CN111813824A - Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line - Google Patents

Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line Download PDF

Info

Publication number
CN111813824A
CN111813824A CN202010488634.1A CN202010488634A CN111813824A CN 111813824 A CN111813824 A CN 111813824A CN 202010488634 A CN202010488634 A CN 202010488634A CN 111813824 A CN111813824 A CN 111813824A
Authority
CN
China
Prior art keywords
power failure
line
failure event
distribution transformer
outgoing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010488634.1A
Other languages
Chinese (zh)
Other versions
CN111813824B (en
Inventor
安义
舒骁骁
欧阳文华
戚沁雅
蒙天琪
周求宽
晏年平
杨浩
郑蜀江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Power Supply Service Management Center Of State Grid Jiangxi Electric Power Co ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
Power Supply Service Management Center Of State Grid Jiangxi Electric Power Co ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Supply Service Management Center Of State Grid Jiangxi Electric Power Co ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical Power Supply Service Management Center Of State Grid Jiangxi Electric Power Co ltd
Priority to CN202010488634.1A priority Critical patent/CN111813824B/en
Publication of CN111813824A publication Critical patent/CN111813824A/en
Application granted granted Critical
Publication of CN111813824B publication Critical patent/CN111813824B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2474Sequence data queries, e.g. querying versioned data
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/165Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values
    • G01R19/16566Circuits and arrangements for comparing voltage or current with one or several thresholds and for indicating the result not covered by subgroups G01R19/16504, G01R19/16528, G01R19/16533
    • G01R19/16571Circuits and arrangements for comparing voltage or current with one or several thresholds and for indicating the result not covered by subgroups G01R19/16504, G01R19/16528, G01R19/16533 comparing AC or DC current with one threshold, e.g. load current, over-current, surge current or fault current
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/165Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values
    • G01R19/16566Circuits and arrangements for comparing voltage or current with one or several thresholds and for indicating the result not covered by subgroups G01R19/16504, G01R19/16528, G01R19/16533
    • G01R19/16576Circuits and arrangements for comparing voltage or current with one or several thresholds and for indicating the result not covered by subgroups G01R19/16504, G01R19/16528, G01R19/16533 comparing DC or AC voltage with one threshold
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Probability & Statistics with Applications (AREA)
  • Water Supply & Treatment (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Computational Linguistics (AREA)
  • Software Systems (AREA)
  • Mathematical Physics (AREA)
  • Fuzzy Systems (AREA)
  • Public Health (AREA)
  • Data Mining & Analysis (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A10 kV line outgoing line power failure event missing report automatic detection method and system, the method does not need to consider medium voltage distribution network line parameter factors, only needs to clarify the line and distribution transformer attribution relation; collecting current on the outlet side of a 10kV line transformer substation, switching-on and switching-off and protection information of an outgoing line switch, and collecting voltage and current on the outlet side of a distribution transformer and power-off event information; and processing and analyzing the acquired data according to a distribution transformer power failure event generation rule, a 10kV line outgoing power failure event generation rule, a 10kV line study and judgment power failure event generation rule and a 10kV line outgoing power failure event missed reporting check rule to obtain a 10kV line outlet power failure event missed reporting condition. The invention fully utilizes the existing electric acquisition devices of the transformer substation and the distribution station area, does not need to add new hardware, and can realize the missing report detection of the power failure event of the outgoing line of the 10kV line by the executable program code of the computer.

Description

Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line
Technical Field
The invention relates to a method and a system for automatically detecting missing report of a 10kV line outgoing line power failure event, and belongs to the technical field of power distribution and utilization.
Background
In the process of generating, transmitting and storing the outgoing line power failure events of the 10kV line, due to the influences of instability of a transformer substation acquisition device, instability of a network channel and the like, the situation that the outgoing line power failure events of the 10kV line are lost is caused, the outgoing line power failure situation of the 10kV line cannot be accurately mastered, further, the 10kV line power failure management is not facilitated, power failure information cannot be accurately issued to users, and the risk of power failure complaints of the users is increased.
At present, the distribution transformer of a 10kV line connected belt finishes the collection of distribution transformer power failure events through an intelligent ammeter and a concentrator, if the distribution transformer power failure events can be uploaded to a storage database, the situation that the 10kV line outgoing power failure events are not reported can be verified according to whether the distribution transformer of the 10kV line connected belt has all power failures, however, the situation that the distribution transformer power failure events are not reported due to the influences of unstable concentrator collecting devices, unstable network channels and the like in the actual situation exists, the situation that the distribution transformer power failure events are not reported simultaneously is caused, the problem that the distribution transformer power failure events are asynchronous in clocks is solved, the power failure starting time of the distribution transformer power failure events is not on the same time axis, and the accuracy of the 10kV line outgoing power failure event report detection is influenced.
Disclosure of Invention
The invention aims to effectively and accurately detect the condition of missing report of the power failure event of the outgoing line of a 10kV line, and provides a method and a system for automatically detecting the missing report of the power failure event of the outgoing line of the 10kV line on the basis of acquired data.
The technical scheme of the invention is that the method for automatically detecting the failure report of the outgoing line power failure event of the 10kV line does not need to consider the parameter factors of the medium voltage distribution network line, and only needs to determine the attribution relationship of the line and the distribution transformer; collecting current on the outlet side of a 10kV line transformer substation, switching-on and switching-off and protection information of an outgoing line switch, and collecting voltage and current on the outlet side of a distribution transformer and power-off event information; and processing and analyzing the acquired data according to a distribution transformer power failure event generation rule, a 10kV line outgoing power failure event generation rule, a 10kV line study judgment power failure event generation rule and a 10kV line outgoing power failure event report omission check rule to obtain a 10kV line outlet power failure event report omission condition.
The method comprises the following specific steps:
(1) collecting outgoing line current of a 10kV line by using a transformer substation outlet voltage and current collecting device; sampling interval is 15 minutes or 30 minutes, and on-off and protection information of the outgoing line switch is collected simultaneously;
(2) collecting the voltage and current at the outlet side of the distribution transformer by using a voltage and current collecting device at the outlet of the distribution transformer; sampling interval is 15 minutes or 30 minutes, and meanwhile, power-on stopping event information of the distribution transformer is collected;
(3) sequencing distribution transformer power failure events in the analysis period according to power failure starting time, and grouping according to the line to which the distribution transformer power failure events belong; grouping distribution transformer power failure events of the same line again according to the power failure starting time difference; each group of distribution transformer power failure events generates 10kV line study and judgment power failure events, the average value of the power failure starting time of each group of distribution transformer power failure events is the power failure starting time of the 10kV line study and judgment power failure events, the average value of the power failure ending time of each group of distribution transformer power failure events is the power failure ending time of the 10kV line study and judgment power failure events, and the fields of the city, the operation unit, the transformer substation, the line name, the distribution transformer power failure station number and the connected distribution transformer station number to which the 10kV line study and judgment power failure events belong are added; finally, a 10kV line generated by a distribution transformer power failure event is researched and judged to be a power failure event to be traversed, and whether the opening and closing information of the outgoing line switch exists or not during the power failure period; if the power failure event exists, the power failure event of the outgoing line of the 10kV line is not reported in a missing way; if the current does not exist, continuously judging whether the outgoing line current of the line of the power failure event exists in two continuous collection points smaller than 1A during the power failure period by the 10kV line; if yes, judging that the power failure event of the 10kV line outgoing line is not reported; otherwise, judging that the power failure event of the 10kV line outgoing line is not reported in a missing way.
The distribution transformer power failure event generation rule is as follows:
the distribution transformer outlet three-phase voltage and current data are combined to verify a distribution transformer power failure event, if the distribution transformer power failure event is in the power failure period and two continuous acquisition point values of a phase voltage or a current value are not zero in the three-phase voltage or the three-phase current, the distribution transformer power failure event is judged to be mistaken, and the distribution transformer power failure event is correspondingly eliminated; otherwise, generating a verified distribution transformer power failure event ckpbtdet, wherein the field comprises a local city, an operation unit, a transformer substation, a line, a distribution transformer name, power failure starting time and power failure ending time;
ckpbtdet is { local city, operation unit, substation, line to which the substation belongs, distribution transformation name, blackout start time, blackout end time, ….
According to the distribution transformer power failure event generation rule, all distribution transformer power failure events in the analysis period are taken and sorted in an ascending order according to the power failure starting time, and a distribution transformer power failure event sequence ckpbtdetlist is generated.
ckpbtdetlist={ckpbtdet1,ckpbtdet2,ckpbtdet3…..}。
The generation rule of the 10kV line outgoing line power failure event is as follows:
generating a 10kV line outgoing line power failure event, abbreviated as ckxltdet, by substation outgoing line switch opening and closing and protection information, wherein fields comprise a local city, an operation unit, a substation, a line name, power failure starting time and power failure ending time;
ckxltdet ═ underground, operation unit, substation, line, blackout start time, blackout end time, ….
According to the rule for generating the outgoing line power failure events of the 10kV line, all outgoing line power failure events of the 10kV line during analysis are taken, ascending sequencing is carried out according to the power failure starting time, and the outgoing line power failure event sequence ckxltdelist of the 10kV line is generated.
ckxltdetlist={ckxltdet1,ckxltdet2,ckxltdet3…..}。
The generation rule of the 10kV line power failure event is as follows:
grouping the distribution transformer power failure event sequences ckpbtdetlist according to the same line to generate distribution transformer power failure event subsequences ckpbtdetlist, sorting each group of ckpbtdetlist according to ascending distribution transformer power failure starting time, judging that the adjacent distribution transformer power failure events in each group of ckpbtdetlist are not in the same group if the difference of the power failure starting time of the adjacent distribution transformer power failure events in each group of ckpbtdetlist exceeds 35 minutes, grouping the distribution transformer power failure events to generate a distribution transformer power failure event grandchild sequence ckpbtdetlist, if the number of distribution transformers in each group of ckpbtdetlist is less than 5, not generating a 10kV line judgment power failure event ybltdet, otherwise generating a 10kV line judgment power failure event ybxltdet, the average value of the power failure starting time of the distribution transformer power failure events in each group of ybpbtdest is ybltdet field power failure starting time, the average value of the power failure starting time of the sub-distribution transformer power failure events in each group of ybpxettdetlist is ybltdet field, the average value of the power failure starting time of the distribution transformer substation, the power failure events of the subb distribution transformer substation, the substation ending time of the distribution transformer substation, the substation name of the distribution transformer substation, the substation ending time of, wherein the number of the connected belt distribution and transformation stations is the sum of the number of the distribution and transformation stop stations and the number of the distribution and transformation stations without power failure;
and (3) according to a power failure event generating rule of the 10kV line, all the 10kV lines during the analysis period are used for researching and judging power failure events, ascending sequencing is carried out according to the power failure starting time, and a 10kV line researching and judging power failure event sequence ybbxllttlist is generated.
ybxltdetlist={ybxltdet1,ybxltdet2,ybxltdet3…..}。
The missing reporting check rule of the 10kV line outgoing power failure event is as follows:
traversing the power failure event sequence ybbxllttlist judged on the 10kV line, and judging that the power failure event of the 10kV line is not missed as long as the power failure starting time of any one 10kV line power failure event in the power failure event sequence ckxllttlist judged on the 10kV line is within 45 minutes before and after the power failure starting time of the power failure event bxlltdet judged on the 10kV line; if not, continuously studying and judging whether the outgoing line current of the power failure event ybxltdet has not less than 2 continuous acquisition points less than 1A during the power failure by the 10kV line; if yes, judging that the power failure event of the outgoing line of the 10kV line is not reported, defining the judged power failure event ybbxltdet of the current 10kV line as the power failure event cxlbxltdet of the outgoing line of the 10kV line, and otherwise, judging that the power failure event of the outgoing line of the 10kV line is not reported.
A kind of 10kV circuit outlet power failure incident fails to report the automatic check-up system, it is a kind of computer equipment, including memorizer, processor and computer program stored on memorizer and run on processor, the said processor implements the following steps when carrying out the said program:
(1) inputting the line outlet current data, outgoing switch opening and closing and protection information acquired by the transformer substation acquisition device into a database memory to generate a 10kV line outgoing power failure event sequence;
(2) inputting the distribution area outlet voltage, current data and distribution transformer power-on stopping event information acquired by the distribution area acquisition device into a database memory to generate a distribution power failure event sequence; generating a 10kV line research and judgment power failure event sequence; generating a 10kV line power failure event after traversing;
(3) judging whether a 10kV line outgoing line power failure event exists within 45min before and after the power failure starting time of the 10kV line research and judgment power failure event;
(4) if the 10kV line outgoing line power failure event exists, the 10kV line outgoing line power failure event is not reported in a missing mode; if no 10kV line outgoing line power failure event exists, judging whether the 10kV line has two continuous collection points with outgoing line current values smaller than 1A during the power failure event or not;
(5) if two continuous collection points smaller than 1A do not exist, the power failure event of the outgoing line of the 10kV line is not reported in a missing way; if two continuous collection points smaller than 1A exist, the alarm is missed in the power failure event of the 10kV line outgoing line;
(6) the method comprises the following steps of defining a 10kV line study and judgment power failure event as a 10kV line outgoing power failure report missing event;
(7) judging whether the 10kV line research power failure event sequence has a 10kV line research power failure event or not, and if the 10kV line research power failure event sequence has a 10kV line research power failure event, turning to the step (2); if not, the test is finished.
The method and the system for automatically detecting the missing report of the 10kV line outgoing line power failure event have the advantages that the existing electrical acquisition devices of the transformer substation and the distribution substation are fully utilized, no additional hardware is needed, and the missing report detection of the 10kV line outgoing line power failure event can be realized through computer executable program codes. Aiming at the problems of missed report and false report of distribution transformer power failure events, the accuracy of studying and judging the power failure events of the 10kV line is improved by reasonably setting the threshold value of the number of distribution transformer power failure events, and the missed report detection rate of the power failure events of the 10kV line is improved by comprehensively studying and judging the outgoing line current of the line. Aiming at the problem of asynchronization of concentrator clocks, distribution transformer power failure events are sequenced according to power failure starting time in the same line, and adjacent distribution transformer power failure events are subjected to threshold setting by adopting a time difference method, so that the problem of asynchronization of concentrator clocks in a distribution area is solved, and generation of 10kV line judgment power failure events is facilitated.
Drawings
FIG. 1 is a flow chart of the method for checking the failure report of the power failure event of the 10kV line outgoing line.
Detailed Description
As shown in fig. 1, the method for automatically checking the failure report of the power failure event of the outgoing line of the 10kV line in the embodiment includes the following specific steps:
(1) acquiring data of a transformer substation: the method comprises the steps of utilizing a substation outgoing line electric acquisition device to acquire the current value of the outlet side of a 10kV line substation, wherein the sampling interval is generally 15 minutes or 30 minutes, adopting a voltage transformer V/V connection method by a voltage transformer, adopting an incomplete star connection method by a current transformer, and simultaneously acquiring outgoing line opening and closing and protection signals of the line by a substation RTU.
(2) The three-phase voltage and current values at the outlet side of the distribution transformer are collected by a transformer area collecting device, the sampling interval is generally 15 minutes or 30 minutes, a voltage transformer is not additionally arranged on the voltage, an electric energy meter is directly collected, the current transformer is connected in a star shape, and meanwhile, the concentrator collects the power-on stop event information of the distribution transformer.
(3) Define the following events
The power failure event of the 10kV line generated by the distribution transformer power failure event set is defined as a power failure event researched and judged for the 10kV line, and is abbreviated as ybxltdet;
a 10kV power failure event generated by the switching-on and switching-off of the outgoing switch of the transformer substation and the protection information is defined as a 10kV line outgoing power failure event, which is abbreviated as ckxltdet;
and a distribution transformer power failure event generated by the power failure event information uploaded by the station area concentrator is defined as a distribution transformer power failure event, which is abbreviated as ckpbtdet.
(4) Sequencing distribution transformer power failure events in the analysis period according to power failure starting time, and grouping according to the line to which the distribution transformer power failure events belong; grouping distribution transformer power failure events of the same line again according to the power failure starting time difference; each group of distribution transformer power failure events generates 10kV line study and judgment power failure events, the average value of the power failure starting time of each group of distribution transformer power failure events is the power failure starting time of the 10kV line study and judgment power failure events, the average value of the power failure ending time of each group of distribution transformer power failure events is the power failure ending time of the 10kV line study and judgment power failure events, and the fields of the city, the operation unit, the transformer substation, the line name, the distribution transformer power failure station number and the connected distribution transformer station number to which the 10kV line study and judgment power failure events belong are added; finally, a 10kV line generated by a distribution transformer power failure event is researched and judged to be a power failure event to be traversed, and whether the opening and closing information of the outgoing line switch exists or not during the power failure period; if the power failure event exists, the power failure event of the outgoing line of the 10kV line is not reported in a missing way; if the current does not exist, continuously judging whether the outgoing line current of the line of the power failure event exists in two continuous collection points smaller than 1A during the power failure period by the 10kV line; if yes, judging that the power failure event of the 10kV line outgoing line is not reported; otherwise, judging that the power failure event of the 10kV line outgoing line is not reported in a missing way.

Claims (7)

1. The method is characterized in that the method does not need to consider medium-voltage distribution network line parameter factors and only needs to determine the attribution relationship of the line and the distribution transformer; collecting current on the outlet side of a 10kV line transformer substation, switching-on and switching-off and protection information of an outgoing line switch, and collecting voltage and current on the outlet side of a distribution transformer and power-off event information; and processing and analyzing the acquired data according to a distribution transformer power failure event generation rule, a 10kV line outgoing power failure event generation rule, a 10kV line study and judgment power failure event generation rule and a 10kV line outgoing power failure event missed reporting check rule to obtain a 10kV line outlet power failure event missed reporting condition.
2. The method for automatically checking the failure report of the power failure event of the 10kV line outlet according to claim 1, which is characterized by comprising the following specific steps:
(1) collecting outgoing line current of a 10kV line by using a transformer substation outlet voltage and current collecting device; sampling interval is 15 minutes or 30 minutes, and on-off and protection information of the outgoing line switch is collected simultaneously;
(2) collecting the voltage and current at the outlet side of the distribution transformer by using a voltage and current collecting device at the outlet of the distribution transformer; sampling interval is 15 minutes or 30 minutes, and meanwhile, power-on stopping event information of the distribution transformer is collected;
(3) sequencing distribution transformer power failure events in the analysis period according to power failure starting time, and grouping according to the line to which the distribution transformer power failure events belong; grouping distribution transformer power failure events of the same line again according to the power failure starting time difference; each group of distribution transformer power failure events generates 10kV line study and judgment power failure events, the average value of the power failure starting time of each group of distribution transformer power failure events is the power failure starting time of the 10kV line study and judgment power failure events, the average value of the power failure ending time of each group of distribution transformer power failure events is the power failure ending time of the 10kV line study and judgment power failure events, and the fields of the city, the operation unit, the transformer substation, the line name, the distribution transformer power failure station number and the connected distribution transformer station number to which the 10kV line study and judgment power failure events belong are added; finally, a 10kV line generated by a distribution transformer power failure event is researched and judged to be a power failure event to be traversed, and whether the opening and closing information of the outgoing line switch exists or not during the power failure period; if the power failure event exists, the power failure event of the outgoing line of the 10kV line is not reported in a missing way; if the current does not exist, continuously judging whether the outgoing line current of the line of the power failure event exists in two continuous collection points smaller than 1A during the power failure period by the 10kV line; if yes, judging that the power failure event of the 10kV line outgoing line is not reported; otherwise, judging that the power failure event of the 10kV line outgoing line is not reported in a missing way.
3. The method for automatically checking the failure report of the 10kV line outgoing line power failure event according to claim 1, wherein the generation rule of the distribution transformer power failure event is as follows:
the distribution transformer outlet three-phase voltage and current data are combined to verify a distribution transformer power failure event, if the distribution transformer power failure event is in the power failure period and two continuous acquisition point values of a phase voltage or a current value are not zero in the three-phase voltage or the three-phase current, the distribution transformer power failure event is judged to be mistaken, and the distribution transformer power failure event is correspondingly eliminated; otherwise, generating a verified distribution transformer power failure event ckpbtdet, wherein the field comprises a local city, an operation unit, a transformer substation, a line, a distribution transformer name, power failure starting time and power failure ending time;
according to the distribution transformer power failure event generation rule, all distribution transformer power failure events in the analysis period are taken and sorted in an ascending order according to the power failure starting time, and a distribution transformer power failure event sequence ckpbtdetlist is generated.
4. The method for automatically checking the failure report of the 10kV line outgoing line power failure event according to claim 1, wherein the generation rule of the 10kV line outgoing line power failure event is as follows:
generating a 10kV line outgoing line power failure event, abbreviated as ckxltdet, by substation outgoing line switch opening and closing and protection information, wherein fields comprise a local city, an operation unit, a substation, a line name, power failure starting time and power failure ending time;
according to the rule for generating the outgoing line power failure events of the 10kV line, all outgoing line power failure events of the 10kV line during analysis are taken, ascending sequencing is carried out according to the power failure starting time, and the outgoing line power failure event sequence ckxltdelist of the 10kV line is generated.
5. The method for automatically checking the failure report of the power failure event of the 10kV line outgoing line according to claim 1, wherein the generation rule of the power failure event of the 10kV line research and judgment is as follows:
grouping the distribution transformer power failure event sequences ckpbtdetlist according to the same line to generate distribution transformer power failure event subsequences ckpbtdetlist, sorting each group of ckpbtdetlist according to ascending distribution transformer power failure starting time, judging that the adjacent distribution transformer power failure events in each group of ckpbtdetlist are not in the same group if the difference of the power failure starting time of the adjacent distribution transformer power failure events in each group of ckpbtdetlist exceeds 35 minutes, grouping the distribution transformer power failure events to generate a distribution transformer power failure event grandchild sequence ckpbtdetlist, if the number of distribution transformers in each group of ckpbtdetlist is less than 5, not generating a 10kV line judgment power failure event ybltdet, otherwise generating a 10kV line judgment power failure event ybxltdet, the average value of the power failure starting time of the distribution transformer power failure events in each group of ybpbtdest is ybltdet field power failure starting time, the average value of the power failure starting time of the sub-distribution transformer power failure events in each group of ybpxettdetlist is ybltdet field, the average value of the power failure starting time of the distribution transformer substation, the power failure ending time of the subb power failure events is added to the substation, the distribution transformer substation, the distribution transformer substation ending time of the distribution transformer substation, and the substation name of the, wherein the number of the connected belt distribution and transformation stations is the sum of the number of the distribution and transformation stop stations and the number of the distribution and transformation stations without power failure;
and (3) according to a power failure event generating rule of the 10kV line, all the 10kV lines during the analysis period are used for researching and judging power failure events, ascending sequencing is carried out according to the power failure starting time, and a 10kV line researching and judging power failure event sequence ybbxllttlist is generated.
6. The method for automatically checking the missed reporting of the 10kV line outgoing power failure event according to claim 1, wherein the verification rule of the missed reporting of the 10kV line outgoing power failure event is as follows:
traversing the power failure event sequence ybbxllttlist judged on the 10kV line, and judging that the power failure event of the 10kV line is not missed as long as the power failure starting time of any one 10kV line power failure event in the power failure event sequence ckxllttlist judged on the 10kV line is within 45 minutes before and after the power failure starting time of the power failure event bxlltdet judged on the 10kV line; if not, continuously studying and judging whether the outgoing line current of the power failure event ybxltdet has not less than 2 continuous acquisition points less than 1A during the power failure by the 10kV line; if yes, judging that the power failure event of the outgoing line of the 10kV line is not reported, defining the judged power failure event ybbxltdet of the current 10kV line as the power failure event cxlbxltdet of the outgoing line of the 10kV line, and otherwise, judging that the power failure event of the outgoing line of the 10kV line is not reported.
7. The 10kV line outgoing line power failure event missing report automatic detection system for realizing the 10kV line outgoing line power failure event missing report automatic detection method according to claims 1-6 is computer equipment, and comprises a memory, a processor and a computer program which is stored on the memory and runs on the processor, and is characterized in that the processor executes the program to realize the following steps:
(1) inputting the line outlet current data, outgoing switch opening and closing and protection information acquired by the transformer substation acquisition device into a database memory to generate a 10kV line outgoing power failure event sequence;
(2) inputting the distribution area outlet voltage, current data and distribution transformer power-on stopping event information acquired by the distribution area acquisition device into a database memory to generate a distribution power failure event sequence; generating a 10kV line research and judgment power failure event sequence; generating a 10kV line power failure event after traversing;
(3) judging whether a 10kV line outgoing line power failure event exists within 45min before and after the power failure starting time of the 10kV line research and judgment power failure event;
(4) if the 10kV line outgoing line power failure event exists, the 10kV line outgoing line power failure event is not reported in a missing mode; if no 10kV line outgoing line power failure event exists, judging whether the 10kV line has two continuous collection points with outgoing line current values smaller than 1A during the power failure event or not;
(5) if two continuous collection points smaller than 1A do not exist, the power failure event of the outgoing line of the 10kV line is not reported in a missing way; if two continuous collection points smaller than 1A exist, the alarm is missed in the power failure event of the 10kV line outgoing line;
(6) the method comprises the following steps of defining a 10kV line study and judgment power failure event as a 10kV line outgoing power failure report missing event;
(7) judging whether the 10kV line research power failure event sequence has a 10kV line research power failure event or not, and if the 10kV line research power failure event sequence has a 10kV line research power failure event, turning to the step (2); if not, the test is finished.
CN202010488634.1A 2020-06-02 2020-06-02 Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line Active CN111813824B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010488634.1A CN111813824B (en) 2020-06-02 2020-06-02 Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010488634.1A CN111813824B (en) 2020-06-02 2020-06-02 Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line

Publications (2)

Publication Number Publication Date
CN111813824A true CN111813824A (en) 2020-10-23
CN111813824B CN111813824B (en) 2022-09-02

Family

ID=72848532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010488634.1A Active CN111813824B (en) 2020-06-02 2020-06-02 Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line

Country Status (1)

Country Link
CN (1) CN111813824B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112557802A (en) * 2021-02-24 2021-03-26 国网江西省电力有限公司电力科学研究院 Accurate analysis method and system for power outage of transformer area
CN113239097A (en) * 2021-07-13 2021-08-10 国网江西省电力有限公司电力科学研究院 Transformer area leakage potential safety hazard analysis method and system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030135476A1 (en) * 2001-05-10 2003-07-17 Holland Paul Edward Flexible and dynamic policies for assessment execution
US20130315073A1 (en) * 2009-09-18 2013-11-28 At&T Intellectual Property I, L.P. Diversity Monitoring for Communication Network Circuits
CN103956831A (en) * 2014-05-15 2014-07-30 广东电网公司佛山供电局 Intelligent diagnosis method for alarming of phase loss of power transmission line distribution transformer
CN106992520A (en) * 2017-05-25 2017-07-28 国网福建省电力有限公司 Power distribution network based on multi-source data stops monitoring method of sending a telegram in reply
CN107727979A (en) * 2017-11-21 2018-02-23 国网福建省电力有限公司 A kind of failure based on distribution main website studies and judges optimization method
CN109919328A (en) * 2019-01-31 2019-06-21 国网浙江省电力有限公司 A kind of low pressure branch line power failure analysis method based on multi-source power-off event
CN110071579A (en) * 2019-06-05 2019-07-30 国网北京市电力公司 Power grid power supply based on ubiquitous electric power Internet of Things ensures and intelligent managing and control system
CN110879327A (en) * 2019-12-06 2020-03-13 国家电网有限公司 10KV line monitoring method by multi-data fusion

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030135476A1 (en) * 2001-05-10 2003-07-17 Holland Paul Edward Flexible and dynamic policies for assessment execution
US20130315073A1 (en) * 2009-09-18 2013-11-28 At&T Intellectual Property I, L.P. Diversity Monitoring for Communication Network Circuits
CN103956831A (en) * 2014-05-15 2014-07-30 广东电网公司佛山供电局 Intelligent diagnosis method for alarming of phase loss of power transmission line distribution transformer
CN106992520A (en) * 2017-05-25 2017-07-28 国网福建省电力有限公司 Power distribution network based on multi-source data stops monitoring method of sending a telegram in reply
CN107727979A (en) * 2017-11-21 2018-02-23 国网福建省电力有限公司 A kind of failure based on distribution main website studies and judges optimization method
CN109919328A (en) * 2019-01-31 2019-06-21 国网浙江省电力有限公司 A kind of low pressure branch line power failure analysis method based on multi-source power-off event
CN110071579A (en) * 2019-06-05 2019-07-30 国网北京市电力公司 Power grid power supply based on ubiquitous electric power Internet of Things ensures and intelligent managing and control system
CN110879327A (en) * 2019-12-06 2020-03-13 国家电网有限公司 10KV line monitoring method by multi-data fusion

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
MAHITOSH BANAFER 等: "Investigation of Power System Cascading Failure and the Causes", 《2018 2ND INTERNATIONAL CONFERENCE ON POWER, ENERGY AND ENVIRONMENT: TOWARDS SMART TECHNOLOGY (ICEPE)》 *
TANGRUI WEI 等: "Research on the Prediction Optimization of Power Outage Duration of 10Kv Distribution Network Based on the Reliability Data of Power Supply Analysis", 《2018 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED)》 *
伍太萍 等: "变电站集中监控数据智能分析研究", 《自动化与仪器仪表》 *
刘兴龙 等: "基于数据挖掘分析提升停电统计准确率技术", 《云南电力技术》 *
董明: "具有高容错能力的电力系统故障诊断的解析模型与方法", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112557802A (en) * 2021-02-24 2021-03-26 国网江西省电力有限公司电力科学研究院 Accurate analysis method and system for power outage of transformer area
CN113239097A (en) * 2021-07-13 2021-08-10 国网江西省电力有限公司电力科学研究院 Transformer area leakage potential safety hazard analysis method and system

Also Published As

Publication number Publication date
CN111813824B (en) 2022-09-02

Similar Documents

Publication Publication Date Title
CN103326467B (en) A kind of protection act report implementation method based on Prudential Master device wave-record chart
CN109687590B (en) Grading outage and restoration reporting method and system
CN112968520B (en) Transformer area topology identification method based on transformer area key node characteristic current information
CN107329040A (en) A kind of power distribution automation main station system single-phase earth fault localization method based on transient state recorder data
CN103105556A (en) Intelligent power grid load testing and recognition method based on steady state and transient state characteristic joint matching
CN111813824B (en) Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line
CN109298287A (en) Small current neutral grounding Distribution Network Failure kind identification method based on fault detector data
CN102608537A (en) Feed network type heavy-power battery testing device
CN107037322A (en) Power distribution network low current grounding localization method based on steady state characteristic
CN114460411A (en) Fault positioning method, device and system for power transmission network, processor and electronic equipment
CN110244163B (en) Intelligent stage-level studying and judging method and device for power failure and recovery events of transformer area
Deng et al. Line outage detection and localization via synchrophasor measurement
CN112946385B (en) Transformer area power failure point positioning method based on circuit breaker
CN109633506B (en) Data acquisition and checking method and monitoring control system in direct current transmission system
Chen et al. Big data analysis based identification method of low-voltage substation area
CN205670180U (en) Based on zero sequence transient analysis low current neutral grounding system fault alignment system
CN111813825B (en) Distribution transformer outlet power failure event missing report automatic detection method and system
CN116799949A (en) Method and device for monitoring electric power of low-voltage transformer area
KR101375282B1 (en) System and method for electric power system data abbreviation
CN112600309B (en) Low-voltage power distribution intelligent diagnosis system with wave recording function
CN115549040A (en) Automatic fault diagnosis method and system for flexible direct current converter station
CN116073360A (en) Low-voltage distribution network user transformation relation and phase relation identification method and system
CN113011047A (en) Reliability analysis method based on secondary system of intelligent substation of 220kV or below
CN112444687A (en) Effective power failure event studying and judging method and device
CN204389604U (en) The network tester of intelligent substation Small Electric Current Earthing And Routing Device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant