CN111898825A - 一种光伏发电功率短期预测方法及装置 - Google Patents
一种光伏发电功率短期预测方法及装置 Download PDFInfo
- Publication number
- CN111898825A CN111898825A CN202010761333.1A CN202010761333A CN111898825A CN 111898825 A CN111898825 A CN 111898825A CN 202010761333 A CN202010761333 A CN 202010761333A CN 111898825 A CN111898825 A CN 111898825A
- Authority
- CN
- China
- Prior art keywords
- rbm
- training
- model
- prediction
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010248 power generation Methods 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000012549 training Methods 0.000 claims abstract description 52
- 238000013528 artificial neural network Methods 0.000 claims abstract description 34
- 238000005457 optimization Methods 0.000 claims abstract description 22
- 238000010606 normalization Methods 0.000 claims abstract description 10
- 238000012545 processing Methods 0.000 claims abstract description 8
- 230000002068 genetic effect Effects 0.000 claims description 12
- 210000002569 neuron Anatomy 0.000 claims description 10
- 230000005855 radiation Effects 0.000 claims description 10
- 239000013598 vector Substances 0.000 claims description 10
- 238000012360 testing method Methods 0.000 claims description 5
- 230000004913 activation Effects 0.000 claims description 4
- 210000004027 cell Anatomy 0.000 claims description 2
- 230000006870 function Effects 0.000 description 10
- 238000010586 diagram Methods 0.000 description 4
- 238000011156 evaluation Methods 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 238000013473 artificial intelligence Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000012886 linear function Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000000306 recurrent effect Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000005070 sampling Methods 0.000 description 2
- 238000012706 support-vector machine Methods 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 238000010220 Pearson correlation analysis Methods 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012417 linear regression Methods 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 230000006386 memory function Effects 0.000 description 1
- 210000004205 output neuron Anatomy 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/045—Combinations of networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Software Systems (AREA)
- Mathematical Physics (AREA)
- General Engineering & Computer Science (AREA)
- Computing Systems (AREA)
- Molecular Biology (AREA)
- Evolutionary Computation (AREA)
- Computational Linguistics (AREA)
- Biophysics (AREA)
- Biomedical Technology (AREA)
- Artificial Intelligence (AREA)
- Life Sciences & Earth Sciences (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
算法 | MSE | MAE | MAPE |
GA-RBM | 0.0821 | 0.2101 | 0.2641 |
GARBM-NARX | 0.0432 | 0.0546 | 0.0733 |
NARX | 0.1034 | 0.2246 | 0.1862 |
算法 | MSE | MAE | MAPE |
GA-RBM | 0.0846 | 0.3156 | 0.2462 |
GARBM-NARX | 0.0246 | 0.0654 | 0.0512 |
NARX | 0.0647 | 0.2134 | 0.1846 |
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010761333.1A CN111898825A (zh) | 2020-07-31 | 2020-07-31 | 一种光伏发电功率短期预测方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010761333.1A CN111898825A (zh) | 2020-07-31 | 2020-07-31 | 一种光伏发电功率短期预测方法及装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111898825A true CN111898825A (zh) | 2020-11-06 |
Family
ID=73184099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010761333.1A Pending CN111898825A (zh) | 2020-07-31 | 2020-07-31 | 一种光伏发电功率短期预测方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111898825A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113159437A (zh) * | 2021-04-30 | 2021-07-23 | 河北工业大学 | 一种短期光伏发电输出功率的预测方法 |
CN113177355A (zh) * | 2021-04-28 | 2021-07-27 | 南方电网科学研究院有限责任公司 | 一种电力负荷预测方法 |
CN113240155A (zh) * | 2021-04-16 | 2021-08-10 | 国网河北省电力有限公司沧州供电分公司 | 预测碳排放量的方法、装置及终端 |
CN113837486A (zh) * | 2021-10-11 | 2021-12-24 | 云南电网有限责任公司 | 一种基于rnn-rbm的配网馈线长期负荷预测方法 |
CN116070798A (zh) * | 2023-03-30 | 2023-05-05 | 国网山东省电力公司滨州供电公司 | 一种光伏发电功率短期预测方法及系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106803128A (zh) * | 2015-11-26 | 2017-06-06 | 华为技术有限公司 | 光伏发电的预测方法和装置 |
CN109214546A (zh) * | 2018-07-09 | 2019-01-15 | 江苏大学 | 一种基于改进的hs-narx神经网络的电力短期负荷预测方法 |
CN110956304A (zh) * | 2019-10-17 | 2020-04-03 | 国网河南省电力公司鹤壁供电公司 | 一种基于ga-rbm的分布式光伏发电量短期预测方法 |
-
2020
- 2020-07-31 CN CN202010761333.1A patent/CN111898825A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106803128A (zh) * | 2015-11-26 | 2017-06-06 | 华为技术有限公司 | 光伏发电的预测方法和装置 |
CN109214546A (zh) * | 2018-07-09 | 2019-01-15 | 江苏大学 | 一种基于改进的hs-narx神经网络的电力短期负荷预测方法 |
CN110956304A (zh) * | 2019-10-17 | 2020-04-03 | 国网河南省电力公司鹤壁供电公司 | 一种基于ga-rbm的分布式光伏发电量短期预测方法 |
Non-Patent Citations (3)
Title |
---|
付青,单英浩,朱昌亚: "基于NARX神经网络的光伏发电功率预测研究", 《电气传动》 * |
刘凯,张立民,孙永威: "基于遗传算法的RBM优化设计", 《微电子学与计算机》 * |
王继东,冉冉,宋智林: "基于改进深度受限玻尔兹曼机算法的光伏发电短期功率概率预测", 《电力自动化设备》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113240155A (zh) * | 2021-04-16 | 2021-08-10 | 国网河北省电力有限公司沧州供电分公司 | 预测碳排放量的方法、装置及终端 |
CN113177355A (zh) * | 2021-04-28 | 2021-07-27 | 南方电网科学研究院有限责任公司 | 一种电力负荷预测方法 |
CN113177355B (zh) * | 2021-04-28 | 2024-01-12 | 南方电网科学研究院有限责任公司 | 一种电力负荷预测方法 |
CN113159437A (zh) * | 2021-04-30 | 2021-07-23 | 河北工业大学 | 一种短期光伏发电输出功率的预测方法 |
CN113837486A (zh) * | 2021-10-11 | 2021-12-24 | 云南电网有限责任公司 | 一种基于rnn-rbm的配网馈线长期负荷预测方法 |
CN113837486B (zh) * | 2021-10-11 | 2023-08-22 | 云南电网有限责任公司 | 一种基于rnn-rbm的配网馈线长期负荷预测方法 |
CN116070798A (zh) * | 2023-03-30 | 2023-05-05 | 国网山东省电力公司滨州供电公司 | 一种光伏发电功率短期预测方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111898825A (zh) | 一种光伏发电功率短期预测方法及装置 | |
CN108921339B (zh) | 基于分位数回归的遗传支持向量机光伏功率区间预测方法 | |
CN112488415A (zh) | 基于经验模态分解和长短时记忆网络的电力负荷预测方法 | |
CN112990556A (zh) | 一种基于Prophet-LSTM模型的用户用电能耗预测方法 | |
CN112116144B (zh) | 一种区域配电网短期负荷预测方法 | |
CN114757427B (zh) | 自回归修正的lstm智能风电场超短期功率预测方法 | |
CN112116162A (zh) | 基于ceemdan-qfoa-lstm的输电线覆冰厚度预测方法 | |
CN113095598A (zh) | 一种多能负荷预测方法、系统、设备和介质 | |
CN112163689A (zh) | 基于深度Attention-LSTM的短期负荷分位点概率预测方法 | |
CN115392387B (zh) | 一种低压分布式光伏发电出力预测方法 | |
CN113516271A (zh) | 一种基于时空神经网络的风电集群功率日前预测方法 | |
CN115115125A (zh) | 基于深度学习融合模型的光伏功率区间概率预测方法 | |
CN115456287A (zh) | 一种基于长短时记忆网络的综合能源系统多元负荷预测方法 | |
CN114298377A (zh) | 一种基于改进极限学习机的光伏发电预测方法 | |
CN115358437A (zh) | 基于卷积神经网络的供电负荷预测方法 | |
CN115879602A (zh) | 一种基于瞬变气象的超短期光伏出力预测方法 | |
CN114596726A (zh) | 基于可解释时空注意力机制的停车泊位预测方法 | |
CN117151770A (zh) | 一种基于注意力机制的lstm碳价预测方法和系统 | |
CN116826737A (zh) | 一种光伏功率的预测方法、装置、存储介质及设备 | |
CN117748495A (zh) | 一种基于残差神经网络的光伏电站短期发电功率预测方法 | |
CN113762591B (zh) | 一种基于gru和多核svm对抗学习的短期电量预测方法及系统 | |
CN118017482A (zh) | 基于预测误差特征提取的灵活性爬坡容量需求分析方法 | |
CN110956304A (zh) | 一种基于ga-rbm的分布式光伏发电量短期预测方法 | |
CN118157127A (zh) | 基于lstm-mm模型的多天气光伏发电功率预测数字孪生系统 | |
CN117559425A (zh) | 一种光伏发电功率预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhu Xiang Inventor after: Guo Li Inventor after: Shi Haoqi Inventor after: Zhao Zongzheng Inventor after: Chai Yuanyuan Inventor after: Liu Yixin Inventor after: Lu Hai Inventor after: Zhang Hao Inventor before: Zhu Xiang Inventor before: Guo Li Inventor before: Shi Haoqi Inventor before: Zhao Zongzheng Inventor before: Chai Yuanyuan Inventor before: Liu Yixin |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20201106 |