05 1984-05-29 Teijin Limited Method for improving soft ground by sand drain method and cylindrical bag for use in same
CN104652408A (en) * 2015-02-13 2015-05-27 福建省建专岩土工程有限公司 Strip-shaped sand bag pile and construction method thereof
CN106498923A (en) * 2016-12-15 2017-03-15 邓亚光 Consolidation sand filling bag composite pile system and its construction method from after draining
CN107287999A (en) * 2017-06-09 2017-10-24 中国铁建大桥工程局集团有限公司 Rigid pile composite foundation united drainage consolidation reinforces highway soft soil ground construction
CN107630449A (en) * 2017-08-17 2018-01-26 中山大学 A kind of degradable sand wick
CN210395308U (en) * 2019-08-01 2020-04-24 中化明达(福建)地质勘测有限公司 Plug board structure of plastic drainage board

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4451175A (en) * 1982-02-05 1984-05-29 Teijin Limited Method for improving soft ground by sand drain method and cylindrical bag for use in same
CN104652408A (en) * 2015-02-13 2015-05-27 福建省建专岩土工程有限公司 Strip-shaped sand bag pile and construction method thereof
CN106498923A (en) * 2016-12-15 2017-03-15 邓亚光 Consolidation sand filling bag composite pile system and its construction method from after draining
CN107287999A (en) * 2017-06-09 2017-10-24 中国铁建大桥工程局集团有限公司 Rigid pile composite foundation united drainage consolidation reinforces highway soft soil ground construction
CN107630449A (en) * 2017-08-17 2018-01-26 中山大学 A kind of degradable sand wick
CN210395308U (en) * 2019-08-01 2020-04-24 中化明达(福建)地质勘测有限公司 Plug board structure of plastic drainage board

Also Published As

Publication number Publication date
CN111962497B (en) 2021-07-27

Similar Documents

Publication Publication Date Title
CN108442365B (en) Anti-blocking reinforced permeable pile and construction method
US10167606B2 (en) Method and apparatus for stabilising a dike
CA3013981C (en) Fiber block system
CN111962497B (en) Foundation reinforcing structure and reinforcing structure installation method
CN111173006B (en) Ecological slope protection method for reinforcing hilly soil by combining permeable retaining wall and sounding type bar planting belt
JP4707001B2 (en) Improvement method of vacuum consolidation of soft ground mixed with permeable layer
CN106194213B (en) A kind of shed hole structure and construction method across debris flow gully
JP6370645B2 (en) Slope stabilization method for seismic and rainproof measures of earth structures by using pressure injection type rod-shaped reinforcements
CN114737521B (en) Environment-friendly ecological slope protection structure and construction method thereof
CN113186950B (en) Ecological protection construction method for high fill slope
KR20090032599A (en) Compression structure and method for reinforcing the surface of a slope
CN109653107A (en) A kind of permeable energy absorbing type asphalt pavement structure and its laying method
JP3694687B2 (en) Ground drainage method and ground drainage structure
CN211973028U (en) Flexible anti-blocking device for grouting hole
CN210395430U (en) Earth work bag pile up fixed retaining wall structure
CN210658330U (en) Reduce bored concrete pile of anti-frictional resistance
CN210395427U (en) Geotextile bag with separation layer
CN210459278U (en) Retaining wall structure with flow guiding function
KR20110016223A (en) Upward type ground reinforcement equipment using a compressed and dispersed composite anchor with a drain and constructing method the same
KR20040028222A (en) Drainage structure for basic improvement of soil of road using vertical drainage member
CN113494096A (en) Splicing type reinforcing device for gravel soil of steep slope in mountain area
CN113668559B (en) Supporting construction for building foundation ditch
CN214328755U (en) River course for hydraulic engineering
KR200370619Y1 (en) Ground anchor reinforced with public works textile
CN219118125U (en) Slope surface soil reinforcing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant