CN111921900A - Automatic shell fragment of controller clamps power tube and insulation test equipment - Google Patents

Automatic shell fragment of controller clamps power tube and insulation test equipment Download PDF

Info

Publication number
CN111921900A
CN111921900A CN202010705036.5A CN202010705036A CN111921900A CN 111921900 A CN111921900 A CN 111921900A CN 202010705036 A CN202010705036 A CN 202010705036A CN 111921900 A CN111921900 A CN 111921900A
Authority
CN
China
Prior art keywords
cylinder
controller
shell fragment
insulation test
power tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010705036.5A
Other languages
Chinese (zh)
Inventor
张凌志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Zhidong Mechanical And Electrical Equipment Co ltd
Original Assignee
Wuxi Zhidong Mechanical And Electrical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Zhidong Mechanical And Electrical Equipment Co ltd filed Critical Wuxi Zhidong Mechanical And Electrical Equipment Co ltd
Priority to CN202010705036.5A priority Critical patent/CN111921900A/en
Publication of CN111921900A publication Critical patent/CN111921900A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/34Sorting according to other particular properties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/02Measures preceding sorting, e.g. arranging articles in a stream orientating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/36Sorting apparatus characterised by the means used for distribution
    • B07C5/361Processing or control devices therefor, e.g. escort memory
    • B07C5/362Separating or distributor mechanisms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/027Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same using hydraulic or pneumatic means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention belongs to the technical field of controller assembly test equipment, and relates to a controller automatic spring plate clamping power tube and insulation test equipment, which comprises a working table, wherein a machine mainboard is obliquely arranged on the top surface of the working table, and a material pressing station is arranged at the upper part of the machine mainboard; pressing material station top installation shell fragment cylinder of impressing, the piston rod connection shell fragment sword of impressing of shell fragment cylinder presses on the material station, sets up the dress shell fragment barrier plate that can go up and down corresponding to the below of shell fragment cylinder of impressing, still installs shell fragment propelling movement cylinder on the machine mainboard, the piston rod fixed connection shell fragment push rod of shell fragment propelling movement cylinder. The equipment can automatically push the elastic sheet into a controller elastic sheet installation clamping groove, automatically press the elastic sheet into the controller, fix the controller power tube on a heat dissipation aluminum shell, automatically perform insulation test on the controller, and sort the tested controller according to a test result. The working efficiency and the assembling quality are improved, and the assembling cost is reduced.

Description

Automatic shell fragment of controller clamps power tube and insulation test equipment
Technical Field
The invention belongs to the technical field of controller assembly test equipment, and relates to an automatic spring plate clamping power tube of a controller and insulation test equipment.
Background
The electric vehicle controller is a central control component of the electric vehicle. At present, the power tube is generally pressed on the shell of the controller in a spring plate pressing mode. In the prior art, a method of manual mechanical cooperation with an individual process is adopted for assembly, for example, a spring piece is manually placed into a spring piece clamping groove of a controller, the controller is placed into a spring piece pressing machine to press the spring piece, then the controller is manually transmitted to the next process to perform insulation test on a heat dissipation shell, information is lifted by an insulation test machine, the controller is qualified and unqualified after the insulation test is manually sorted, and the whole process needs a large amount of manual work.
Disclosure of Invention
The invention aims at the problems and provides a power tube and insulation test equipment for automatic clip mounting of a controller, the equipment can automatically push a clip into a clip mounting groove of the controller, automatically push the clip into the controller to fix the power tube of the controller on a radiating aluminum shell, automatically test the insulation of the controller, and sort the tested controller according to the test result. The working efficiency and the assembling quality are improved, and the assembling cost is reduced.
According to the technical scheme of the invention: the utility model provides an automatic shell fragment of controller clamps power tube and insulation test equipment which characterized in that: the automatic feeding device comprises a working table, wherein a machine main board is obliquely arranged on the top surface of the working table, and a material pressing station is arranged at the upper part of the machine main board;
an elastic piece pressing-in cylinder is installed above the material pressing station, a piston rod of the elastic piece pressing-in cylinder is connected with an elastic piece pressing-in knife, an elastic piece loading stop plate capable of lifting is arranged on the material pressing station and below the elastic piece pressing-in cylinder corresponding to the elastic piece pressing-in cylinder, an elastic piece pushing cylinder is further installed on the machine main board, a piston rod of the elastic piece pushing cylinder is fixedly connected with an elastic piece pushing rod, a spring piece box is further arranged above the machine main board, a plurality of spring pieces are arranged in the spring piece box, and the spring pieces can slide to the elastic piece pushing rod and are pushed to the material pressing station;
the lower part of a machine mainboard is provided with an insulation test cylinder, the piston rod end of the insulation test cylinder is connected with a mounting plate, two insulation test thimbles are arranged on the mounting plate in parallel, a defective product temporary placement box is arranged on the axial outer side of the insulation test cylinder, and a defective product pushing cylinder is arranged below the insulation test cylinder to push defective products to the defective product temporary placement box;
a blanking station is formed on the machine main board and below the machine main board corresponding to the material pressing station, and a conveying belt is arranged at the blanking station.
As a further improvement of the invention, the machine main board is supported and arranged on the working table through the machine supporting feet.
As a further improvement of the invention, a connecting sheet is arranged at the end of the piston rod of the elastic sheet pushing cylinder, the connecting sheet is vertically connected with an elastic sheet pushing rod, and an elastic sheet pushing rod step is arranged on the elastic sheet pushing rod.
As a further improvement of the invention, a material guiding piece is arranged between the discharge hole of the spring sheet box and the elastic sheet pushing rod.
As a further improvement of the invention, an insulation barrier plate cylinder is arranged below the machine main board, a piston rod of the insulation barrier plate cylinder is fixedly connected with an insulation test barrier plate, and the upper end of the insulation test barrier plate penetrates through a guide hole on the surface of the machine main board.
As a further improvement of the invention, the elastic sheet pushing rod and the elastic sheet pushing cylinder are arranged in parallel.
As a further improvement of the invention, a positioning assembly is further arranged on the side part of the material pressing station, the positioning assembly comprises a workpiece positioning cylinder, and the piston rod end of the workpiece positioning cylinder is connected with a positioning rod.
The invention has the technical effects that: the product of the invention can automatically push the elastic sheet into the controller elastic sheet installation clamping groove, automatically press the elastic sheet into the controller, fix the controller power tube on the radiating aluminum shell, automatically perform insulation test on the controller, and sort the tested controller according to the test result. The working efficiency and the assembling quality are improved, and the assembling cost is reduced.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of a press-fitting portion of the spring piece.
Detailed Description
The following further describes embodiments of the present invention with reference to the drawings.
In fig. 1 and 2, the device comprises a working table 1, a machine mainboard 2, a machine support leg 3, a defective product temporary storage box 4, an elastic sheet pushing cylinder 5, a connecting sheet 6, an elastic sheet pushing rod 7, an elastic sheet pushing rod step 8, a spring sheet box 9, a spring sheet 10, an insulation blocking plate cylinder 11, an insulation test blocking plate 12, a conveying belt 13, an elastic sheet pressing cylinder 14, an elastic sheet pressing knife 15, an elastic sheet loading blocking plate 16, an insulation test cylinder 17, an insulation test thimble 18, a defective product pushing cylinder 19, a controller 20, a horizontal positioning cylinder 21, a workpiece positioning cylinder 22 and the like.
As shown in fig. 1 and 2, the invention relates to a controller automatic spring plate clamping power tube and insulation testing equipment, which comprises a working table 1, wherein a machine mainboard 2 is obliquely arranged on the top surface of the working table 1, the machine mainboard 2 is supported and arranged on the working table 1 through machine support legs 3 during specific arrangement, and a material pressing station is arranged at the upper part of the machine mainboard 2.
Press material station top installation shell fragment cylinder 14 of impressing, shell fragment 14's piston rod connection shell fragment sword 15 of impressing, press on the material station, it can go up and down to set up the loading piece barrier plate 16 corresponding to the below that shell fragment cylinder 14 was impressed, still install shell fragment propelling movement cylinder 5 on the machine mainboard 2, the piston rod fixed connection shell fragment push rod 7 of shell fragment propelling movement cylinder 5, machine mainboard 2 top still sets up spring plate box 9, set up a plurality of spring leafs 10 in the spring plate box 9, the spring leaf can slide to on the shell fragment push rod 7, and push to pressing the material station by shell fragment push rod 7. It can be understood that the spring plate pushing rod 7 is arranged in parallel with the spring plate pushing cylinder 5. It can be understood that, in a specific use, the spring plate blocking plate 16 is driven by a jacking cylinder arranged on the machine main board 2 to perform lifting adjustment.
The lower part of machine mainboard 2 sets up insulating test cylinder 17, and the tailpiece of the piston rod of insulating test cylinder 17 connects the mounting panel, and parallel arrangement has two insulating test thimble 18 on the mounting panel, and the axial outside of insulating test cylinder 17 sets up the defective products and puts box 4 temporarily, and the below of insulating test cylinder 17 sets up defective products propelling movement cylinder 19 in order to put box 4 temporarily with the defective products propelling movement to the defective products.
A blanking station is formed on the machine main board 2 and below the material pressing station, and a conveying belt 13 is arranged at the blanking station.
The piston rod end of the elastic sheet pushing cylinder 5 is provided with a connecting sheet 6, the connecting sheet 6 is vertically connected with an elastic sheet pushing rod 7, and an elastic sheet pushing rod step 8 is arranged on the elastic sheet pushing rod 7.
Set up the guide between the discharge gate of spring case 9 and shell fragment push rod 7 to the realization is led the spring leaf 10 in the spring case 9 and is sent to shell fragment push rod 7 on, at the during operation, when spring leaf 10 slides to shell fragment push rod 7 on, shell fragment push rod step 8 supports and leans on the tip in spring leaf 10, in order to realize the effective propelling movement to spring leaf 10.
The below of machine mainboard 2 sets up insulating barrier plate cylinder 11, and insulating test barrier plate 12 is connected in insulating barrier plate cylinder 11's piston rod fastening, and the guiding hole on machine mainboard 2 surface is passed to the upper end of insulating test barrier plate 12.
As shown in fig. 1 and 2, when the product of the invention works, a controller 20 of a spring piece 10 to be pressed is put into a pressing station from the upper part of the pressing station, and the controller 20 is limited and fixed by a spring piece blocking plate 16; the spring piece 10 in the spring piece box 9 slides to the spring piece pushing rod 7 through the material guiding piece under the action of gravity, the step 8 of the spring piece pushing rod abuts against the end part of the spring piece 10 along the length direction, and the spring piece 10 is pushed to the material pressing station by the spring piece pushing rod 7. In order to avoid the reset process of the elastic sheet pushing rod 7, the spring sheet 10 is driven to reset together, a positioning assembly is further arranged on the side portion of the elastic sheet pressing cylinder 14 and comprises a workpiece positioning cylinder 22, the piston rod end of the workpiece positioning cylinder 22 is connected with a positioning rod, after the spring sheet 10 is connected with the controller 20 in a press-fitting mode, the workpiece positioning cylinder 22 drives the positioning rod to move downwards and is pressed on the spring sheet 10, the elastic sheet pushing rod 7 is enabled to reset, the spring sheet 10 and the controller 20 are left on a material pressing station, and the next step of the process is continued.
The spring plate pressing cylinder 14 drives the spring plate pressing knife 15 to press downwards, the spring plate 10 is pressed on the controller 20, and after the spring plate 10 is pressed, the spring plate blocking plate 16 contracts downwards to release the controller 20. When the controller 20 slides down to the insulation test blocking plate 12 along the blanking station, the insulation test blocking plate 12 limits the controller 20, at this time, the insulation test cylinder 17 drives the insulation test ejector pins 18 to test the controller 20, one of the two insulation test ejector pins 18 is abutted against the shell of the controller 20, and the other one is abutted against the circuit board of the controller 20. It can be understood that, in order to ensure that the controller 20 does not change the direction when descending, and descends smoothly, a material guide plate is arranged at the side of the blanking station.
As shown in fig. 2, when the product of the present invention is used specifically, in order to ensure that the controller 20 can slide down to the material pressing station smoothly without deflection when the material is discharged, horizontal positioning cylinders 21 are respectively installed on both sides of the upper portion of the material pressing station, and when the product is operated, the two horizontal positioning cylinders 21 position and center the controller 20, so as to ensure that the controller 20 moves down smoothly.

Claims (7)

1. The utility model provides an automatic shell fragment of controller clamps power tube and insulation test equipment which characterized in that: the automatic feeding device comprises a working table (1), wherein a machine main board (2) is obliquely arranged on the top surface of the working table (1), and a material pressing station is arranged on the upper part of the machine main board (2);
an elastic piece pressing-in cylinder (14) is installed above the material pressing station, a piston rod of the elastic piece pressing-in cylinder (14) is connected with an elastic piece pressing-in knife (15), a lifting elastic piece blocking plate (16) is arranged on the material pressing station and below the elastic piece pressing-in cylinder (14), an elastic piece pushing cylinder (5) is further installed on the machine main board (2), a piston rod of the elastic piece pushing cylinder (5) is fixedly connected with an elastic piece pushing rod (7), a spring piece box (9) is further arranged above the machine main board (2), a plurality of spring pieces (10) are arranged in the spring piece box (9), and the spring pieces can slide onto the elastic piece pushing rod (7) and are pushed to the material pressing station by the elastic piece pushing rod (7);
an insulation test cylinder (17) is arranged at the lower part of the machine main board (2), the piston rod end of the insulation test cylinder (17) is connected with a mounting plate, two insulation test ejector pins (18) are arranged on the mounting plate in parallel, a defective product temporary storage box (4) is arranged on the axial outer side of the insulation test cylinder (17), and a defective product pushing cylinder (19) is arranged below the insulation test cylinder (17) to push defective products to the defective product temporary storage box (4);
a blanking station is formed on the machine main board (2) and below the machine main board corresponding to the material pressing station, and a conveying belt (13) is arranged at the blanking station.
2. The automatic shrapnel clamping power tube and insulation test device of the controller of claim 1, wherein: the machine main board (2) is supported and arranged on the working table (1) through the machine support legs (3).
3. The automatic shrapnel clamping power tube and insulation test device of the controller of claim 1, wherein: piston rod end installation connection piece (6) of shell fragment propelling movement cylinder (5), shell fragment push rod (7) is connected perpendicularly in connection piece (6), sets up shell fragment push rod step (8) on shell fragment push rod (7).
4. The automatic shrapnel clamping power tube and insulation test device of the controller of claim 1, wherein: a material guiding piece is arranged between the discharge hole of the spring sheet box (9) and the elastic sheet pushing rod (7).
5. The automatic shrapnel clamping power tube and insulation test device of the controller of claim 1, wherein: the machine mainboard (2) below sets up insulating barrier plate cylinder (11), and insulating test barrier plate (12) are connected in the piston rod fastening of insulating barrier plate cylinder (11), and the guiding hole on machine mainboard (2) surface is passed to the upper end of insulating test barrier plate (12).
6. The automatic shrapnel clamping power tube and insulation test device of the controller of claim 1, wherein: the elastic sheet pushing rod (7) and the elastic sheet pushing cylinder (5) are arranged in parallel.
7. The automatic shrapnel clamping power tube and insulation test device of the controller of claim 1, wherein: the lateral part of the material pressing station is further provided with a positioning assembly, the positioning assembly comprises a workpiece positioning cylinder (22), and the piston rod end of the workpiece positioning cylinder (22) is connected with a positioning rod.
CN202010705036.5A 2020-07-21 2020-07-21 Automatic shell fragment of controller clamps power tube and insulation test equipment Pending CN111921900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010705036.5A CN111921900A (en) 2020-07-21 2020-07-21 Automatic shell fragment of controller clamps power tube and insulation test equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010705036.5A CN111921900A (en) 2020-07-21 2020-07-21 Automatic shell fragment of controller clamps power tube and insulation test equipment

Publications (1)

Publication Number Publication Date
CN111921900A true CN111921900A (en) 2020-11-13

Family

ID=73314177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010705036.5A Pending CN111921900A (en) 2020-07-21 2020-07-21 Automatic shell fragment of controller clamps power tube and insulation test equipment

Country Status (1)

Country Link
CN (1) CN111921900A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113649290A (en) * 2021-08-13 2021-11-16 苏州速安行新能源科技有限公司 Transmission process method for processing battery pack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113649290A (en) * 2021-08-13 2021-11-16 苏州速安行新能源科技有限公司 Transmission process method for processing battery pack

Similar Documents

Publication Publication Date Title
CN110480314B (en) Automatic riveting machine
CN211192824U (en) Automatic assembling and detecting equipment for fixing rotating pin of E-shaped clamp spring of accelerator pedal
CN110744296A (en) Automatic assembling and detecting equipment for fixing rotating pin of E-shaped clamp spring of accelerator pedal
CN110665855A (en) Full-automatic detection equipment for performance of electric control valve
CN111921900A (en) Automatic shell fragment of controller clamps power tube and insulation test equipment
CN212576908U (en) Automatic shell fragment of controller clamps power tube and insulation test equipment
CN105974289A (en) Apparatus capable of online automatic detection of voltage resistance of high-voltage ceramic capacitor
CN210232133U (en) Press-fit device for new energy automobile battery control board and connector
CN209477205U (en) A kind of automatic press-riveting device for clutch balancing machine
CN115156881B (en) Automatic assembly device for electromagnet
CN207171418U (en) A kind of LED masks and mainboard press equipment
CN218079867U (en) Pipe riveting point mechanism
CN110976737A (en) Multi-station special grinding and riveting machine and working method
CN112338870B (en) Automatic plate spring assembling equipment
CN210907007U (en) Full-automatic detection equipment for performance of electric control valve
CN211144680U (en) A assembly and high-low pressure detection device for ignition coil
CN114769440A (en) Iron core press riveting equipment for relay
CN212419498U (en) Rivet material loading assembly device
CN116618571B (en) Automatic riveting equipment for connector and PCB on probe card
CN220190099U (en) Conversion plug buckle equipment and test equipment
CN220042561U (en) Inserted terminal automaton
CN218854907U (en) Elastic sheet assembling and detecting equipment
CN219026582U (en) Multi-station automatic spring sheet loading equipment
CN218272515U (en) Assembly testing device
CN217254236U (en) Automatic feeding steel ball pressing mechanism for steel ball pressing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination