CN111735355B - Quick dust removal structure in tunnel drilling and blasting engineering - Google Patents

Quick dust removal structure in tunnel drilling and blasting engineering Download PDF

Info

Publication number
CN111735355B
CN111735355B CN202010448657.XA CN202010448657A CN111735355B CN 111735355 B CN111735355 B CN 111735355B CN 202010448657 A CN202010448657 A CN 202010448657A CN 111735355 B CN111735355 B CN 111735355B
Authority
CN
China
Prior art keywords
tunnel
water bag
dust removal
removal structure
elastic block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202010448657.XA
Other languages
Chinese (zh)
Other versions
CN111735355A (en
Inventor
余闯
温正军
叶昌鹏
董合费
吴则祥
王生
邱浩
王洲
徐温仁
林克慧
汪志江
胡滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Oujiang Water Diversion Development Co ltd
Wenzhou University
Original Assignee
Wenzhou Oujiang Water Diversion Development Co ltd
Wenzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Oujiang Water Diversion Development Co ltd, Wenzhou University filed Critical Wenzhou Oujiang Water Diversion Development Co ltd
Priority to CN202010448657.XA priority Critical patent/CN111735355B/en
Publication of CN111735355A publication Critical patent/CN111735355A/en
Application granted granted Critical
Publication of CN111735355B publication Critical patent/CN111735355B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D5/00Safety arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a rapid dust removal structure in tunnel drilling and blasting engineering, which comprises a water drum A blocked at the outer end of an explosive jack, wherein an elastic block is arranged in the center of the water drum A, a flat large water drum B is attached to the side wall of a tunnel, a strip-shaped tearing tape is arranged on the large water drum B, two ends of a pull rope are respectively connected with the elastic block and a pull head of the tearing tape, the elastic block is outwards burst after the explosive explodes, the elastic block sequentially drives the pull rope and the pull head, and the pull head tears the tearing tape towards the outer end. The water bag A in the rapid dust removal structure can splash water to the stone blocks during blasting to prevent dust, but the subsequently sprayed stone block water bag A cannot be involved, the pull rope is pulled through the outward popping force of the elastic block, the pull head is further made to pull the tearing strip of the water bag B, so that the water can be sprayed downwards, the tearing strip is torn and pulled to be delayed through the popping action of the elastic block at the moment of blasting, the subsequently sprayed stone blocks can be wetted, and the step of preventing dust is achieved.

Description

Rapid dust removal structure in tunnel drilling and blasting engineering
Technical Field
The invention relates to a rapid dust removal structure in tunnel drilling and blasting engineering.
Background
Can produce a large amount of smoke and dust in the tunnel blasting, make the operation personnel can't get into the tunnel clearance rubble for a long time, according to statistics about generally needing 2 hours just can make the smoke and dust subside to can visual degree, consequently greatly influenced the engineering progress.
The traditional mode generally comprises a water spraying method and a pipeline dust removing method, but the water spraying method cannot spray water at the first time during blasting to prevent smoke dust from generating, and water spraying equipment is required to enter a site after blasting, so that the best dust removing time is lost. And the pipeline pumping method has slow effect and limited help for the project progress.
Disclosure of Invention
The invention aims to provide a rapid dust removal structure in a tunnel drilling and blasting project, which can splash water at the moment of explosion and stone ejection after explosion to perform dust suppression treatment.
Therefore, the rapid dust removal structure in the tunnel drilling and blasting engineering comprises a water drum A (2) sealed at the outer end of a jack of an explosive (1), liquid is stored in the water drum A (2), an elastic block (3) is arranged in the center of the water drum A (2), a large flat water drum B (4) is attached to the side wall of a tunnel, liquid is stored in the large water drum B (4), a strip-shaped tearing tape (5) is arranged on the large water drum B (4), two ends of a pull rope (6) are respectively connected with the elastic block (3) and a pull head (7) of the tearing tape (5), the explosive (1) is exploded outwards to break out the elastic block (3), the elastic block (3) sequentially drives the pull rope (6) and the pull head (7), and the pull head (7) tears the tearing tape (5) outwards.
Furthermore, the back of the big water bag B (4) is provided with an adhesive tape, and the big water bag B (4) is fixed on the side wall of the tunnel in an adhesive mode.
Furthermore, the big water drum B (4) is provided with a through hole (8), and the screw rod (9) penetrates through the through hole (8) and is fixed on the side wall of the tunnel.
Further, the water bag A (2) extends to cover the whole blast surface (10).
Furthermore, a track (11) is erected on the ground of the tunnel, a support frame matched with the tunnel in shape is arranged in the tunnel, the support frame is provided with a bottom plate (12) and a ring frame (13) close to the side wall of the tunnel, a pulley (14) sleeved on the track (11) is arranged at the bottom of the bottom plate (12), and the big water drum B (4) is bound on the fixed ring frame (13) and close to the side wall of the tunnel.
Furthermore, the ring frame (13) is made of steel bars, a large water bag C (15) is hung on the ring frame, liquid is stored in the large water bag C (15), the tearing tape (5) is arranged on the large water bag C (15), and two ends of the stay cable (6) are respectively connected with the elastic block (3) and the pull head (7) of the tearing tape (5).
Furthermore, the water drum B (4) is made of a high-strength plastic bag, and the tearing belt (5) is made of strip-shaped thin-layer plastic.
The invention has the technical effects that:
1. the water bag A can be used for splashing water to the stone in the first time during blasting to prevent the generation of dust.
2. The water bag A can splash water while blasting, but the stone water bag A sprayed subsequently cannot be sprayed, the pull rope is pulled by the force of the elastic block popping outwards, the pull head pulls the tearing belts of the large water bag B and the large water bag C apart, water can be sprayed downwards, the stone blocks sprayed subsequently are also moistened, and accordingly dust is prevented.
Drawings
Fig. 1 is a schematic structural diagram of a rapid dust removal structure in a tunnel drilling and blasting engineering provided in embodiment 1 of the present invention.
Fig. 2 is a schematic structural diagram of a rapid dust removal structure in a tunnel drilling and blasting engineering according to embodiment 2 of the present invention, wherein a ladle C is not hung on a ring frame.
Fig. 3 is a schematic structural diagram of a rapid dust removal structure in a tunnel drilling and blasting engineering provided in embodiment 2 of the present invention, wherein a large water drum C is hung on a ring frame.
Fig. 4 is a schematic plan view of the structure of the coil form of fig. 2.
Detailed Description
The present invention will be described in further detail with reference to examples.
Referring to fig. 1, the rapid dust removal structure in tunnel drilling and blasting engineering provided by embodiment 1 of the present invention includes a water bag a2 sealed at an outer end of a plug hole of an explosive 1, a liquid is stored in the water bag a2, an elastic block 3 is arranged at a center of the water bag a2, a flat large water bag B4 is attached to a side wall of a tunnel, a liquid is stored in the water bag B4, a strip-shaped tearing tape 5 is provided on the large water bag B4, two ends of a pulling cable 6 are respectively connected with a pulling head 7 of the elastic block 3 and the tearing tape 5, the elastic block 3 is outwardly collapsed after the explosive 1 explodes, the elastic block 3 sequentially drives the pulling cable 6 and the pulling head 7, and the pulling head 7 tears the tearing tape 5 to an outer end.
Referring to fig. 1, the big water bag B4 is provided with an adhesive tape on the back, and the big water bag B4 is fixed on the side wall of the tunnel by adhesion. The pasting and fixing mode is simple and easy to implement, and is suitable for scenes with smooth tunnel walls.
Referring to fig. 1, the water drum B4 is provided with a through hole 8, and a screw 9 passes through the through hole 8 and is fixed on the side wall of the tunnel. The large water drum is firm and reliable in fixing mode and suitable for scenes with stable tunnel structures.
Referring to fig. 1, the water bag a2 extends over the entire blast surface 10, and the water bag extending over the entire blast surface can fully block the escape of smoke during explosion.
Referring to fig. 2-4, a track 11 is erected on the ground of the tunnel provided by embodiment 2 of the invention, a support frame adapted to the shape of the tunnel is arranged in the tunnel, the support frame has a bottom plate 12 and a ring 13 close to the side wall of the tunnel, a pulley 14 sleeved on the track 11 is arranged at the bottom of the bottom plate 12, and the water drum B4 is bound and fixed on the ring 13 and close to the side wall of the tunnel. The setting of circle frame can be quick through the good water drum transportation entering of track with ligature in advance, and needn't rely on tunnel wall hoist and mount water drum, avoid causing the unstability of tunnel lateral wall. The ring frame 13 is made of steel bars, a big water bag C15 is hung on the ring frame, liquid is stored in the big water bag C15, a tearing tape 5 is arranged on the big water bag C15, and two ends of the pull rope 6 are respectively connected with the elastic block 3 and the pull head 7 of the tearing tape 5. Above-mentioned support frame can be along the track with the water drum in from the outside transportation in the tunnel to need not to rely on the tunnel wall to hang the dress, consequently receive the influence of tunnel self condition less, the setting of water drum is convenient fast better, maneuverability is stronger.
In the above embodiments, in order to improve the dust adsorption effect of the liquid, the liquids stored in the water bag a2, the large water bag B4 and the large water bag C15 contain water, and a small amount of grease or salt is added to the water, and the grease may be industrially extracted grease, such as triglyceride.

Claims (10)

1. A tunnel bores quick dust removal structure among exploding engineering, characterized by: the novel explosive-proof tunnel is characterized by comprising a water bag A (2) which is plugged at the outer end of an insertion hole of an explosive (1), liquid is stored in the water bag A (2), an elastic block (3) is arranged at the center of the water bag A (2), a flat large water bag B (4) is attached to the side wall of the tunnel, liquid is stored in the large water bag B (4), a strip-shaped tearing tape (5) is arranged on the large water bag B (4), two ends of an inhaul cable (6) are respectively connected with a pull head (7) of the elastic block (3) and the tearing tape (5), the elastic block (3) is outwards burst after the explosive (1) explodes, the elastic block (3) sequentially drives the inhaul cable (6) and the pull head (7), and the tearing tape (5) is torn towards the outer end of the pull head (7).
2. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 1, which is characterized in that: the back of the big water bag B (4) is provided with an adhesive tape, and the big water bag B (4) is fixed on the side wall of the tunnel in an adhesive mode.
3. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 1, which is characterized in that: the big water bag B (4) is provided with a through hole (8), and the screw rod (9) penetrates through the through hole (8) and is fixed on the side wall of the tunnel.
4. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 1, 2 or 3, wherein: the water pocket A (2) extends over the entire blasting surface (10).
5. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 1, 2 or 3, which is characterized in that: the tunnel ground is provided with a track (11), a support frame matched with the tunnel in shape is arranged in the tunnel, the support frame is provided with a bottom plate (12) and a ring frame (13) close to the side wall of the tunnel, the bottom of the bottom plate (12) is provided with a pulley (14) sleeved on the track (11), and the big water drum B (4) is bound on the fixing ring frame (13) and close to the side wall of the tunnel.
6. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 4, which is characterized in that: the tunnel ground is provided with a track (11) in an overhead manner, a support frame matched with the tunnel in shape is arranged in the tunnel, the support frame is provided with a bottom plate (12) and a ring frame (13) close to the side wall of the tunnel, the bottom of the bottom plate (12) is provided with a pulley (14) sleeved on the track (11), and the water drum B (4) is bound on the fixing ring frame (13) and is close to the side wall of the tunnel.
7. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 5, which is characterized in that: the ring frame (13) is made of steel bars, a large water bag C (15) is hung on the ring frame, liquid is stored in the large water bag C (15), the tearing tape (5) is arranged on the large water bag C (15), and two ends of the stay cable (6) are respectively connected with the elastic block (3) and the pull head (7) of the tearing tape (5).
8. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 6, which is characterized in that: the ring frame (13) is made of steel bars, a large water bag C (15) is hung on the ring frame, liquid is stored in the large water bag C (15), the tearing tape (5) is arranged on the large water bag C (15), and two ends of the inhaul cable (6) are respectively connected with the elastic block (3) and the pull head (7) of the tearing tape (5).
9. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 1, 2 or 3, which is characterized in that: the big water bag B (4) is made of a high-strength plastic bag, and the tearing tape (5) is made of strip-shaped thin-layer plastic.
10. The rapid dust removal structure in the tunnel drilling and blasting engineering according to claim 1, 2 or 3, wherein: the liquid stored in the water bag A (2) and the large water bag B (4) contains water, and a small amount of grease or salt is added into the water.
CN202010448657.XA 2020-05-25 2020-05-25 Quick dust removal structure in tunnel drilling and blasting engineering Expired - Fee Related CN111735355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010448657.XA CN111735355B (en) 2020-05-25 2020-05-25 Quick dust removal structure in tunnel drilling and blasting engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010448657.XA CN111735355B (en) 2020-05-25 2020-05-25 Quick dust removal structure in tunnel drilling and blasting engineering

Publications (2)

Publication Number Publication Date
CN111735355A CN111735355A (en) 2020-10-02
CN111735355B true CN111735355B (en) 2022-09-13

Family

ID=72647713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010448657.XA Expired - Fee Related CN111735355B (en) 2020-05-25 2020-05-25 Quick dust removal structure in tunnel drilling and blasting engineering

Country Status (1)

Country Link
CN (1) CN111735355B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU37860A1 (en) * 1959-02-16
WO2012131525A1 (en) * 2011-03-31 2012-10-04 Ael Mining Services Limited Charging of blasting boreholes
CN204902692U (en) * 2015-08-03 2015-12-23 中交第一公路工程局有限公司 Blasting system is blockked up in tunnel tunnelling big gun hole water seal
CN205748141U (en) * 2016-06-21 2016-11-30 中国水利水电第五工程局有限公司 A kind of Tunnel Blasting charge constitution
CN209510374U (en) * 2018-11-21 2019-10-18 江西金汐实业有限公司 Proscenia drops in the quick-fried dedusting of brill used in Tunnel Engineering
CN210239734U (en) * 2019-05-28 2020-04-03 中国铁道科学研究院集团有限公司铁道建筑研究所 Dust and smoke removing device for tunnel blasting
CN210426293U (en) * 2019-08-03 2020-04-28 贵州久远爆破工程有限责任公司 Water stemming bag for dust fall in tunnel blasting
CN110425949B (en) * 2019-09-16 2022-06-07 山东天宝爆破有限公司 Open blasting smoke dust treatment method

Also Published As

Publication number Publication date
CN111735355A (en) 2020-10-02

Similar Documents

Publication Publication Date Title
CN102179017B (en) High-rise building external wall suspension type remote control fire distinguishing device and method
CN111735355B (en) Quick dust removal structure in tunnel drilling and blasting engineering
CN206088729U (en) Portable electric welding cage
CN107088275A (en) A kind of high-rise extinguishing device and the extinguishing method using the extinguishing device
CN111636749A (en) Inclined telegraph pole righting device
CN213984791U (en) Device is loaded to big gun hole cartridge explosive
CN111336880A (en) Dust settling method for mine blasting
RU2101501C1 (en) Method of preservation of mine working
CN102296610B (en) Device for removing square pile and construction method thereof
CN217557637U (en) Auxiliary tool for scaffold climbing
CN104727741B (en) A kind of Rope ladder for escaping fire hydrant cabinet of fire-fighting
CN205352200U (en) Planar spring launches line throwing apparatus
JPH10305798A (en) Underwater fitting frame and lifting device
CN217067482U (en) Suspension type heptafluoropropane environmental protection extinguishing device
CN216995798U (en) Fresh-keeping device is used in sales of Hami melon convenient to buffer protection
CN214436016U (en) Carpet formula instrument of putting out a fire
CN216845923U (en) Underwater explosive-filled coil with anti-floating function
JPS5719422A (en) Fixing method of net in process covering slope with net
CN210286659U (en) Lower arm placing and fixing device for overhead working truck
JPS55142826A (en) Pressure striking in method and device therefor
JPS5532870A (en) Method of rising up ground-assembling sound-proof cylinder for crawler running type pile driver
SU1668686A1 (en) Anchor support for mine workings
ATE29761T1 (en) ANCHOR REMOVAL METHOD, APPARATUS THEREFORE AND ANCHOR REMOVAL DEVICE.
Lehnen On the initial dynamic response of RC-chimneys due to system-change caused by blast
JP2015158093A (en) Submergence prevention method for component in over-water operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220913