CN111794557A - Bracket for renovating and transforming large-scale building concrete roof and roof dismantling method thereof - Google Patents

Bracket for renovating and transforming large-scale building concrete roof and roof dismantling method thereof Download PDF

Info

Publication number
CN111794557A
CN111794557A CN202010575242.9A CN202010575242A CN111794557A CN 111794557 A CN111794557 A CN 111794557A CN 202010575242 A CN202010575242 A CN 202010575242A CN 111794557 A CN111794557 A CN 111794557A
Authority
CN
China
Prior art keywords
roof
bracket
lifting
roof panel
renovating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010575242.9A
Other languages
Chinese (zh)
Inventor
杜晓龙
王利
宋辉
陈永福
吴凯
王兵臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction Engineering Group Co Ltd
Original Assignee
Beijing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Construction Engineering Group Co Ltd filed Critical Beijing Construction Engineering Group Co Ltd
Priority to CN202010575242.9A priority Critical patent/CN111794557A/en
Publication of CN111794557A publication Critical patent/CN111794557A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G23/082Wrecking of buildings using shears, breakers, jaws and the like

Abstract

The invention relates to a bracket for renovating and reforming a concrete roof of a large building and a roof dismantling method thereof, belonging to the technical field of renovating and reforming a building roof. Through when demolising the roof boarding, arrange the roof boarding in the bracket on, regard the bracket as main hoist and mount stress point to avoid direct hoist and mount on old roof boarding, avoid the roof boarding fragile because of the old time, at the in-process of hoist and mount, take place the breakage, cause the potential safety hazard.

Description

Bracket for renovating and transforming large-scale building concrete roof and roof dismantling method thereof
Technical Field
The invention relates to the technical field of renovation and reconstruction of building roofs, in particular to a bracket for renovation and reconstruction of a concrete roof of a large building and a roof dismantling method thereof.
Background
At present, most roof structures of buildings such as large-span and large-space conference centers, museums, exhibition halls, gymnasiums and the like built in China adopt steel truss structure roofs.
The steel truss structure roof comprises a steel truss and a reinforced concrete roof panel arranged on the steel truss, the roof panel and the steel truss are welded and fixed, however, in some buildings built in the 60-80 years of the 20 th century, the reinforced concrete roof panel on the roof is weakened in structural strength after 50-60 years, and the earthquake resistance is insufficient, and in order to solve the problems, an old roof panel dismantling technology is needed to safely dismantle the old roof panel.
Disclosure of Invention
Aiming at the defects in the prior art, the first purpose of the invention is to provide the bracket for renovating and transforming the large-scale building concrete roof, which can be used for dismantling the roof panel, the roof panel is arranged on the bracket, and the bracket is used as a main hoisting stress point, so that the roof panel is prevented from being directly hoisted on the old roof panel, and the bracket has a simple structure and low manufacturing cost.
The second purpose of the invention is to provide a bracket for renovating and transforming a large-scale building concrete roof, which is used for a roof dismantling method and is convenient for safely dismantling roof boards.
The above object of the present invention is achieved by the following technical solutions:
the bracket for renovating and reconstructing the concrete roof of the large-scale building comprises two horizontal rods which are parallel to each other, the two ends of each horizontal rod are respectively and fixedly provided with a horizontal rod, the horizontal rods and the horizontal rods form a rectangular frame, two lifting lugs are respectively and fixedly arranged on the horizontal rods, and lifting ropes are connected to the lifting lugs.
Through adopting above-mentioned technical scheme, form the frame that size and roof boarding are unanimous through the mutual welding of horizontal pole and horizontal pole, can be used for demolising of roof boarding, arrange the roof boarding in the bracket, regard the bracket as main hoist and mount stress point to avoid direct hoist and mount on old roof boarding, avoid the roof boarding fragile because of the old time, at the in-process of hoist and mount, take place the breakage, cause the problem of potential safety hazard, its simple structure, cost are low simultaneously.
The present invention in a preferred example may be further configured to: and a plurality of support rods parallel to the cross rod are fixedly arranged in the frame at intervals.
By adopting the technical scheme, the stability and the bearing capacity of the frame are improved.
The present invention in a preferred example may be further configured to: the frame comprises a plurality of sections of frame units, supporting rods are respectively arranged at the splicing positions of two adjacent frame units, a plurality of pairs of threaded holes which are coaxially arranged are formed in the supporting rods, and fixing bolts are arranged in the threaded holes in a penetrating mode to fix the two frame units.
Through adopting above-mentioned technical scheme, through dividing into polylith frame element with the frame, reduce the length of frame, be convenient for with the bracket from indoor fortune to the roof wait to demolish the below of roof boarding.
The present invention in a preferred example may be further configured to: the lifting rope is characterized in that two ends of the lifting rope are respectively connected with a mechanical fixture, the mechanical fixture comprises a U-shaped clamp, two side walls of the U-shaped clamp are provided with corresponding insertion holes, and the U-shaped clamp is clamped on the lifting lug and is connected with the lifting lug through fastening bolts which sequentially penetrate through the insertion holes and the lifting lug.
Through adopting above-mentioned technical scheme, directly utilize U type card to press from both sides to hold on the lug, the bolt fastening is convenient for the lifting rope and the lug are connected and are dismantled.
The present invention in a preferred example may be further configured to: two ends of the cross rod respectively extend out of two sides of the frame.
Through adopting above-mentioned technical scheme, better bearing the roof boarding.
The present invention in a preferred example may be further configured to: the horizontal rod and the supporting rod are made of square steel, and the cross rod is made of H-shaped steel.
Through adopting above-mentioned technical scheme, because roof boarding on the bracket its main action of gravity is on the horizontal pole, utilize H shaped steel to make the horizontal pole, guarantee its bearing capacity, the light square steel of gravity is selected for use to the horizon bar and bracing piece and is made, under the prerequisite of guaranteeing bracket bearing capacity, reduces the weight of bracket.
The present invention in a preferred example may be further configured to: before dismantling, firstly cutting the seam joint of the roof panel to be dismantled, then conveying the bracket to the lower part of the roof panel to be dismantled on the roof from the indoor, respectively forming four holes at the positions corresponding to the lifting lugs of the bracket on the roof panel, penetrating the lifting rope positioned above the roof panel from the holes, connecting the lifting rope with the lifting lugs by using a mechanical fixture on the lifting rope, tensioning the lifting rope, dragging the roof panel by using the bracket, then cutting and separating the roof panel from the welding position of the steel roof truss, and upwards supporting and dismantling the old roof panel by using the bracket.
Through adopting above-mentioned technical scheme, when detaching old roof boarding, arrange the roof boarding in the bracket, regard the bracket as main hoist and mount stress point to avoid direct hoist and mount on old roof boarding, avoid it fragile because of the old time, at the in-process of hoist and mount, take place the breakage, cause the potential safety hazard.
The present invention in a preferred example may be further configured to: the roof board and the steel roof truss are cut by gas welding.
Through adopting above-mentioned technical scheme, lead to the fact destruction to steel roof truss when avoiding the cutting, influence its structural strength.
The present invention in a preferred example may be further configured to: the roof panel is provided with a small portal frame, the lifting rope is connected with the hoisting equipment on the small portal frame, and the old roof panel is detached through the force applied by the hoisting equipment.
By adopting the technical scheme, when the roof panel which cannot be covered by the crane boom is dismantled, the roof panel is dismantled by arranging the small portal frame on the roof.
In summary, the invention has the following beneficial technical effects:
1. by manufacturing the bracket matched with the roof board, when the old roof board is dismantled, the bracket is arranged at the bottom of the roof board, and the bracket is used as a main component for dismantling the roof board, so that the problem of crushing in the hoisting process caused by direct hoisting on the roof board is avoided, and the safety is high; in addition, the bracket has simple structure and low counterfeiting;
2. and the small portal frame is utilized to disassemble at the place where the suspension arm of the crane can not cover, so that the crane is more convenient.
Drawings
FIG. 1 is a schematic view of a bracket;
FIG. 2 is an enlarged partial schematic view of portion A of FIG. 1;
fig. 3 is a structural diagram of a use state of the bracket.
In the figure, 1, a horizontal rod; 2. a cross bar; 3. lifting lugs; 4. a lifting rope; 5. a support bar; 6. a frame unit; 7. a mechanical clamp; 71. a U-shaped card; 72. fastening a bolt; 8. a roof panel.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, the bracket for renovating and reconstructing a concrete roof of a large building disclosed by the invention comprises two horizontal rods 1 which are parallel to each other, cross rods 2 are respectively welded at two ends of each horizontal rod 1, the horizontal rods 1 and the cross rods 2 form a rectangular frame, the size of the frame is the same as that of a roof panel 8 to be dismantled, two lifting lugs 3 are respectively welded on the two horizontal rods 2, the two lifting lugs 3 are symmetrically arranged along the central axis of the frame in the length direction of the horizontal rods 1, lifting ropes 4 are connected to the lifting lugs 3, and the frame is lifted up through the lifting ropes 4.
The inside interval of frame is even to be equipped with many bracing pieces 5 that are on a parallel with horizontal pole 2, and the both ends of bracing piece 5 weld with horizon bar 1 respectively, increase the stability and the load capacity of frame.
Because roof boarding 8 is on its main action of gravity of bracket on horizontal pole 2, in order to guarantee the bearing of bracket to roof boarding 8, make horizon bar 1 and bracing piece 5 by square steel, horizontal pole 2 is made by H shaped steel. In addition, extend the both ends of horizontal pole 2 respectively the both sides of frame to better bearing roof boarding 8.
Further, because 8 individual length of roof boarding are 4-6m, length is longer, in order to be convenient for transport the bracket from indoor to the roof and wait to demolish the below of roof boarding 8, divide into the polylith with the frame, the frame includes multisection frame element 6, two adjacent frame element 6 have set firmly bracing piece 5 respectively in the concatenation punishment, set up many pairs of coaxial screw holes that set up on the lateral wall of two bracing pieces 5, the fixing bolt wears to establish in the screw hole, the cooperation nut is connected two bracing pieces 5 side by side, it is fixed to make 6 concatenations of frame element. By dividing the frame into a plurality of frame units 6, the length of the frame is reduced, facilitating transport of the frame.
The two ends of the lifting rope 4 are respectively connected with a mechanical clamp 7, each mechanical clamp 7 comprises a U-shaped clamp 71, two side walls of each U-shaped clamp 71 are respectively provided with corresponding jacks, the U-shaped clamps 71 are clamped on the lifting lugs 3, the U-shaped clamps 71 are connected with the lifting lugs 3 through fastening bolts 72 which sequentially penetrate through the jacks and the lifting lugs 3 and matched nuts, and therefore the lifting rope 4 is convenient to connect with and detach from the lifting lugs 3.
Referring to fig. 3, since the roof panel 8 has a weak structural strength and a crisp texture over several decades, it is likely to be broken during the dismantling process and fall into the room, which may cause a safety hazard. Therefore, in order to ensure the safe removal of the old roof, the present solution proposes that the method for removing the old roof panels 8 by using the brackets comprises the following steps:
and (3) dismantling the roof panels 8 from low to high in sequence, and before dismantling, cutting the joint of the seam of the roof panel 8 to be dismantled by using a cutting machine to separate the adjacent roof panels 8. And then the frame unit 6 is transported to the lower part of the roof panel 8 to be dismantled from the room, and is assembled and fixed. The position that corresponds lug 3 on old roof boarding 8 sets up four holes respectively, pass two holes respectively with the both ends of lifting rope 4, utilize mechanical fixture 7 to be connected with lug 3, establish lifting rope 4 hook on the lifting hook of crane, taut lifting rope 4, utilize the bracket to drag roof boarding 8, then with four angular point cutting separation of roof boarding 8 and steel roof truss welded, adopt the gas welding cutting during the cutting, avoid causing destruction to steel roof truss, influence its structural strength. After the cutting is completed, the old roof panels 8 are lifted upwards by the brackets and detached. After the first roof panel 8 is removed, the bracket is placed into a room from the hole of the first roof panel 8, the bracket is detached from the mechanical fixture 7, the bracket is moved to the position below the roof panel 8 to be removed, and the steps are repeated to remove the roof panel 8.
When the area of the roof is large, the suspension arms of the crane cannot completely cover the whole roof, and when the roof panel 8 which cannot be covered by the suspension arms of the crane is removed, the small portal frame is arranged on the roof, the lifting ropes 4 are connected with the electric block or the chain block on the portal frame, the old roof panel 8 is removed by the force applied by the electric block or the chain block, and then the roof is lifted off by the crane.
According to the method, when the old roof panel 8 is detached, the roof panel 8 is placed on the bracket, and the bracket is used as a main hoisting stress point, so that the roof panel is prevented from being directly hoisted on the old roof panel 8, and the roof panel 8 is prevented from being broken due to frangibility for a long time in the hoisting process to cause potential safety hazards.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (9)

1. Bracket for renovating and transforming concrete roof of large building, which is characterized in that: the lifting device comprises two parallel horizontal rods (1), wherein cross rods (2) are fixedly arranged at two ends of each horizontal rod (1) respectively, rectangular frames are formed by the horizontal rods (1) and the cross rods (2), two lifting lugs (3) are fixedly arranged on the cross rods (2) respectively, and lifting ropes (4) are connected to the lifting lugs (3).
2. The bracket for renovating a concrete roof of a large building according to claim 1, characterized in that: a plurality of support rods (5) parallel to the cross rod (2) are fixedly arranged in the frame at intervals.
3. The bracket for renovating a concrete roof of a large building according to claim 2, characterized in that: the frame comprises a plurality of sections of frame units (6), two adjacent frame units (6) are respectively provided with a supporting rod (5) at the splicing position, a plurality of pairs of coaxially arranged threaded holes are formed in the supporting rods (5), and fixing bolts are arranged in the threaded holes in a penetrating mode to fix the two frame units (6).
4. The bracket for renovating a concrete roof of a large building according to claim 1, characterized in that: the lifting rope is characterized in that two ends of the lifting rope (4) are respectively connected with a mechanical clamp (7), the mechanical clamp (7) comprises a U-shaped clamp (71), two side walls of the U-shaped clamp (71) are provided with corresponding insertion holes, and the U-shaped clamp (71) is clamped on the lifting lug (3) and is connected with the lifting lug (3) through fastening bolts (72) which sequentially penetrate through the insertion holes and the lifting lug (3).
5. The bracket for renovating a concrete roof of a large building according to claim 1, characterized in that: two ends of the cross rod (2) respectively extend out of two sides of the frame.
6. The bracket for renovating a concrete roof of a large building according to claim 1, characterized in that: the horizontal rod (1) and the support rod (5) are made of square steel, and the cross rod (2) is made of H-shaped steel.
7. A method of demolishing a concrete roof of a large building using the bracket according to any one of claims 1 to 6, comprising the steps of: before dismantling, firstly cutting the seam joint of the roof panel to be dismantled, then conveying the bracket to the lower part of the roof panel to be dismantled on the roof from the indoor, respectively forming four holes at the positions corresponding to the lifting lugs of the bracket on the roof panel, penetrating the lifting rope positioned above the roof panel from the holes, connecting the lifting rope with the lifting lugs by using a mechanical fixture on the lifting rope, tensioning the lifting rope, dragging the roof panel by using the bracket, then cutting and separating the roof panel from the welding position of the steel roof truss, and upwards supporting and dismantling the old roof panel by using the bracket.
8. A method of demolishing a concrete ceiling of a large scale building using a bracket according to claim 7, wherein: the roof board and the steel roof truss are cut by gas welding.
9. A method of demolishing a concrete ceiling of a large scale building using a bracket according to claim 7, wherein: the roof panel is provided with a small portal frame, the lifting rope is connected with the hoisting equipment on the small portal frame, and the old roof panel is detached through the force applied by the hoisting equipment.
CN202010575242.9A 2020-06-22 2020-06-22 Bracket for renovating and transforming large-scale building concrete roof and roof dismantling method thereof Pending CN111794557A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010575242.9A CN111794557A (en) 2020-06-22 2020-06-22 Bracket for renovating and transforming large-scale building concrete roof and roof dismantling method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010575242.9A CN111794557A (en) 2020-06-22 2020-06-22 Bracket for renovating and transforming large-scale building concrete roof and roof dismantling method thereof

Publications (1)

Publication Number Publication Date
CN111794557A true CN111794557A (en) 2020-10-20

Family

ID=72804612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010575242.9A Pending CN111794557A (en) 2020-06-22 2020-06-22 Bracket for renovating and transforming large-scale building concrete roof and roof dismantling method thereof

Country Status (1)

Country Link
CN (1) CN111794557A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114704122A (en) * 2022-04-19 2022-07-05 北京首钢建设集团有限公司 Method for dismantling roof of existing building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114704122A (en) * 2022-04-19 2022-07-05 北京首钢建设集团有限公司 Method for dismantling roof of existing building
CN114704122B (en) * 2022-04-19 2023-12-01 北京首钢建设集团有限公司 Method for dismantling roof of existing building

Similar Documents

Publication Publication Date Title
CN201297036Y (en) Discharging platform
CN107327068B (en) Steel structure truss string system roof ceiling structure and construction method thereof
CN104831844B (en) The unidirectional double rope inverted cone-shaped cable curtain wall construction methods of arc
CN109113369B (en) Safe demolition method for manual demolition of cylindrical building
CN107060098A (en) A kind of high-altitude wire frame Steel Structure Installation method based on sliding platform
KR101658907B1 (en) Cable Dome demolition method used to remove the tension in the diagonal cable
CN111794557A (en) Bracket for renovating and transforming large-scale building concrete roof and roof dismantling method thereof
CN111335651A (en) Truss hoisting auxiliary device, truss construction method and supervision method thereof
JP2012001902A (en) Demolition method for building
CN111852063A (en) Construction method for renovating and reforming large building roof
CN212224732U (en) Bracket for renovating and reforming large-scale building concrete roof
CN218405428U (en) Operation device is transported to cylinder
JP2927321B2 (en) Dismantling method of large hanging boiler
CN109368479A (en) Fixed system and floor remove handling method
CN114033189A (en) Large-area high-altitude grid structure aluminum grid ceiling construction device and construction method
CN110805308B (en) Method for installing and dismantling temporary support at top center of silo
CN210917011U (en) Cable tower structure and bridge
CN110374006B (en) Construction method for dismantling space anisotropic large-tonnage steel beam bracket
CN103743581A (en) Internal-climbing tower crane test platform apparatus and test method
CN110318344B (en) Novel steel box girder No. 0 block support and No. 0 block erection construction method
CN210438301U (en) Light slat lifting device for building partition wall
JPH06323503A (en) Assembling method for large size suspension type boiler
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN209210183U (en) Fixed system
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method

Legal Events