CN111750342A - Instant-boiling water boiler - Google Patents

Instant-boiling water boiler Download PDF

Info

Publication number
CN111750342A
CN111750342A CN202010760446.XA CN202010760446A CN111750342A CN 111750342 A CN111750342 A CN 111750342A CN 202010760446 A CN202010760446 A CN 202010760446A CN 111750342 A CN111750342 A CN 111750342A
Authority
CN
China
Prior art keywords
water
heating
insulation
heat
control probe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010760446.XA
Other languages
Chinese (zh)
Inventor
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jieshui Environmental Protection Technology Co ltd
Original Assignee
Shanghai Jieshui Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jieshui Environmental Protection Technology Co ltd filed Critical Shanghai Jieshui Environmental Protection Technology Co ltd
Priority to CN202010760446.XA priority Critical patent/CN111750342A/en
Publication of CN111750342A publication Critical patent/CN111750342A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/28Methods of steam generation characterised by form of heating method in boilers heated electrically
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/42Applications, arrangements, or dispositions of alarm or automatic safety devices
    • F22B37/46Applications, arrangements, or dispositions of alarm or automatic safety devices responsive to low or high water level, e.g. for checking, suppressing, extinguishing combustion in boilers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/48Devices for removing water, salt, or sludge from boilers; Arrangements of cleaning apparatus in boilers; Combinations thereof with boilers
    • F22B37/50Devices for removing water, salt, or sludge from boilers; Arrangements of cleaning apparatus in boilers; Combinations thereof with boilers for draining or expelling water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/32Feed-water heaters, i.e. economisers or like preheaters arranged to be heated by steam, e.g. bled from turbines
    • F22D1/34Feed-water heaters, i.e. economisers or like preheaters arranged to be heated by steam, e.g. bled from turbines and returning condensate to boiler with main feed supply

Abstract

The invention discloses an instant-boiling water boiler, which comprises a water boiling tank (1), wherein an insulation can (3) is arranged at the opening part of the water boiling tank (1), boiling water can overflow from the opening part of the water boiling tank (1) to the insulation can (3), an insulation pipe (4) is arranged in the insulation can (3), a warm water tank (5) is arranged in the insulation can (3), the warm water tank (5) is provided with a first communicating pipe (6) which extends out of the insulation can (3), and the first communicating pipe (6) is communicated with the water boiling tank (1) positioned outside the insulation can (3), and the instant-boiling water boiler is characterized in that: install heating controller (11) on first connecting pipe (6), set up heat dissipation heat-conducting element in heating controller (11), give when heat dissipation heat-conducting element can give the control mainboard cooling of self heating controller (11) cooling water heating in first connecting pipe (6). The open water boiler can preheat cold water by utilizing heat generated by steam of the water boiler, and can preheat cooling water secondarily by utilizing heat generated by electronic control equipment, so that the energy-saving effect is improved.

Description

Instant-boiling water boiler
Technical Field
The invention belongs to the technical field of water heaters, and particularly relates to an instant-boiling water boiler.
Background
A water boiler is also called a boiling water boiler, and is drinking water equipment which is designed and developed for meeting the requirement of more people on drinking boiled water and is used for producing boiled water by converting electric energy or other fuels into heat energy through combustion. The boiler can be divided into an electric heating boiler and a steam boiler according to a heating source, wherein the electric heating boiler is divided according to different heating principles: conventional water boilers, boiling water boilers, stepping water boilers, instant-boiling water boilers, hot-push instant-heating water boilers and electromagnetic water boilers. The water boiler is divided into the following parts according to the working form: water storage type water boilers and instant heating type water boilers; the steam boiler is divided into an intermittent steam boiler and a continuous steam boiler. The electric water boiler is generally simpler and easier to use than a steam boiler, is cheap and good, and has small volume, so most of the electric water boilers appearing on the market are electric water boilers.
Traditional electric boiler drinks after giving cold water heating through the heating pipe, because the structure of current electric boiler leads to producing negative and positive water and thousand cold water, and people drink the back and unfavorable to health, chinese patent ZL201720306138.3 discloses an open boiler heating system improvement structure promptly, and it is including boiling the water tank, the heating pipe is equipped with to boiling the bottom of water tank, the insulation can is installed to boiling the oral area of water tank, and boiling water can spill over the insulation can from boiling the water tank oral area, be equipped with the insulating tube in the insulation can, warm water tank dress is in the insulation can, its characterized in that: the warm water tank is provided with a first communicating pipe which extends out of the insulation can and is communicated with the water boiling tank positioned outside the insulation can, the first communicating pipe is provided with an electromagnetic valve, boiled water and steam inside the insulation can of the water boiler can preheat the warm water tank inside the insulation can, warm water of the warm water tank flows into the insulation can after being boiled by the water boiling tank, and the circulation is performed, so that cold water can be preheated by utilizing multiple waste heat, the energy-saving effect is improved, meanwhile, a water outlet is provided with a timing and clean water discharge valve, and water is regularly discharged every day, so that the existence of water at. However, the steam boiled by the water boiler adopts a treatment mode of directly discharging the steam to the outside of the water boiler, and a large amount of heat energy is wasted.
Disclosure of Invention
The invention aims to overcome the technical defect that a large amount of heat energy is wasted due to the fact that steam after boiling of the existing water boiler is directly discharged to the outside of the water boiler, and provides the instant-boiling water boiler, which can preheat cold water by using heat of the steam generated by the water boiler, can secondarily preheat cooling water by using heat generated by electronic control equipment, improves the energy-saving effect, and simultaneously turns the steam into condensed water to be reused to save water resources.
Technical scheme
In order to achieve the technical purpose, the invention designs an instant-boiling water boiler which comprises a water boiling tank, wherein a heating pipe is arranged at the bottom of the water boiling tank, an insulation box is arranged at the opening part of the water boiling tank, boiling water can overflow from the opening part of the water boiling tank to the insulation box, an insulation pipe is arranged in the insulation box, a warm water tank is arranged in the insulation box, the warm water tank is provided with a first communicating pipe which extends out of the insulation box, and the first communicating pipe is communicated with the water boiling tank positioned outside the insulation box, and the instant-boiling water boiler is characterized in: the first communication pipe is communicated with a water outlet of a cold-heat exchanger, the cold-heat exchanger is communicated with a steam outlet on the heat preservation box, and a solenoid valve is arranged in front of a cold water inlet of the cold-heat exchanger;
install heating controller on the first communicating pipe, set up heat dissipation heat conduction element in the heating controller, give when heat dissipation heat conduction element can give self heating controller's control mainboard cooling water heating in the first communicating pipe.
Furthermore, the heat dissipation and heat conduction element is a silicon controlled rectifier, and the silicon controlled rectifier is arranged close to the first communication pipe.
Furthermore, a water quantity control probe, a heating control probe and a heating stop control probe are arranged in the heat preservation box, the water quantity control probe can control the electromagnetic valve to stop water inflow, the heating control probe can control the heating pipe to start heating, the heating stop control probe can control the heating pipe to stop heating, the heating stop control probe is located outside the warm water tank, and the water quantity control probe and the heat control probe extend into the warm water tank.
Furthermore, a drain outlet is formed in the bottom of the heat insulation box.
Furthermore, a steam outlet is arranged on the heat preservation box.
Furthermore, a boiled water outlet is formed in the bottom of the heat preservation box.
Further, the heating controller is capable of controlling the water level control probe, the heating control probe, and the stop heating control probe.
Advantageous effects
The instant-boiling water boiler provided by the invention can preheat cold water by using heat of steam generated by the water boiler, and can preheat cooling water secondarily by using heat energy generated by electronic control equipment, so that the energy-saving effect is improved, and meanwhile, the steam is changed into condensed water to be reused, so that water resources are saved.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention.
Detailed Description
In order to make the technical problems, technical solutions and advantageous effects solved by the present invention more apparent, the following detailed description of the features and exemplary embodiments of the present invention is provided. It should be understood that the following description of specific embodiments is merely illustrative of the invention, which may be practiced by those skilled in the art without some of these specific details. In the drawings and the following description, well-known techniques and structures are not described in detail in order to avoid unnecessarily obscuring the present invention. One embodiment of an instant water boiler according to the present invention is described below with reference to the accompanying drawings.
Examples
As shown in the attached figure 1, the instant-boiling water boiler comprises a water boiling tank 1, wherein a heating pipe 2 is arranged at the bottom of the water boiling tank 1, an insulation can 3 is arranged at the opening part of the water boiling tank 1, and a drain outlet 302 is arranged at the bottom of the insulation can 3. The heat preservation box 3 is provided with a steam outlet 301. The bottom of the heat preservation box 3 is provided with a boiled water outlet 303. Boiling water can overflow from the opening part of the boiling water tank 1 to the heat preservation tank 3, a heat preservation pipe 4 is arranged in the heat preservation tank 3, the warm water tank 5 is provided with a first communication pipe 6 which extends out of the heat preservation tank 3, the first communication pipe 6 is communicated with the boiling water tank 1 positioned outside the heat preservation tank 3, the first communication pipe 6 is communicated with a water outlet 1202 of a cold-heat exchanger 12, the cold-heat exchanger 12 is communicated with a steam outlet 301 on the heat preservation tank 3, and a solenoid valve 7 is arranged in front of a cold water inlet 1201 of the;
install heating controller 11 on first connecting pipe 6, set up heat dissipation heat conduction element (not shown in the attached drawing) in the heating controller 11, heat dissipation heat conduction element can give for self heating controller 11's control mainboard cooling the cooling water heating in the first connecting pipe 6 simultaneously. In this embodiment, the heat dissipation and conduction element is a thyristor, and the thyristor is arranged in close contact with the first communication pipe 6. A water quantity control probe 10, a heating control probe 9 and a heating stop control probe 8 are arranged in the heat insulation box 3, and the heating controller 11 can control the water quantity control probe 10, the heating control probe 9 and the heating stop control probe 8. The water quantity control probe 10 can control the electromagnetic valve 7 to stop water inflow, the heating control probe 9 can control the heating pipe 2 to start heating, the heating control probe 8 can control the heating pipe 2 to stop heating, the heating control probe 8 is stopped to be located outside the warm water tank 5, and the water quantity control probe 10 and the heat control probe 9 stretch into the warm water tank 5.
The working process of the embodiment is that cold water enters the cold-heat exchanger 12 through the cold water inlet 1201, steam generated by boiled water in the insulation can 3 enters the cold-heat exchanger 12 through the steam outlet 301, the steam temperature is reduced to be condensed water after heat energy exchange, the condensed water is discharged, the cold water after primary preheating enters the first communication pipe 6 from the water outlet 1202, and cold water in the first communication pipe 6 passes through the heating controller 11. The controllable silicon absorbs heat energy on the control mainboard to cool the mainboard, transfers the heat energy to cold water to preheat the cold water for the second time, then the cold water continuously flows into the water boiling tank 1, is heated by the heating pipe 2 in the water boiling tank 1 and then overflows into the heat insulation box 3 from the mouth. Meanwhile, the boiled water in the heat preservation box 3 can preheat the warm water tank 5 in the heat preservation box 3, the warm water in the warm water tank 5 flows into the heat preservation box 3 after being boiled in the boiling water tank 1, the circulation is carried out, the steam enters the cold-heat exchanger 12 through the steam outlet 301 again, the cold water is preheated by utilizing the excess heat energy, and the energy-saving effect is improved.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (7)

1. The utility model provides an open boiler promptly, it includes boiling water tank (1), heating pipe (2) are equipped with to the bottom of boiling water tank (1), insulation can (3) are installed to the oral area of boiling water tank (1), and boiling water can overflow insulation can (3) from boiling water tank (1) oral area, be equipped with insulation tube (4) in insulation can (3), warm water tank (5) dress is in insulation can (3), warm water tank (5) are equipped with first communicating pipe (6) and stretch out insulation can (3), first communicating pipe (6) and the boiling water tank (1) intercommunication that is located insulation can (3) outside, its characterized in that: the first communication pipe (6) is communicated with a water outlet (1202) of a cold-heat exchanger (12), the cold-heat exchanger (12) is communicated with a steam outlet (301) on the heat preservation box (3), and an electromagnetic valve (7) is arranged in front of a cold water inlet (1201) of the cold-heat exchanger (12);
install heating controller (11) on first connecting pipe (6), set up heat dissipation heat-conducting element in heating controller (11), give when heat dissipation heat-conducting element can give the control mainboard cooling of self heating controller (11) cooling water heating in first connecting pipe (6).
2. The improved structure of the heating system of the instant-boiling water boiler as claimed in claim 1, wherein: the heat dissipation and heat conduction element is a silicon controlled rectifier, and the silicon controlled rectifier is arranged close to the first communication pipe (6).
3. The improved structure of the heating system of the instant-boiling water boiler as claimed in claim 1, wherein: be provided with water yield control probe (10) in insulation can (3), heating control probe (9) and stop heating control probe (8), water yield control probe (10) can control solenoid valve (7) and stop intaking, heating control probe (9) can control heating pipe (2) and begin to heat, stop heating control probe (8) can control heating pipe (2) and stop heating, stop heating control probe (8) and be located warm water tank (5) outside, water yield control probe (10) and heat control probe (9) stretch into inside warm water tank (5).
4. The improved structure of the heating system of the instant-boiling water boiler as claimed in claim 1, wherein: a sewage draining outlet (302) is arranged at the bottom of the heat preservation box (3).
5. The improved structure of the heating system of the instant-boiling water boiler as claimed in claim 1, wherein: and a steam outlet (301) is formed in the heat preservation box (3).
6. The improved structure of the heating system of the instant-boiling water boiler as claimed in claim 1, wherein: the bottom of the heat preservation box (3) is provided with a boiled water outlet (303).
7. The improved structure of the heating system of the instant-boiling water boiler as claimed in claim 3, wherein: the heating controller (11) can control the water quantity control probe (10), the heating control probe (9) and the heating stop control probe (8).
CN202010760446.XA 2020-07-31 2020-07-31 Instant-boiling water boiler Pending CN111750342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010760446.XA CN111750342A (en) 2020-07-31 2020-07-31 Instant-boiling water boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010760446.XA CN111750342A (en) 2020-07-31 2020-07-31 Instant-boiling water boiler

