CN111693455A - Drilling fluid mud cake generation test method - Google Patents

Drilling fluid mud cake generation test method Download PDF

Info

Publication number
CN111693455A
CN111693455A CN202010410514.XA CN202010410514A CN111693455A CN 111693455 A CN111693455 A CN 111693455A CN 202010410514 A CN202010410514 A CN 202010410514A CN 111693455 A CN111693455 A CN 111693455A
Authority
CN
China
Prior art keywords
drilling fluid
oil
rock sample
confining pressure
mud cake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010410514.XA
Other languages
Chinese (zh)
Inventor
刘伟
罗超
谭强
周宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN202010410514.XA priority Critical patent/CN111693455A/en
Publication of CN111693455A publication Critical patent/CN111693455A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N19/00Investigating materials by mechanical methods
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Pathology (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明涉及一种钻井液泥饼生成试验方法。所述方法包括:使隔油套置于试验岩样的外周围,并使隔油套与所述试验岩样的环空填充满填料;使围压筒与隔油套之间形成围压油容置腔;将试验岩样的一端固定,另一端加载轴向应力至预设值;通过向围压油容置腔注入油液以使隔油套形成内外压差;通过向所述围压筒的周壁施加径向应力至预设值以模拟地层在不同深度处的水平地应力;通过向试验岩样内部环空形成的钻井液容置腔注入钻井液并施加应力至所设应力值;将试验岩样的环境加热至预设温度;观察或记录所述钻井液泥饼生成的过程。本发明能够较好地还原在钻井过程中钻井液发生滤失生成泥饼的过程,能够为探索井壁失稳问题提供有力的理论基础。

Figure 202010410514

The invention relates to a test method for drilling mud cake generation. The method includes: placing an oil separator on the outer periphery of the test rock sample, and filling the annulus between the oil separator and the test rock sample with filler; forming a confining pressure oil between the confining pressure cylinder and the oil separator accommodating cavity; one end of the test rock sample is fixed, and the other end is loaded with axial stress to a preset value; by injecting oil into the confining pressure oil accommodating cavity, the oil separator can form an internal and external pressure difference; The peripheral wall of the cylinder is subjected to radial stress to a preset value to simulate the horizontal in-situ stress of the formation at different depths; the drilling fluid is injected into the drilling fluid holding cavity formed by the internal annulus of the test rock sample and the stress is applied to the set stress value; The environment of the test rock sample is heated to a preset temperature; the process of forming the mud cake of the drilling fluid is observed or recorded. The invention can better restore the process of the drilling fluid filtrating to generate mud cake during the drilling process, and can provide a powerful theoretical basis for exploring the problem of wellbore instability.

Figure 202010410514

Description

一种钻井液泥饼生成试验方法A kind of test method for drilling mud cake generation

技术领域technical field

本发明涉及油气井钻井工程技术领域,具体涉及一种钻井液泥饼生成试验井筒模拟机构及系统。The invention relates to the technical field of oil and gas well drilling engineering, in particular to a wellbore simulation mechanism and system for a drilling fluid mud cake generation test.

背景技术Background technique

在钻井过程中,由于井壁的渗透作用,钻井液会发生滤失,滤液进入地层。在钻井液滤失的过程中,井壁表面因钻井液中的固体颗粒的堆积产生一定厚度的泥饼,钻井液的泥饼对于控制钻井液滤失,维护井壁稳定及润滑起着极其重要的作用。井壁上形成滤饼后,渗透性减小,阻止或减慢了钻井液继续侵入地层。在钻井过程中钻井液的滤液损失是必然的,通过滤失可形成滤饼保护井壁。因此,泥饼的形成对于防止钻井液中水相侵入地层和维持井壁稳定具有十分重要的意义。During the drilling process, due to the penetration of the well wall, the drilling fluid will be filtrated, and the filtrate will enter the formation. In the process of drilling fluid filtration, a certain thickness of mud cake is formed on the surface of the well wall due to the accumulation of solid particles in the drilling fluid. The mud cake of the drilling fluid plays an extremely important role in controlling the filtration of the drilling fluid and maintaining the stability and lubrication of the well wall. effect. After a filter cake is formed on the wellbore, the permeability decreases, preventing or slowing down the further intrusion of drilling fluid into the formation. During the drilling process, the filtrate loss of the drilling fluid is inevitable, and the filter cake can be formed to protect the well wall through the filtration loss. Therefore, the formation of mud cake is of great significance to prevent the water phase in drilling fluid from invading the formation and maintain the stability of the wellbore.

钻井液的滤失量与地层的渗透率密切相关,渤中地区中深层硬脆性泥页岩基质渗透率极低,在泥页岩内分布有近水平的层理,众多的微裂缝为钻井液提供了渗流通道,钻井液中的水相以微裂缝为渗流通道进入地层,由于钻井液的渗流可能会导致钻井液在井壁上形成泥饼,从而阻止钻井液的渗流,防止钻井液中水相进入地层造成泥页岩地层发生水化,导致井壁失稳等复杂事故的发生。近年来,面对国内外油气资源勘探开发的需求,所钻遇的地层条件愈来愈复杂,泥页岩井壁失稳问题愈加复杂,然而对于含有微裂缝的硬脆性泥页岩井壁泥饼的评价缺乏深入的认识,目前尚无高效模拟真实地层泥饼状态的试验装置与方法。The fluid loss of the drilling fluid is closely related to the permeability of the formation. The medium and deep hard brittle mud shale matrix in the Bozhong area has extremely low permeability, and there are near-horizontal bedding in the mud shale. Numerous micro-fractures provide drilling fluids. The water phase in the drilling fluid enters the formation through micro-fractures as seepage channels. The seepage of the drilling fluid may cause the drilling fluid to form a mud cake on the well wall, thereby preventing the seepage of the drilling fluid and preventing the water phase in the drilling fluid. Entering the formation causes hydration of the shale formation, leading to complex accidents such as wellbore instability. In recent years, in the face of the needs of exploration and development of oil and gas resources at home and abroad, the stratum conditions encountered have become more and more complex, and the problem of shale wellbore instability has become more and more complicated. The evaluation lacks in-depth understanding, and there is currently no experimental device and method for effectively simulating the real formation mudcake state.

在钻井过程中,硬脆性泥页岩井壁失稳的机理一直是学术上备受争论的方面,因此有必要开展室内试验,为理论分析和数值模拟综合研究提供支持,尤其揭示硬脆性泥页岩井壁失稳的机理,为安全、快速钻井提供技术支持。During the drilling process, the mechanism of wellbore instability in hard and brittle mud shale has always been a hotly debated aspect in academics. Therefore, it is necessary to carry out laboratory tests to provide support for comprehensive theoretical analysis and numerical simulation research, especially to reveal hard and brittle mud shale wells. The mechanism of wall instability provides technical support for safe and rapid drilling.

发明内容SUMMARY OF THE INVENTION

本发明旨在提供一种钻井液泥饼生成试验方法,以模拟在钻井过程中泥饼的形成并进而可对泥饼进行评价,进而为深层裂缝硬脆性泥页岩钻井过程提供可靠的理论基础。The present invention aims to provide a mud cake generation test method for drilling fluid, so as to simulate the formation of mud cake in the drilling process and then evaluate the mud cake, thereby providing a reliable theoretical basis for the drilling process of deep fracture hard and brittle mud shale .

本发明提出一种钻井液泥饼生成试验方法,所述方法包括:The present invention proposes a test method for drilling mud cake generation, the method comprising:

使隔油套置于试验岩样的外周围,并使所述隔油套与所述试验岩样的环空填充满填料;The oil separator is placed around the outer periphery of the test rock sample, and the annulus between the oil separator and the test rock sample is filled with fillers;

使围压筒与所述隔油套之间形成围压油容置腔;A confining oil accommodating cavity is formed between the confining pressure cylinder and the oil separator;

将所述试验岩样的一端固定,另一端加载轴向应力至预设值以模拟地层在不同深度处的垂向应力;One end of the test rock sample is fixed, and the other end is loaded with axial stress to a preset value to simulate the vertical stress of the formation at different depths;

通过向所述围压油容置腔注入油液以使所述隔油套形成内外压差;By injecting oil into the confining pressure oil accommodating cavity, the oil separator sleeve forms an internal and external pressure difference;

通过向所述围压筒的周壁施加径向应力至预设值以模拟地层在不同深度处的水平地应力;By applying radial stress to a preset value to the peripheral wall of the confining pressure cylinder to simulate the horizontal in-situ stress of the formation at different depths;

通过向所述试验岩样内部环空形成的钻井液容置腔注入钻井液并施加应力至所设应力值;injecting drilling fluid into the drilling fluid accommodating cavity formed in the inner annulus of the test rock sample and applying stress to the set stress value;

将所述试验岩样的环境加热至预设温度;heating the environment of the test rock sample to a preset temperature;

观察或记录所述钻井液泥饼生成的过程。Observe or record the formation process of the mud cake of the drilling fluid.

根据本发明的一种实施方式,所述填料的抗压强度大于等于60MPa。According to an embodiment of the present invention, the compressive strength of the filler is greater than or equal to 60 MPa.

根据本发明的一种实施方式,所述填料形状为球形,所述填料为实心陶粒。According to an embodiment of the present invention, the shape of the filler is spherical, and the filler is solid ceramsite.

根据本发明的一种实施方式,通过改变所述填料的粒径大小来改变远场地层渗透率的大小。According to an embodiment of the present invention, the size of the far field formation permeability is changed by changing the particle size of the filler.

根据本发明的一种实施方式,通过溢流控制阀控制所述钻井液容置腔内的钻井液应力。According to an embodiment of the present invention, the drilling fluid stress in the drilling fluid accommodating cavity is controlled by an overflow control valve.

根据本发明的一种实施方式,通过在所述围压筒外壁设置加热环将所述试验岩样的环境加热至预设温度。According to an embodiment of the present invention, the environment of the test rock sample is heated to a preset temperature by arranging a heating ring on the outer wall of the confining pressure cylinder.

根据本发明的一种实施方式,所述试验岩样的顶部与所述隔油套密封,所述试验岩样的底部与所述隔油套密封;所述围压油容置腔在所述隔油套外形成密闭空间。According to an embodiment of the present invention, the top of the test rock sample is sealed with the oil separator, and the bottom of the test rock sample is sealed with the oil separator; the confining pressure oil accommodating cavity is in the A closed space is formed outside the grease trap.

根据本发明的一种实施方式,通过监测所述围压油容置腔内部上方径向及外部下方轴向的压力,及通过监测所述试验岩样上端外侧的温度以便对所述试验进行控制。According to an embodiment of the present invention, the test is controlled by monitoring the radial pressure inside the confining oil accommodating cavity and the axial pressure below the outside, and monitoring the temperature outside the upper end of the test rock sample. .

根据本发明的一种实施方式,通过围压油泵向所述围压容置腔注入油液,所述围压油泵与所述围压容置腔形成循环路线,用以监测所述围压容置腔内是否充满围油液。According to an embodiment of the present invention, oil is injected into the confining pressure accommodating cavity through a confining pressure oil pump, and the confining pressure oil pump and the confining pressure accommodating cavity form a circulation route for monitoring the confining pressure accommodating cavity Check whether the cavity is full of surrounding oil.

根据本发明的一种实施方式,通过溢流阀溢流,用以控制钻井液的液柱压力。According to an embodiment of the present invention, the overflow valve is used to control the liquid column pressure of the drilling fluid.

本发明的技术方案可以用作钻井液与地层相互作用的模拟试验,能够较好地还原在钻井过程中井壁形成泥饼的过程,本发明设置的温压控制能够较好地模拟真实工况,本发明形成的泥饼可以用来评价钻井液在地层造壁性能的特性,能够较好地评价钻井液的封堵效果,为探索钻井液与地层相互作用而导致的井壁失稳问题提供了坚实的理论基础。The technical solution of the present invention can be used as a simulation test of the interaction between drilling fluid and formation, and can better restore the process of mud cake formation on the wellbore during the drilling process. The mud cake formed by the invention can be used to evaluate the characteristics of drilling fluid in formation wall-building performance, can better evaluate the plugging effect of the drilling fluid, and provides a solution for exploring the problem of wellbore instability caused by the interaction between the drilling fluid and the formation. solid theoretical foundation.

附图说明Description of drawings

图1为本发明一实施例钻井液泥饼质量试验装置整体结构示意图;1 is a schematic diagram of the overall structure of a drilling fluid mud cake quality test device according to an embodiment of the present invention;

图2是本发明一实施例井筒模拟机构结构示意图;2 is a schematic structural diagram of a wellbore simulation mechanism according to an embodiment of the present invention;

图3是图2本发明一实施例井筒模拟机构的俯视图;Fig. 3 is a top view of the wellbore simulation mechanism according to an embodiment of the present invention;

附图标号:Reference number:

A井筒模拟机构、B温压控制装置,C钻井液作业装置,1支架,2围压筒,3轴向加载柱塞,4隔油套,5试验岩样,6陶粒,7容置腔,8密封垫片,9密封垫片,10压力传感器,11压力传感器,12压力传感器,13围压容置腔,15轴向加载底座,16轴向加载柱塞泵,17径向加载柱塞泵,18溢流控制阀,19围压油泵,20钻井液活塞泵,21流量控制阀,22流量控制阀,23流量控制阀,24流量控制阀,25温度传感器,26控制系统,27围压容置腔底座,28温度加载器,29底部固定件,30顶部固定件,31压力表,32流量控制阀,33围压筒内壁,34环空。A Wellbore simulation mechanism, B temperature and pressure control device, C drilling fluid operation device, 1 support, 2 confining pressure cylinders, 3 axial loading plungers, 4 oil separators, 5 test rock samples, 6 ceramsites, 7 accommodating cavities , 8 sealing gaskets, 9 sealing gaskets, 10 pressure sensors, 11 pressure sensors, 12 pressure sensors, 13 confining pressure chambers, 15 axial loading bases, 16 axial loading piston pumps, 17 radial loading pistons Pump, 18 overflow control valve, 19 confining pressure oil pump, 20 drilling fluid piston pump, 21 flow control valve, 22 flow control valve, 23 flow control valve, 24 flow control valve, 25 temperature sensor, 26 control system, 27 confining pressure accommodating cavity base, 28 temperature loader, 29 bottom fixing piece, 30 top fixing piece, 31 pressure gauge, 32 flow control valve, 33 inner wall of confining pressure cylinder, 34 annular space.

具体实施方式Detailed ways

以下将结合附图对本发明的较佳实施例进行详细说明,以便更清楚理解本发明的目的、特点和优点。应理解的是,附图所示的实施例并不是对本发明范围的限制,而只是为了说明本发明技术方案的实质精神。The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings, so as to more clearly understand the objects, features and advantages of the present invention. It should be understood that the embodiments shown in the accompanying drawings are not intended to limit the scope of the present invention, but are only intended to illustrate the essential spirit of the technical solutions of the present invention.

本发明为开展室内试验,以揭示油井壁尤其是硬脆性泥页岩井壁失稳的机理,为理论分析和数值模拟综合研究提供支持,进一步为安全、快速钻井提供技术支持。The present invention conducts laboratory tests to reveal the instability mechanism of oil well walls, especially hard and brittle mud shale well walls, provides support for theoretical analysis and numerical simulation comprehensive research, and further provides technical support for safe and rapid drilling.

如图1所示,本发明试验方法基于的系统主要由井筒模拟机构A、温压控制装置B和钻井液作业装置C组成。As shown in FIG. 1 , the system on which the test method of the present invention is based is mainly composed of a wellbore simulation mechanism A, a temperature and pressure control device B, and a drilling fluid operation device C.

为了试验,准备试验岩样5,所诉试验岩样5的内孔形成钻井液容置腔7。For the test, a test rock sample 5 is prepared, and the inner hole of the test rock sample 5 forms a drilling fluid accommodating cavity 7 .

其中,如图2所示,为了尽可能真实模拟油井的地貌及虑失过程,本发明提出的所述井筒模拟机构A主要包括:Among them, as shown in Figure 2, in order to simulate the topography of the oil well and the loss-taking process as realistically as possible, the wellbore simulation mechanism A proposed by the present invention mainly includes:

地层模拟填料6,可同轴地设置在试验岩样5的外部,用于模拟远场地层,考虑到填料模拟地层情况,填料的抗压强度优选大于等于60MPa,同时为保证井筒模拟机构能够顺利进行,填料形状优选为球形,作为模拟地层填料的材料比如实心陶粒等材料。The stratum simulating filler 6 can be coaxially arranged outside the test rock sample 5 to simulate the far-field stratum. Considering the simulating stratum conditions of the filler, the compressive strength of the filler is preferably greater than or equal to 60MPa. Carrying out, the shape of the filler is preferably spherical, as the material for simulating the formation filler, such as solid ceramsite and the like.

隔油套4,可同轴地设置在试验岩样5和地层模拟填料的最外侧,用于将外围的油液与井筒机构隔离,优选为绝缘隔油热缩套,热缩套便于固定岩样以及顶部和底部固定件。The oil separator 4 can be coaxially arranged on the outermost side of the test rock sample 5 and the formation simulating packing, and is used to isolate the oil in the periphery from the wellbore mechanism. sample and top and bottom mounts.

顶部固定件30可为垫块,所述顶部固定件可同轴地设置在试验岩样5的顶部;当然结构可不受此种方式限制。The top fixing member 30 can be a spacer, and the top fixing member can be coaxially arranged on the top of the test rock sample 5; of course, the structure is not limited in this way.

底部固定件29可为垫块式底座,所述底部固定件同轴地设置在试验岩样底部,用于固定试验岩样;The bottom fixing member 29 can be a block-type base, and the bottom fixing member is coaxially arranged at the bottom of the test rock sample for fixing the test rock sample;

顶部垫片9,可设置在顶部垫块30和试验岩样5之间;The top gasket 9 can be arranged between the top block 30 and the test rock sample 5;

底部垫片8,可设置在底部固定件29和试验岩样5之间。The bottom gasket 8 can be arranged between the bottom fixing member 29 and the test rock sample 5 .

顶部垫片9和底部垫片8中心都设有通孔,以便与上下固定件的内部通道连通。Both the top gasket 9 and the bottom gasket 8 are provided with through holes in the center so as to communicate with the inner passages of the upper and lower fixing members.

所述顶部垫片9和底部垫片8用于密封试验岩样顶部和底部,防止钻井液渗漏。The top gasket 9 and the bottom gasket 8 are used to seal the top and bottom of the test rock sample to prevent drilling fluid leakage.

当然上述部件不是都是必要设置,可根据需要变换。Of course, the above components are not all necessary settings, and can be changed as needed.

所述温压控制装置B主要包括:The temperature and pressure control device B mainly includes:

围压筒2,设置于所述井筒模拟机构的外围,所述围压筒与所述井筒模拟机构之间形成有围压容置腔,以便在围压容置腔内注入油液,以与井筒模拟机构内的压力形成压差,以便进行钻井液注入的模拟;The confining pressure cylinder 2 is arranged on the periphery of the wellbore simulation mechanism, and a confining pressure accommodating cavity is formed between the confining pressure cylinder and the wellbore simulating mechanism, so that oil can be injected into the confining pressure accommodating cavity to be compatible with the wellbore simulation mechanism. The pressure in the wellbore simulation mechanism forms a pressure differential for the simulation of drilling fluid injection;

温度加载器28可设置为加热环,所述加热环28设置在围压筒2外周上,用于对所述井筒模拟机构进行整体加热(热量可通过围压容置腔13内的油液传导);当然加热装置可不受此种方式限制;The temperature loader 28 can be set as a heating ring, and the heating ring 28 is set on the outer circumference of the confining pressure cylinder 2 to heat the wellbore simulation mechanism as a whole (the heat can be conducted through the oil in the confining pressure accommodating cavity 13 ). ); of course, the heating device is not limited in this way;

轴向加载柱塞泵16,所述轴向加载柱塞泵16设置在围压筒2底部,用于对井筒模拟机构加载轴向应力;Axially loaded plunger pump 16, the axially loaded plunger pump 16 is arranged at the bottom of the confining pressure cylinder 2 to load axial stress on the wellbore simulation mechanism;

围压油泵19,所述围压油泵19可通过流量管线分别在围压筒2的上下位置处连通所述围压筒2内部形成的围压容置腔13,可向微压腔13内注入油液,所述流量管线上可设置有流量控制阀21、22、23、24;The confining pressure oil pump 19, the confining pressure oil pump 19 can be connected to the confining pressure accommodating cavity 13 formed inside the confining pressure cylinder 2 at the upper and lower positions of the confining pressure cylinder 2 through the flow pipeline, and can be injected into the micro-pressure cavity 13 Oil, the flow line can be provided with flow control valves 21, 22, 23, 24;

径向加载柱塞泵17,所述径向加载柱塞泵17通过加压管线连通围压筒内壁33,通过挤压筒壁用以给井筒模拟机构加载径向应力。The radially loaded plunger pump 17 is connected to the inner wall 33 of the confining pressure cylinder through a pressurized pipeline, and is used to apply radial stress to the wellbore simulation mechanism by squeezing the cylinder wall.

轴向加载柱塞3,所述轴向加载柱塞3抵接设置在围压筒2的顶部,用于和支架1相连接固定以便于加载轴向应力。The axial loading plunger 3 is abutted on the top of the confining pressure cylinder 2 and is used for connecting and fixing with the bracket 1 so as to load axial stress.

围压筒底座27,所述围压筒底座27设置在轴向加载柱塞泵16上端,所述围压筒底座27内部设置有流量管线,且可通过轴向加载底座15与井筒模拟机构相连通;The confining pressure cylinder base 27 is arranged on the upper end of the axial loading plunger pump 16 , the confining pressure cylinder base 27 is provided with a flow pipeline inside, and can be connected to the wellbore simulation mechanism through the axial loading base 15 Pass;

轴向加载底座15,可设置在围压筒底座27上部。The axial loading base 15 can be arranged on the upper part of the confining cylinder base 27 .

围压筒可设计为上方有盖,盖上有连通口,下方敞口配备底座的形式,也可自身下方设有底部等形式,结构可作适当变换。The confining pressure cylinder can be designed with a cover on the top, a communication port on the cover, and an open bottom with a base, or a bottom on the bottom of itself, and the structure can be appropriately changed.

支架1可用于支撑整个温压控制装置。The bracket 1 can be used to support the entire temperature and pressure control device.

当然上述部件并非都是必要设置,可根据需要变换。Of course, the above components are not all necessary settings, and can be changed as required.

所述钻井液作业装置C可包括:The drilling fluid operation device C may include:

钻井液泵20,通过流量管线连通所述钻井液容置腔7;The drilling fluid pump 20 communicates with the drilling fluid accommodating cavity 7 through a flow line;

溢流控制阀18,所述溢流控制阀18设置在钻井液泵20所连通的流量管线的尾部,也就是井筒模拟机构的下游,以便控制隔油筒内的压力;An overflow control valve 18, the overflow control valve 18 is arranged at the tail of the flow line connected to the drilling fluid pump 20, that is, downstream of the wellbore simulation mechanism, so as to control the pressure in the oil trap;

流量控制阀32,所述流量控制阀32设置在钻井液泵20与钻井液容置腔7之间的流量管线上;Flow control valve 32, the flow control valve 32 is arranged on the flow line between the drilling fluid pump 20 and the drilling fluid accommodating cavity 7;

压力表31,所述流量控制阀31设置在钻井液泵20与钻井液容置腔7之间的流量管线上。The pressure gauge 31, the flow control valve 31 is arranged on the flow line between the drilling fluid pump 20 and the drilling fluid accommodating cavity 7.

当然上述部件不是都是必要设置,可根据需要变换。Of course, the above components are not all necessary settings, and can be changed as needed.

上述系统还可进一步包括数据采集机构,所述数据采集机构可包括:The above system may further include a data collection mechanism, and the data collection mechanism may include:

压力传感器10,所述压力传感器10可布置在井筒模拟机构内钻井液容置腔的入口处,用于监测井筒模拟机构井筒内的压力;a pressure sensor 10, the pressure sensor 10 can be arranged at the entrance of the drilling fluid accommodating cavity in the wellbore simulation mechanism, and is used for monitoring the pressure in the wellbore of the wellbore simulation mechanism;

压力传感器11,所述压力传感器11可布置在围压筒内侧,用于监测所加径向应力的大小;a pressure sensor 11, the pressure sensor 11 can be arranged inside the confining pressure cylinder to monitor the magnitude of the applied radial stress;

压力传感器12,所述压力传感器12可布置在轴向加载底座15外侧,用于监测所加轴向应力的大小;a pressure sensor 12, the pressure sensor 12 can be arranged outside the axial loading base 15 for monitoring the magnitude of the applied axial stress;

温度传感器25,所述温度传感器布置在井筒模拟机构的外侧,用于监测井筒模拟机构的温度;a temperature sensor 25, the temperature sensor is arranged outside the wellbore simulation mechanism, and is used for monitoring the temperature of the wellbore simulation mechanism;

所述压力传感器10与所述压力传感器11的压力差为钻井液发生滤失的压差。The pressure difference between the pressure sensor 10 and the pressure sensor 11 is the pressure difference of the filtration of drilling fluid.

顶部固定件30和底部固定件29可通过绝缘热缩套固定在试验岩样5的两端。The top fixing member 30 and the bottom fixing member 29 can be fixed on both ends of the test rock sample 5 by insulating heat shrinkable sleeves.

本发明中可通过改变模拟地层的填料的粒径的大小来改变远场地层渗透率的大小。In the present invention, the permeability of the far field formation can be changed by changing the particle size of the filler of the simulated formation.

试验时,当所述压力表31显示有压力增加时,可关闭所述流量控制阀32,打开压力控制阀25,通过压力管线施加钻井液容置腔7中的钻井液压力。During the test, when the pressure gauge 31 shows an increase in pressure, the flow control valve 32 can be closed, the pressure control valve 25 can be opened, and the drilling fluid pressure in the drilling fluid accommodating chamber 7 can be applied through the pressure line.

所述流量控制阀21、22、23、24可用于控制围压油进入到围压容置腔内,当围压容置腔内充满围压油时,应该先关闭所述流量控制阀24,再关闭其余流量控制阀21、22、23。The flow control valves 21, 22, 23, and 24 can be used to control the confining pressure oil to enter the confining pressure accommodating cavity. When the confining pressure accommodating cavity is full of confining pressure oil, the flow control valve 24 should be closed first. The remaining flow control valves 21, 22, 23 are closed again.

上述方案中,本发明的压力控制形成拟三轴压力控制系统,所述拟三轴压力控制系统包括:轴向压力控制系统和径向压力控制系统,所述轴向压力控制系统主要涉及轴向加载柱塞泵16以及围压筒底座27;所述径向压力控制系统主要涉及围压油泵19、围压筒2和径向加载柱塞泵17以及围压筒底座27。In the above solution, the pressure control of the present invention forms a quasi-triaxial pressure control system, the quasi-triaxial pressure control system includes: an axial pressure control system and a radial pressure control system, and the axial pressure control system mainly involves the axial pressure control system. Loading plunger pump 16 and confining pressure cylinder base 27 ; the radial pressure control system mainly involves confining pressure oil pump 19 , confining pressure cylinder 2 , radially loading plunger pump 17 and confining pressure cylinder base 27 .

具体地,根据本发明的一种实施方式,利用上述系统进行钻井液泥饼生成试验时,主要进行下列操作:Specifically, according to an embodiment of the present invention, when the above-mentioned system is used to perform the drilling fluid mud cake generation test, the following operations are mainly performed:

首先,用所述外边缘绝缘热缩套(即隔油套)4将试验岩样5进行固定,试验岩样5与外边缘绝缘热缩套(即隔油套)4之间形成环空,并将外边缘绝缘热缩套4与试验岩样5的环空填充满陶粒,利用所述顶部固定件30和底部固定件29将试验岩样5固定,放置于所述轴向加载底座16;First, the test rock sample 5 is fixed with the outer edge insulating heat shrinkable sleeve (ie, the oil separator) 4, and an annular space is formed between the test rock sample 5 and the outer edge insulating heat shrinkable sleeve (ie the oil separator) 4, The outer edge insulating heat shrinkable sleeve 4 and the annular space of the test rock sample 5 are filled with ceramsite, and the test rock sample 5 is fixed by the top fixing member 30 and the bottom fixing member 29, and placed on the axial loading base 16 ;

然后,将所述压力传感器11和压力传感器12分别布置在围压筒2的内侧和轴向加载底座15外侧,同时将一个温度传感器25布置在在所述井筒模拟机构的顶部固定件30的外侧,并通过数据线将全部所述压力传感器11、压力传感器(2和温度传感器25与所述的温度压力控制系统26连接;Then, the pressure sensor 11 and the pressure sensor 12 are arranged on the inner side of the confining pressure cylinder 2 and the outer side of the axial loading base 15, respectively, while a temperature sensor 25 is arranged on the outer side of the top fixing member 30 of the wellbore simulation mechanism , and connect all the pressure sensors 11, pressure sensors (2 and temperature sensors 25 with the temperature and pressure control system 26 through data lines;

然后,将所述围压筒2下放至围压筒底座27,围压筒2与所述井筒模拟机构之间形成围压油容置腔13,用于存放围压油,便于施加径向应力;Then, the confining pressure cylinder 2 is lowered to the confining pressure cylinder base 27, and a confining pressure oil accommodating cavity 13 is formed between the confining pressure cylinder 2 and the wellbore simulation mechanism, which is used to store the confining pressure oil and is convenient for applying radial stress ;

之后,将所述的围压油泵19通过流量管线将油液注入到围压油容置腔13,同时在每一所述的流量管线上安装所述流量控制阀21、流量控制阀22、流量控制阀23、流量控制阀24,以便控制围压油容置腔内的油压;After that, the confining oil pump 19 is injected into the confining oil accommodating chamber 13 through the flow line, and the flow control valve 21, the flow control valve 22, the flow Control valve 23 and flow control valve 24 to control the oil pressure in the confining oil accommodating chamber;

之后,打开所述温压控制系统中所述的轴向加载柱塞泵16,通过所述轴向加载柱塞泵16向所述的井筒模拟机构施加轴向应力至预设值以模拟地层在不同深度处的垂向应力,打开所述温压控制系统中径向加载柱塞泵17,通过所述径向加载柱塞泵17向所述的围压筒2施加径向应力至预设值以模拟地层在不同深度处的水平地应力,通过所述径向加载柱塞泵加载径向应力的同时,通过所述钻井液活塞泵20向所述试验岩样内部环空形成的所述钻井液容置腔7注入钻井液并施加应力至所述溢流控制阀32所设应力,同时打开所述加热环28将所述井筒模拟机构加热至预设温度;After that, the axial loading plunger pump 16 in the temperature and pressure control system is turned on, and the axial stress is applied to the wellbore simulation mechanism to a preset value through the axial loading plunger pump 16 to simulate the formation in Vertical stress at different depths, turn on the radially loaded plunger pump 17 in the temperature and pressure control system, and apply radial stress to the confining pressure cylinder 2 to a preset value through the radially loaded plunger pump 17 In order to simulate the horizontal in-situ stress of the formation at different depths, while the radial stress is loaded by the radial loading plunger pump, the drilling fluid piston pump 20 is used to drill into the inner annulus of the test rock sample. The drilling fluid is injected into the fluid holding chamber 7 and stress is applied to the stress set by the overflow control valve 32, and the heating ring 28 is opened at the same time to heat the wellbore simulation mechanism to a preset temperature;

之后,所述控制系统26实时采集所述压力传感器11、压力传感器12和温度传感器25测量的试验数据;After that, the control system 26 collects the test data measured by the pressure sensor 11, the pressure sensor 12 and the temperature sensor 25 in real time;

之后,待所述钻井液作业系统循环钻井液一段时间后,拆除试验装备,取出所述试验岩样观察试验岩样内部环空井壁,保存试验数据。Afterwards, after the drilling fluid operation system circulates the drilling fluid for a period of time, the test equipment is dismantled, the test rock sample is taken out to observe the inner annular well wall of the test rock sample, and the test data is saved.

可选的,该方法还包括步骤:关闭所述温压控制机构,对所述围压容置腔2、钻井液作业系统、轴向和径向加载分别进行泄压,拆卸评价硬脆性泥页岩地层钻井液泥饼质量试验装置,回收所述压力传感器和温度传感器,将所述外边缘绝缘热缩套和所述陶粒一同丢弃。Optionally, the method further includes the steps of: closing the temperature and pressure control mechanism, decompressing the confining pressure accommodating chamber 2, the drilling fluid operating system, and the axial and radial loading respectively, and disassembling and evaluating the hard and brittle mud sheets. The test device for the mud cake quality of rock formation drilling fluid recovers the pressure sensor and the temperature sensor, and discards the outer edge insulating heat shrinkable sleeve and the ceramsite together.

可选的,重复上述步骤以测量不同钻井液种类、密度、井深、地层情况、温度下硬脆性泥页岩地层钻敬业液泥饼质量及其变化规律。Optionally, the above steps are repeated to measure the quality of drilling fluid and mud cake in hard and brittle mud shale formations under different drilling fluid types, densities, well depths, formation conditions, and temperatures and their changing laws.

可选的,所述钻井液在试验准备阶段根据现场资料进行配置。Optionally, the drilling fluid is configured according to field data in the test preparation stage.

可选的,在所述钻井液作业系统的流量管线上安装压力表,用来监测钻井液作业系统压力变化。Optionally, a pressure gauge is installed on the flow line of the drilling fluid operation system to monitor pressure changes of the drilling fluid operation system.

可选的,所述井筒模拟机构中所述顶部和底部固定件直径应与外绝缘热缩套直径相同,且所述顶部固定件和底部固定件内形成与所述试验岩样尺寸相同的环空。Optionally, in the wellbore simulation mechanism, the diameter of the top and bottom fixing pieces should be the same as the diameter of the outer insulating heat shrinkable sleeve, and the top fixing piece and the bottom fixing piece should form a ring with the same size as the test rock sample. null.

可选的,所述井筒模拟机构在试验岩样顶部用绝缘垫片密封,用以防止钻井液从上部渗漏到陶粒地层,确保钻井液在井筒内形成径向滤失。Optionally, the wellbore simulation mechanism is sealed with an insulating gasket on the top of the test rock sample to prevent the drilling fluid from seeping into the ceramsite formation from the upper part, so as to ensure that the drilling fluid forms radial filtration in the wellbore.

可选的,所述井筒模拟机构在试验岩样底部用绝缘垫片密封,用以防止钻井液发生渗透。Optionally, the wellbore simulation mechanism is sealed with an insulating gasket at the bottom of the test rock sample to prevent the penetration of drilling fluid.

可选的,所述围压筒通过支架和围压筒底座进行固定支撑。Optionally, the confining pressure cylinder is fixedly supported by a bracket and a confining pressure cylinder base.

可选的,所述围压油泵与围压筒相连接的流量管线上设置有4个流量控制阀用于控制围压油泵流量开关。Optionally, four flow control valves are provided on the flow line connecting the confining pressure oil pump and the confining pressure cylinder to control the flow switch of the confining pressure oil pump.

可选的,所述钻井液泵以及围压油泵通过流量控制阀控制流量流通。Optionally, the drilling fluid pump and the confining pressure oil pump control flow and circulation through a flow control valve.

需要说明的是,上述步骤并非都是必要设置,顺序也不受此限制,可根据实际操作进行调整。It should be noted that the above steps are not all necessary settings, and the sequence is not limited by this, and can be adjusted according to actual operations.

实施例Example

如图1所示,本发明提供的评价硬脆性泥页岩地层钻井液泥饼质量模拟试验装置,主要由井筒模拟机构、温压控制装置和钻井液作业装置组成。As shown in Figure 1, the simulation test device for evaluating the mud cake quality of the hard and brittle mud shale formation provided by the present invention is mainly composed of a wellbore simulation mechanism, a temperature and pressure control device and a drilling fluid operation device.

如图2、3所示,井筒模拟结构包括:与试验岩样5同轴的绝缘热缩套4,试验岩样5与同轴热缩套4之间环空填充的陶粒6,试验岩样顶端和低端的密封垫片9和密封垫片8,顶部固定件30和底部固定件29,用于固定试验岩样5。试验岩样5的内孔形成的钻井液容置腔7,该容置腔与上下固定件内的钻井液通道连通,以容纳钻井液。底部固定件29内部设有环空34。As shown in Figures 2 and 3, the wellbore simulation structure includes: an insulating heat-shrinkable sleeve 4 coaxial with the test rock sample 5, a ceramsite 6 filled in the annular space between the test rock sample 5 and the coaxial heat-shrinkable sleeve 4, and the test rock The sealing gaskets 9 and 8 at the top and bottom of the sample, the top fixing member 30 and the bottom fixing member 29 are used to fix the test rock sample 5. A drilling fluid accommodating cavity 7 is formed in the inner hole of the test rock sample 5, and the accommodating cavity is communicated with the drilling fluid passages in the upper and lower fixing members to accommodate the drilling fluid. An annular space 34 is provided inside the bottom fixing member 29 .

温压控制机构包括:围压筒2,围压筒2内形成围压容置腔13,轴向加载柱塞3,围压容置腔底座27,轴向加载底座15,轴向加载柱塞泵16,径向压力加载柱塞泵17,围压油泵19,流量控制阀21,流量控制阀22,流量控制阀23,流量控制阀24,温度加载器28。支架1可为上下加载柱塞及柱塞泵提供支撑与安装定位。轴向加载柱塞3和轴向加载底座15分别在试验岩样5的上下端抵接井筒模拟机构。The temperature and pressure control mechanism includes: a confining pressure cylinder 2, a confining pressure accommodating cavity 13 is formed in the confining pressure cylinder 2, an axial loading plunger 3, a confining pressure accommodating cavity base 27, an axial loading base 15, and an axial loading plunger Pump 16 , radial pressure loading plunger pump 17 , confining pressure oil pump 19 , flow control valve 21 , flow control valve 22 , flow control valve 23 , flow control valve 24 , temperature loader 28 . The bracket 1 can provide support and installation positioning for the upper and lower loading plungers and plunger pumps. The axial loading plunger 3 and the axial loading base 15 respectively contact the wellbore simulation mechanism at the upper and lower ends of the test rock sample 5 .

其中围压容置腔13内注满围压油并通过流量控制阀23和流量控制阀24保证围压容置腔内流量质量不变,并通过径向压力柱塞泵17向试验岩样施加应力以模拟地层水平应力。通过轴向压力柱塞泵16向试验岩样施加垂向应力。The confining pressure accommodating cavity 13 is filled with confining pressure oil, and the flow control valve 23 and the flow control valve 24 ensure that the flow quality in the confining pressure accommodating cavity remains unchanged, and the radial pressure plunger pump 17 applies pressure to the test rock sample. Stress to simulate formation horizontal stress. Vertical stress is applied to the test rock sample by an axial pressure plunger pump 16 .

如图1所示,钻井液作业装置包括:钻井液活塞泵20,溢流控制阀18,流量控制阀32,压力表31。As shown in FIG. 1 , the drilling fluid operation device includes: a drilling fluid piston pump 20 , an overflow control valve 18 , a flow control valve 32 , and a pressure gauge 31 .

其中通过钻井液泵20向试验岩样内孔钻井液容置腔7内注入钻井液,并通过钻井液泵20施加钻井液液柱压力,用以使井筒和地层形成压差。The drilling fluid is injected into the drilling fluid accommodation cavity 7 in the inner hole of the test rock sample through the drilling fluid pump 20, and the drilling fluid column pressure is applied through the drilling fluid pump 20 to form a pressure difference between the wellbore and the formation.

优选的,该装置还包括数据控制系统,所述数据控制系统包括:压力传感器和温度传感器。所述压力传感器包括轴向压力传感器与径向压力传感器,分别布置在所述围压筒底座和围压容置腔内侧;所述温度传感器通过管线连接在顶部垫块外侧。通过数据控制系统,精确地控制轴向加载应力、径向加载应力以及加载温度,以达到模拟地层的效果。Preferably, the device further includes a data control system, and the data control system includes: a pressure sensor and a temperature sensor. The pressure sensor includes an axial pressure sensor and a radial pressure sensor, which are respectively arranged at the base of the confining pressure cylinder and the inside of the confining pressure accommodating cavity; the temperature sensor is connected to the outside of the top cushion block through a pipeline. Through the data control system, the axial loading stress, radial loading stress and loading temperature are precisely controlled to achieve the effect of simulating the formation.

优选的,所述地层模拟机构采用在试验岩样外部添加陶粒形成高渗透地层,用以存放钻井液滤液。Preferably, the formation simulation mechanism adopts the addition of ceramsite to the outside of the test rock sample to form a high-permeability formation for storing drilling fluid filtrate.

优选的,所述井筒模拟机构在试验岩样顶部用绝缘垫片密封,用以防止钻井液从上部渗漏,确保钻井液在井筒内形成径向滤失。Preferably, the wellbore simulation mechanism is sealed with an insulating gasket at the top of the test rock sample to prevent the drilling fluid from leaking from the upper part and ensure that the drilling fluid forms radial filtration in the wellbore.

优选的,所述井筒模拟机构在试验岩样底部用绝缘垫片密封,用以防止钻井液从下部渗漏,确保钻井液在井筒内形成径向滤失。Preferably, the wellbore simulation mechanism is sealed with an insulating gasket at the bottom of the test rock sample to prevent the leakage of drilling fluid from the bottom and ensure that the drilling fluid forms radial filtration in the wellbore.

优选的,所述围压油泵与围压容置腔形成循环,用以监测围压容置腔内是否充满围压油。Preferably, the confining pressure oil pump forms a cycle with the confining pressure accommodating cavity to monitor whether the confining pressure accommodating cavity is full of confining pressure oil.

优选的,所述井筒与外界相隔绝,钻井液泵与井筒形成不了循环,通过溢流阀溢流,用以控制钻井液液柱压力,与围压容置腔形成内外压差,为钻井液滤失提供压力条件。Preferably, the wellbore is isolated from the outside world, and the drilling fluid pump cannot form a circulation with the wellbore, and overflows through the overflow valve to control the pressure of the drilling fluid column, and form an internal and external pressure difference with the confining pressure accommodating cavity, which is the drilling fluid Fluid loss provides pressure conditions.

优选的,所述轴向压力控制系统和径向压力控制系统通过支架和底座进行固定。Preferably, the axial pressure control system and the radial pressure control system are fixed by a bracket and a base.

需要说明的是,在本文中,诸如“第一”和“第二”等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that, in this document, relational terms such as "first" and "second" etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply these There is no such actual relationship or sequence between entities or operations. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus. Without further limitation, an element qualified by the phrase "comprising a..." does not preclude the presence of additional identical elements in a process, method, article or apparatus that includes the element.

上述各实施例仅用于说明本发明,其中实施例的各零部件、装置都是可以有所变化的,各实施方式都可根据需要进行组合或删减,附图中并非所有部件都是必要设置,本文中所定义的一般原理可以在不脱离本申请的精神或范围的情况下,在其它实施例中实现。因此,本申请将不会被限制于本文所述的这些实施例,凡是在本发明技术方案的基础上进行的等同变换和改进,均不应排除在本发明的保护范围之外。The above-mentioned embodiments are only used to illustrate the present invention, and the various parts and devices of the embodiments can be changed to some extent, and each embodiment can be combined or deleted as required, and not all components in the accompanying drawings are necessary. However, the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to these embodiments described herein, and all equivalent transformations and improvements based on the technical solutions of the present invention should not be excluded from the protection scope of the present invention.

Claims (10)

1. A drilling fluid mud cake generation test method is characterized by comprising the following steps:
placing an oil separation sleeve on the outer periphery of a test rock sample, and filling filler in an annular space between the oil separation sleeve and the test rock sample;
a confining pressure oil accommodating cavity is formed between the confining pressure cylinder and the oil separating sleeve;
fixing one end of the test rock sample, and loading axial stress to a preset value to simulate vertical stress of the stratum at different depths;
oil liquid is injected into the confining pressure oil containing cavity to enable the oil separation sleeve to form internal and external pressure difference;
applying radial stress to the peripheral wall of the confining pressure cylinder to a preset value to simulate horizontal ground stress of the stratum at different depths;
injecting drilling fluid into a drilling fluid containing cavity formed by the annular space inside the test rock sample and applying stress to a set stress value;
heating the environment of the test rock sample to a preset temperature;
observing or recording the process of the formation of the mud cake of the drilling fluid.
2. The drilling fluid mud cake formation test method of claim 1, wherein the compressive strength of the filler is greater than or equal to 60 MPa.
3. The drilling fluid mud cake formation test method of claim 1 or 2, wherein the filler is spherical and solid ceramsite.
4. The drilling fluid mud cake formation test method of claim 1 or 2, wherein the magnitude of far field formation permeability is varied by varying the particle size of the filler.
5. The drilling fluid mud cake formation test method of claim 1 or 2, wherein drilling fluid stress in the drilling fluid containment chamber is controlled by an overflow control valve.
6. The drilling fluid mud cake formation test method as claimed in claim 1 or 2, wherein the environment of the test rock sample is heated to a preset temperature by arranging a heating ring on the outer wall of the confining pressure cylinder.
7. The drilling fluid mud cake formation test method of claim 1 or 2, wherein the top of the test rock sample is sealed to the oil jacket and the bottom of the test rock sample is sealed to the oil jacket; the confining pressure oil accommodating cavity forms a closed space outside the oil separation sleeve.
8. A drilling fluid mud cake formation test method as claimed in claim 1 or 2, wherein the test is controlled by monitoring the radial pressure above the inside of the containment oil chamber and the axial pressure below the outside of the containment oil chamber, and by monitoring the temperature outside the upper end of the test rock sample.
9. The drilling fluid mud cake generation test method according to claim 1 or 2, wherein oil is injected into the confining pressure accommodating cavity through a confining pressure oil pump, and the confining pressure oil pump and the confining pressure accommodating cavity form a circulation path for monitoring whether the confining pressure accommodating cavity is filled with the confining pressure oil or not.
10. A drilling fluid mud cake formation test method according to claim 1 or 2, characterized in that overflow is performed through an overflow valve for controlling the fluid column pressure of the drilling fluid.
CN202010410514.XA 2020-05-14 2020-05-14 Drilling fluid mud cake generation test method Pending CN111693455A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010410514.XA CN111693455A (en) 2020-05-14 2020-05-14 Drilling fluid mud cake generation test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010410514.XA CN111693455A (en) 2020-05-14 2020-05-14 Drilling fluid mud cake generation test method

Publications (1)

Publication Number Publication Date
CN111693455A true CN111693455A (en) 2020-09-22

Family

ID=72477761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010410514.XA Pending CN111693455A (en) 2020-05-14 2020-05-14 Drilling fluid mud cake generation test method

Country Status (1)

Country Link
CN (1) CN111693455A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112394018A (en) * 2020-10-16 2021-02-23 中国石油大学(北京) Measuring instrument and method for filtering loss
CN112903957A (en) * 2021-01-18 2021-06-04 中国石油大学(华东) Shale stress-damage-drilling fluid interaction experimental device and testing method
CN115127995A (en) * 2022-07-27 2022-09-30 西南石油大学 Device and method for testing adhesion strength between drilling fluid mud cake and well wall

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202339307U (en) * 2011-11-03 2012-07-18 中国石油天然气股份有限公司 Device for measuring water absorption diffusion coefficient of shale
CN103161455A (en) * 2011-12-15 2013-06-19 长江大学 High temperature and high pressure shale well wall stability evaluation device
CN103758513A (en) * 2014-01-10 2014-04-30 西南石油大学 Method for evaluating simulation of full-size well wall stability
CN103806907A (en) * 2014-01-26 2014-05-21 西南石油大学 Method and device for testing rock drillability of deep well drilling and extra-deep well drilling
CN203672687U (en) * 2013-12-09 2014-06-25 中国石油大学(华东) Simulation forming device for drilling fluid mud cakes
CN104153760A (en) * 2014-07-22 2014-11-19 中国石油大学(华东) Oil-gas well cement sheath seal characteristic simulation test device and test method
CN106680106A (en) * 2017-01-06 2017-05-17 中国石油大学(华东) Simulation experiment device and method for mudstone and drilling liquid interaction under stratum conditions
CN206233918U (en) * 2016-11-09 2017-06-09 中国石油大学(华东) Oil/gas Well cement sheath sealing integrity test device
CN206386120U (en) * 2017-01-12 2017-08-08 中国石油集团钻井工程技术研究院 The experimental provision that property of drilling fluid influences on the borehole wall under detection simulated formation environment
CN109083630A (en) * 2018-08-30 2018-12-25 陕西延长石油(集团)有限责任公司研究院 A method of for appraisal drilling liquid sealing characteristics
CN109541175A (en) * 2018-11-20 2019-03-29 中国地质大学(北京) A kind of simulation down-hole drilling fluids recycle the device and method to form mud cake
CN110018056A (en) * 2019-04-15 2019-07-16 中国石油大学(北京) A kind of sandstone reservoir wellbore stability evaluation experimental device and method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202339307U (en) * 2011-11-03 2012-07-18 中国石油天然气股份有限公司 Device for measuring water absorption diffusion coefficient of shale
CN103161455A (en) * 2011-12-15 2013-06-19 长江大学 High temperature and high pressure shale well wall stability evaluation device
CN203672687U (en) * 2013-12-09 2014-06-25 中国石油大学(华东) Simulation forming device for drilling fluid mud cakes
CN103758513A (en) * 2014-01-10 2014-04-30 西南石油大学 Method for evaluating simulation of full-size well wall stability
CN103806907A (en) * 2014-01-26 2014-05-21 西南石油大学 Method and device for testing rock drillability of deep well drilling and extra-deep well drilling
CN104153760A (en) * 2014-07-22 2014-11-19 中国石油大学(华东) Oil-gas well cement sheath seal characteristic simulation test device and test method
CN206233918U (en) * 2016-11-09 2017-06-09 中国石油大学(华东) Oil/gas Well cement sheath sealing integrity test device
CN106680106A (en) * 2017-01-06 2017-05-17 中国石油大学(华东) Simulation experiment device and method for mudstone and drilling liquid interaction under stratum conditions
CN206386120U (en) * 2017-01-12 2017-08-08 中国石油集团钻井工程技术研究院 The experimental provision that property of drilling fluid influences on the borehole wall under detection simulated formation environment
CN109083630A (en) * 2018-08-30 2018-12-25 陕西延长石油(集团)有限责任公司研究院 A method of for appraisal drilling liquid sealing characteristics
CN109541175A (en) * 2018-11-20 2019-03-29 中国地质大学(北京) A kind of simulation down-hole drilling fluids recycle the device and method to form mud cake
CN110018056A (en) * 2019-04-15 2019-07-16 中国石油大学(北京) A kind of sandstone reservoir wellbore stability evaluation experimental device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112394018A (en) * 2020-10-16 2021-02-23 中国石油大学(北京) Measuring instrument and method for filtering loss
CN112394018B (en) * 2020-10-16 2022-04-12 中国石油大学(北京) Measuring instrument and method for filtering loss
CN112903957A (en) * 2021-01-18 2021-06-04 中国石油大学(华东) Shale stress-damage-drilling fluid interaction experimental device and testing method
CN115127995A (en) * 2022-07-27 2022-09-30 西南石油大学 Device and method for testing adhesion strength between drilling fluid mud cake and well wall

Similar Documents

Publication Publication Date Title
CN111693455A (en) Drilling fluid mud cake generation test method
US4253327A (en) Method and apparatus for measuring rock permeability at elevated pressures and temperature
CN102735548B (en) Multifunctional true triaxial flow solid coupling test system
CN104153760B (en) Oil/gas Well cement sheath sealing characteristics simulating test device and experimental technique
CN113295552B (en) High-temperature high-pressure true triaxial direct shear fracture seepage coupling test device and use method
US4848145A (en) In-situ linear flow proppant conductivity test cell
EP2810062B1 (en) Apparatus for testing lost circulation materials for subterranean formations
CN102011581B (en) Drilling plugging simulation evaluation device for stress-sensitive formation
CN102809574A (en) Device for testing coupling function of multi-physics field of core rock and use method of device
CN102735549A (en) Multifunctional true triaxial flow solid coupling pressure chamber
WO2002103159A1 (en) An apparatus for sampling and logging on all producing zones of a well
CN105067494A (en) Permeability testing method and device based on radial percolation experiment
CN113109181B (en) High-temperature high-pressure conventional triaxial direct shear fracture seepage coupling test device and use method thereof
CN109916725B (en) A liquid nitrogen freezing and gasification expansion-induced cracking experimental test system and method
CN109632502A (en) Multi-joint experimental system and its experimental method
CN106812521A (en) Oil testing device and oil testing tubular column
WO2024051797A1 (en) Pressure-preserved coring tool, use method, and reservoir analysis method
CN110887766A (en) Compact gas-seal-layer mining fluid-solid coupling gas-water nonlinear seepage experimental device and method
CN211206162U (en) A device for studying the permeability law of drilling and completion fluids around the wellbore
CN115110931B (en) Characterization method for low permeability reservoir pressure flooding water injection permeability increasing degree
CA3048262C (en) Measurement cell and associated measurement method
CN214749640U (en) An experimental device for hydraulic fracturing and microwave fracturing combined with anti-reflection shale
CN212964408U (en) A high-efficient experimental apparatus for rock mechanics triaxial experiment
CN109959595B (en) Method and device for testing permeability in hydraulic sand fracturing process of tight reservoir
CN111781328A (en) Drilling fluid mud cake generation test shaft simulation mechanism and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination