CN111734433A - Comprehensive tunnel structure - Google Patents

Comprehensive tunnel structure Download PDF

Info

Publication number
CN111734433A
CN111734433A CN202010657948.XA CN202010657948A CN111734433A CN 111734433 A CN111734433 A CN 111734433A CN 202010657948 A CN202010657948 A CN 202010657948A CN 111734433 A CN111734433 A CN 111734433A
Authority
CN
China
Prior art keywords
comprehensive
cabin
fan
communicated
escape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010657948.XA
Other languages
Chinese (zh)
Inventor
袁松
冉龙洲
张生
白赟
郑国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Communication Surveying and Design Institute Co Ltd
Original Assignee
Sichuan Communication Surveying and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Communication Surveying and Design Institute Co Ltd filed Critical Sichuan Communication Surveying and Design Institute Co Ltd
Priority to CN202010657948.XA priority Critical patent/CN111734433A/en
Publication of CN111734433A publication Critical patent/CN111734433A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/002Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/003Ventilation of traffic tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F11/00Rescue devices or other safety devices, e.g. safety chambers or escape ways

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Pulmonology (AREA)
  • Emergency Management (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a comprehensive tunnel structure which comprises an annular lining structure, wherein a traffic lane road surface is arranged in the lining structure, sidewalks are arranged on two sides of the traffic lane road surface, the comprehensive tunnel structure further comprises a comprehensive cabin, a sewage cabin, an air duct, an escape channel and a ventilator room, the comprehensive cabin and the sewage cabin are arranged below the traffic lane road surface, the air duct, the escape channel and the ventilator room are arranged below the sidewalks, a fan A and a fan B are arranged in the ventilator room, one end of the fan A is communicated with the sewage cabin, the other end of the fan A is communicated with the air duct, one end of the fan B is communicated with the comprehensive cabin, the other end of the fan B is communicated with the air duct, the escape channel and the ventilator room are both communicated with the ground, the comprehensive cabin is communicated with the escape channel. The invention realizes the synchronous construction of the road tunnel and the comprehensive pipe gallery, effectively utilizes the space and saves the investment.

Description

Comprehensive tunnel structure
Technical Field
The invention relates to the technical field of tunnel structures, in particular to a comprehensive tunnel structure.
Background
With the rapid development of the urbanization process in China, the underground comprehensive pipe gallery is well-established. And more urban roads need to adopt tunnels to cross mountains. How to combine utility tunnel and urban road tunnel, to effectively utilizing the tunnel invert space, practice thrift urban land, reduce the repeated construction, practice thrift the investment and have important meaning.
Disclosure of Invention
The invention aims to provide a comprehensive tunnel structure, which is used for realizing synchronous construction of a road tunnel and a comprehensive pipe gallery, effectively utilizing space and saving investment.
The invention is realized by the following technical scheme:
the utility model provides a comprehensive tunnel structure, includes annular lining cutting structure, be provided with the lane road surface in the lining cutting structure, the both sides on lane road surface are provided with the pavement, still include and synthesize cabin, bilge tank, wind channel, escape way and fan room, synthesize cabin and bilge tank setting in lane road surface below, wind channel, escape way and fan room set up in the pavement below, be provided with fan A and fan B in the fan room, fan A one end and bilge tank intercommunication, the other end and wind channel intercommunication, fan B one end and comprehensive cabin intercommunication, the other end and wind channel intercommunication, escape way and fan room all communicate with ground, synthesize cabin and escape way intercommunication, bilge tank and fan room intercommunication.
A tunnel is arranged in the lining structure, a channel special for air supply and exhaust for the sewage cabin is formed among the fan A, the sewage cabin and the air duct, and a channel special for air supply and exhaust for the comprehensive cabin is formed among the fan B, the comprehensive cabin and the air duct.
The utility tunnel (the utility cabin, the sewage cabin, the air duct, the escape passage and the ventilator room) is arranged in the road surface of the lane in the tunnel and the inverted arch space below the lane, thereby being beneficial to saving urban land, reducing repeated construction and investment, and the underground pipe gallery facilities in the tunnel are easy to implement and maintain.
Meanwhile, the invention is provided with a functional comprehensive pipe gallery for meeting tunnel operation, and is also provided with a safety system comprising an escape passage for escaping, wherein the escape passage is used for connecting the comprehensive cabin and the ground; the ventilating machine room not only has functionality for installation fan A and fan B, simultaneously, also be well system of fleing, the ventilating machine room is used for communicateing bilge chamber and ground, and when taking place dangerous situation, personnel's accessible ventilating machine room in the bilge chamber gets into ground, and escape way and ventilating machine room be two independent systems of fleing promptly, escape way and ventilating machine room access to 2 different pavement ground respectively, and not only the security is better, and rationally distributed, do benefit to saving space, improve the security simultaneously.
Furthermore, a door opening is formed between the comprehensive cabin and the escape passage, and a door opening is formed between the sewage cabin and the ventilator room.
Further, the door opening is provided with a door in a matching way.
Furthermore, the side walls of the escape passage and the ventilator room are provided with crawling ladders, and the tops of the crawling ladders are communicated with the ground.
The ladder stand is convenient to be arranged on the ground in the same direction, occupies small area and does not need energy consumption.
Furthermore, escape holes are formed in the sidewalks, and the tops of the crawling ladders are communicated with the escape holes.
Furthermore, one side of the sidewalk close to the road surface of the traffic lane is provided with an isolation guardrail.
The isolation guardrail has a blocking effect, so that people on a sidewalk are prevented from entering a roadway surface, and the safety of a tunnel is improved. The isolation barrier may be made of stainless steel.
Further, the wind channel is arranged in parallel with the sidewalk and penetrates through the whole tunnel.
Further, escape way and fan room set up 2 people respectively in the lane below.
The escape passage and the ventilator room are reasonably arranged, and the space is saved.
Compared with the prior art, the invention has the following advantages and beneficial effects:
1. the utility tunnel (the utility cabin, the sewage cabin, the air duct, the escape passage and the ventilator room) is arranged in the road surface of the lane in the tunnel and the inverted arch space below the lane, thereby being beneficial to saving urban land, reducing repeated construction and investment, and the underground pipe gallery facilities in the tunnel are easy to implement and maintain.
2. The invention is not only provided with a functional comprehensive pipe gallery for meeting the tunnel operation, but also provided with a safety system comprising an escape passage for escaping, wherein the escape passage is used for connecting the comprehensive cabin and the ground, and when a dangerous case occurs, personnel in the comprehensive cabin can enter the ground through the escape passage; the ventilating machine room not only has functionality for installation fan A and fan B, simultaneously, also be well system of fleing, the ventilating machine room is used for communicateing bilge chamber and ground, and when taking place dangerous situation, personnel's accessible ventilating machine room in the bilge chamber gets into ground, and escape way and ventilating machine room be two independent systems of fleing promptly, escape way and ventilating machine room access to 2 different pavement ground respectively, and not only the security is better, and rationally distributed, do benefit to saving space, improve the security simultaneously.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. In the drawings:
FIG. 1 is a first schematic diagram of a tunnel structure;
FIG. 2 is a second schematic diagram of a tunnel structure;
FIG. 3 is a third schematic view of a tunnel structure;
FIG. 4 is a top view of the backfill space below the pavement of the sidewalk and the driveway.
Reference numbers and corresponding part names in the drawings:
1-lining structure, 2-roadway surface, 3-sidewalk, 4-isolation guardrail, 5-comprehensive cabin, 6-sewage cabin, 7-air duct, 8-escape channel, 9-ventilator room, 10-ladder, 11-escape hole, 12-fan A, 13-fan B, 14-door opening.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to examples and accompanying drawings, and the exemplary embodiments and descriptions thereof are only used for explaining the present invention and are not meant to limit the present invention.
Example 1:
as shown in fig. 1-4, a comprehensive tunnel structure comprises an annular lining structure 1, a roadway 2 is arranged in the lining structure 1, sidewalks 3 are arranged on two sides of the roadway 2, a comprehensive cabin 5, a sewage cabin 6, an air duct 7, an escape channel 8 and a ventilator room 9 are further included, the air duct 7 is arranged in parallel with the sidewalks 3 and penetrates through the whole tunnel, the comprehensive cabin 5 and the sewage cabin 6 are arranged below the roadway 2, the air duct 7, the escape channel 8 and the ventilator room 9 are arranged below the sidewalks 3, a fan a12 and a fan B13 are arranged in the ventilator room 9, one end of the fan a12 is communicated with the sewage cabin 6, the other end of the fan a is communicated with the air duct 7 and is used for supplying and exhausting air for the sewage cabin 6, one end of the fan B13 is communicated with the comprehensive cabin 5, the other end of the fan B is communicated with the air duct 7 and is used for supplying and, the escape passage 8 and the ventilator room 9 are both communicated with the ground, the comprehensive cabin 5 and the escape passage 8 are communicated through a door opening 14, the sewage cabin 6 and the ventilator room 9 are communicated through the door opening 14, a door is arranged in the door opening 14 in a matching manner, the side walls of the escape passage 8 and the ventilator room 9 are both provided with a ladder stand 10, the top of the ladder stand 10 is communicated with an escape hole 11 arranged on the sidewalk 3, when the sewage cabin 6 is in an emergency, personnel can enter the ventilator room 9 through the door opening 14, and escape or emergency rescue is carried out through the ladder stand 10 and the escape hole 11; when people in the comprehensive cabin 5 can enter the escape passage 8 through the door opening 14, escape or emergency rescue can be carried out through the ladder stand 10 and the escape hole 11.
In the embodiment, not only is a functional comprehensive pipe gallery arranged to meet tunnel operation, but also a safety system is arranged, including an escape channel 8 for escape, wherein the escape channel 8 is used for connecting the comprehensive cabin 5 and the ground, and when a dangerous situation occurs, people in the comprehensive cabin 5 can enter the ground through the escape channel 8; the ventilator room 9 not only has functionality for installation fan A12 and fan B13, simultaneously, also be well system of fleing, the ventilator room 9 is used for intercommunication bilge chamber 6 and ground, and when taking place the dangerous situation, personnel's accessible ventilator room 9 in the bilge chamber 6 gets into ground, and escape channel 8 and ventilator room 9 promptly are two independent systems of fleing, escape channel 8 and ventilator room 9 lead to 2 different pavement 3 ground respectively, and not only the security is better, and rationally distributed, do benefit to saving space, improve the security simultaneously.
This embodiment effectively utilizes tunnel invert space construction utility tunnel in urban road construction, practices thrift the urban land used, reduces the repeated construction, practices thrift the investment. The underground pipe gallery installation in the tunnel is easy to implement and convenient to maintain.
Example 2:
as shown in fig. 1-4, in the present embodiment, based on embodiment 1, an isolation barrier 4 is disposed on one side of the sidewalk 3 close to the roadway surface 2; the escape passage 8 and the ventilator room 9 are respectively arranged below the 2 person lanes 3.
The above-mentioned embodiments are intended to illustrate the objects, technical solutions and advantages of the present invention in further detail, and it should be understood that the above-mentioned embodiments are merely exemplary embodiments of the present invention, and are not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (8)

1. A comprehensive tunnel structure comprises an annular lining structure (1), wherein a roadway road surface (2) is arranged in the lining structure (1), sidewalks (3) are arranged on two sides of the roadway road surface (2), the comprehensive tunnel structure is characterized by further comprising a comprehensive cabin (5), a bilge cabin (6), an air duct (7), an escape channel (8) and a ventilator room (9), the comprehensive cabin (5) and the bilge cabin (6) are arranged below the roadway road surface (2), the air duct (7), the escape channel (8) and the ventilator room (9) are arranged below the sidewalk (3), a fan A (12) and a fan B (13) are arranged in the ventilator room (9), one end of the fan A (12) is communicated with the bilge cabin (6), the other end of the fan A is communicated with the air duct (7), one end of the fan B (13) is communicated with the comprehensive cabin (5), the other end is communicated with an air duct (7), the escape passage (8) and the ventilator room (9) are communicated with the ground, the comprehensive cabin (5) is communicated with the escape passage (8), and the sewage cabin (6) is communicated with the ventilator room (9).
2. A comprehensive tunnel structure according to claim 1, characterized in that a door opening (14) is provided between the comprehensive cabin (5) and the escape route (8), and a door opening (14) is provided between the bilge chamber (6) and the ventilator room (9).
3. Comprehensive tunnel structure according to claim 2, characterized in that said door opening (14) is fitted with a door.
4. A comprehensive tunnel structure according to claim 1, characterized in that the escape route (8) and the side walls of the ventilator room (9) are provided with ladder stands (10), the tops of the ladder stands (10) opening into the ground.
5. A comprehensive tunnel structure according to claim 4, characterized in that the sidewalk (3) is provided with escape holes (11), and the top of the ladder (10) is open to the escape holes (11).
6. A comprehensive tunnel structure according to claim 1, characterized in that the side of the sidewalk (3) close to the roadway surface (2) is provided with a barrier fence (4).
7. A comprehensive tunnel structure according to any one of claims 1-6, characterized in that the air ducts (7) are arranged parallel to the walkways (3) and extend through the entire tunnel.
8. A comprehensive tunnel structure according to any one of claims 1-6, characterized in that the escape route (8) and the ventilator room (9) are respectively disposed below the 2-person walkway (3).
CN202010657948.XA 2020-07-09 2020-07-09 Comprehensive tunnel structure Pending CN111734433A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010657948.XA CN111734433A (en) 2020-07-09 2020-07-09 Comprehensive tunnel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010657948.XA CN111734433A (en) 2020-07-09 2020-07-09 Comprehensive tunnel structure

Publications (1)

Publication Number Publication Date
CN111734433A true CN111734433A (en) 2020-10-02

Family

ID=72655757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010657948.XA Pending CN111734433A (en) 2020-07-09 2020-07-09 Comprehensive tunnel structure

Country Status (1)

Country Link
CN (1) CN111734433A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113446043A (en) * 2021-08-13 2021-09-28 中国电建集团河北省电力勘测设计研究院有限公司 Cable tunnel ventilator room arrangement method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113446043A (en) * 2021-08-13 2021-09-28 中国电建集团河北省电力勘测设计研究院有限公司 Cable tunnel ventilator room arrangement method

Similar Documents

Publication Publication Date Title
CN207685859U (en) A kind of underground pipe gallery
CN106013221B (en) Four layers of class rectangle Urban Underground Complex
CN101182781B (en) Breathing place used for synthesis pipe canal
CN204919244U (en) Open type road that sinks
CN207131443U (en) Under extra-long railway tunnel vertical shaft pattern Rescue Station take precautions against natural calamities ventilation and smoke evacuation system
CN111734433A (en) Comprehensive tunnel structure
CN212202067U (en) Take utility tunnel's tunnel structure
CN106013222B (en) Three circular cross section Urban Underground Complexes
CN204803915U (en) Synthesize piping lane and synthesize installing port
CN106638682A (en) Efficient-seismic-reduction quasi-rectangular city underground architecture complex
Liu et al. Innovative solutions for layout planning and implementation of a metro station and its accessory structures in mountainous cities, China
CN214695537U (en) Ventilation and escape node structure for natural gas cabin of comprehensive pipe rack
CN201077994Y (en) Breathing place used for synthesis pipe canal
CN215906846U (en) Underground pipe gallery
CN105604089B (en) Semi-underground utility tunnel
CN204370766U (en) A kind of view ventilating shaft and building
CN205077513U (en) Utility tunnel and underpass uncovered formula structure of building together
CN112681039B (en) Multi-energy public infrastructure corridor
CN205712172U (en) A kind of Impacts Evaluation of Urban Tunnel version of lateral open
CN209975566U (en) City underground space connection structure
CN211948551U (en) Underground parking garage and urban tunnel co-construction structure
CN210369035U (en) Subway station structure
CN207079623U (en) A kind of class rectangle Urban Underground Complex of efficiently damping
CN206110168U (en) Three -layer quasi -rectangular city underground complex
CN105735350A (en) Laterally exposed city underground road structure form

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination