CN111877322A - Construction method of bored concrete cast-in-place pile - Google Patents

Construction method of bored concrete cast-in-place pile Download PDF

Info

Publication number
CN111877322A
CN111877322A CN202010454971.9A CN202010454971A CN111877322A CN 111877322 A CN111877322 A CN 111877322A CN 202010454971 A CN202010454971 A CN 202010454971A CN 111877322 A CN111877322 A CN 111877322A
Authority
CN
China
Prior art keywords
pile
hole
air bag
pile hole
base layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010454971.9A
Other languages
Chinese (zh)
Inventor
陈学光
崔军
胡军
高丙山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202010454971.9A priority Critical patent/CN111877322A/en
Publication of CN111877322A publication Critical patent/CN111877322A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a construction method of a bored concrete cast-in-place pile, which comprises the steps of leveling a field; drilling; reaming; sinking into a reinforcement cage; pouring concrete; and breaking the pile head. According to the invention, the hole diameter of the pre-pile hole is smaller than that of the pile hole in the design drawing, the air bag is utilized to restore the cylindrical shape and simultaneously extrude the hole wall of the pre-pile hole to expand the hole, so that the hole wall and the soil layer of the final pile hole are compact and stable in structure, and the gas can be directly discharged into the air, so that the method is convenient and simple, is convenient to realize and further improves the working efficiency; during pouring, the hole wall is of a compact structure, so that the range of concrete penetrating into a soil layer from the hole wall is greatly reduced, and the range of concrete polluting the soil layer is further reduced; according to the invention, the problem of deviation in the subsequent drilling process of the drill rod can be avoided by carrying out mortar cleaning and filling operation on the surface of the base layer, so that the problem of lengthened construction time caused by repeatedly adjusting the drill rod is avoided.