Publications (1)

Publication Number Publication Date
CN111750342A true CN111750342A (en) 2020-10-09

Family

ID=72712774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010760446.XA Pending CN111750342A (en) 2020-07-31 2020-07-31 Instant-boiling water boiler

Country Status (1)

Country Link
CN (1) CN111750342A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113028653A (en) * 2021-04-16 2021-06-25 佛山市汉尔普电气科技有限公司 Small power large flow instant electric water boiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113028653A (en) * 2021-04-16 2021-06-25 佛山市汉尔普电气科技有限公司 Small power large flow instant electric water boiler

Similar Documents

Publication Publication Date Title
CN106073494B (en) Undercounter energy conservation instant-heating water drinking machine
CN103727702B (en) Semiconductor heat pump energy-saving instant-hot faucet
CN111750342A (en) Instant-boiling water boiler
CN202166203U (en) Electric auxiliary direct or indirect type forced or natural circulation solar water heater
CN208658858U (en) Rush the fixed warm mother and baby's machine of milk
CN207299499U (en) A kind of combined intelligent thermostatic electric water heater
CN109869911A (en) A kind of combustion gas constant temperature heating stove
CN213300048U (en) Instant-boiling water boiler
CN102269477B (en) Heat pump assisted direct solar water heater
CN208551272U (en) Fixed temperature warm water mother and baby's machine
CN203240739U (en) Mixed type multipurpose energy-saving water heater
CN205548321U (en) Stepping type water boiler
CN213551223U (en) Water supply system for cold boiled water
CN207084699U (en) A kind of instant heating type drinking machine
CN208519978U (en) A kind of air energy water boiler
CN206118994U (en) Continuous mashing off system
CN207741600U (en) A kind of heating system energy-saving type heat exchanger
CN208222875U (en) A kind of solar-energy air-energy boiled water hot-water heating system
CN212006202U (en) Water bath heating type energy-saving warm water device
CN206656494U (en) Graphene carbon electric boiler
CN205448402U (en) Full -automatic cooling / heat and heating water system of direct -fired machine and solar energy coupling
CN206695367U (en) A kind of immediate boiling boiler heating structure-improved
CN201748650U (en) Heat exchange device of water-storage wall-mounted gas boiler
CN205227772U (en) High -efficient commercial electric heat water dispenser
CN106820983A (en) A kind of instant heating type drinking machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination