CN111827040A CN202010718900.5A CN202010718900A CN111827040A CN 111827040 A CN111827040 A CN 111827040A CN 202010718900 A CN202010718900 A CN 202010718900A CN 111827040 A CN111827040 A CN 111827040A
Authority
CN
China
Prior art keywords
well
pipeline
sleeve
concrete
pipe well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010718900.5A
Other languages
Chinese (zh)
Inventor
韩筱宇
刘天娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jihao Construction Engineering Co ltd
Original Assignee
Hubei Jihao Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jihao Construction Engineering Co ltd filed Critical Hubei Jihao Construction Engineering Co ltd
Priority to CN202010718900.5A priority Critical patent/CN111827040A/en
Publication of CN111827040A publication Critical patent/CN111827040A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor

Abstract

The invention provides a construction process of a road with a pipeline well, which comprises the steps of digging and cleaning a roadbed, laying a base layer, shaping the base layer, pouring concrete and constructing a cement concrete surface layer, wherein a pipeline well sleeve is prefabricated in a factory before the concrete is poured, the side edge of the pipeline well sleeve is a straight plane, the prefabricated pipeline well sleeve is sleeved outside the pipeline well, the upper surface of the pipeline well sleeve is flush with the pipeline well as far as possible, the concrete is poured after the pipeline well sleeve is sleeved, and then the normal cement concrete surface layer construction is carried out. According to the invention, in the construction of the road with the pipe shaft, the prefabricated square pipe shaft sleeve is sleeved outside the pipe shaft, and then the concrete pouring operation is carried out, so that the concrete around the pipe shaft is vibrated more conveniently and quickly, no trace is left, and the road surface is smoother.

Description

Construction process for well road with pipeline
Technical Field
The invention belongs to a road construction process, and particularly relates to a construction process of a road with a pipe well.
Background
At present, when a road with a pipe well is constructed, because the pipe well is generally of a circular structure, concrete vibration at the edge of the pipe well is inconvenient when concrete is poured, traces in the vibration moving process are easy to appear, the road surface is uneven, the attractiveness is affected, and the driving comfort is affected.
Disclosure of Invention
The invention aims to solve the technical problem of providing a construction process for a road with a pipe well.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
a construction process for pipeline with pipeline well includes such steps as excavating and cleaning road bed, laying basic layer, shaping basic layer, pouring concrete, constructing cement concrete surface layer, prefabricating pipeline well sleeve, sleeving the prefabricated pipeline well sleeve outside pipeline well, making the upper surface of pipeline well sleeve flush with pipeline well, pouring concrete after sleeving, and constructing cement concrete surface layer.
The side of the pipe well external member is provided with a steel bar protruding out of the surface, and the steel bar is embedded in the pipe well external member.
The side of the pipeline well sleeve is provided with an inwards concave slotted hole.
The slotted hole and the reinforcing steel bar are coaxially arranged.
And a transverse strip-shaped groove is processed on the side surface of the pipe well sleeve.
The invention has the beneficial effects that: according to the invention, in the construction of the road with the pipe shaft, the prefabricated square pipe shaft sleeve is sleeved outside the pipe shaft, and then the concrete pouring operation is carried out, so that the concrete around the pipe shaft is vibrated more conveniently and quickly, no trace is left, and the road surface is smoother.
Drawings
FIG. 1 is a front view of a piping well assembly;
FIG. 2 is a side view of a pipe well kit.
Detailed Description
The present invention will be further described with reference to the following examples.
As shown in fig. 1 and 2, a construction process for a pipeline with a pipeline well comprises the steps of excavating and cleaning a roadbed, laying a base layer, shaping the base layer, pouring concrete and constructing a cement concrete surface layer, wherein the processes are the prior art and are not described too much, a pipeline well sleeve is prefabricated in a factory before the concrete is poured, the side edge of the pipeline well sleeve is a straight plane, the whole pipeline well sleeve in the embodiment is of a cuboid structure, a through hole 1 for embedding the pipeline well is formed in the middle of the pipeline well sleeve, the prefabricated pipeline well sleeve is sleeved outside the pipeline well, the upper surface of the pipeline well sleeve is flush with the pipeline well as much as possible, the concrete is poured after the pipeline well sleeve is sleeved, and then the construction of the normal cement concrete surface layer is carried out. In order to reduce the possibility of water inflow in the pipe well, the middle of the pipe well sleeve is high and low in periphery, and the height difference is controlled within 5cm, so that the influence on a travelling crane is small, accumulated water at the periphery of the pipe well can be reduced, the possibility of water inflow in the pipe well is reduced, and the waterproof requirement on the pipe well can be slightly reduced.
In order to better combine with the concrete that pours afterwards for the piping shaft external member, will the piping shaft external member side be equipped with the reinforcing bar 2 of protrusion in this surface, reinforcing bar 2 is pre-buried in the piping shaft external member, reinforcing bar 2 partly extend to the piping shaft outside can be with the concrete that pours after and combine together, if the road surface has laying reinforcing bar 2, can also weld with reinforcing bar 2, increase joint strength between them, make follow-up not produce the crack or reduce the crack. In the further embodiment, the side surface of the pipe well sleeve is provided with an inwards concave slotted hole 3. Further, the slot 3 is arranged coaxially with the reinforcement bar 2. Further, a transverse strip-shaped groove 4 is machined on the side surface of the pipe well sleeve. The strip-shaped groove 4 is arranged to fill the later poured concrete therein, so that the connection between the two is strengthened.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to explain the principles of the invention, and that various modifications and alterations can be made by those skilled in the art without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a have pipeline well road construction technology, excavate the clearance including the road bed, lay basic unit, basic unit plastic, concreting, cement concrete surface course construction, its characterized in that: the method comprises the steps of prefabricating a pipe well sleeve in a factory before concrete pouring construction, wherein the side edge of the pipe well sleeve is a straight plane, sleeving the prefabricated pipe well sleeve outside a pipe well, enabling the upper surface of the pipe well sleeve to be flush with the pipe well as much as possible, pouring concrete after the pipe well sleeve is well sleeved, and then performing normal cement concrete surface layer construction.
2. The process of constructing a well with a pipeline as claimed in claim 1, wherein: the side of the pipe well external member is provided with a steel bar protruding out of the surface, and the steel bar is embedded in the pipe well external member.
3. The process of constructing a well with a pipeline as claimed in claim 2, wherein: the side of the pipeline well sleeve is provided with an inwards concave slotted hole.
4. The process of constructing a well with a pipeline as claimed in claim 3, wherein: the slotted hole and the reinforcing steel bar are coaxially arranged.
5. The process of constructing a well with a pipeline as claimed in claim 1, wherein: and a transverse strip-shaped groove is processed on the side surface of the pipe well sleeve.
CN202010718900.5A 2020-07-23 2020-07-23 Construction process for well road with pipeline Pending CN111827040A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010718900.5A CN111827040A (en) 2020-07-23 2020-07-23 Construction process for well road with pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010718900.5A CN111827040A (en) 2020-07-23 2020-07-23 Construction process for well road with pipeline

Publications (1)

Publication Number Publication Date
CN111827040A true CN111827040A (en) 2020-10-27

Family

ID=72925445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010718900.5A Pending CN111827040A (en) 2020-07-23 2020-07-23 Construction process for well road with pipeline

Country Status (1)

Country Link
CN (1) CN111827040A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285613A (en) * 2003-03-20 2004-10-14 Kamiya Kenchiku Sekkei:Kk Construction method for building foundation
CN205369311U (en) * 2016-01-06 2016-07-06 深圳市路桥建设集团有限公司 A walling crib for reinforcing or inspection shaft on maintenance town road
CN108252176A (en) * 2018-03-14 2018-07-06 袁州 A kind of pavement engineering construction method equipped with inspection shaft
CN110295627A (en) * 2019-06-28 2019-10-01 上海二十冶建设有限公司 Road inspection well construction method
CN110295628A (en) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 A kind of pavement construction method with inspection shaft
CN210975404U (en) * 2019-10-25 2020-07-10 中建科技长春有限公司 Composite assembled road surface board

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285613A (en) * 2003-03-20 2004-10-14 Kamiya Kenchiku Sekkei:Kk Construction method for building foundation
CN205369311U (en) * 2016-01-06 2016-07-06 深圳市路桥建设集团有限公司 A walling crib for reinforcing or inspection shaft on maintenance town road
CN108252176A (en) * 2018-03-14 2018-07-06 袁州 A kind of pavement engineering construction method equipped with inspection shaft
CN110295627A (en) * 2019-06-28 2019-10-01 上海二十冶建设有限公司 Road inspection well construction method
CN110295628A (en) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 A kind of pavement construction method with inspection shaft
CN210975404U (en) * 2019-10-25 2020-07-10 中建科技长春有限公司 Composite assembled road surface board

Similar Documents

Publication Publication Date Title
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN201588207U (en) Concreting device at construction joints
CN209924233U (en) Assembled building floor structure
CN104294753A (en) Bridge prefabricated hollow pier stud connecting structure and construction method thereof
CN103374880B (en) The connecting structure of a kind of precast pier and cushion cap and dock construction method thereof
CN204343463U (en) A kind of waterproof construction of prefabricated reinforced concrete composite wallboard piece
CN102011410A (en) Prefabricated prestressed underground continuous wall and construction method thereof
CN103669866A (en) Construction method of basement reinforced concrete column joint connecting structure
CN112695795A (en) Precast concrete T shape post rim of a cup basis
CN105297905A (en) Method for connecting prefabricated floor and prefabricated vertical component
CN101487290A (en) Construction method for construction floating window
CN203961014U (en) A kind of precast concrete building structure
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN111827040A (en) Construction process for well road with pipeline
CN104153460B (en) Construction method for horizontally connecting between precast concrete component and component
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN105220809B (en) A kind of arch top plate and the attachment structure and its construction method of bracket stake
CN109024144B (en) Municipal assembled road and construction method thereof
CN204174527U (en) The hollow pier stud syndeton of a kind of bridge prefabrication
CN207348280U (en) A kind of novel precast floor slab
CN206245465U (en) Suitable for the wall transverse direction dry type attachment structure of assembled architecture
CN104911999A (en) Construction method for deeply burying anchor
CN215210984U (en) Ride partial reverse construction method underground continuous wall of striding sewage pipe
CN206829176U (en) A kind of prefabricated block brick assembled plastic drainage pipeline basis
CN207513020U (en) A kind of assembly concrete girder construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination