CN111798085A - Civilized city creation management system and investigation method - Google Patents
Civilized city creation management system and investigation method Download PDFInfo
- Publication number
- CN111798085A CN111798085A CN202010413960.6A CN202010413960A CN111798085A CN 111798085 A CN111798085 A CN 111798085A CN 202010413960 A CN202010413960 A CN 202010413960A CN 111798085 A CN111798085 A CN 111798085A
- Authority
- CN
- China
- Prior art keywords
- module
- management module
- account
- management
- investigation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000011835 investigation Methods 0.000 title claims abstract description 46
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000011156 evaluation Methods 0.000 claims abstract description 22
- 230000008569 process Effects 0.000 claims abstract description 17
- 230000006870 function Effects 0.000 claims abstract description 7
- 238000007726 management method Methods 0.000 claims description 89
- 238000012544 monitoring process Methods 0.000 claims description 11
- 238000012545 processing Methods 0.000 claims description 9
- 238000011160 research Methods 0.000 claims description 6
- 238000013523 data management Methods 0.000 claims description 4
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000013461 design Methods 0.000 abstract description 2
- 230000010354 integration Effects 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 21
- 238000007689 inspection Methods 0.000 description 5
- 238000012937 correction Methods 0.000 description 3
- 238000012550 audit Methods 0.000 description 2
- 238000007405 data analysis Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a civilized city creation management system, which comprises a civilized city management platform, wherein modules arranged on the civilized city management platform comprise: the system management module has the functions of setting the operation authority of the system user and adding, deleting, modifying and inquiring the account number of the system user; the data statistics management module is used for checking the investigation scores and the deduction conditions of all the evaluation points in all the index systems; and the comprehensive grading management module is used for carrying out examination and evaluation according to the score condition and checking the rectification progress of all rectification units. The invention has novel concept, reasonable design and convenient use, forms a set of processes for investigation by arranging the functional module inside, utilizes the data statistics management module in the functional module to check and reform, solves two problems provided in the background technology, and has the advantages of system flexibility and convenient integration.
Description
Technical Field
The invention relates to the technical field of software systems, in particular to a civilized city creation management system and a survey method.
Background
The nationwide civilization city is one of all city brands in the mainland of China with the highest gold content and the highest creation difficulty, is a comprehensive honor title reflecting the whole civilization level of the city, is the highest honor in the comprehensive category evaluation of the city in China at present, and is also the city brand with the most value. The evaluation is mainly carried out by adopting six aspects of listening to reports, material auditing, investigation, network investigation, field investigation and overall observation. The difficulties in the above six aspects are considered in the field. There are three specific field investigation methods: one is real scene (situation) simulation verification, such as: dialing a legal service hotline, dialing a right-to-maintain reporting phone, and the like; secondly, field investigation, namely entering the field to check whether the inspected object meets the evaluation standard, such as: viewing related work records and the like in a community; and thirdly, performing real-time observation, namely, performing real-time observation on the object to be observed at a real-time observation point within a certain time according to the real-time observation requirement.
At present, the system for civilized city creation mainly realizes the data acquisition who surveys on the spot through the APP end, carries out data analysis and then finds the problem to the data collection, issues other units rectification after integrating the problem through the paper method, and its shortcoming is that the system is only simple storage picture and problem, can't feed back the problem to rectification unit in real time and go to handle, does not realize closed loop in the aspect of the system promptly the problem is finally rectified by who, by what rectification problem. The second disadvantage is that the material auditing is only to store and export data, which can not realize the system limitation of the data uploading format and content, and the uploading material is not searched and audited, so the flexibility is poor. The third disadvantage is that the overall situation cannot be quantitatively reflected on the investigation result.
Disclosure of Invention
In view of the two drawbacks mentioned in the background, it is an object of the present invention to provide a civilized city creation management system including:
a civilized city creation management system comprises a civilized city management platform, wherein modules arranged on the civilized city management platform comprise:
the system management module has the functions of setting the operation authority of the system user and adding, deleting, modifying and inquiring the account number of the system user;
the system comprises a field investigation module, a data processing module and a data processing module, wherein the field investigation module is used for establishing an evaluation index system, issuing item problems under the index system and managing rectification work;
the data statistics management module is used for checking the investigation scores and the deduction conditions of all the evaluation points in all the index systems and counting the scores;
and the comprehensive grading management module is used for carrying out examination and evaluation according to the score condition and checking the rectification progress of all rectification units.
Further, the system management module comprises a user management module and a role authority management module, wherein the user management module is used for creating an account, setting the operation authority of the account, and adding, deleting, modifying and inquiring the account, wherein the account comprises a system administrator account, a unit account and an investigator account; the role authority management module is used for setting the operation authority of each account.
Further, the field investigation module comprises an evaluation index management module, a data management module and a data auditing management module, wherein the field investigation data statistics management module is used for establishing an evaluation index system, and the data auditing module is used for issuing item problems under the index system; and the rectification management module is used for managing rectification work.
Further, the material processing module comprises a material uploading module and a material auditing module, the material uploading module is used for uploading survey materials, and the material auditing module is used for auditing and feeding back the uploaded materials.
Furthermore, the module arranged on the civilized city management platform further comprises a monitoring management module, the monitoring management module calls the electronic map module to carry out investigation monitoring, and geographical marking can be carried out on the electronic map module according to the position to be investigated.
Another object of the present invention is to provide a method for surveying using the above-mentioned civilized city creation management system, comprising the steps of:
s100, creating a system administrator account through the user management module, logging in the system administrator account, and acquiring corresponding authority to operate;
s200, creating a research project library through the field research module;
s300, establishing a department account number through the user management module, setting corresponding authority, and setting an item problem of an investigation project library through a field investigation module according to the corresponding department condition;
s400, establishing an account through the user management module, and setting corresponding authority;
s500, the investigator logs in the account on the terminal software and calls the investigation project library set in the step S300 to carry out field investigation;
s600, the investigator uploads the acquired investigation data through terminal software on the system, and after the auditing process, the investigator settles the case if the auditing process is passed, and enters the rectification process if the auditing process is not passed until the investigator settles the case after the auditing process is passed.
Has the advantages that: the invention has novel concept, reasonable design and convenient use, and provides a civilized city creation management system which forms a set of processes for investigation by arranging functional modules inside, utilizes a data statistics management module in the functional modules to check and reform, solves the three problems in the background technology, has the advantages of system flexibility and convenient integration, has the standard of quantitative assessment, and is convenient for imagination and mastering.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a flow chart of an embodiment of a survey method corresponding to the civilized city creation management system according to the present invention.
Detailed Description
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
example one
Referring to fig. 1, a system for creating and managing a civilized city includes a civilized city management platform, and modules disposed on the civilized city management platform include:
the system management module has the functions of setting the operation authority of the system user and adding, deleting, modifying and inquiring the account number of the system user;
the system comprises a field investigation module, a data processing module and a data processing module, wherein the field investigation module is used for establishing an evaluation index system, issuing item problems under the index system and managing rectification work;
the data statistics management module is used for checking the investigation scores and the deduction conditions of all the evaluation points in all the index systems and counting the scores;
and the comprehensive grading management module is used for carrying out examination and evaluation according to the score condition and checking the rectification progress of all rectification units.
Further, the system management module comprises a user management module and a role authority management module, wherein the user management module is used for creating an account, setting the operation authority of the account, and adding, deleting, modifying and inquiring the account, wherein the account comprises a system administrator account, a unit account and an investigator account; the role authority management module is used for setting the operation authority of each account.
Further, the field investigation module comprises an evaluation index management module, a data management module and a data auditing management module, and the field investigation data statistics management module is used for creating an evaluation index system, including basic library index management, point location type management for quantification, sampling frame management and index version management. The data auditing module is used for issuing item problems under an index system, specifically comprises basic information management, project issuing management and point location live management, and audits problem data and correction data; the rectification management module is used for managing rectification work, and specifically comprises patrol, audit and rectification management.
Further, the material processing module comprises a material uploading module and a material auditing module, the material uploading module is used for uploading survey materials, and the material auditing module is used for auditing and feeding back the uploaded materials.
Furthermore, the module arranged on the civilized city management platform further comprises a monitoring management module, the monitoring management module calls the electronic map module to carry out investigation monitoring, and geographical marking can be carried out on the electronic map module according to the position to be investigated. By calling the electronic map module, inspection of inspection paths of inspection personnel, inspection of inspection areas and the like can be realized. The realization of the function, the electronic map module has the geographical position marking function, which is often the common technology, and is not repeated herein.
Besides, the functions of the data statistics management module can also comprise a problem data summarizing module, an area problem data change statistics module and the like.
In the above embodiment, the civilized city creation management system is a software system, is developed in JAVA language during development, and forms a system management module through the civilized city creation management system to generate and manage each account, specifically, according to the hierarchy and the authority, sets a system management account, a department account and an account, and a user logs in a corresponding account at each hierarchy to perform work according to the authority. Because the system is needed to set the investigation item library of the evaluation index system, specifically the database, the database is used in SQL Server 2012 during specific implementation. In the investigation project library, corresponding entry problems and corresponding calling authorities need to be set so as to be convenient for use in field investigation. When an investigator actually investigates, the investigator uploads the materials acquired by the investigator through the material processing module, and sends the materials to the corresponding account through the system background for auditing and feedback, and the materials are rectified. The data statistics management module is a statistic module of a quantitative value and is used for investigating scores and deduction conditions, counting the scores and checking the correction progress of all correction units. And comparing and visually displaying the generated quantitative data through a data analysis and display module. In order to realize supervision on investigators, the hardware support of the network positioning module is used, and the monitoring management module is used for positioning and calling to realize monitoring.
Example two
Referring to fig. 2, a surveying method using the civilized city creation management system described above includes the following steps:
s100, creating a system administrator account through the user management module, logging in the system administrator account, and acquiring corresponding authority to operate;
s200, creating a research project library through the field research module;
s300, establishing a department account number through the user management module, setting corresponding authority, and setting an item problem of an investigation project library through a field investigation module according to the corresponding department condition;
s400, establishing an account through the user management module, and setting corresponding authority;
s500, the investigator logs in the account on the terminal software and calls the investigation project library set in the step S300 to carry out field investigation;
s600, the investigator uploads the acquired investigation data through terminal software on the system, and after the auditing process, the investigator settles the case if the auditing process is passed, and enters the rectification process if the auditing process is not passed until the investigator settles the case after the auditing process is passed.
The foregoing detailed description of the preferred embodiments of the invention has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.
Claims (5)
1. A civilized city creation management system is characterized by comprising a civilized city management platform, wherein modules arranged on the civilized city management platform comprise:
the system management module has the functions of setting the operation authority of the system user and adding, deleting, modifying and inquiring the account number of the system user;
the system comprises a field investigation module, a data processing module and a data processing module, wherein the field investigation module is used for establishing an evaluation index system, issuing item problems under the index system and managing rectification work;
the data statistics management module is used for checking the investigation scores and the deduction conditions of all the evaluation points in all the index systems and counting the scores;
and the comprehensive grading management module is used for carrying out examination and evaluation according to the score condition and checking the rectification progress of all rectification units.
2. A civilized city creation management system as claimed in claim 1, wherein: the system management module comprises a user management module and a role authority management module, wherein the user management module is used for creating an account, setting the operation authority of the account, and adding, deleting, modifying and inquiring the account, wherein the account comprises a system administrator account, a unit account and an investigator account; the role authority management module is used for setting the operation authority of each account.
3. A civilized city creation management system as claimed in claim 2, wherein: the field investigation module comprises an evaluation index management module, a data management module and a data auditing management module, wherein the evaluation index management module is used for establishing an evaluation index system, and the data auditing management module is used for issuing item problems under the index system; and the data management module is used for managing the rectification work.
4. A civilized city creation management system as claimed in claim 3, wherein: the module arranged on the civilized city management platform further comprises a monitoring management module, the monitoring management module calls an electronic map module to carry out investigation monitoring, and geographical marking can be carried out on the electronic map module according to the position to be investigated.
5. A survey method using the civilized city creation management system of claim 4, comprising the steps of:
s100, creating a system administrator account through the user management module, logging in the system administrator account, and acquiring corresponding authority to operate;
s200, creating a research project library through the field research module;
s300, establishing a department account number through the user management module, setting corresponding authority, and setting an item problem of an investigation project library through a field investigation module according to the corresponding department condition;
s400, establishing an account through the user management module, and setting corresponding authority;
s500, the investigator logs in the account on the terminal software and calls the investigation project library set in the step S300 to carry out field investigation;
s600, the investigator uploads the acquired investigation data through terminal software on the system, and after the auditing process, the investigator settles the case if the auditing process is passed, and enters the rectification process if the auditing process is not passed until the investigator settles the case after the auditing process is passed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010413960.6A CN111798085A (en) | 2020-05-15 | 2020-05-15 | Civilized city creation management system and investigation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010413960.6A CN111798085A (en) | 2020-05-15 | 2020-05-15 | Civilized city creation management system and investigation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111798085A true CN111798085A (en) | 2020-10-20 |
Family
ID=72806105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010413960.6A Pending CN111798085A (en) | 2020-05-15 | 2020-05-15 | Civilized city creation management system and investigation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111798085A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110096355A (en) * | 2010-02-22 | 2011-08-30 | 광운대학교 산학협력단 | Decision making system for city regeneration |
CN106779625A (en) * | 2017-01-20 | 2017-05-31 | 泰华智慧产业集团股份有限公司 | Application method and system that service is used |
WO2017223547A1 (en) * | 2016-06-24 | 2017-12-28 | Ad Exchange Group | Automated aggregated multivariate testing systems, methods, and processes |
CN207352663U (en) * | 2017-10-13 | 2018-05-11 | 青岛低碳一起行智能互联科技有限公司 | The indoor and outdoor fitness equipment of workout path and the monitoring device and system of sports equipment |
CN110070275A (en) * | 2019-04-08 | 2019-07-30 | 合肥安玛尔市场信息咨询有限公司 | A kind of data acquisition and management system based on Urban Governance mode |
CN111581927A (en) * | 2020-04-03 | 2020-08-25 | 深圳市维度统计咨询股份有限公司 | Ocean economic operation monitoring and early warning system and computer equipment |
-
2020
- 2020-05-15 CN CN202010413960.6A patent/CN111798085A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110096355A (en) * | 2010-02-22 | 2011-08-30 | 광운대학교 산학협력단 | Decision making system for city regeneration |
WO2017223547A1 (en) * | 2016-06-24 | 2017-12-28 | Ad Exchange Group | Automated aggregated multivariate testing systems, methods, and processes |
CN106779625A (en) * | 2017-01-20 | 2017-05-31 | 泰华智慧产业集团股份有限公司 | Application method and system that service is used |
CN207352663U (en) * | 2017-10-13 | 2018-05-11 | 青岛低碳一起行智能互联科技有限公司 | The indoor and outdoor fitness equipment of workout path and the monitoring device and system of sports equipment |
CN110070275A (en) * | 2019-04-08 | 2019-07-30 | 合肥安玛尔市场信息咨询有限公司 | A kind of data acquisition and management system based on Urban Governance mode |
CN111581927A (en) * | 2020-04-03 | 2020-08-25 | 深圳市维度统计咨询股份有限公司 | Ocean economic operation monitoring and early warning system and computer equipment |
Non-Patent Citations (2)
Title |
---|
宁津生等: "《测绘学概论》", 武汉大学出版社, pages: 110 - 111 * |
宁津生等: "《零基础轻松学SQL Server 2016》", 31 March 2020, 机械工业出版社, pages: 228 - 111 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110347644B (en) | Paperless inspection and detection system and operation method thereof | |
CN115375146A (en) | Digital construction integrated platform | |
CN110210981A (en) | Insurance business Claims Resolution method, apparatus, computer installation and storage medium | |
CN109214784A (en) | A kind of method, client, server and the system of fire-fighting inspection management | |
CN111694554B (en) | Visual subway construction quality tracing system and control method thereof | |
CN112070338A (en) | Enterprise internal auxiliary auditing method | |
CN109636312A (en) | Land control engineering online monitoring and management system | |
CN112529478A (en) | Biological information management device, method, server, and computer storage medium | |
CN115062675A (en) | Full-spectrum pollution tracing method based on neural network and cloud system | |
CN112508343A (en) | Implementation method of visual construction management and control system for construction quality management | |
CN113806170A (en) | Method, system, medium and terminal for automatically generating engineering industry supervision log | |
CN111897873A (en) | Inspection system and inspection method based on big data | |
CN115186025A (en) | Automatic configuration method, system and equipment of visual report | |
CN111652699A (en) | Data transmission method for tax receipt system | |
CN109284978A (en) | System and method for accurately identifying poverty-stricken user | |
CN111798085A (en) | Civilized city creation management system and investigation method | |
CN112508541A (en) | Portable mobile phone acquisition software system based on training trainee information data acquisition | |
CN111428139A (en) | Safety supervision and inspection method and system | |
CN110209575A (en) | Test document generation method, device, electronic equipment and storage medium | |
CN110597899B (en) | Project expense management method and system | |
CN113344518A (en) | Project management system | |
CN113052493A (en) | Efficiency monitoring system and working method | |
CN112734393A (en) | Intelligent management platform for corporate enterprise and external administration unit | |
CN116955463B (en) | Multi-source heterogeneous data integration system | |
CN115934749B (en) | Integrated processing method and application of natural disaster comprehensive risk census data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |