CN111716272A - Lead seal assembly equipment for electric energy meter - Google Patents

Lead seal assembly equipment for electric energy meter Download PDF

Info

Publication number
CN111716272A
CN111716272A CN202010664525.0A CN202010664525A CN111716272A CN 111716272 A CN111716272 A CN 111716272A CN 202010664525 A CN202010664525 A CN 202010664525A CN 111716272 A CN111716272 A CN 111716272A
Authority
CN
China
Prior art keywords
electric energy
energy meter
piston
cylinder body
air cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010664525.0A
Other languages
Chinese (zh)
Inventor
董强
祝新荣
赵亚光
轩林辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Dc Energy Equipment Co ltd
Original Assignee
Hangzhou Dc Energy Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Dc Energy Equipment Co ltd filed Critical Hangzhou Dc Energy Equipment Co ltd
Priority to CN202010664525.0A priority Critical patent/CN111716272A/en
Publication of CN111716272A publication Critical patent/CN111716272A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
    • B25B11/02Assembly jigs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/004Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed
    • B23P21/006Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed the conveying means comprising a rotating table

Abstract

The invention discloses electric energy meter lead sealing assembly equipment which comprises a first conveyor belt, a second conveyor belt, a rack and an indexing turntable arranged on the rack, wherein a plurality of positioning tools for placing electric energy meters are arranged in the circumferential direction of the indexing turntable; the positioning tool is provided with a placing groove for placing the electric energy meter, an inflation ring is arranged on the side wall of the placing groove, and an inflation cylinder which is used for automatically inflating the inflation ring after the electric energy meter is placed into the placing groove is arranged at the bottom of the placing groove. According to the positioning tool, when the electric energy meter is placed in the positioning tool, the inflation cylinder can inflate the inflation ring, so that the inflation ring expands, the electric energy meter can be reliably fixed on the positioning tool after the inflation ring expands, the electric energy meter is accurately positioned, and accurate assembly is facilitated.

Description

Lead seal assembly equipment for electric energy meter
Technical Field
The invention relates to the technical field of electric energy meter assembly, in particular to electric energy meter lead seal assembly equipment.
Background
An electric energy meter is an instrument for measuring electric energy, and is also called a watt-hour meter, a fire meter, an electric energy meter and a kilowatt-hour meter, and refers to instruments for measuring various electric quantities. The lead sealing of the electric energy meter is an important process for assembling the electric energy meter, and is added to prevent electricity stealing by someone, once the device is damaged, the possibility of electricity stealing is indicated, and the existing lead sealing structure is generally assembled through automatic equipment. When the electric energy meter is assembled with the lead sealing structure, the electric energy meter needs to be placed on the positioning tool firstly, the positioning tool is fixed on the indexing turntable, along with the rotation of the indexing turntable, the electric energy meter placed on the positioning tool sequentially passes through each assembling device, and each assembling device is responsible for one assembling procedure, so that the assembly of the whole lead sealing structure is completed. Be provided with the standing groove that is used for placing the electric energy meter on current electric energy meter location frock, the open area of standing groove generally is greater than the orthographic projection area of electric energy meter, be convenient for the electric energy meter can easily put into the location frock, but like this, back in the electric energy meter puts into the location frock, because the open area of standing groove generally is greater than the orthographic projection area of electric energy meter, make the electric energy meter put into form certain clearance between the lateral wall of back and standing groove in the standing groove, can't carry out fine fixed to the electric energy meter, lead to the electric energy meter to receive external force effect when the assembly and can produce certain rocking in the standing groove down, be unfavorable for carrying out accurate assembly.
Such as: the invention discloses a Chinese patent publication No. CN102109592A, and relates to a tooling plate for a single-meter-position electric energy meter for online detection, which relates to the tooling plate and solves the technical problems of poor conveying capacity and low online detection efficiency of the existing electric energy meter. The invention comprises a bottom plate and is characterized in that a positioning insulating plate is arranged on the upper surface of the bottom plate, a plurality of bulges are arranged on the periphery of the positioning insulating plate, a conductive metal layer is arranged on the upper surface of the positioning insulating plate, and a guide piece is arranged on the lower surface of the bottom plate. According to the invention, when the electric energy meter is placed in the tooling plate, a certain gap is formed between the electric energy meter and the tooling plate, and the electric energy meter can shake to a certain extent under the action of external force during assembly, so that the electric energy meter is not beneficial to accurate assembly.
Disclosure of Invention
The invention aims to solve the problems that when an existing electric energy meter is assembled with a lead seal structure, due to the fact that a positioning tool cannot well fix the electric energy meter, the electric energy meter can shake a certain amount in a placing groove under the action of external force during assembly, and accurate assembly is not facilitated.
The purpose of the invention is realized by the following technical scheme: the electric energy meter lead seal assembly equipment comprises a first conveyor belt, a second conveyor belt, a rack and an indexing turntable arranged on the rack, wherein a plurality of positioning tools for placing electric energy meters are arranged in the circumferential direction of the indexing turntable, and a first clamping device for clamping the electric energy meters placed on the first conveyor belt onto the positioning tools and a second clamping device for clamping the electric energy meters placed on the positioning tools onto the second conveyor belt are arranged on the rack; the positioning tool is provided with a placing groove for placing the electric energy meter, an inflation ring is arranged on the side wall of the placing groove, and an inflation cylinder which is used for automatically inflating the inflation ring after the electric energy meter is placed into the placing groove is arranged at the bottom of the placing groove.
According to the lead seal structure, an electric energy meter to be assembled is placed on a first conveying belt, the electric energy meter with the assembly is conveyed to one side of a dividing rotary table through the first conveying belt, the electric energy meter on the first conveying belt is clamped and taken onto a positioning tool on the dividing rotary table through a first clamping device, then the dividing rotary table rotates to enable the electric energy meter on the positioning tool to sequentially pass through various assembling devices, each assembling device is responsible for one assembling process, so that the assembly of the whole lead seal structure is completed, the dividing rotary table rotates the electric energy meter to a second conveying belt accessory after the electric energy meter is assembled, the assembled electric energy meter is clamped and taken onto a second conveying belt through a second clamping device, and the assembled electric energy meter is conveyed outwards through the second conveying belt. According to the positioning tool, when the electric energy meter is placed in the positioning tool, the inflation cylinder can inflate the inflation ring, so that the inflation ring expands, and the electric energy meter can be reliably fixed on the positioning tool after the inflation ring expands, so that the electric energy meter is prevented from shaking in the placing groove under the action of external force during assembly, the electric energy meter is accurately positioned, and accurate assembly is facilitated.
Preferably, the inflation cylinder comprises a first cylinder body, a first piston is arranged in the first cylinder body, a first air cavity is formed between the first piston and one end in the first cylinder body, the first air cavity is connected with the inflation ring through a first connecting pipe, a first piston rod is arranged on the first piston, and the first piston rod penetrates through the first cylinder body upwards. After the electric energy meter is placed in the placing groove, under the action of gravity of the electric energy meter, the electric energy meter downwards presses the first piston rod, the first piston rod downwards presses the inflation cylinder to inflate the inflation ring, the inflation ring expands after inflation, accurate positioning is carried out on the electric energy meter, and accurate assembly is facilitated.
Preferably, a first spring is arranged in the first air cavity, and two ends of the first spring are respectively abutted against the first piston and the first cylinder body; a guide cylinder is arranged on the first cylinder body, a sliding cavity is arranged in the guide cylinder, a lock tongue is connected in the sliding cavity in a sliding manner, a lock groove matched with the lock tongue is formed in the first piston, a first magnet is arranged at one end, away from the first piston, of the lock tongue, and a fourth spring is arranged between the first magnet and one end of the sliding cavity; a second cylinder body and a third cylinder body are arranged at the bottom of the placing groove, a second piston is arranged in the second cylinder body, a second air cavity is formed between the second piston and one end in the second cylinder body, a second spring is arranged between the other end in the second cylinder body and the second piston, a second piston rod is arranged on the second piston, a second magnet matched with the first magnet is arranged on the second piston rod, and an exhaust device connected with the second air cavity is arranged on the second cylinder body; a third piston is arranged in the third cylinder body, a third air cavity is formed between the third piston and one end in the third cylinder body, the second air cavity is connected with the third air cavity through a second connecting pipe, a third piston rod is arranged on the third piston, and the third piston rod penetrates through the third cylinder body upwards; a one-way valve is arranged on the third cylinder body and connected with the third air cavity; and a third spring is arranged in the third air cavity, and two ends of the third spring are respectively abutted against the third piston and the third cylinder body. When the electric energy meter is placed in the positioning tool, a certain downward pressure can be applied to the electric energy meter by means of the first clamping device, so that the first piston moves downwards by overcoming the elastic force of the spring, when the first piston moves to a position corresponding to the spring bolt, the spring bolt extends into the locking groove to fix the first piston at the position, and at the moment, due to the movement of the first piston, the gas in the first gas cavity is filled into the inflatable ring through the first connecting pipe, so that the inflatable ring expands; in the process, the third piston rod also moves downwards at the same time, the third piston rod drives the third piston to move downwards, so that the third air cavity is compressed, air in the third air cavity is filled into the second air cylinder through the second connecting pipe, so that the second air cylinder expands to push the second piston and the second piston rod to move, so that the second magnet which is originally opposite to the first magnet moves downwards and is staggered with the first magnet, due to the existence of the exhaust device and the second spring, the air in the second air cavity can be discharged outwards at a certain speed, so that the second piston, the second piston rod and the second magnet can return to the initial position at a certain speed, the time for the second magnet to return to the initial position can be realized by adjusting the exhaust speed of the exhaust device, in the practical process, the time for the second magnet to return to the initial position can be controlled to be at the same level as the assembly time of the lead seal of the electric energy meter by adjusting the exhaust speed of the exhaust device, after the electric energy meter assembly is completed, the second magnet just returns to the initial position, the second magnet is just right opposite to the first magnet, first magnet moves towards the direction of keeping away from first piston under the magnetic force effect of second magnet, and then drive the spring bolt and move towards the direction of keeping away from first piston, make the spring bolt break away from the locked groove, first piston upwards moves under the effect of first spring like this, in this process, gas in the gas ring is inhaled back to first air cavity, the gas ring contracts, loosen the electric energy meter, first piston drives first piston rod upward movement at the in-process of upwards moving simultaneously, upwards jack-up the electric energy meter, make be convenient for press from both sides the second conveyer belt with the electric energy meter from the location frock.
Preferably, the exhaust device comprises an exhaust hole arranged on the second cylinder body, an internal thread is arranged on the inner wall of the exhaust hole, the exhaust hole is in threaded connection with a moving block, and a taper hole is formed in the moving block; a fixed rod is arranged in the exhaust hole, and one end of the fixed rod is provided with a taper block corresponding to the taper hole. Through rotating the movable block, the movable block can move in the exhaust hole, so that the distance between the taper hole and the taper block can be adjusted, the width of a gap between the taper hole and the taper block is changed, and the aim of adjusting the exhaust speed is fulfilled.
Preferably, a connecting rib plate is arranged between the fixed rod and the inner wall of the exhaust hole. The connecting rib plate is used for fixing the fixing rod in the center of the exhaust hole.
Preferably, the upper end of the first piston rod is provided with a first pressure plate.
Preferably, a second pressure plate is disposed at an upper end of the third piston rod.
Preferably, the first clamping device comprises a first electric guide rail, and the first clamping jaw is arranged on the first electric guide rail.
Preferably, the second clamping device comprises a second electric guide rail, and the second clamping jaw is arranged on the second electric guide rail.
The invention has the beneficial effects that: according to the positioning tool, when the electric energy meter is placed in the positioning tool, the inflation cylinder can inflate the inflation ring, so that the inflation ring expands, and the electric energy meter can be reliably fixed on the positioning tool after the inflation ring expands, so that the electric energy meter is prevented from shaking in the placing groove under the action of external force during assembly, the electric energy meter is accurately positioned, and accurate assembly is facilitated.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an enlarged view of a portion a in fig. 1.
Fig. 3 is an enlarged view of a portion B in fig. 1.
Fig. 4 is a top view of the positioning tool.
Fig. 5 is a sectional view taken in the direction of a-a in fig. 4.
Fig. 6 is an enlarged view of the portion C in fig. 5.
Fig. 7 is an enlarged view of a portion D in fig. 6.
Fig. 8 is an enlarged view of a portion E of fig. 6.
In the figure: 1. a frame, 2, a first conveyor belt, 3, a second conveyor belt, 4, an indexing turntable, 5, a positioning tool, 6, a first electric guide rail, 7, a first clamping jaw, 8, a second electric guide rail, 9, a second clamping jaw, 10, a placing groove, 11, an air ring, 12, a first pressing plate, 13, a second cylinder body, 14, a first connecting pipe, 15, a first cylinder body, 16, a first piston, 17, a first piston rod, 18, a first air cavity, 19, a first spring, 20, a second air cavity, 21, a second piston, 22, a second piston rod, 23, a second magnet, 24, a second spring, 25, a second connecting pipe, 26, a third cylinder body, 27, a third air cavity, 28, a third piston, 29, a third piston rod, 30, a second pressing plate, 31, a third spring, 32, a one-way valve, 33, a guide cylinder, 34, a sliding cavity, 35, a locking tongue, 36, a first magnet, 37, a fourth spring, 38. the locking groove 39, the exhaust hole 40, the moving block 41, the taper hole 42, the fixing rod 43, the taper block 44 and the connecting rib plate.
Detailed Description
The invention is further described by the following detailed description in conjunction with the accompanying drawings.
Example (b):
as shown in fig. 1 to 8, the lead sealing assembly equipment for the electric energy meter comprises a first conveyor belt 2, a second conveyor belt 3, a machine frame 1 and an indexing turntable 4 arranged on the machine frame 1, wherein the indexing turntable 4 is connected with a motor, and the indexing turntable 4 is driven by the motor to rotate. The first conveyor belt 2 and the second conveyor belt 3 are both located at the side of the indexing turntable 4. A plurality of positioning tools 5 used for placing the electric energy meter are arranged on the circumference direction of the indexing turntable 4. The rack 1 is provided with a first clamping device for taking the electric energy meter clamps placed on the first conveyor belt 2 onto the positioning tool 5 and a second clamping device for taking the electric energy meter clamps placed on the positioning tool 5 onto the second conveyor belt 3. The first clamping device comprises a first electric guide rail 6, and a first clamping jaw 7 is arranged on the first electric guide rail 6. The first clamping jaw 7 clamps the electric energy meter, and the first electric guide rail 6 can drive the first clamping jaw to move along the axial direction of the first clamping jaw. The second clamping device comprises a second electric guide rail 8, and a second clamping jaw 9 is arranged on the second electric guide rail 8. The second clamping jaw 9 clamps the electric energy meter, and the second electric guide rail 8 can drive the second clamping jaw 9 to move along the axial direction of the second clamping jaw.
A placing groove 10 is arranged on the positioning tool 5. The side wall of the placing groove 10 is provided with an air inflation ring 11, and the air inflation ring 11 is arranged along the circumferential direction of the side wall of the placing groove 10. The bottom of the placing groove 10 is provided with an inflating cylinder. The inflation cylinder comprises a first cylinder body 15, a first piston 16 is arranged in the first cylinder body 15, a first piston rod 17 is arranged on the first piston 16, and the first piston rod penetrates through the first cylinder body 15 upwards. The upper end of the first piston rod 17 is provided with a first presser plate 12. A first air cavity 18 is formed between the first piston 16 and one end in the first cylinder 15, a first spring 19 is arranged in the first air cavity 18, and two ends of the first spring 19 are respectively abutted against the first piston 16 and the first cylinder 15. The first air cavity 18 is connected with the air-filled ring 11 through a first connecting pipe 14. The side of the first cylinder 15 is provided with a guide cylinder 33, a sliding cavity 34 is arranged in the guide cylinder 33, a lock tongue 35 is connected in the sliding cavity 34 in a sliding manner, and a lock groove 38 matched with the lock tongue 35 is arranged on the first piston 16. A first magnet 36 is arranged at one end of the bolt 35 away from the lock slot 38, and