CN111798085A - Civilized city creation management system and investigation method - Google Patents

Civilized city creation management system and investigation method Download PDF

Info

Publication number
CN111798085A
CN111798085A CN202010413960.6A CN202010413960A CN111798085A CN 111798085 A CN111798085 A CN 111798085A CN 202010413960 A CN202010413960 A CN 202010413960A CN 111798085 A CN111798085 A CN 111798085A
Authority
CN
China
Prior art keywords
module
management module
account
management
investigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010413960.6A
Other languages
Chinese (zh)
Inventor
黄海阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Dimension Statistics Consulting Co ltd
Original Assignee
Shenzhen Dimension Statistics Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Dimension Statistics Consulting Co ltd filed Critical Shenzhen Dimension Statistics Consulting Co ltd
Priority to CN202010413960.6A priority Critical patent/CN111798085A/en
Publication of CN111798085A publication Critical patent/CN111798085A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a civilized city creation management system, which comprises a civilized city management platform, wherein modules arranged on the civilized city management platform comprise: the system management module has the functions of setting the operation authority of the system user and adding, deleting, modifying and inquiring the account number of the system user; the data statistics management module is used for checking the investigation scores and the deduction conditions of all the evaluation points in all the index systems; and the comprehensive grading management module is used for carrying out examination and evaluation according to the score condition and checking the rectification progress of all rectification units. The invention has novel concept, reasonable design and convenient use, forms a set of processes for investigation by arranging the functional module inside, utilizes the data statistics management module in the functional module to check and reform, solves two problems provided in the background technology, and has the advantages of system flexibility and convenient integration.

Description

Civilized city creation management system and investigation method
Technical Field
The invention relates to the technical field of software systems, in particular to a civilized city creation management system and a survey method.
Background
The nationwide civilization city is one of all city brands in the mainland of China with the highest gold content and the highest creation difficulty, is a comprehensive honor title reflecting the whole civilization level of the city, is the highest honor in the comprehensive category evaluation of the city in China at present, and is also the city brand with the most value. The evaluation is mainly carried out by adopting six aspects of listening to reports, material auditing, investigation, network investigation, field investigation and overall observation. The difficulties in the above six aspects are considered in the field. There are three specific field investigation methods: one is real scene (situation) simulation verification, such as: dialing a legal service hotline, dialing a right-to-maintain reporting phone, and the like; secondly, field investigation, namely entering the field to check whether the inspected object meets the evaluation standard, such as: viewing related work records and the like in a community; and thirdly, performing real-time observation, namely, performing real-time observation on the object to be observed at a real-time observation point within a certain time according to the real-time observation requirement.
At present, the system for civilized city creation mainly realizes the data acquisition who surveys on the spot through the APP end, carries out data analysis and then finds the problem to the data collection, issues other units rectification after integrating the problem through the paper method, and its shortcoming is that the system is only simple storage picture and problem, can't feed back the problem to rectification unit in real time and go to handle, does not realize closed loop in the aspect of the system promptly the problem is finally rectified by who, by what rectification problem. The second disadvantage is that the material auditing is only to store and export data, which can not realize the system limitation of the data uploading format and content, and the uploading material is not searched and audited, so the flexibility is poor. The third disadvantage is that the overall situation cannot be quantitatively reflected on the investigation result.
Disclosure of Invention
In view of the two drawbacks mentioned in the background, it is an object of the present invention to provide a civilized city creation management system including:
a civilized city creation management system comprises a civilized city management platform, wherein modules arranged on the civilized city management platform comprise:
the system management module has the functions of setting the operation authority of the system user and adding, deleting, modifying and inquiring the account number of the system user;
the system comprises a field investigation module, a data processing module and a data processing module, wherein the field investigation module is used for establishing an evaluation index system, issuing item problems under the index system and managing rectification work;
the data statistics management module is used for checking the investigation scores and the deduction conditions of all the evaluation points in all the index systems and counting the scores;
and the comprehensive grading management module is used for carrying out examination and evaluation according to the score condition and checking the rectification progress of all rectification units.
Further, the system management module comprises a user management module and a role authority management module, wherein the user management module is used for creating an account, setting the operation authority of the account, and adding, deleting, modifying and inquiring the account, wherein the account comprises a system administrator account, a unit account and an investigator account; the role authority management module is used for setting the operation authority of each account.
Further, the field investigation module comprises an evaluation index management module, a data management module and a data auditing management module, wherein the field investigation data statistics management module is used for establishing an evaluation index system, and the data auditing module is used for issuing item problems under the index system; and the rectification management module is used for managing rectification work.
Further, the material processing module comprises a material uploading module and a material auditing module, the material uploading module is used for uploading survey materials, and the material auditing module is used for auditing and feeding back the uploaded materials.
Furthermore, the module arranged on the civilized city management platform further comprises a monitoring management module, the monitoring management module calls the electronic map module to carry out investigation monitoring, and geographical marking can be carried out on the electronic map module according to the position to be investigated.
Another object of the present invention is to provide a method for surveying using the above-mentioned civilized city creation management system, comprising the steps of:
s100, creating a system administrator account through the user management module, logging in the system administrator account, and acquiring corresponding authority to operate;
s200, creating a research project library through the field research module;
s300, establishing a department account number through the user management module, setting corresponding authority, and setting an item problem of an investigation project library through a field investigation module according to the corresponding department condition;
s400, establishing an account through the user management module, and setting corresponding authority;
s500, the investigator logs in the account on the terminal software and calls the investigation project library set in the step S300 to carry out field investigation;
s600, the investigator uploads the acquired investigation data through terminal software on the system, and after the auditing process, the investigator settles the case if the auditing process is passed, and enters the rectification process if the auditing process is not passed until the investigator settles the case after the auditing process is passed.
Has the advantages that: the invention has novel concept, reasonable design and convenient use, and provides a civilized city creation management system which forms a set of processes for investigation by arranging functional modules inside, utilizes a data statistics management module in the functional modules to check and reform, solves the three problems in the background technology, has the advantages of system flexibility and convenient integration, has the standard of quantitative assessment, and is convenient for imagination and mastering.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a flow chart of an embodiment of a survey method corresponding to the civilized city creation management system according to the present invention.
Detailed Description
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
example one
Referring to fig. 1, a system for creating and managing a civilized city includes a civilized city management platform, and modules disposed on the civilized city management platform include:
the system management module has the functions of setting the operation authority of the system user and adding, deleting, modifying and inquiring the account number of the system user;
the system comprises a field investigation module, a data processing module and a data processing module, wherein the field investigation module is used for establishing an evaluation index system, issuing item problems under the index system and managing rectification work;
the data statistics management module is used for checking the investigation scores and the deduction conditions of all the evaluation points in all the index systems and counting the scores;
and the comprehensive grading management module is used for carrying out examination and evaluation according to the score condition and checking the rectification progress of all rectification units.
Further, the system management module comprises a user management module and a role authority management module, wherein the user management module is used for creating an account, setting the operation authority of the account, and adding, deleting, modifying and inquiring the account, wherein the account comprises a system administrator account, a unit account and an investigator account; the role authority management module is used for setting the operation authority of each account.
Further, the field investigation module comprises an evaluation index management module, a data management module and a data auditing management module, and the field investigation data statistics management module is used for creating an evaluation index system, including basic library index management, point location type management for quantification, sampling frame management and index version management. The data auditing module is used for issuing item problems under an index system, specifically comprises basic information management, project issuing management and point location live management, and audits problem data and correction data; the rectification management module is used for managing rectification work, and specifically comprises patrol, audit and rectification management.
Further, the material processing module comprises a material uploading module and a material auditing module, the material uploading module is used for uploading survey materials, and the material auditing module is used for auditing and feeding back the uploaded materials.
Furthermore, the module arranged on the civilized city management platform further comprises a monitoring management module, the monitoring management module calls the electronic map module to carry out investigation monitoring, and geographical marking can be carried out on the electronic map module according to the position to be investigated. By calling the electronic map module, inspection of inspection paths of inspection personnel, inspection of inspection areas and the like can be realized. The realization of the function, the electronic map module has the geographical position marking function, which is often the common technology, and is not repeated herein.
Besides, the functions of the data statistics management module can also comprise a problem data summarizing module, an area problem data change statistics module and the like.
In the above embodiment, the civilized city creation management system is a software system, is developed in JAVA language during development, and forms a system management module through the civilized city creation management system to generate and manage each account, specifically, according to the hierarchy and the authority, sets a system management account, a department account and an account, and a user logs in a corresponding account at each hierarchy to perform work according to the authority. Because the system is needed to set the investigation item library of the evaluation index system, specifically the database, the database is used in SQL Server 2012 during specific implementation. In the investigation project library, corresponding entry problems and corresponding calling authorities need to be set so as to be convenient for use in field investigation. When an investigator actually investigates, the investigator uploads the materials acquired by the investigator through the material processing module, and sends the materials to the corresponding account through the system background for auditing and feedback, and the materials are rectified. The data statistics management module is a statistic module of a quantitative value and is used for investigating scores and deduction conditions, counting the scores and checking the correction progress of all correction units. And comparing and visually displaying the generated quantitative data through a data analysis and display module. In order to realize supervision on investigators, the hardware support of the network positioning module is used, and the monitoring management module is used for positioning and calling to realize monitoring.
Example two
Referring to fig. 2, a surveying method using the civilized city creation management system described above includes the following steps:
s100, creating a system administrator account through the user management module, logging in the system administrator account, and acquiring corresponding authority to operate;
s200, creating a research project library through the field research module;
s300, establishing a department account number through the user management module, setting corresponding authority, and setting an item problem of an investigation project library through a field investigation module according to the corresponding department condition;
s400, establishing an account through the user management module, and setting corresponding authority;
s500, the investigator logs in the account on the terminal software and calls the investigation project library set in the step S300 to carry out field investigation;
s600, the investigator uploads the acquired investigation data through terminal software on the system, and after the auditing process, the investigator settles the case if the auditing process is passed, and enters the rectification process if the auditing process is not passed until the investigator settles the case after the auditing process is passed.
The foregoing detailed description of the preferred embodiments of the invention has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.

Claims (5)

1. A civilized city creation management system is characterized by comprising a civilized city management platform, wherein modules arranged on the civilized city management platform comprise:
the system management module has the functions of setting the operation authority of the system user and adding, deleting, modifying and inquiring the account number of the system user;
the system comprises a field investigation module, a data processing module and a data processing module, wherein the field investigation module is used for establishing an evaluation index system, issuing item problems under the index system and managing rectification work;
the data statistics management module is used for checking the investigation scores and the deduction conditions of all the evaluation points in all the index systems and counting the scores;
and the comprehensive grading management module is used for carrying out examination and evaluation according to the score condition and checking the rectification progress of all rectification units.
2. A civilized city creation management system as claimed in claim 1, wherein: the system management module comprises a user management module and a role authority management module, wherein the user management module is used for creating an account, setting the operation authority of the account, and adding, deleting, modifying and inquiring the account, wherein the account comprises a system administrator account, a unit account and an investigator account; the role authority management module is used for setting the operation authority of each account.
3. A civilized city creation management system as claimed in claim 2, wherein: the field investigation module comprises an evaluation index management module, a data management module and a data auditing management module, wherein the evaluation index management module is used for establishing an evaluation index system, and the data auditing management module is used for issuing item problems under the index system; and the data management module is used for managing the rectification work.
4. A civilized city creation management system as claimed in claim 3, wherein: the module arranged on the civilized city management platform further comprises a monitoring management module, the monitoring management module calls an electronic map module to carry out investigation monitoring, and geographical marking can be carried out on the electronic map module according to the position to be investigated.
5. A survey method using the civilized city creation management system of claim 4, comprising the steps of:
s100, creating a system administrator account through the user management module, logging in the system administrator account, and acquiring corresponding authority to operate;
s200, creating a research project library through the field research module;
s300, establishing a department account number through the user management module, setting corresponding authority, and setting an item problem of an investigation project library through a field investigation module according to the corresponding department condition;
s400, establishing an account through the user management module, and setting corresponding authority;
s500, the investigator logs in the account on the terminal software and calls the investigation project library set in the step S300 to carry out field investigation;
s600, the investigator uploads the acquired investigation data through terminal software on the system, and after the auditing process, the investigator settles the case if the auditing process is passed, and enters the rectification process if the auditing process is not passed until the investigator settles the case after the auditing process is passed.
CN202010413960.6A 2020-05-15 2020-05-15 Civilized city creation management system and investigation method Pending CN111798085A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010413960.6A CN111798085A (en) 2020-05-15 2020-05-15 Civilized city creation management system and investigation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010413960.6A CN111798085A (en) 2020-05-15 2020-05-15 Civilized city creation management system and investigation method

Publications (1)

Publication Number Publication Date
CN111798085A true CN111798085A (en) 2020-10-20

Family

ID=72806105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010413960.6A Pending CN111798085A (en) 2020-05-15 2020-05-15 Civilized city creation management system and investigation method

Country Status (1)

Country Link
CN (1) CN111798085A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110096355A (en) * 2010-02-22 2011-08-30 광운대학교 산학협력단 Decision making system for city regeneration
CN106779625A (en) * 2017-01-20 2017-05-31 泰华智慧产业集团股份有限公司 Application method and system that service is used
WO2017223547A1 (en) * 2016-06-24 2017-12-28 Ad Exchange Group Automated aggregated multivariate testing systems, methods, and processes
CN207352663U (en) * 2017-10-13 2018-05-11 青岛低碳一起行智能互联科技有限公司 The indoor and outdoor fitness equipment of workout path and the monitoring device and system of sports equipment
CN110070275A (en) * 2019-04-08 2019-07-30 合肥安玛尔市场信息咨询有限公司 A kind of data acquisition and management system based on Urban Governance mode
CN111581927A (en) * 2020-04-03 2020-08-25 深圳市维度统计咨询股份有限公司 Ocean economic operation monitoring and early warning system and computer equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110096355A (en) * 2010-02-22 2011-08-30 광운대학교 산학협력단 Decision making system for city regeneration
WO2017223547A1 (en) * 2016-06-24 2017-12-28 Ad Exchange Group Automated aggregated multivariate testing systems, methods, and processes
CN106779625A (en) * 2017-01-20 2017-05-31 泰华智慧产业集团股份有限公司 Application method and system that service is used
CN207352663U (en) * 2017-10-13 2018-05-11 青岛低碳一起行智能互联科技有限公司 The indoor and outdoor fitness equipment of workout path and the monitoring device and system of sports equipment
CN110070275A (en) * 2019-04-08 2019-07-30 合肥安玛尔市场信息咨询有限公司 A kind of data acquisition and management system based on Urban Governance mode
CN111581927A (en) * 2020-04-03 2020-08-25 深圳市维度统计咨询股份有限公司 Ocean economic operation monitoring and early warning system and computer equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宁津生等: "《测绘学概论》", 武汉大学出版社, pages: 110 - 111 *
宁津生等: "《零基础轻松学SQL Server 2016》", 31 March 2020, 机械工业出版社, pages: 228 - 111 *

Similar Documents

Publication Publication Date Title
CN110347644B (en) Paperless inspection and detection system and operation method thereof
CN115375146A (en) Digital construction integrated platform
CN110210981A (en) Insurance business Claims Resolution method, apparatus, computer installation and storage medium
CN109214784A (en) A kind of method, client, server and the system of fire-fighting inspection management
CN111694554B (en) Visual subway construction quality tracing system and control method thereof
CN112070338A (en) Enterprise internal auxiliary auditing method
CN109636312A (en) Land control engineering online monitoring and management system
CN112529478A (en) Biological information management device, method, server, and computer storage medium
CN115062675A (en) Full-spectrum pollution tracing method based on neural network and cloud system
CN112508343A (en) Implementation method of visual construction management and control system for construction quality management
CN113806170A (en) Method, system, medium and terminal for automatically generating engineering industry supervision log
CN111897873A (en) Inspection system and inspection method based on big data
CN115186025A (en) Automatic configuration method, system and equipment of visual report
CN111652699A (en) Data transmission method for tax receipt system
CN109284978A (en) System and method for accurately identifying poverty-stricken user
CN111798085A (en) Civilized city creation management system and investigation method
CN112508541A (en) Portable mobile phone acquisition software system based on training trainee information data acquisition
CN111428139A (en) Safety supervision and inspection method and system
CN110209575A (en) Test document generation method, device, electronic equipment and storage medium
CN110597899B (en) Project expense management method and system
CN113344518A (en) Project management system
CN113052493A (en) Efficiency monitoring system and working method
CN112734393A (en) Intelligent management platform for corporate enterprise and external administration unit
CN116955463B (en) Multi-source heterogeneous data integration system
CN115934749B (en) Integrated processing method and application of natural disaster comprehensive risk census data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination