CN111824917A - Overlap joint structure, manufacturing method thereof, truss and escalator or moving sidewalk - Google Patents

Overlap joint structure, manufacturing method thereof, truss and escalator or moving sidewalk Download PDF

Info

Publication number
CN111824917A
CN111824917A CN202010644125.3A CN202010644125A CN111824917A CN 111824917 A CN111824917 A CN 111824917A CN 202010644125 A CN202010644125 A CN 202010644125A CN 111824917 A CN111824917 A CN 111824917A
Authority
CN
China
Prior art keywords
connection
assembly
plate
docking
connection member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010644125.3A
Other languages
Chinese (zh)
Inventor
左东林
何星泉
关口健太郎
彭盼盈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator China Co Ltd
Hitachi Elevator Guangzhou Escalator Co Ltd
Original Assignee
Hitachi Elevator China Co Ltd
Hitachi Elevator Guangzhou Escalator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator China Co Ltd, Hitachi Elevator Guangzhou Escalator Co Ltd filed Critical Hitachi Elevator China Co Ltd
Priority to CN202010644125.3A priority Critical patent/CN111824917A/en
Publication of CN111824917A publication Critical patent/CN111824917A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B23/00Component parts of escalators or moving walkways
    • B66B23/22Balustrades
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B23/00Component parts of escalators or moving walkways
    • B66B23/22Balustrades
    • B66B23/24Handrails

Abstract

The invention relates to a connection structure, a manufacturing method thereof, a truss and an escalator or a moving sidewalk, which comprises the following steps: a first docking member, a second docking member, a first connecting assembly and a second connecting assembly; the first connection member and the second connection member comprise beam frames, first connection plates and second connection plates; the first connection plate is welded and fixed on the upper part of the beam frame, the first connection member and the second connection member are respectively provided with a first assembly hole penetrating through the first connection plate and the beam frame, and the first connection assembly is inserted and fixed in two adjacent first assembly holes; and the second connection plate is welded and fixed at the bottom of the beam frame, the first connection member and the second connection member are also provided with second assembly holes which penetrate through the second connection plate and the beam frame, and the second connection assembly is inserted and fixed in the second assembly holes.

Description

Overlap joint structure, manufacturing method thereof, truss and escalator or moving sidewalk
Technical Field
The invention relates to the technical field of escalators or moving sidewalks, in particular to a connection structure, a manufacturing method of the connection structure, a truss and an escalator or moving sidewalk.
Background
Traditionally, as urbanization steps have advanced, more and more large-span escalators or moving walkways have been invested in urban public service systems. However, for the large-span escalator or moving sidewalk, the truss of the escalator or moving sidewalk is generally designed into a sectional type splicing structure due to the limitation of insufficient length of raw materials, high transportation and installation costs and the like, and at this time, the design of a splicing structure for connecting two adjacent sectional trusses needs to be considered.
In the prior art, a connection structure for connecting two adjacent segmented trusses generally comprises a transition mounting plate and a large number of bolt groups, wherein the bolt groups are used for assembling and fixing the transition mounting plate and the two adjacent segmented trusses in a threaded manner. However, in consideration of the connection strength, more bolt holes need to be processed on the transition mounting plate and the segmented truss, so that bolt hole alignment and assembly procedures are heavy during field assembly, the processing efficiency is affected, and the labor intensity is high; and because the hole site processing quantity is many, and the accumulative error is big, in order to guarantee the counterpoint precision of bolt group and bolt hole when the on-the-spot equipment, the bolt hole on the transition mounting panel generally can not be processed together when the truss is made, and need join in marriage the brill according to the bolt hole position on the truss in the on-the-spot, and the manufacturing procedure is many, and the cycle is long, influences the installation progress of automatic escalator or moving walk.
Disclosure of Invention
Therefore, a connection structure, a manufacturing method thereof, a truss, an escalator or a moving sidewalk are needed to be provided, and the problems of complex processes, high labor intensity and low processing efficiency in the prior art are solved.
In one aspect, the present application provides a docking structure, the docking structure includes: a first docking member, a second docking member, a first connecting assembly and a second connecting assembly;
the first connection member and the second connection member comprise beam frames, first connection plates and second connection plates; the first connection plate is welded and fixed on the upper part of the beam frame, the first connection member and the second connection member are respectively provided with a first assembly hole penetrating through the first connection plate and the beam frame, and the first connection assembly is inserted and fixed in two adjacent first assembly holes; and the second connection plate is welded and fixed at the bottom of the beam frame, the first connection member and the second connection member are also provided with second assembly holes which penetrate through the second connection plate and the beam frame, and the second connection assembly is inserted and fixed in the second assembly holes.
The connection structure is applied to a truss structure of an escalator or a moving sidewalk, and is particularly used for assembling and connecting two adjacent segmented trusses (namely a first segmented truss and a second segmented truss), so that the processing procedures are reduced, the processing efficiency is improved, and the labor intensity of workers is reduced. Specifically, during production, a first connection plate can be welded and fixed on the upper part of a beam frame in a factory, and a first assembly hole is integrally drilled on the first connection plate and the beam frame; simultaneously welding and fixing a second connection plate to the bottom of the beam frame, and respectively drilling second assembly holes on the second connection plate and the beam frame to obtain a first connection member and a second connection member which have basically the same or completely the same structures; then, the first connection member and the second connection member are transported to a construction site, the first connection member is fixedly installed at the end part of the first segmental truss, the second connection member is fixedly installed at the end part of the second segmental truss, and at the moment, the first connection member and the second connection member are adjacently and oppositely arranged at the connection part of the first segmental truss and the second segmental truss; and finally, inserting and fixing the first connecting assembly into the two adjacent first assembling holes, and inserting and fixing the second connecting assembly into the two adjacent second assembling holes, so that the assembly of the first connection member and the second connection member can be completed quickly, and the first sectional truss and the second sectional truss can be assembled into a whole finally. Compare in traditional connection structure of refuting, the first connection board of refuting and the second connection board of refuting can be fixed on the roof beam structure by integrated processing in advance in this scheme to whole trompil not only can obtain necessary sufficient structural strength, and the trompil is small in quantity simultaneously, does not need the scene to carry out the trompil operation, and assembly process and step are simple, and processing cycle is short, and workman low in labor strength does benefit to and improves production machining efficiency.
The technical solution of the present application is further described below:
in one embodiment, the beam frame comprises a bottom cross beam, two longitudinal beams and a middle cross beam, the bottom ends of the two longitudinal beams are arranged on the bottom cross beam, and two ends of the middle cross beam are respectively connected to the middles of the two longitudinal beams; the first connection plate is welded and fixed on the upper portion of the longitudinal beam, and the second connection plate is welded and fixed on the bottom cross beam.
In one embodiment, in the first connection member and the second connection member, the first assembling holes are two and are arranged at intervals in the vertical direction, two opposite first assembling holes in the same horizontal plane are in one group, and the first connecting assemblies are in one-to-one assembly connection with the two groups of first assembling holes.
In one embodiment, in the first connection member and the second connection member, the second assembly holes are all multiple and arranged at intervals along the transverse direction, two opposite second assembly holes in the same vertical plane are in one group, and the second connection assemblies are multiple and are in one-to-one assembly connection with multiple groups of second assembly holes.
In one embodiment, the connection structure further comprises a pre-positioning assembly and a reinforcing base plate, the reinforcing base plate is arranged on the longitudinal beam, the first connection member and the second connection member are provided with pre-positioning holes penetrating through the reinforcing base plate and the longitudinal beam, and the pre-positioning assemblies are inserted and fixed in the two adjacent pre-positioning holes.
In one embodiment, the first and second connection members further each include a first reinforcing plate and a second reinforcing plate, the first reinforcing plate is fixedly connected with the upper chord and the longitudinal beam, and the second reinforcing plate is fixedly connected with the bottom cross beam and the longitudinal beam.
In one embodiment, the second connection plate is provided with a positioning groove, and the positioning groove is used for inserting the end part of the lower chord.
In addition, the present application also provides a manufacturing method of the docking structure, which includes the following steps:
welding and fixing a first connection plate on the upper part of a beam frame, and integrally drilling the first connection plate and the beam frame to form a first assembly hole;
welding and fixing a second connection plate to the bottom of the beam frame, and respectively drilling second assembly holes on the second connection plate and the beam frame to obtain a first connection member and a second connection member;
inserting and fixing the first connection assembly into the first fitting hole of the first docking member and the first fitting hole of the second docking member;
inserting and fixing a second connection assembly into the second assembly hole of the first docking member and the second assembly hole of the second docking member.
In another aspect, the present application also provides a truss including the docking structure as described above.
Finally, the present application also provides an escalator or moving walkway comprising a truss as described above.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the invention and, together with the description, serve to explain the invention and not to limit the invention.
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a truss according to an embodiment of the invention;
FIG. 2 is a schematic structural diagram of the docking structure of FIG. 1;
fig. 3 is a right side view of the first docking member of fig. 2;
fig. 4 is a schematic structural diagram of a first docking plate according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of a second docking plate according to an embodiment of the present invention;
FIG. 6 is a bottom view of the structure of FIG. 5;
fig. 7 is a flowchart illustrating a method for manufacturing a docking structure according to an embodiment of the present invention.
Description of reference numerals:
10. a first docking member; 20. a second docking member; 30. a first connection assembly; 40. a second connection assembly; 50. a beam frame; 51. a bottom cross member; 52. a stringer; 53. a middle cross beam; 60. a first docking plate; 61. a first assembly hole; 70. a second docking plate; 71. positioning a groove; 72. a second assembly hole 80, a pre-positioning assembly; 90. reinforcing the base plate; 100. a first reinforcing plate; 110. a second reinforcing plate; 200. a docking structure; 300. a truss; 310. an upper chord member; 320. and a lower chord member.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.
The embodiment of the application provides an escalator or a moving sidewalk, which is used for automatically conveying pedestrians between two fixedly arranged places so as to overcome complex terrain obstacles, avoid the pedestrians from walking and reduce physical loss of the pedestrians.
The escalator is a fixed electric driving device which is formed by combining a chain conveyor with a special structure form and two belt conveyors with a special structure form, is provided with a circulating movement ladder way and is used for conveying passengers upwards or downwards at different story heights of a building. Specifically, it may be a continuous transport machine having a walk-substituting property in which a carrier moves up and down. The escalator consists of a ladder way and handrails at two sides. The main components of the device comprise steps, a traction chain and a chain wheel, a guide rail system, a main transmission system (comprising a motor, a speed reducer, a brake, an intermediate transmission link and the like), a driving main shaft, a ladder way tensioning device, a handrail system, a comb plate, a ladder framework, an electric system and the like. The stairs horizontally move at the entrance of the passenger so as to facilitate the passenger to climb the stairs and gradually form the stairs later; the steps disappear gradually near the exit and the steps 50 move horizontally again to facilitate the passengers getting off the stairs.
The moving walkway, in turn, refers to a fixed electrically driven installation with a circulating (plate or belt) walkway for transporting passengers with a horizontal or inclined angle not greater than 12 °. The structure of the escalator is similar to that of an escalator and mainly comprises a moving pavement and a handrail. The moving sidewalk is suitable for places with concentrated pedestrian streams, such as stations, docks, shopping malls, airports, exhibition halls, sports halls and the like. The step-like shape is not formed even when the movable road surface is inclined.
The main bearing framework of the automatic sidewalk or the escalator is the truss 300. As will be readily appreciated, the truss 300 is typically a steel frame structure formed by welding or assembling steel members for installation in a construction site to carry a main drive system, a track system, etc.
For some large span applications, the length of the truss 300 may need to be designed to be correspondingly long. However, due to the limitations of installation and transportation, the steel members constituting the truss 300 cannot be made into a long whole, and thus a sectional design is required. The original integral truss 300 is manufactured into the segmented truss with shorter length and smaller volume and the corresponding connection structure 200, and the segmented truss is assembled and connected into the integral truss by means of the connection structure 200, so that the use requirement is met, meanwhile, the assembly and connection are convenient, and the structural strength is high.
As shown in fig. 1, fig. 2, fig. 4 and fig. 5, a schematic structural diagram of a connection structure 200 equipped in a truss 300 for applying the connection structure 200 according to an embodiment of the present application is shown, where the connection structure 200 includes: a first docking member 10, a second docking member 20, a first connecting assembly 30 and a second connecting assembly 40.
The first and second docking members 10 and 20 each include a beam 50, a first docking plate 60, and a second docking plate 70; the first connection plate 60 is welded and fixed on the upper portion of the beam frame 50, the first connection member 10 and the second connection member 20 are further provided with first assembly holes 61 penetrating through the first connection plate 60 and the beam frame 50, and the first connection assembly 30 is inserted and fixed in two adjacent first assembly holes 61; and a second connection plate 70 is welded and fixed at the bottom of the beam frame 50, the first connection member 10 and the second connection member 20 are also provided with second assembly holes 72 which penetrate through the second connection plate 70 and the beam frame 50, and the second connection assembly 40 is inserted and fixed in two adjacent second assembly holes 72.
The implementation of the technical scheme of the embodiment has the following beneficial effects: the connection structure 200 of the above scheme is applied to a truss 300 structure of an escalator or a moving sidewalk, and is specifically used for assembling and connecting two adjacent segmented trusses (i.e., a first segmented truss and a second segmented truss), so that the number of machining processes is reduced, the machining efficiency is improved, and the labor intensity of workers is reduced. Specifically, during production, the first connector plate 60 may be welded and fixed to the upper portion of the beam frame 50 in a factory, and the first assembly holes 61 may be integrally drilled in the first connector plate 60 and the beam frame 50; meanwhile, welding and fixing a second connection plate 70 to the bottom of the beam frame 50, and drilling second assembly holes 72 on the second connection plate 70 and the beam frame 50 respectively; the first and second docking members 10 and 20, which are substantially or exactly the same in structure, have been obtained; then, the first connection member 10 and the second connection member 20 are transported to a construction site, the first connection member 10 is fixedly installed at the end of the first segmental truss, the second connection member 20 is fixedly installed at the end of the second segmental truss, and at the moment, the first connection member 10 and the second connection member 20 are adjacently and oppositely arranged at the connection position of the first segmental truss and the second segmental truss; finally, the first connecting assembly 30 is inserted and fixed into two adjacent first assembling holes 61, and the second connecting assembly 40 is inserted and fixed into two adjacent second assembling holes 72, so that the assembly of the first connection member 10 and the second connection member 20 can be completed quickly, and the first sectional truss and the second sectional truss can be assembled into a whole finally. Compared with the traditional connection structure 200, the first connection plate 60 and the second connection plate 70 can be integrally machined and fixed on the beam frame 50 in advance in the scheme and are integrally perforated, necessary enough structural strength can be obtained, the number of the perforated holes is small, the hole perforating operation is not needed on site, the assembling process and the steps are simple, the machining period is short, the labor intensity of workers is low, and the production and machining efficiency is improved.
Referring to fig. 1, for convenience of description and understanding of the present invention, the truss 300 is divided into two parts, i.e. the truss 300 includes a first part truss and a second part truss. The first and second segmented trusses each include an upper chord 310 and a lower chord 320, and the upper chord 310 and the lower chord 320 are arranged side by side at intervals in the height direction. Specifically, the upper chord 310 and the lower chord 320 may be steel structural members such as angle steels and channel steels, and the materials are convenient to obtain, and have good applicability and implementation.
In order to obtain higher overall structural strength of the truss 300, a plurality of web chords arranged vertically or obliquely are further connected between the upper chord 310 and the lower chord 320. Alternatively, the web may be welded, bolted, or riveted to the upper and lower chords 310, 320; the concrete selection can be carried out according to the actual requirement.
It should be noted that the first connection plate 60 should be welded to the upper chord 310 in a welting manner, and the second connection plate 70 should be welded to the lower chord 320 in a welting manner, so as to facilitate accurate positioning when the connection structure 200 is assembled with the upper chord 310 and the lower chord 320.
It is easy to understand that the first connection member 10 and the second connection member 20 adopt a symmetrical structure design, so as to facilitate reducing the manufacturing cost and difficulty and improving the production efficiency.
As shown in fig. 7, the present application also provides a method for manufacturing the docking structure 200, which includes the following steps:
s100: welding and fixing a first connection plate 60 on the upper part of the beam frame 50, and integrally drilling a first assembly hole 61 on the first connection plate 60 and the beam frame 50;
s200: welding and fixing a second connection plate 70 to the bottom of the beam frame 50, and drilling second assembly holes 72 on the second connection plate 70 and the beam frame 50 respectively to obtain a first connection member 10 and a second connection member 20;
s300: inserting and fixing the first connection assembly 30 into the first fitting hole 61 of the first docking member 10 and the first fitting hole 61 of the second docking member 20;
s400: inserting and fixing a second connection assembly 40 into the second fitting hole 72 of the first docking member 10 and the second fitting hole of the second docking member 20. According to the scheme, the effects of prefabricating each part in a factory and then integrally assembling the parts on a construction site can be realized, the operation is convenient and fast, and the connection reliability is high.
And because the first assembly hole 61 on the first connection plate 60 and the second assembly hole 72 on the second connection plate 70 are both opened during the manufacturing of the parts and then are connected with the truss in a welding manner, the need for on-site hole matching and drilling like the traditional connection structure is avoided, and the operation time is long and the difficulty is high.
With continued reference to fig. 2 and 3, in some embodiments, the beam frame 50 includes a bottom cross beam 51, two longitudinal beams 52 and a middle cross beam 53, bottom ends of the two longitudinal beams 52 are disposed on the bottom cross beam 51, and two ends of the middle cross beam 53 are respectively connected to middle portions of the two longitudinal beams 52; the first connector board 60 is fixed to the upper portion of the longitudinal beam 52 by welding, and the second connector board 70 is fixed to the bottom cross beam 51 by welding. At this time, the bottom cross member 51, the longitudinal members 52 and the middle cross member 53 are combined to form the first connecting member 10 and the second connecting member 20 which are stable in structure, so that the connecting structure 200 after being assembled and formed can reliably connect and support the upper chord 310 and the lower chord 320. Also, the first and second docking plates 60 and 70 located above and below facilitate strengthening of the connection tightness of the first and second docking members 10 and 20 in a vertical plane.
Further, in the first connection member 10 with in the second connection member 20, first pilot hole 61 is two and sets up along vertical interval, is in two relative in the same horizontal plane first pilot hole 61 is a set of, first connecting elements 30 is two, and with two sets of first pilot hole 61 one-to-one assembled connection. This ensures that the connection mechanism has sufficient connection strength, and ensures the surface parallelism of the left and right upper chords 310 and the straightness of the escalator or moving walkway when the truss 300 is connected by the connection structure 200.
Further, in the first connection member 10 and the second connection member 20, the second assembling holes 72 are a plurality of and are arranged along a transverse interval, two opposite second assembling holes 72 in the same vertical plane are a group, the second connecting assembly 40 is a plurality of, and is connected with a plurality of groups in a one-to-one correspondence manner through the second assembling holes 72. As can be seen from the results of the mechanical analysis, the axial force on the lower chord 320 is generally the largest, so that the second assembly hole 72 for connection is disposed on the bottom cross beam 51 (i.e., the bottom of the truss 300) and connected by the second connecting assembly 40, the connection force is optimized more directly and effectively, and the deformation resistance effect and the deformation resistance capability are better. At this moment, not only can the surplus space of truss 300 bottom be fully utilized, do not influence other parts (such as step, guide rail are drawn, railing etc.) normal assembly connection simultaneously, simultaneously through arranging multiunit second coupling assembling 40, can make the connection intensity of refuting connection structure 200 and truss 300 higher, the bottom can bear bigger axle power, guarantees escalator or moving walk's bulk rigidity, applicable in the big span occasion of high lift and no intermediate strut.
It should be noted that the first connecting assembly 30 and the second connecting assembly 40 are preferably torsional shear type high strength bolts, which are connected by friction, that is, the friction between the contact surfaces is used to bear the load. Accordingly, the first and second fitting holes 61 and 72 are bolt holes. In actual use, the escalator or the moving sidewalk is usually subjected to variable loads (such as loads applied by passengers with different weights), so that the connection in the mode has good anti-fatigue effect, and the service life of the truss 300 can be properly prolonged; the existing connection structure usually uses a hinged bolt, and a screw rod is directly stressed, so that a bolt hole needs to be drilled on site to ensure the processing precision, the connection mode adopts a high-strength bolt friction type connection, so that the screw rod can not bear the force, the gap between the hole wall of the bolt hole and the outer wall of the screw rod can reach 2mm, and the operation difficulty is reduced.
It should be further noted that the hole diameter of the bolt hole on the bottom cross beam 51 is at least 2mm larger than the hole diameter of the bolt hole on the second connector plate 70, so as to facilitate the subsequent alignment and assembly. Because of the friction connection, the screw rod is not stressed at the moment, so that the aperture of the bolt holes in the first connection plate 60 and the second connection plate 70 is at least 2mm larger than the diameter of the screw rod, and the alignment difficulty is effectively reduced.
With reference to fig. 2 and fig. 3, in addition, on the basis of any of the above embodiments, the connection structure 200 further includes a pre-positioning assembly 80 and a reinforcing backing plate 90, the reinforcing backing plate 90 is disposed on the longitudinal beam 52, the first connection member 10 and the second connection member 20 are further provided with pre-positioning holes penetrating through the reinforcing backing plate 90 and the longitudinal beam 52, and the pre-positioning assembly 80 is inserted and fixed in two adjacent pre-positioning holes. Through the pre-positioning assembly 80 and the pre-positioning holes on the two sides in assembly connection, the first connection component 10 and the second connection component 20 can be accurately aligned in assembly connection, and the assembly difficulty of each subsequent connection component and the corresponding assembly hole is reduced.
Specifically, the pre-positioning assembly 80 includes a socket pin and a backing plate. The base plate is welded and fixed on the longitudinal beam 52 in advance, then a pre-positioning hole is integrally drilled on the base plate and the longitudinal beam 52, and then the socket pin is connected with the pre-positioning holes on the two sides in an inserting mode. The purpose of arranging the backing plate is to increase the connection strength, improve the hole edge strength of the pre-positioning hole and prevent the hole edge from bursting due to overlarge pressure.
The second connection plate 70 is provided with a positioning groove 71, and the positioning groove 71 is used for inserting the end of the lower chord member 320. Therefore, the lower chord 320 and the second connection plate 70 can be assembled and positioned, and the connection position precision is ensured.
With reference to fig. 2 and fig. 3, on the basis of any of the above embodiments, each of the first and second segmented trusses includes an upper chord 310 and a lower chord 320 arranged vertically side by side, each of the first and second connection members 10 and 20 further includes a first reinforcing plate 100 and a second reinforcing plate 110, the first reinforcing plate 100 is fixedly connected to the upper chord 310 and the longitudinal beam 52, and the second reinforcing plate 110 is fixedly connected to the bottom cross beam 51 and the longitudinal beam 52. By additionally arranging the first reinforcing plate 100 and the second reinforcing plate 110, the overall structural strength and rigidity of the connection structure 200 can be further enhanced, and the variable load bearing capacity is improved.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, the first feature "on" or "under" the second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
It will be understood that when an element is referred to as being "secured to" or "disposed on" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "upper," "lower," "left," "right," and the like as used herein are for illustrative purposes only and do not denote a unique embodiment.

Claims (10)

1. A docking structure, comprising: a first docking member, a second docking member, a first connecting assembly and a second connecting assembly;
the first connection member and the second connection member comprise beam frames, first connection plates and second connection plates; the first connection plate is fixed on the upper part of the beam frame, the first connection member and the second connection member are respectively provided with a first assembly hole penetrating the first connection plate and the beam frame, and the first connection assembly is inserted and fixed in two adjacent first assembly holes; and
the second is refuted and is connected the board and be fixed in the bottom of roof beam structure, first refute connect the component with the second is refuted and is connected the component still all be equipped with run through set up in the second refute the board with second pilot hole on the roof beam structure, second coupling assembling is planted and is fixed in adjacent two in the second pilot hole.
2. The docking structure of claim 1, wherein the beam frame comprises a bottom cross beam, two longitudinal beams and a middle cross beam, wherein the bottom ends of the two longitudinal beams are arranged on the bottom cross beam, and the two ends of the middle cross beam are respectively connected to the middle parts of the two longitudinal beams; the first connection plate is welded and fixed on the upper portion of the longitudinal beam, and the second connection plate is welded and fixed on the bottom cross beam.
3. The connection structure according to claim 1 or 2, wherein in the first connection member and the second connection member, the first assembly holes are two and are arranged at intervals in a vertical direction, two opposite first assembly holes in the same horizontal plane are in one group, and the first connection assemblies are two and are assembled and connected with the two groups of first assembly holes in a one-to-one correspondence manner.
4. The connection structure according to claim 1 or 2, wherein in the first connection member and the second connection member, the second assembly holes are plural and arranged at intervals in the transverse direction, two opposite second assembly holes in the same vertical plane are in one group, and the second connection assemblies are plural and are assembled and connected with the plural groups of the second assembly holes in a one-to-one correspondence manner.
5. The connection structure according to claim 2, further comprising a pre-positioning assembly and a reinforcing backing plate, wherein the reinforcing backing plate is disposed on the longitudinal beam, the first connection member and the second connection member are both provided with pre-positioning holes penetrating through the reinforcing backing plate and the longitudinal beam, and the pre-positioning assemblies are inserted and fixed in the two adjacent pre-positioning holes.
6. The docking structure of claim 2 wherein each of the first and second docking members further comprises a first and second reinforcing plate, the first reinforcing plate being fixedly connected to the top chord and the longitudinal beam, respectively, and the second reinforcing plate being fixedly connected to the bottom cross beam and the longitudinal beam, respectively.
7. The connection structure of claim 6, wherein the second connection plate is provided with a positioning groove for inserting an end of the lower chord.
8. A manufacturing method of a connection structure is characterized by comprising the following steps:
welding and fixing a first connection plate on the upper part of a beam frame, and integrally drilling the first connection plate and the beam frame to form a first assembly hole;
welding and fixing a second connection plate to the bottom of the beam frame, and respectively drilling second assembly holes on the second connection plate and the beam frame to obtain a first connection member and a second connection member;
inserting and fixing the first connection assembly into the first fitting hole of the first docking member and the first fitting hole of the second docking member;
inserting and fixing a second connection assembly into the second assembly hole of the first docking member and the second assembly hole of the second docking member.
9. A truss including a docking structure according to any one of claims 1 to 7.
10. Escalator or moving walkway, characterized in that it comprises a truss according to claim 9.
CN202010644125.3A 2020-07-07 2020-07-07 Overlap joint structure, manufacturing method thereof, truss and escalator or moving sidewalk Pending CN111824917A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010644125.3A CN111824917A (en) 2020-07-07 2020-07-07 Overlap joint structure, manufacturing method thereof, truss and escalator or moving sidewalk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010644125.3A CN111824917A (en) 2020-07-07 2020-07-07 Overlap joint structure, manufacturing method thereof, truss and escalator or moving sidewalk

Publications (1)

Publication Number Publication Date
CN111824917A true CN111824917A (en) 2020-10-27

Family

ID=72901105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010644125.3A Pending CN111824917A (en) 2020-07-07 2020-07-07 Overlap joint structure, manufacturing method thereof, truss and escalator or moving sidewalk

Country Status (1)

Country Link
CN (1) CN111824917A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113148820A (en) * 2021-02-24 2021-07-23 上海三菱电梯有限公司 Single-piece type frame, integral type frame and old ladder truss transformation structure of escalator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6357485A (en) * 1986-05-10 1988-03-12 株式会社日立製作所 Frame joint device for passenger conveyor
JPH01308387A (en) * 1988-06-06 1989-12-13 Hitachi Ltd Frame body and mold member therefor and manufacture of connection thereof
CN101224840A (en) * 2008-02-05 2008-07-23 苏州江南嘉捷电梯股份有限公司 Sectionalizing device for girders of passenger conveying equipment
CN104003281A (en) * 2014-06-11 2014-08-27 日立电梯(广州)自动扶梯有限公司 Overlap-connecting structure of escalator truss
CN203938346U (en) * 2014-04-22 2014-11-12 西尼电梯(杭州)有限公司 Moving staircase girders connection structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6357485A (en) * 1986-05-10 1988-03-12 株式会社日立製作所 Frame joint device for passenger conveyor
JPH01308387A (en) * 1988-06-06 1989-12-13 Hitachi Ltd Frame body and mold member therefor and manufacture of connection thereof
CN101224840A (en) * 2008-02-05 2008-07-23 苏州江南嘉捷电梯股份有限公司 Sectionalizing device for girders of passenger conveying equipment
CN203938346U (en) * 2014-04-22 2014-11-12 西尼电梯(杭州)有限公司 Moving staircase girders connection structure
CN104003281A (en) * 2014-06-11 2014-08-27 日立电梯(广州)自动扶梯有限公司 Overlap-connecting structure of escalator truss

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗玉斌: ""广州地铁自动扶梯建设工程精细化管理体系中的质量控制"", 《中国电梯》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113148820A (en) * 2021-02-24 2021-07-23 上海三菱电梯有限公司 Single-piece type frame, integral type frame and old ladder truss transformation structure of escalator

Similar Documents

Publication Publication Date Title
JP4824157B2 (en) Long escalator and moving walkway support structure
KR101320972B1 (en) Truss construction for a passenger conveyor
US6685002B1 (en) Method of escalator modernization
CN105603860B (en) Prefabricated T beam and construction method
US20150239711A1 (en) Track System for an Escalator or Moving Walkway
CN101177956B (en) Flexible railway separating thrusting slip construction method and equipment thereof
CN111824917A (en) Overlap joint structure, manufacturing method thereof, truss and escalator or moving sidewalk
CN103010912A (en) Passenger conveying equipment
KR20150043379A (en) Overhead conveying device having column gantries
JP2007518650A (en) Moving walkway, moving slope, or escalator
CN105829235A (en) Moving Walk
US20220145610A1 (en) Truss section connection region
JP2011195213A (en) Passenger conveyor
JP4860485B2 (en) Moving walkway, moving slope, or escalator
KR20120003342A (en) Gable frame improved connection strength and constructability of beam
CN214217850U (en) Assembled elevator well and elevator thereof
CN111824915A (en) Truss structure and escalator or moving walk
CN216786858U (en) Crawling ladder and bridge erecting machine
CN220814626U (en) Combined beam type stair
CN214696963U (en) Steel structure splicing platform slideway frame for sliding construction
CN215442791U (en) Combined stair connecting structure and combined stair
CN220057640U (en) Track type bridge cast-in-situ breast board construction platform
CN114277673B (en) Large-span large-inclination-angle basket type steel girder and arch segment assembling method
CN218756950U (en) Pedestrian overpass ladder way
CN216040756U (en) Prefabricated subway station platform of assembling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201027