Description

Construction method of bored concrete cast-in-place pile
Technical Field
The invention relates to the field of buildings, in particular to a construction method of a bored concrete cast-in-place pile.
Background
In the prior art, an envelope formed by cast-in-place bored piles is a common envelope, but in the construction process of the existing construction method of the cast-in-place bored concrete piles, the problem of drill rod deviation can occur in the specific drilling process because the construction process of cleaning the surface of a base layer is not available, so that the position of the drill rod needs to be adjusted, and the construction efficiency is affected. In addition, because the cast-in-place pile has no soil extrusion effect, the inner wall of the pile hole is relatively soft, when concrete is cast, a large amount of concrete permeates into gaps of soil layers on the inner wall of the pile hole, so that the range of the concrete polluting the soil layers is large, and the space for improving the soil layer is also provided.
Disclosure of Invention
The invention aims to solve the defects of the prior art and provides a construction method of a bored concrete cast-in-place pile.
In order to achieve the purpose, the invention adopts the following technical scheme: a construction method of a bored concrete pile comprises the following steps:
(1) site leveling
The treatment operation of the surface of the base layer comprises cleaning mortar, filling holes and incomplete openings on the surface of the base layer, and measuring pile sites on a leveled field;
(2) drilling holes
According to the position of the pile to be measured, embedding the pile casing at a first preset position on the surface of the base layer and determining the central point of the pile casing; arranging a drilling machine at a second preset position on the surface of the base layer, enabling the central line of a drill rod of the drilling machine to coincide with the central point of the pile casing, and enabling the drill rod to move in the vertical direction by taking the central point of the pile casing as a starting point to drill a hole section so as to form a pre-pile hole, wherein the aperture of the pre-pile hole is larger than the outer diameter of the reinforcement cage and smaller than that of a pile hole in a design drawing;
(3) enlarging holes
Placing a hollow cylindrical air bag in the pre-pile hole, wherein the outer diameter of the air bag is 0.2-3 cm larger than the aperture of the pile hole in the design drawing, the length of the air bag is consistent with the depth of the pile hole in the design drawing, the top of the air bag is flush with the ground and is communicated with a gas injection pipe, a plurality of flow balls are contained in the air bag and used for vertically compacting the pre-pile hole, gas is injected into the air bag, the air bag is supported by the gas, the air bag is slowly enlarged, hole expansion is further realized, the air flow drives the flow balls to vertically compact the inner wall of the pre-pile hole, when the pressure in the air bag is 1.1 times of the air pressure, the air blowing is stopped, the air bag is kept stand for at least 20 minutes, and the gas in the;
(4) sinking into reinforcement cage
Hoisting a reinforcement cage in the pre-pile hole by using a gantry crane;
(5) pouring concrete;
pouring concrete into the pre-pile hole by using a guide pipe so as to seal the reinforcement cage in the concrete;
(6) and breaking the pile head.
And (2) after the concrete is solidified for a first preset time period, pulling the pile casing out of the surface of the base layer to form an annular mounting groove on the surface of the base layer for accommodating the pile casing.
In the step (2), the aperture of the pre-pile hole is 95% of the aperture of the pile hole in the design drawing.
In the step (2), the hole depth of the pre-pile hole is 96% of the hole depth of the pile hole in the design drawing.
In the step (2), marking a first preset position on the surface of the base layer, and carrying out density detection on the soil body at the first preset position; embedding the protective cylinder at a first preset position by at least one of pressurization, vibration and hammering; wherein, one end of the protective cylinder is 20cm to 30cm higher than the surface of the base layer.
In the step (3), a plurality of steel arc-shaped pressing plates are arranged on the outer side wall of the air bag and used for enabling the inner wall of the pre-pile hole to be pre-piled
And (4) smoothing.
And (5) conveying cement paste into the annular mounting groove through a grouting pipe to fill the annular mounting groove.
The invention has the beneficial effects that: according to the invention, the hole diameter of the pre-pile hole is smaller than that of the pile hole in the design drawing, the air bag is utilized to restore the cylindrical shape and simultaneously extrude the hole wall of the pre-pile hole to expand the hole, so that the hole wall and the soil layer of the final pile hole are compact and stable in structure, and the gas can be directly discharged into the air, so that the method is convenient and simple, is convenient to realize and further improves the working efficiency; during pouring, the hole wall is of a compact structure, so that the range of concrete penetrating into a soil layer from the hole wall is greatly reduced, and the range of concrete polluting the soil layer is further reduced; according to the invention, the problem of deviation in the subsequent drilling process of the drill rod can be avoided by carrying out mortar cleaning and filling operation on the surface of the base layer, so that the problem of lengthened construction time caused by repeatedly adjusting the drill rod is avoided.
Detailed Description
The invention will be further illustrated with reference to specific examples: a construction method of a bored concrete pile comprises the following steps:
(1) site leveling
The treatment operation of the surface of the base layer comprises cleaning mortar, filling holes and incomplete openings on the surface of the base layer, and measuring pile sites on a leveled field;
(2) drilling holes
According to the position of the pile to be measured, embedding the pile casing at a first preset position on the surface of the base layer and determining the central point of the pile casing; arranging a drilling machine at a second preset position on the surface of the base layer, enabling the central line of a drill rod of the drilling machine to coincide with the central point of the pile casing, and enabling the drill rod to move in the vertical direction by taking the central point of the pile casing as a starting point to drill a hole section so as to form a pre-pile hole, wherein the aperture of the pre-pile hole is larger than the outer diameter of the reinforcement cage and smaller than that of a pile hole in a design drawing;
(3) enlarging holes
Placing a hollow cylindrical air bag in the pre-pile hole, wherein the outer diameter of the air bag is 0.2-3 cm larger than the aperture of the pile hole in the design drawing, the length of the air bag is consistent with the depth of the pile hole in the design drawing, the top of the air bag is flush with the ground and is communicated with a gas injection pipe, a plurality of flow balls are contained in the air bag and used for vertically compacting the pre-pile hole, gas is injected into the air bag, the air bag is supported by the gas, the air bag is slowly enlarged, hole expansion is further realized, the air flow drives the flow balls to vertically compact the inner wall of the pre-pile hole, when the pressure in the air bag is 1.1 times of the air pressure, the air blowing is stopped, the air bag is kept stand for at least 20 minutes, and the gas in the;
(4) sinking into reinforcement cage
Hoisting a reinforcement cage in the pre-pile hole by using a gantry crane;
(5) pouring concrete;
pouring concrete into the pre-pile hole by using a guide pipe so as to seal the reinforcement cage in the concrete;
(6) and breaking the pile head.
And (2) after the concrete is solidified for a first preset time period, pulling the pile casing out of the surface of the base layer to form an annular mounting groove on the surface of the base layer for accommodating the pile casing.
In the step (2), the aperture of the pre-pile hole is 95% of the aperture of the pile hole in the design drawing.
In the step (2), the hole depth of the pre-pile hole is 96% of the hole depth of the pile hole in the design drawing.
In the step (2), marking a first preset position on the surface of the base layer, and carrying out density detection on the soil body at the first preset position; embedding the protective cylinder at a first preset position by at least one of pressurization, vibration and hammering; wherein, one end of the protective cylinder is 20cm to 30cm higher than the surface of the base layer.
In the step (3), a plurality of steel arc-shaped pressing plates are arranged on the outer side wall of the air bag and used for enabling the inner wall of the pre-pile hole to be pre-piled
And (4) smoothing.
And (5) conveying cement paste into the annular mounting groove through a grouting pipe to fill the annular mounting groove.
Example 1
A construction method of a bored concrete pile comprises the following steps:
(1) site leveling
The treatment operation of the surface of the base layer comprises cleaning mortar, filling holes and incomplete openings on the surface of the base layer, and measuring pile sites on a leveled field;
(2) drilling holes
According to the position of the pile to be measured, embedding the pile casing at a first preset position on the surface of the base layer and determining the central point of the pile casing; arranging a drilling machine at a second preset position on the surface of the base layer, enabling the central line of a drill rod of the drilling machine to coincide with the central point of the pile casing, and enabling the drill rod to move in the vertical direction by taking the central point of the pile casing as a starting point to drill a hole section so as to form a pre-pile hole, wherein the aperture of the pre-pile hole is larger than the outer diameter of the reinforcement cage and smaller than that of a pile hole in a design drawing;
(3) enlarging holes
Placing a hollow cylindrical air bag in the pre-pile hole, wherein the outer diameter of the air bag is 0.2 cm larger than the aperture of the pile hole in the design drawing, the length of the air bag is consistent with the depth of the pile hole in the design drawing, the top of the air bag is flush with the ground and is communicated with a gas injection pipe, a plurality of flow balls are placed in the air bag and used for vertically compacting the pre-pile hole, pumping gas into the air bag, the gas supports the air bag, the air bag slowly grows, and further hole expansion is realized, because the air bag is continuously inflated, the air flow drives the flow balls to vertically compact the inner wall of the pre-pile hole, when the pressure in the air bag is 1.1 times of the air pressure, stopping blowing, standing for at least 20 minutes, and discharging the gas in the air bag;
(4) sinking into reinforcement cage
Hoisting a reinforcement cage in the pre-pile hole by using a gantry crane;
(5) pouring concrete;
pouring concrete into the pre-pile hole by using a guide pipe so as to seal the reinforcement cage in the concrete;
(6) and breaking the pile head.
And (2) after the concrete is solidified for a first preset time period, pulling the pile casing out of the surface of the base layer to form an annular mounting groove on the surface of the base layer for accommodating the pile casing.
In the step (2), the aperture of the pre-pile hole is 95% of the aperture of the pile hole in the design drawing.
In the step (2), the hole depth of the pre-pile hole is 96% of the hole depth of the pile hole in the design drawing.
In the step (2), marking a first preset position on the surface of the base layer, and carrying out density detection on the soil body at the first preset position; embedding the protective cylinder at a first preset position by at least one of pressurization, vibration and hammering; wherein, one end of the protective cylinder is 20cm to 30cm higher than the surface of the base layer.
In the step (3), a plurality of steel arc-shaped pressing plates are arranged on the outer side wall of the air bag and used for enabling the inner wall of the pre-pile hole to be pre-piled
And (4) smoothing.
And (5) conveying cement paste into the annular mounting groove through a grouting pipe to fill the annular mounting groove.
Example 2
A construction method of a bored concrete pile comprises the following steps:
(1) site leveling
The treatment operation of the surface of the base layer comprises cleaning mortar, filling holes and incomplete openings on the surface of the base layer, and measuring pile sites on a leveled field;
(2) drilling holes
According to the position of the pile to be measured, embedding the pile casing at a first preset position on the surface of the base layer and determining the central point of the pile casing; arranging a drilling machine at a second preset position on the surface of the base layer, enabling the central line of a drill rod of the drilling machine to coincide with the central point of the pile casing, and enabling the drill rod to move in the vertical direction by taking the central point of the pile casing as a starting point to drill a hole section so as to form a pre-pile hole, wherein the aperture of the pre-pile hole is larger than the outer diameter of the reinforcement cage and smaller than that of a pile hole in a design drawing;
(3) enlarging holes
Placing a hollow cylindrical air bag in the pre-pile hole, wherein the outer diameter of the air bag is 3 cm larger than the aperture of the pile hole in the design drawing, the length of the air bag is consistent with the depth of the pile hole in the design drawing, the top of the air bag is flush with the ground and is communicated with a gas injection pipe, a plurality of flow balls are placed in the air bag and used for vertically compacting the pre-pile hole, and gas is pumped into the air bag to support the air bag, so that the air bag is slowly enlarged, and further hole expansion is realized, because the air bag is continuously inflated, the air flow drives the flow balls to vertically compact the inner wall of the pre-pile hole, when the pressure in the air bag is 1.1 times of the air pressure, the air blowing is stopped, the air bag is kept stand for at least;
(4) sinking into reinforcement cage
Hoisting a reinforcement cage in the pre-pile hole by using a gantry crane;
(5) pouring concrete;
pouring concrete into the pre-pile hole by using a guide pipe so as to seal the reinforcement cage in the concrete;
(6) and breaking the pile head.
And (2) after the concrete is solidified for a first preset time period, pulling the pile casing out of the surface of the base layer to form an annular mounting groove on the surface of the base layer for accommodating the pile casing.
In the step (2), the aperture of the pre-pile hole is 95% of the aperture of the pile hole in the design drawing.
In the step (2), the hole depth of the pre-pile hole is 96% of the hole depth of the pile hole in the design drawing.
In the step (2), marking a first preset position on the surface of the base layer, and carrying out density detection on the soil body at the first preset position; embedding the protective cylinder at a first preset position by at least one of pressurization, vibration and hammering; wherein, one end of the protective cylinder is 20cm to 30cm higher than the surface of the base layer.
In the step (3), a plurality of steel arc-shaped pressing plates are arranged on the outer side wall of the air bag and used for enabling the inner wall of the pre-pile hole to be pre-piled
And (4) smoothing.
And (5) conveying cement paste into the annular mounting groove through a grouting pipe to fill the annular mounting groove.
Example 3
A construction method of a bored concrete pile comprises the following steps:
(1) site leveling
The treatment operation of the surface of the base layer comprises cleaning mortar, filling holes and incomplete openings on the surface of the base layer, and measuring pile sites on a leveled field;
(2) drilling holes
According to the position of the pile to be measured, embedding the pile casing at a first preset position on the surface of the base layer and determining the central point of the pile casing; arranging a drilling machine at a second preset position on the surface of the base layer, enabling the central line of a drill rod of the drilling machine to coincide with the central point of the pile casing, and enabling the drill rod to move in the vertical direction by taking the central point of the pile casing as a starting point to drill a hole section so as to form a pre-pile hole, wherein the aperture of the pre-pile hole is larger than the outer diameter of the reinforcement cage and smaller than that of a pile hole in a design drawing;
(3) enlarging holes
Placing a hollow cylindrical air bag in the pre-pile hole, wherein the outer diameter of the air bag is 1 cm larger than the aperture of the pile hole in the design drawing, the length of the air bag is consistent with the depth of the pile hole in the design drawing, the top of the air bag is flush with the ground and is communicated with a gas injection pipe, a plurality of flow balls are placed in the air bag and used for vertically compacting the pre-pile hole, and gas is pumped into the air bag to support the air bag, so that the air bag is slowly enlarged, and further hole expansion is realized, because the air bag is continuously inflated, the air flow drives the flow balls to vertically compact the inner wall of the pre-pile hole, when the pressure in the air bag is 1.1 times of the air pressure, the air blowing is stopped, the air bag is kept stand for at least;
(4) sinking into reinforcement cage
Hoisting a reinforcement cage in the pre-pile hole by using a gantry crane;
(5) pouring concrete;
pouring concrete into the pre-pile hole by using a guide pipe so as to seal the reinforcement cage in the concrete;
(6) and breaking the pile head.
And (2) after the concrete is solidified for a first preset time period, pulling the pile casing out of the surface of the base layer to form an annular mounting groove on the surface of the base layer for accommodating the pile casing.
In the step (2), the aperture of the pre-pile hole is 95% of the aperture of the pile hole in the design drawing.
In the step (2), the hole depth of the pre-pile hole is 96% of the hole depth of the pile hole in the design drawing.
In the step (2), marking a first preset position on the surface of the base layer, and carrying out density detection on the soil body at the first preset position; embedding the protective cylinder at a first preset position by at least one of pressurization, vibration and hammering; wherein, one end of the protective cylinder is 20cm to 30cm higher than the surface of the base layer.
In the step (3), a plurality of steel arc-shaped pressing plates are arranged on the outer side wall of the air bag and used for enabling the inner wall of the pre-pile hole to be pre-piled
And (4) smoothing.
And (5) conveying cement paste into the annular mounting groove through a grouting pipe to fill the annular mounting groove.
The present invention has been described in connection with the specific embodiments, and it is obvious that the specific implementation of the present invention is not limited by the above-mentioned manner, and it is within the protection scope of the present invention as long as various modifications are made by using the method concept and technical solution of the present invention, or the present invention is directly applied to other occasions without modification.

Claims (7)

1. A construction method of a bored concrete pile is characterized by comprising the following steps:
(1) site leveling
The treatment operation of the surface of the base layer comprises cleaning mortar, filling holes and incomplete openings on the surface of the base layer, and measuring pile sites on a leveled field;
(2) drilling holes
According to the position of the pile to be measured, embedding the pile casing at a first preset position on the surface of the base layer and determining the central point of the pile casing; arranging a drilling machine at a second preset position on the surface of the base layer, enabling the central line of a drill rod of the drilling machine to coincide with the central point of the pile casing, and enabling the drill rod to move in the vertical direction by taking the central point of the pile casing as a starting point to drill a hole section so as to form a pre-pile hole, wherein the aperture of the pre-pile hole is larger than the outer diameter of the reinforcement cage and smaller than that of a pile hole in a design drawing;
(3) enlarging holes
Placing a hollow cylindrical air bag in the pre-pile hole, wherein the outer diameter of the air bag is 0.2-3 cm larger than the aperture of the pile hole in the design drawing, the length of the air bag is consistent with the depth of the pile hole in the design drawing, the top of the air bag is flush with the ground and is communicated with a gas injection pipe, a plurality of flow balls are contained in the air bag and used for vertically compacting the pre-pile hole, gas is injected into the air bag, the air bag is supported by the gas, the air bag is slowly enlarged, hole expansion is further realized, the air flow drives the flow balls to vertically compact the inner wall of the pre-pile hole, when the pressure in the air bag is 1.1 times of the air pressure, the air blowing is stopped, the air bag is kept stand for at least 20 minutes, and the gas in the;
(4) sinking into reinforcement cage
Hoisting a reinforcement cage in the pre-pile hole by using a gantry crane;
(5) pouring concrete;
pouring concrete into the pre-pile hole by using a guide pipe so as to seal the reinforcement cage in the concrete;
(6) and breaking the pile head.
2. The method of constructing a bored concrete pile according to claim 1, wherein in the step (2), after the concrete is set for a first predetermined period of time, the casing is pulled out from the surface of the base layer to form an annular installation groove on the surface of the base layer for receiving the casing.
3. The method for constructing a bored concrete pile according to claim 1, wherein in the step (2), the diameter of the pre-pile hole is 95% of the diameter of the pile hole in the design drawing.
4. The method for constructing a bored concrete pile according to claim 1, wherein in the step (2), the depth of the pre-pile hole is 96% of the depth of the pile hole in the design drawing.
5. The construction method of the bored concrete pile according to claim 1, wherein in the step (2), a first preset position is marked on the surface of the base layer, and density detection is performed on a soil body at the first preset position; embedding the protective cylinder at a first preset position by at least one of pressurization, vibration and hammering; wherein, one end of the protective cylinder is 20cm to 30cm higher than the surface of the base layer.
6. The method for constructing a bored concrete pile according to claim 1, wherein in the step (3), the outer side wall of the air bag is provided with a plurality of steel-made arc-shaped pressing plates for smoothing the inner wall of the pre-pile hole.
7. The method for constructing a bored concrete pile according to claim 1, wherein in the step (5), cement paste is supplied into the annular installation groove through the grout pipe to fill the annular installation groove.
CN202010454971.9A 2020-05-26 2020-05-26 Construction method of bored concrete cast-in-place pile Pending CN111877322A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010454971.9A CN111877322A (en) 2020-05-26 2020-05-26 Construction method of bored concrete cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010454971.9A CN111877322A (en) 2020-05-26 2020-05-26 Construction method of bored concrete cast-in-place pile

Publications (1)

Publication Number Publication Date
CN111877322A true CN111877322A (en) 2020-11-03

Family

ID=73153965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010454971.9A Pending CN111877322A (en) 2020-05-26 2020-05-26 Construction method of bored concrete cast-in-place pile

Country Status (1)

Country Link
CN (1) CN111877322A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759288A (en) * 2016-11-29 2017-05-31 昆山顶牛市政建设有限公司 One kind building bored pile construction method
CN108978640A (en) * 2018-08-07 2018-12-11 佛山市房建集团有限公司 Cast-in-place pile construction method
CN110387880A (en) * 2019-07-29 2019-10-29 中铁十二局集团建筑安装工程有限公司 A kind of bored pile construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759288A (en) * 2016-11-29 2017-05-31 昆山顶牛市政建设有限公司 One kind building bored pile construction method
CN108978640A (en) * 2018-08-07 2018-12-11 佛山市房建集团有限公司 Cast-in-place pile construction method
CN110387880A (en) * 2019-07-29 2019-10-29 中铁十二局集团建筑安装工程有限公司 A kind of bored pile construction method

Similar Documents

Publication Publication Date Title
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN110318393A (en) A kind of construction method of composite pile
US20140056651A1 (en) Method of providing a support column
CN106351585A (en) Hole collapse and shrinkage prevention bidirectional spiral extrusion and expansion drilling tool and construction technology thereof
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
CN113502817B (en) Method for automatically constructing prestressed pile
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
CN111042121B (en) Construction method of bored backfill end pile foundation
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN112942322A (en) Anti-floating pile structure and construction method thereof
CN111877322A (en) Construction method of bored concrete cast-in-place pile
CN111519612A (en) Construction method of full-casing follow-up long spiral drilling pressure-grouting secant pile
CN216339582U (en) Combined inclined support for foundation pit support
CN113322947B (en) Cast-in-place pile construction method for forming pile by utilizing air pressure pushing and vibrating concrete
CN212336070U (en) Karst foundation variable-rigidity primary-secondary pile
CN208088287U (en) Half casing guncreting pile construction equipment
CN112323781A (en) High-bearing holding-pressure type hammering pressure-grouting pile forming construction method
CN215211008U (en) Pile foundation construction device for treating waste air-raid shelter and pile foundation thereof
CN113322936B (en) Soil body reinforcing construction method and construction auxiliary device for thick sand layer karst area
CN219240540U (en) Auxiliary device for determining verticality of excavation of cast-in-situ pile foundation of iron tower
CN111535334B (en) Construction method of double-core expanded pile anchor foundation pit supporting structure
CN105887812A (en) Single-pile-casing construction method for static pressure sinking pipe carrier cast-in-place pile
CN118273312A (en) Reinforcement cage construction technology for solving karst cave
CN112049142A (en) Variable-rigidity composite pile of karst foundation and construction method thereof
CN117266147A (en) Construction method for improving quality of pebble stratum cast-in-situ screw pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201103

RJ01 Rejection of invention patent application after publication