a fourth spring 37 is arranged between the first magnet 36 and one end of the sliding cavity 34. The placing groove 10 is provided with a second cylinder 13 and a third cylinder 26 at the bottom. A second piston 21 is disposed in the second cylinder 13, a second air chamber 20 is formed between the second piston 21 and one end of the second cylinder 13, and a second spring 24 is disposed between the other end of the second cylinder 13 and the second piston 21. The second piston 21 is provided with a second piston rod 22, and the second piston rod 22 is provided with a second magnet 23 which is matched with the first magnet 36. The second cylinder 13 is provided with an exhaust device connected to the second air chamber 20. The exhaust device comprises an exhaust hole 39 arranged on the second cylinder body 13, internal threads are arranged on the inner wall of the exhaust hole 39, a moving block 40 is connected in the exhaust hole 39 through threads, and a taper hole 41 is arranged on the moving block 40; a fixed rod 42 is arranged in the exhaust hole 39, one end of the fixed rod 42 is provided with a conical block 43 corresponding to the conical hole 41, and the conical block 43 is in a circular truncated cone shape. A connecting rib plate 44 is arranged between the fixing rod 42 and the inner wall of the exhaust hole 39. A third piston 28 is arranged in the third cylinder 26, a third piston rod 29 is arranged on the third piston 28, and the third piston rod 29 passes through the third cylinder 26 upwards. The upper end of the third piston rod 29 is provided with a second presser plate 30. The third air chamber 27 is connected to the second air chamber 20 through a second connection pipe 25. A third spring 31 is disposed in the third air chamber 27, and both ends of the third spring 31 abut against the third piston 28 and the third cylinder 26, respectively. The third cylinder 26 is provided with a check valve 32, and the check valve 32 is connected to the third air chamber 27. When the electric energy meter is placed in the positioning tool, a certain downward pressure can be applied to the electric energy meter by means of the first clamping device, so that the first piston moves downwards by overcoming the elastic force of the spring, when the first piston moves to a position corresponding to the spring bolt, the spring bolt extends into the locking groove to fix the first piston at the position, at the moment, due to the movement of the first piston, gas in the first gas cavity is filled into the inflatable ring through the first connecting pipe, so that the inflatable ring expands, the inflatable ring expands after being inflated, the electric energy meter is accurately positioned, and accurate assembly is facilitated; in the process, the third piston rod also moves downwards at the same time, the third piston rod drives the third piston to move downwards, so that the third air cavity is compressed, air in the third air cavity is filled into the second air cylinder through the second connecting pipe, so that the second air cylinder expands to push the second piston and the second piston rod to move, so that the second magnet which is originally opposite to the first magnet moves downwards and is staggered with the first magnet, due to the existence of the exhaust device and the second spring, the air in the second air cavity can be discharged outwards at a certain speed, so that the second piston, the second piston rod and the second magnet can return to the initial position at a certain speed, the time for the second magnet to return to the initial position can be realized by adjusting the exhaust speed of the exhaust device, in the practical process, the time for the second magnet to return to the initial position can be controlled to be at the same level as the assembly time of the lead seal of the electric energy meter by adjusting the exhaust speed of the exhaust device, after the electric energy meter assembly is completed, the second magnet just returns to the initial position, the second magnet is just right opposite to the first magnet, first magnet moves towards the direction of keeping away from first piston under the magnetic force effect of second magnet, and then drive the spring bolt and move towards the direction of keeping away from first piston, make the spring bolt break away from the locked groove, first piston upwards moves under the effect of first spring like this, in this process, gas in the gas ring is inhaled back to first air cavity, the gas ring contracts, loosen the electric energy meter, first piston drives first piston rod upward movement at the in-process of upwards moving simultaneously, upwards jack-up the electric energy meter, make be convenient for press from both sides the second conveyer belt with the electric energy meter from the location frock.
According to the lead seal structure, an electric energy meter to be assembled is placed on a first conveying belt, the electric energy meter with the assembly is conveyed to one side of a dividing rotary table through the first conveying belt, the electric energy meter on the first conveying belt is clamped and taken onto a positioning tool on the dividing rotary table through a first clamping device, then the dividing rotary table rotates to enable the electric energy meter on the positioning tool to sequentially pass through various assembling devices, each assembling device is responsible for one assembling process, so that the assembly of the whole lead seal structure is completed, the dividing rotary table rotates the electric energy meter to a second conveying belt accessory after the electric energy meter is assembled, the assembled electric energy meter is clamped and taken onto a second conveying belt through a second clamping device, and the assembled electric energy meter is conveyed outwards through the second conveying belt. According to the invention, the positioning tool can effectively fix and position the electric energy meter, so that the positioning meter can be accurately assembled.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (9)

1. The utility model provides an electric energy meter lead sealing rigging equipment which characterized in that: the electric energy meter clamping device comprises a first conveyor belt, a second conveyor belt, a rack and an indexing turntable arranged on the rack, wherein a plurality of positioning tools for placing electric energy meters are arranged in the circumferential direction of the indexing turntable; the positioning tool is provided with a placing groove for placing the electric energy meter, an inflation ring is arranged on the side wall of the placing groove, and an inflation cylinder which is used for automatically inflating the inflation ring after the electric energy meter is placed into the placing groove is arranged at the bottom of the placing groove.
2. The electric energy meter lead sealing assembly equipment as claimed in claim 1, wherein the inflation cylinder comprises a first cylinder body, a first piston is arranged in the first cylinder body, a first air cavity is formed between the first piston and one end in the first cylinder body, the first air cavity is connected with the inflation ring through a first connecting pipe, a first piston rod is arranged on the first piston, and the first piston rod penetrates upwards through the first cylinder body.
3. The electric energy meter lead sealing assembly equipment as claimed in claim 2, wherein a first spring is arranged in the first air cavity, and two ends of the first spring are respectively abutted against the first piston and the first cylinder body; a guide cylinder is arranged on the first cylinder body, a sliding cavity is arranged in the guide cylinder, a lock tongue is connected in the sliding cavity in a sliding manner, a lock groove matched with the lock tongue is formed in the first piston, a first magnet is arranged at one end, away from the first piston, of the lock tongue, and a fourth spring is arranged between the first magnet and one end of the sliding cavity; a second cylinder body and a third cylinder body are arranged at the bottom of the placing groove, a second piston is arranged in the second cylinder body, a second air cavity is formed between the second piston and one end in the second cylinder body, a second spring is arranged between the other end in the second cylinder body and the second piston, a second piston rod is arranged on the second piston, a second magnet matched with the first magnet is arranged on the second piston rod, and an exhaust device connected with the second air cavity is arranged on the second cylinder body; a third piston is arranged in the third cylinder body, a third air cavity is formed between the third piston and one end in the third cylinder body, the second air cavity is connected with the third air cavity through a second connecting pipe, a third piston rod is arranged on the third piston, and the third piston rod penetrates through the third cylinder body upwards; a one-way valve is arranged on the third cylinder body and connected with the third air cavity; and a third spring is arranged in the third air cavity, and two ends of the third spring are respectively abutted against the third piston and the third cylinder body.
4. The electric energy meter lead sealing assembly equipment as claimed in claim 3, wherein the exhaust device comprises an exhaust hole arranged on the second cylinder body, an internal thread is arranged on the inner wall of the exhaust hole, a moving block is connected to the exhaust hole in a threaded manner, and a taper hole is arranged on the moving block; a fixed rod is arranged in the exhaust hole, and one end of the fixed rod is provided with a taper block corresponding to the taper hole.
5. The electric energy meter lead sealing assembly equipment as claimed in claim 4, wherein a connecting rib plate is arranged between the fixing rod and the inner wall of the exhaust hole.
6. The electric energy meter lead sealing assembly equipment as claimed in claim 2, wherein a first pressing plate is arranged at the upper end of the first piston rod.
7. The electric energy meter lead sealing assembly equipment as claimed in claim 3, wherein the upper end of the third piston rod is provided with a second pressing plate.
8. The electric energy meter lead sealing assembly equipment as claimed in claim 1, wherein the first clamping device comprises a first electric guide rail, and a first clamping jaw is arranged on the first electric guide rail.
9. The electric energy meter lead sealing assembly equipment as claimed in claim 1, wherein the second clamping device comprises a second electric guide rail, and a second clamping jaw is arranged on the second electric guide rail.
CN202010664525.0A 2020-07-10 2020-07-10 Lead seal assembly equipment for electric energy meter Withdrawn CN111716272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010664525.0A CN111716272A (en) 2020-07-10 2020-07-10 Lead seal assembly equipment for electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010664525.0A CN111716272A (en) 2020-07-10 2020-07-10 Lead seal assembly equipment for electric energy meter

Publications (1)

Publication Number Publication Date
CN111716272A true CN111716272A (en) 2020-09-29

Family

ID=72572346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010664525.0A Withdrawn CN111716272A (en) 2020-07-10 2020-07-10 Lead seal assembly equipment for electric energy meter

Country Status (1)

Country Link
CN (1) CN111716272A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113579671A (en) * 2021-07-16 2021-11-02 杭州德创能源设备有限公司 Lead sealing equipment for electric energy meter

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102109592A (en) * 2011-01-30 2011-06-29 浙江省电力公司 Single meter-position electric energy meter tooling plate for on-line detection
CN202275557U (en) * 2011-11-01 2012-06-13 北京市电力公司 Lead seal tool plate for electric energy meter
CN102990356A (en) * 2012-12-03 2013-03-27 周俊雄 Semi-automatic assembly equipment of fire extinguisher pressure gauge
CN203390791U (en) * 2013-08-02 2014-01-15 河南省杜甫机械制造有限公司 Clamping device with air bags
CN205290722U (en) * 2015-08-19 2016-06-08 许继集团有限公司 Automatic quick positioner of electric energy meter on metaplasia product line
JP2016132061A (en) * 2015-01-19 2016-07-25 トヨタ自動車株式会社 Assembling device of differential gear
CN208100308U (en) * 2018-03-21 2018-11-16 唐山丞起汽车零部件有限公司 A kind of Double-linkage locking auxiliary support apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102109592A (en) * 2011-01-30 2011-06-29 浙江省电力公司 Single meter-position electric energy meter tooling plate for on-line detection
CN202275557U (en) * 2011-11-01 2012-06-13 北京市电力公司 Lead seal tool plate for electric energy meter
CN102990356A (en) * 2012-12-03 2013-03-27 周俊雄 Semi-automatic assembly equipment of fire extinguisher pressure gauge
CN203390791U (en) * 2013-08-02 2014-01-15 河南省杜甫机械制造有限公司 Clamping device with air bags
JP2016132061A (en) * 2015-01-19 2016-07-25 トヨタ自動車株式会社 Assembling device of differential gear
CN205290722U (en) * 2015-08-19 2016-06-08 许继集团有限公司 Automatic quick positioner of electric energy meter on metaplasia product line
CN208100308U (en) * 2018-03-21 2018-11-16 唐山丞起汽车零部件有限公司 A kind of Double-linkage locking auxiliary support apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113579671A (en) * 2021-07-16 2021-11-02 杭州德创能源设备有限公司 Lead sealing equipment for electric energy meter

Similar Documents

Publication Publication Date Title
CN109552874A (en) A kind of automatic electric logging device
CN202033159U (en) Air tightness detector for car lamps
CN107275136B (en) A kind of knob assembly bench
CN109502356A (en) It is a kind of can automatic clamping and classify flexible clamp for stacking
CN102635778B (en) Automatic inflator for nitrogen spring
CN111716272A (en) Lead seal assembly equipment for electric energy meter
CN108994242A (en) A kind of elastic slice riveting equipment in airtight detecting apparatus
CN111791166A (en) Rotatory assembly devices of electric energy meter
CN209623982U (en) A kind of equipment for sealing diaphragm air-leakage test
CN109060258A (en) A kind of elastic slice height detection apparatus in airtight detecting apparatus
CN205981578U (en) Wrist -watch gas tightness check out test set
CN202647182U (en) Nitrogen spring automatic inflator
CN112058702B (en) Cover plate testing machine
CN108231628B (en) Sealing and testing integrated machine capable of reversely braiding and braiding belt
CN108917566A (en) A kind of adhesive material flatness detector that band locally detects
CN212794657U (en) Electric energy meter positioning tool
CN209513243U (en) The resistance to plug of connector plastic shell detects jig
CN209070079U (en) Full-automatic pcb board electric logging device
CN108037124A (en) Conducting particles press mark detection device and its detection method
CN207964201U (en) A kind of device for detecting sealability
CN110420874A (en) A kind of air pump solenoid valve integral test system
CN209589007U (en) One kind being based on detection device product thickness testing agency
CN212314891U (en) ATE test equipment with autoloading function
CN110319801B (en) Three-coordinate measuring clamp for circular arc bottom surface tenon blade
CN203813615U (en) Automatic auxiliary production line of servo motors

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200929