CN111877708B - Wall cement for building plasters leveling device - Google Patents

Wall cement for building plasters leveling device Download PDF

Info

Publication number
CN111877708B
CN111877708B CN202010680969.3A CN202010680969A CN111877708B CN 111877708 B CN111877708 B CN 111877708B CN 202010680969 A CN202010680969 A CN 202010680969A CN 111877708 B CN111877708 B CN 111877708B
Authority
CN
China
Prior art keywords
rack
mounting
sides
gear
transmission belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202010680969.3A
Other languages
Chinese (zh)
Other versions
CN111877708A (en
Inventor
朱夏莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shengze Construction Co ltd
Original Assignee
Shandong Shengze Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shengze Construction Co ltd filed Critical Shandong Shengze Construction Co ltd
Priority to CN202010680969.3A priority Critical patent/CN111877708B/en
Publication of CN111877708A publication Critical patent/CN111877708A/en
Application granted granted Critical
Publication of CN111877708B publication Critical patent/CN111877708B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/16Implements for after-treatment of plaster or the like before it has hardened or dried, e.g. smoothing-tools, profile trowels

Abstract

The invention relates to a leveling device, in particular to a leveling device for cement plastering of a wall for a building. The invention aims to solve the technical problem of how to provide a leveling device for cement plastering on a wall for a building, which does not need to be manually operated by holding a handle, reduces the manual operation difficulty and ensures the construction quality. In order to solve the above technical problems, the present invention provides a leveling device for cement plastering on a wall for construction, comprising: the mounting rack is provided with an opening at the upper part, a fixed rod is connected to the side surface of the upper part of the mounting rack, and a servo motor is arranged on one side of the top of the mounting rack; the polishing mechanism is connected between the mounting frame and the fixed rod; the bottom of the mounting frame is connected with a transverse moving mechanism which is matched with the polishing mechanism. According to the wall plastering machine, the wall plastering and leveling are achieved without manually holding the handle through the polishing mechanism and the transverse moving mechanism, so that the manual operation difficulty is reduced, and the manual work efficiency is improved.

Description

Wall cement for building plasters leveling device
Technical Field
The invention relates to a leveling device, in particular to a leveling device for cement plastering of a wall for a building.
Background
The wall plastering means the surface layer engineering of plastering cement mortar, mixed mortar and lime mortar on the wall. The plastering work of the indoor and outdoor wall is a work after the construction of the building structure is finished, and the plastering work can play the functions of moisture prevention, weathering prevention, heat insulation and the like, and can prevent the building wall from being eroded by wind, rain, snow and the like. The concrete wall surface constructed by the large formwork is smooth and flat, but the wall surface constructed by the large formwork needs to be plastered and leveled at the joint of the longitudinal and transverse walls, the joint of the upper layer and the lower layer of the staircase, the opening of the door and the window and the like.
At present, scrape thick liquid and plaster the operation and mainly rely on the manual work to accomplish, need carry out the bottom to the wall and plaster many times repeatedly, unable one shot forming in addition, during manual construction, need hold the handle and operate, constructor's technique is uneven, thereby cause construction quality poor stability, work efficiency is low, the construction progress is slow, and the manual work needs to use very long time to accomplish the operation in addition, long-time operation is owing to receive the influence of reaction force, lead to hand fatigue easily, still there is the physical demands big, high problems of intensity of labour.
Therefore, the cement plastering leveling device for the building wall needs to be researched and developed without manually holding the handle, so that the manual operation difficulty is reduced, and the construction quality is ensured.
Disclosure of Invention
(1) Technical problem to be solved
The invention aims to overcome the defects that the manual holding of a handle is used for wall plastering and leveling, the operation difficulty is high, and the construction quality is difficult to ensure.
(2) Technical scheme
In order to solve the above technical problems, the present invention provides a leveling device for cement plastering on a wall for construction, comprising: the mounting rack is provided with an opening at the upper part, a fixed rod is connected to the side surface of the upper part of the mounting rack, and a servo motor is arranged on one side of the top of the mounting rack; the polishing mechanism is connected between the mounting frame and the fixed rod; the bottom of the mounting frame is connected with a transverse moving mechanism which is matched with the polishing mechanism.
Preferably, the grinding mechanism comprises: the fixed rod is connected with a fixed plate which is vertical and is positioned in the opening of the mounting rack; the upper side and the lower side of the side surface of one side of the mounting rack are both connected with connecting rods; the connecting rod is fixedly connected with the rack ring; the upper end and the lower end of the side surface of one side of the fixed plate are rotatably connected with the transmission belt pulley, and an output shaft of the servo motor is connected with the transmission belt pulley below; the toothed belt is connected between the two transmission belt pulleys; a first gear is arranged between the rack ring and the rack belt and is respectively meshed with the rack ring and the rack belt; the first gear is connected with a fixed connecting shaft; the lantern rings are connected to the fixed connecting shaft and are attached to the side faces of the mounting frame and the fixing plate; the end part of the grinding disc is connected with a grinding disc.
Preferably, the lateral moving mechanism includes: the two sides of the top of the bottom plate are both provided with sliding chutes, and the sliding chutes on the two sides of the bottom plate are both connected with drawing plates in a sliding manner; the two sides of the top of the bottom plate are both connected with the first rack rails; the two sides of the drawing plate are both connected with the second rack rails; the wheel shafts are rotatably connected to two sides of the bottom of the mounting frame and penetrate through the mounting frame; the two ends of the wheel shafts on the two sides are connected with the toothed idler wheels which are matched with the first rack rail and the second rack rail; the two sides of the outer end of the drawing plate are in threaded connection with the horizontal adjusting structures; the middle part of the outer end of the drawing plate is connected with a handle.
Preferably, an automatic moving mechanism is further included, and the automatic moving mechanism includes: the bottom of the mounting rack is connected with two connecting plates; the mounting shaft is rotatably connected between the two connecting plates; the mounting shaft is connected with a second gear which is matched with the first gear; the first transmission belt is connected between the mounting shaft and one side wheel shaft; and a second transmission belt is connected between wheel shafts on two sides of the second transmission belt.
Preferably, a cart structure is further included, the cart structure including: one side of the mounting frame, which is close to the servo motor, is connected with the connecting frame; the bottom of the connecting frame is rotatably connected with the wheels; the top of the connecting frame is connected with a push rod.
Preferably, the method further comprises the following steps: the middle part of the side surface of the fixed plate is provided with two round holes, and the horizontal observation tube is arranged in each of the two round holes.
(3) Advantageous effects
1. According to the wall plastering machine, the wall plastering and leveling are achieved without manually holding the handle through the polishing mechanism and the transverse moving mechanism, so that the manual operation difficulty is reduced, and the manual work efficiency is improved.
2. The automatic moving mechanism does not need to manually push the toothed roller to move on the first rack rail and the second rack rail, so that the manual operation difficulty is further reduced.
3. The cart structure facilitates manual movement of the device, and further reduces the manual operation difficulty.
4. The balance degree of the device is checked through the horizontal observation pipe, so that the plastering condition can be conveniently observed, and the construction quality is ensured.
Drawings
Fig. 1 is a schematic perspective view of a first embodiment of the present invention.
Fig. 2 is a schematic perspective view of a second embodiment of the present invention.
Fig. 3 is a third perspective view of the present invention.
Fig. 4 is a partially enlarged schematic view of the grinding mechanism of the present invention.
Fig. 5 is an enlarged view of part a of the present invention.
Fig. 6 is an enlarged view of part B of the present invention.
The labels in the figures are: 1-mounting frame, 2-fixing bar, 3-servomotor, 4-grinding mechanism, 41-fixing plate, 42-connecting bar, 43-rack ring, 44-driving pulley, 45-rack bar, 46-first gear, 47-fixing connecting shaft, 48-collar, 49-grinding disc, 5-lateral moving mechanism, 51-toothed roller, 52-bottom plate, 53-first rack rail, 54-second rack rail, 55-pulling plate, 56-horizontal adjusting mechanism, 57-handle, 58-wheel shaft, 6-automatic moving mechanism, 61-connecting plate, 62-mounting shaft, 63-second gear, 64-first driving belt, 65-second driving belt, 7-cart structure, 71-wheels, 72-connecting frame, 73-push rod, 8-horizontal observation tube.
Detailed Description
The invention is further described below with reference to the figures and examples.
First embodiment
The utility model provides a leveling device for wall cement plastering for building, as shown in fig. 1-6, including mounting bracket 1, dead lever 2, servo motor 3, grinding machanism 4 and lateral shifting mechanism 5, the opening has been opened to the rear side of mounting bracket 1, be connected with dead lever 2 on the leading flank on 1 upper portion of mounting bracket, servo motor 3 is installed to the top front side of mounting bracket 1, be connected with grinding machanism 4 between mounting bracket 1 and the dead lever 2, 1 bottom of mounting bracket is connected with lateral shifting mechanism 5, lateral shifting mechanism 5 and grinding machanism 4 cooperation.
The grinding mechanism 4 comprises a fixing plate 41, a connecting rod 42, a rack ring 43, a transmission belt pulley 44, a rack belt 45, a first gear 46, a fixed connecting shaft 47, a lantern ring 48 and a grinding disc 49, the fixing plate 41 is connected to the fixing rod 2, the fixing plate 41 is vertical and is positioned in an opening of the mounting frame 1, the connecting rod 42 is connected to the upper side and the lower side of the front side of the mounting frame 1, the rack ring 43 is fixedly connected to the connecting rod 42, the transmission belt pulley 44 is rotatably connected to the upper end and the lower end of the front side of the fixing plate 41, an output shaft of the servo motor 3 is connected to the transmission belt pulley 44 below, a rack belt 45 is connected between the two transmission belt pulleys 44, a first gear 46 is arranged between the rack ring 43 and the rack belt 45, the first gear 46 is respectively meshed with the rack ring 43 and the rack belt 45, the first gear 46 is connected with the fixed connecting shaft 47, and the rear portion of the fixed connecting shaft 47 is connected with the lantern ring 48, two lantern rings 48 are attached to the side faces of the mounting frame 1 and the fixing plate 41, and a grinding disc 49 is connected to the rear end of the fixing connecting shaft 47.
The transverse moving mechanism 5 comprises a toothed roller 51, a bottom plate 52, a first rack rail 53, a second rack rail 54, a drawing plate 55, a horizontal adjusting structure 56, a handle 57 and a wheel shaft 58, sliding grooves are formed in the front side and the rear side of the top of the bottom plate 52, the drawing plate 55 is connected to the sliding grooves in the left side and the right side of the bottom plate 52 in a sliding mode, the first rack rail 53 is connected to the front side and the rear side of the top of the bottom plate 52, the second rack rail 54 is connected to the front side and the rear side of the drawing plate 55, the wheel shaft 58 in the left side and the right side rotatably connects to the left side and the right side of the bottom of the mounting frame 1, the toothed roller 51 is connected to the two ends of the wheel shaft 58 in the left side and the right side, the toothed roller 51 is matched with the first rack rail 53 and the second rack rail 54, the horizontal adjusting structure 56 is connected to the front side and the rear side of the outer end of the drawing plate 55 in a threaded connection mode, and the middle of the outer end of the drawing plate 55 is connected with the handle 57.
When the wall surface construction plastering leveling operation is manually needed, the bottom plate 52 is placed at a construction position, the drawing plates 55 at two sides are drawn out, then the horizontal adjusting structure 56 is rotated to adjust the bottom plate 52 to be in a horizontal state, the toothed roller 51 is manually placed on the bottom plate 52 and meshed with the first rack track 53, the grinding disc 49 is contacted with the wall surface, the servo motor 3 is started, the servo motor 3 rotates to drive the transmission belt pulley 44 to rotate, the transmission belt pulley 44 rotates to drive the toothed belt 45 to rotate, the rack belt 45 rotates to drive the first gear 46 to rotate and move along the track of the rack ring 43, the movement of the first gear 46 drives the grinding disc 49 to move and rotate through the fixed connecting shaft 47, the lantern ring 48 plays a role in guiding and limiting, the grinding disc 49 rotates to plaster and level the wall surface, the toothed roller 51 is pushed to move on the first rack track 53 and the second rack track 54, so that the grinding disc 49 plasters and levels the wall surface in a large range, when accomplishing construction operations, close servo motor 3, the manual work is moved away from the device on the bottom plate 52, will take out board 55 and push away to the bottom plate 52 in, make things convenient for artificial accomodating, so, need not artifical manual handle of holding through grinding machanism 4 and lateral shifting mechanism 5 and plaster the level to the wall, alleviateed the artificial operation degree of difficulty, improved artificial work efficiency.
Second embodiment
On the basis of the first embodiment, as shown in fig. 2 and 6, the automatic moving mechanism 6 is further included, the automatic moving mechanism 6 includes a connecting plate 61, a mounting shaft 62, a second gear 63, a first transmission belt 64 and a second transmission belt 65, the two connecting plates 61 are connected to the bottom of the mounting frame 1, the mounting shaft 62 is rotatably connected between the two connecting plates 61, the second gear 63 is connected to the front portion of the mounting shaft 62, the second gear 63 is matched with the first gear 46, the first transmission belt 64 is connected between the front portion of the mounting shaft 62 and the rear portion of the left wheel axle 58, and the second transmission belt 65 is connected between the front portions of the left wheel axle 58 and the right wheel axle 58.
When the first gear 46 rotates and is meshed with the second gear 63, the first gear 46 rotates to drive the second gear 63 to rotate, the second gear 63 rotates to drive the left wheel shaft 58 to rotate through the mounting shaft 62 and the first transmission belt 64, the left wheel shaft 58 rotates to drive the right wheel shaft 58 to rotate through the second transmission belt 65, and therefore the automatic moving mechanism 6 does not need to manually push the toothed roller 51 to move on the first rack rail 53 and the second rack rail 54, and the difficulty of manual operation is further reduced.
As shown in fig. 3, the trolley structure 7 is further included, the trolley structure 7 includes wheels 71, a connecting frame 72 and a push rod 73, the connecting frame 72 is connected to the front side of the mounting frame 1, the wheels 71 are rotatably connected to the bottom of the connecting frame 72, and the push rod 73 is connected to the top of the connecting frame 72.
When the manual work needs to carry out wall construction plastering and leveling operation, the push rod 73 is held by hand to incline the device forwards, the wheels 71 are contacted with the ground, and then the device is pushed to move through the push rod 73, so the manual operation difficulty is further reduced.
As shown in fig. 1, the device further comprises a horizontal observation tube 8, two round holes are formed in the middle of the front side surface of the fixing plate 41, and the horizontal observation tube 8 is installed in each of the two round holes.
The manual work is when the operation, looks over the levelness of bottom plate 52 through horizontal observation pipe 8, makes mounting bracket 1 and mill 49 be in the vertical state, so can improve the effect of making level of wall body, guarantees construction quality.
The above examples are merely representative of preferred embodiments of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, various changes, modifications and substitutions can be made without departing from the spirit of the present invention, and these are all within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (3)

1. The utility model provides a leveling device that plasters to wall for building which characterized in that includes: the mounting rack (1) is provided with an opening at the upper part, a fixed rod (2) is connected to the side surface of the upper part of the mounting rack, and a servo motor (3) is arranged on one side of the top of the mounting rack;
the polishing mechanism (4) is connected between the mounting frame (1) and the fixing rod (2);
the bottom of the mounting frame (1) is connected with a transverse moving mechanism (5), and the transverse moving mechanism (5) is matched with the polishing mechanism (4);
the grinding mechanism (4) comprises:
the fixing plate (41) is connected to the fixing rod (2), and the fixing plate (41) is vertical and is positioned in the opening of the mounting rack (1);
the upper side and the lower side of the side surface of one side of the mounting rack (1) are both connected with the connecting rods (42);
the rack ring (43) is fixedly connected to the connecting rod (42);
the upper end and the lower end of the side surface of one side of the fixing plate (41) are rotatably connected with the transmission belt pulley (44), and the output shaft of the servo motor (3) is connected with the transmission belt pulley (44) below;
a rack belt (45), wherein the rack belt (45) is connected between the two transmission belt pulleys (44);
a first gear (46) is arranged between the rack ring (43) and the rack belt (45), and the first gear (46) is respectively meshed with the rack ring (43) and the rack belt (45);
the first gear (46) is connected with a fixed connecting shaft (47);
the lantern ring (48), the fixed connecting shaft (47) is connected with two lantern rings (48), and the two lantern rings (48) are attached to the side faces of the mounting rack (1) and the fixed plate (41);
the end part of the fixed connecting shaft (47) is connected with a grinding disc (49);
the lateral movement mechanism (5) includes:
the device comprises a bottom plate (52), sliding grooves are formed in two sides of the top of the bottom plate (52), and pulling plates (55) are connected to the sliding grooves in the two sides of the bottom plate (52) in a sliding mode;
the two sides of the top of the bottom plate (52) are connected with the first rack rails (53);
the two sides of the drawing plate (55) are connected with the second rack rails (54);
the wheel shafts (58) are rotatably connected to two sides of the bottom of the mounting frame (1), and the wheel shafts (58) on the two sides penetrate through the mounting frame (1);
the two ends of the wheel shafts (58) on the two sides are connected with the toothed idler wheels (51), and the toothed idler wheels (51) are matched with the first rack rail (53) and the second rack rail (54);
the two sides of the outer end of the drawing plate (55) are both in threaded connection with the horizontal adjusting structures (56);
the middle part of the outer end of the drawing plate (55) is connected with the handle (57);
still including automatic moving mechanism (6), automatic moving mechanism (6) include:
the bottom of the mounting frame (1) is connected with two connecting plates (61);
the mounting shaft (62) is rotatably connected between the two connecting plates (61);
the mounting shaft (62) is connected with a second gear (63), and the second gear (63) is matched with the first gear (46);
a first transmission belt (64), wherein the first transmission belt (64) is connected between the mounting shaft (62) and one side wheel shaft (58);
and a second transmission belt (65) is connected between the wheel shafts (58) at the two sides of the second transmission belt (65).
2. A wall cement plastering leveling device for building according to claim 1, further comprising a cart structure (7), wherein the cart structure (7) comprises:
the connecting frame (72) is connected to one side, close to the servo motor (3), of the mounting frame (1);
the bottom of the connecting frame (72) is rotatably connected with the wheel (71);
the top of the push rod (73) is connected with the push rod (73) of the connecting frame (72).
3. A wall cement plastering leveling device for construction according to claim 2, further comprising: horizontal observation pipe (8), the middle part of fixed plate (41) side is opened has two round holes, all installs horizontal observation pipe (8) in two round holes.
CN202010680969.3A 2020-07-15 2020-07-15 Wall cement for building plasters leveling device Expired - Fee Related CN111877708B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010680969.3A CN111877708B (en) 2020-07-15 2020-07-15 Wall cement for building plasters leveling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010680969.3A CN111877708B (en) 2020-07-15 2020-07-15 Wall cement for building plasters leveling device

Publications (2)

Publication Number Publication Date
CN111877708A CN111877708A (en) 2020-11-03
CN111877708B true CN111877708B (en) 2021-12-21

Family

ID=73154476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010680969.3A Expired - Fee Related CN111877708B (en) 2020-07-15 2020-07-15 Wall cement for building plasters leveling device

Country Status (1)

Country Link
CN (1) CN111877708B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605722A (en) * 2021-07-20 2021-11-05 陈志平 Plastering device for cement mortar in constructional engineering
CN116201326A (en) * 2022-12-17 2023-06-02 国惠智能科技(江苏)有限公司 Cement coating equipment for architectural decoration
CN116623916B (en) * 2023-07-19 2023-09-22 河北科信博工程机械制造有限公司 Driving trowelling machine for building construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202672675U (en) * 2012-05-07 2013-01-16 黎光 Multifunctional remote control automatic plastering machine
CN202718370U (en) * 2012-07-09 2013-02-06 三明市金达机电设备有限公司 Concrete wall space leveling device
CN208179152U (en) * 2018-04-25 2018-12-04 湖州高锐科技有限公司 A kind of automatic wall surface grinding machine
CN109441074A (en) * 2018-11-22 2019-03-08 温州正建设有限公司 A kind of levelling trowel that building finishing uses
CN110185242A (en) * 2019-05-30 2019-08-30 滕以飞 A kind of building floor tile decoration gap filler device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018183935A1 (en) * 2017-03-31 2018-10-04 Canvas Construction, Inc. Automated drywall painting system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202672675U (en) * 2012-05-07 2013-01-16 黎光 Multifunctional remote control automatic plastering machine
CN202718370U (en) * 2012-07-09 2013-02-06 三明市金达机电设备有限公司 Concrete wall space leveling device
CN208179152U (en) * 2018-04-25 2018-12-04 湖州高锐科技有限公司 A kind of automatic wall surface grinding machine
CN109441074A (en) * 2018-11-22 2019-03-08 温州正建设有限公司 A kind of levelling trowel that building finishing uses
CN110185242A (en) * 2019-05-30 2019-08-30 滕以飞 A kind of building floor tile decoration gap filler device

Also Published As

Publication number Publication date
CN111877708A (en) 2020-11-03

Similar Documents

Publication Publication Date Title
CN111877708B (en) Wall cement for building plasters leveling device
CN104032961B (en) A kind of method of assembled concrete prefabricated wallboard and special mechanism
CN107740566B (en) Building wall mortar strickle robot
CN204040493U (en) A kind of special mechanism of assembled concrete prefabricated wallboard
CN101338615A (en) Automatic plastering machine
CN201065634Y (en) Automatic plastering machine
CN109394098A (en) Construction metope automatic cleaning apparatus
CN2883552Y (en) Wall plastering machine
CN203452353U (en) Wall body levelling machine
CN2607412Y (en) Multifunctional automatic lift plastering machine
CN219528299U (en) Wall plastering leveling device
CN220167518U (en) Concrete placement auxiliary frame for construction
CN219080880U (en) Wall mortar laying device for architectural design
CN217711581U (en) Building detection equipment of making level that facilitates use
CN214144782U (en) Cement troweling device for building construction
CN219863895U (en) Floor tile paving and ash scraping device
CN217232594U (en) Automatic mortar leveling machine
CN218970705U (en) Brick spray set for construction
CN219863881U (en) Wall surface finishing and polishing machine
CN216196717U (en) Cement troweling device for constructional engineering
CN215801096U (en) Railway bridge floor waterproof layer edge coating device
CN214621006U (en) Flatness detection device for civil engineering
CN219451387U (en) Wall trowelling device for interior decoration
CN220725667U (en) Cement paving device for paving floor tiles
CN214034608U (en) Fitment wall body hand truck that plasters

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20211201

Address after: 257300 No.35 Guangkai Road, economic development zone, Guangrao County, Dongying City, Shandong Province

Applicant after: Shandong Shengze Construction Co.,Ltd.

Address before: 330038 room 507, Jianshe building, No. 1318, Fenghe Avenue, Honggutan new area, Nanchang City, Jiangxi Province

Applicant before: Zhu Xialian

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211221