CN111750841A - 一种建筑轴线控制检测方法 - Google Patents

一种建筑轴线控制检测方法 Download PDF

Info

Publication number
CN111750841A
CN111750841A CN202010634628.2A CN202010634628A CN111750841A CN 111750841 A CN111750841 A CN 111750841A CN 202010634628 A CN202010634628 A CN 202010634628A CN 111750841 A CN111750841 A CN 111750841A
Authority
CN
China
Prior art keywords
pendant
building
measuring
points
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010634628.2A
Other languages
English (en)
Inventor
姜兆双
郭建平
王伟林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202010634628.2A priority Critical patent/CN111750841A/zh
Publication of CN111750841A publication Critical patent/CN111750841A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种建筑轴线控制检测方法,属于多层框架结构安装施工技术领域。将简易测量装置放置在每根框架柱的顶部,然后放下三个吊坠,当端部两个吊坠与首层地面的两个测量圆点重合时,依照两点成一线的原理,此时第三个吊坠落点即是建筑轴线点。优点在于,简单易操作,利用简易测量装置及两点成一线原理,有效地控制了每层框架的建筑轴线,避免了长期使用测量仪器及专业测量人员,节省了人力物力,大大降低了施工成本。

Description

一种建筑轴线控制检测方法
技术领域
本发明属于多层框架结构安装施工技术领域,特别是提供了一种建筑轴线控制检测方法。
背景技术
多层框架结构施工时,对于建筑轴线的控制一般都采取测量仪器往上进行返点坐标控制,需要专业的测量人员长期配合,且测量操作不当也会产生一定的误差,后期调整费工费时,加大了实干成本。
发明内容
本发明的目的在于提供一种建筑轴线控制检测方法,将简易测量装置放置在每根框架柱的顶部,然后放下三个吊坠,当端部两个吊坠与首层地面的两个测量圆点重合时,依照两点成一线的原理,此时第三个吊坠落点即是建筑轴线点。具体步骤如下:
第一步,先加工制作一简易测量装置,该装置由两根立柱2及一根横梁1组成,在横梁1的中心线上开设三个圆孔,并在每个圆孔上设置第一个吊坠3、第二个吊坠4、第三个吊坠5(图1、图2);
第二步,在厂房6的首层地面利用测量仪器标出建筑定位轴线点,并在每个定位轴线点轴线的水平方向标出间距与测量装置上三个圆孔等距离的两个测量圆点7,使两个测量圆点7与建筑轴线点在一条直线上(图3);
第三步,在首层框架结构安装完毕后,将简易测量装置放置在每根框架柱8的顶部,然后同时放下第一个吊坠3、第二个吊坠4、第三个吊坠5,当端部第二个吊坠4、第三个吊坠5与首层地面的两个测量圆点7重合时,依照两点成一线的原理,此时第一个吊坠3落点即是建筑轴线点,按照此方法将首层框架柱8上所有的建筑轴线点检测出来,然后依据检测出的建筑轴线点调整框架柱8和框架梁9,使框架结构达到允许偏差范围。以此方法直到安装调整完整体多层框架结构,减少累积误差,满足整体建筑轴线要求(图4、图5)。
本发明的优点在于,简单易操作,利用简易测量装置及两点成一线原理,有效地控制了每层框架的建筑轴线,避免了长期使用测量仪器及专业测量人员,节省了人力物力,大大降低了施工成本,为公司取得了良好的经济效益。
附图说明
图1为简易测量装置主视图。
图2为简易测量装置俯视图。
图3为厂房地面建筑轴线及测量圆点俯视图。
图4为简易测量装置放置在首层框架上主视图。
图5为简易测量装置测量使用主视图。
图中,横梁1、立柱2、第一个吊坠3、第二个吊坠4、第三个吊坠5、厂房6、测量圆点7、框架柱8、框架梁9。
具体实施方式
图1-图5为本发明的一种具体实施方式。具体实施方式如下:
第一步,先加工制作一简易测量装置,该装置由两根立柱2及一根横梁1组成,在横梁1的中心线上开设三个圆孔,并在每个圆孔上设置第一个吊坠3、第二个吊坠4、第三个吊坠5;
第二步,在厂房6的首层地面利用测量仪器标出建筑定位轴线点,并在每个定位轴线点轴线的水平方向标出间距与测量装置上三个圆孔等距离的两个测量圆点7,使两个测量圆点7与建筑轴线点在一条直线上;
第三步,在首层框架结构安装完毕后,将简易测量装置放置在每根框架柱8的顶部,然后同时放下第一个吊坠3、第二个吊坠4、第三个吊坠5,当端部第二个吊坠4、第三个吊坠5与首层地面的两个测量圆点7重合时,依照两点成一线的原理,此时第一个吊坠3落点即是建筑轴线点,按照此方法将首层框架柱8上所有的建筑轴线点检测出来,然后依据检测出的建筑轴线点调整框架柱8和框架梁9,使框架结构达到允许偏差范围。以此方法直到安装调整完整体多层框架结构,减少累积误差,满足整体建筑轴线要求。
本发明在对炼铁厂房框架结构施工中,先加工制作一简易测量装置,该装置由两根立柱及一根横梁组成,在横梁的中心线上开设三个圆孔,并在每个圆孔上设置吊坠,同时在厂房的首层地面利用测量仪器标出建筑定位轴线点,并在每个定位轴线点轴线的垂直方向标出间距与测量装置上三个圆孔等距离的两个测量圆点,使两个测量圆点与建筑轴线点在一条直线上。在首层框架结构安装完毕后,将简易测量装置放置在每根框架柱的顶部,然后放下三个吊坠,当端部两个吊坠与首层地面的两个测量圆点重合时,依照两点成一线的原理,此时第三个吊坠落点即是建筑轴线点,按照此方法将首层框架柱上所有的建筑轴线点检测出来,然后依据检测出的建筑轴线点调整框架柱和框架梁达到允许偏差范围,以此方法直到安装调整完整体多层框架结构,减少累积误差,满足整体建筑轴线要求。该方法简单易操作,利用简易测量装置及两点成一线原理,有效地控制了每层框架的建筑轴线,避免了长期使用测量仪器及专业测量人员,节省了人力物力,大大降低了施工成本,为以后类似施工积累了宝贵的经验。

Claims (1)

1.一种建筑轴线控制检测方法,其特征在于,步骤如下:
第一步,先加工制作一简易测量装置,该装置由两根立柱(1)及一根横梁(1)组成,在横梁(1)的中心线上开设三个圆孔,并在每个圆孔上设置第一个吊坠(3);
第二步,在厂房(6)的首层地面利用测量仪器标出建筑定位轴线点,并在每个定位轴线点轴线的水平方向标出间距与测量装置上三个圆孔等距离的两个测量圆点(7),使两个测量圆点(7)与建筑轴线点在一条直线上;
第三步,在首层框架结构安装完毕后,将简易测量装置放置在每根框架柱(8)的顶部,然后同时放下第一个吊坠(3)、第二个吊坠(4)、第三个吊坠(5),当端部第二个吊坠(4)、第三个吊坠(5)与首层地面的两个测量圆点(7)重合时,此时,第一个吊坠(3)落点即是建筑轴线点,按照此方法将首层框架柱(8)上所有的建筑轴线点检测出来,然后依据检测出的建筑轴线点调整框架柱(8)和框架梁(9),使框架结构达到允许偏差范围。
CN202010634628.2A 2020-07-04 2020-07-04 一种建筑轴线控制检测方法 Pending CN111750841A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010634628.2A CN111750841A (zh) 2020-07-04 2020-07-04 一种建筑轴线控制检测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010634628.2A CN111750841A (zh) 2020-07-04 2020-07-04 一种建筑轴线控制检测方法

Publications (1)

Publication Number Publication Date
CN111750841A true CN111750841A (zh) 2020-10-09

Family

ID=72679349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010634628.2A Pending CN111750841A (zh) 2020-07-04 2020-07-04 一种建筑轴线控制检测方法

Country Status (1)

Country Link
CN (1) CN111750841A (zh)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1558184A (zh) * 2004-02-09 2004-12-29 许善海 一种铅垂
US20100178836A1 (en) * 2007-11-16 2010-07-15 Shanghai Nine Eagles Electronic Technology Co., Ltd. Single rotor model helicopter with improved stability behavior
CN103954190A (zh) * 2014-05-12 2014-07-30 济南黄河路桥工程公司 沟槽开挖尺寸检测器
CN106595587A (zh) * 2017-01-22 2017-04-26 中建安装工程有限公司 一种点式激光抄平笔
CN106705947A (zh) * 2016-11-17 2017-05-24 长安大学 基于三棱锥模型与陀螺全站仪联合的竖井联系测量方法
CN207636084U (zh) * 2017-12-29 2018-07-20 中国建筑第七工程局有限公司 高层垂直度调整检测装置
CN208333469U (zh) * 2018-06-14 2019-01-04 郭东良 放线控制点垂直投测装置
CN208635807U (zh) * 2018-09-30 2019-03-22 山西省农业科学院蔬菜研究所 一种简易田间直角测量仪
CN110652734A (zh) * 2019-10-24 2020-01-07 中国建筑第八工程局有限公司 车载式轨道埋件的定位工具及其定位方法
CN110823204A (zh) * 2019-10-31 2020-02-21 中冶天工集团有限公司 一种测量点位投设固定支架及其使用方法
CN210346708U (zh) * 2019-07-30 2020-04-17 北京首钢建设集团有限公司 一种钢柱安装的测量装置
CN210558769U (zh) * 2019-07-29 2020-05-19 东莞市鑫峰建筑机械有限公司 井道内施工升降机安装定位装置

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1558184A (zh) * 2004-02-09 2004-12-29 许善海 一种铅垂
US20100178836A1 (en) * 2007-11-16 2010-07-15 Shanghai Nine Eagles Electronic Technology Co., Ltd. Single rotor model helicopter with improved stability behavior
CN103954190A (zh) * 2014-05-12 2014-07-30 济南黄河路桥工程公司 沟槽开挖尺寸检测器
CN106705947A (zh) * 2016-11-17 2017-05-24 长安大学 基于三棱锥模型与陀螺全站仪联合的竖井联系测量方法
CN106595587A (zh) * 2017-01-22 2017-04-26 中建安装工程有限公司 一种点式激光抄平笔
CN207636084U (zh) * 2017-12-29 2018-07-20 中国建筑第七工程局有限公司 高层垂直度调整检测装置
CN208333469U (zh) * 2018-06-14 2019-01-04 郭东良 放线控制点垂直投测装置
CN208635807U (zh) * 2018-09-30 2019-03-22 山西省农业科学院蔬菜研究所 一种简易田间直角测量仪
CN210558769U (zh) * 2019-07-29 2020-05-19 东莞市鑫峰建筑机械有限公司 井道内施工升降机安装定位装置
CN210346708U (zh) * 2019-07-30 2020-04-17 北京首钢建设集团有限公司 一种钢柱安装的测量装置
CN110652734A (zh) * 2019-10-24 2020-01-07 中国建筑第八工程局有限公司 车载式轨道埋件的定位工具及其定位方法
CN110823204A (zh) * 2019-10-31 2020-02-21 中冶天工集团有限公司 一种测量点位投设固定支架及其使用方法

Similar Documents

Publication Publication Date Title
CN102434003B (zh) 一种重型双肢钢柱施工工艺
CN109296211B (zh) 一种装配式钢结构建筑构件安装偏差控制方法
CN109291029B (zh) 基于空间坐标测量的多点放样工装及放样方法
CN103174302A (zh) 大直径筒仓仓顶的施工方法
CN203625921U (zh) 地脚螺栓预埋安装精度控制装置
CN204024092U (zh) 一种新型型钢柱定位组件
CN106223623B (zh) 钢结构箱型拱形屋架安装方法
CN107859037A (zh) 一种大型埋件锚杆结构的安装定位机构及方法
CN110725348B (zh) 立柱桩纠偏装置及纠偏施工方法
CN111750841A (zh) 一种建筑轴线控制检测方法
CN118036136A (zh) 一种基于gps与bim技术的叠合板吊装安装定位方法及系统
CN111807229A (zh) 无人天车实际位置与鞍座绝对位置的对应装置及对应方法
CN218847590U (zh) 一种用于乘客电梯轿厢架制备精度的立式测试装置
CN101255767A (zh) 异形构件的虚拟四面体顶点测量定位方法
CN207671554U (zh) 一种大型钢管吊装组合定位调节装置
CN215594981U (zh) 一种现浇混凝土楼板标高测控装置
CN213234338U (zh) 一种预埋螺杆预埋位置辅助控制器
CN212228067U (zh) 一种建筑轴线控制检测装置
CN212612029U (zh) 预制装配式下部结构安装空间姿态监控设备
CN111485727B (zh) 钢结构雨棚屋拱梁吊装焊接的施工方法
CN210002275U (zh) 一种用于节段预制拼装直线桥线形控制的装置
CN212271652U (zh) 一种高速铁路简支箱梁接触网预埋件定位装置
CN206876291U (zh) 柱式传感器偏载测试装置
CN202627326U (zh) 高层建筑型钢混凝土组合结构用的型钢柱
CN206815191U (zh) 一种满堂支架空间梁端索导管定位装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20201009