CN111663508A - River course clearance is held back net with rubbish - Google Patents

River course clearance is held back net with rubbish Download PDF

Info

Publication number
CN111663508A
CN111663508A CN202010609976.4A CN202010609976A CN111663508A CN 111663508 A CN111663508 A CN 111663508A CN 202010609976 A CN202010609976 A CN 202010609976A CN 111663508 A CN111663508 A CN 111663508A
Authority
CN
China
Prior art keywords
fixedly connected
rod
net
trash
interception net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010609976.4A
Other languages
Chinese (zh)
Inventor
闫亚秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010609976.4A priority Critical patent/CN111663508A/en
Publication of CN111663508A publication Critical patent/CN111663508A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/10Devices for removing the material from the surface
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • E02B15/0807Devices for reducing the polluted area with or without additional devices for removing the material with stabilising elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • E02B15/0835Devices for reducing the polluted area with or without additional devices for removing the material fixed to permanent structure, e.g. harbour wall or river bank
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • E02B15/0842Devices for reducing the polluted area with or without additional devices for removing the material adapted to be towed for operation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • E02B15/085Details of connectors

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention belongs to the technical field of river environment management, and particularly relates to a garbage interception net for clearing a river channel, which comprises two interception net positioning rods, two supporting ropes, a garbage collection plate and a traction rope, wherein an interception net body is fixedly connected between the interception net positioning rods; the rubbish that drifts off in the river course upper reaches is intercepted through holding back the net body, the staff can be regular salvage the rubbish by the interception, the staff is when clearing up apart from oneself rubbish far away, can stand and drive rubbish collection plate to oneself removal at the one end pulling haulage rope that holds back the net body, thereby it takes to oneself to hold back the rubbish that the net body other end was intercepted to hold back through rubbish collection plate, clear up rubbish again, drive rubbish collection plate at the pulling haulage rope at last and reset.

Description

River course clearance is held back net with rubbish
Technical Field
The invention relates to the technical field of river environment treatment, in particular to a garbage interception net for river channel cleaning.
Background
The economic development is accompanied by the pollution of human beings to the environment at the same time, the plastic bag is praised as the most successful and failed invention, the plastic bag not only facilitates the daily life of people, but also pollutes the earth on which the human beings depend for survival, in recent years, articles such as garbage bags, worn clothes and the like in the daily life of people can be seen everywhere in rivers and lakes, the pollution to rivers is only increased but not reduced, the country is forced to carry out regulation and treatment on the river pollution, and the regulation and treatment of the river pollution is one of the most main work tasks of hydraulic engineering.
In the existing method for river regulation, the garbage in the river is generally cleaned and salvaged manually for the narrow river channel, the interception net is built to intercept the garbage in the river, the garbage intercepted by the interception net can be cleaned manually, but because a certain width is formed between the river channels, people often cannot clean the garbage intercepted by the other end of the interception net when standing at one end of the interception net in the cleaning process, and the difficulty in cleaning the garbage by people cannot be reduced.
Disclosure of Invention
The invention aims to provide a garbage intercepting net for river channel cleaning, which aims to solve the following technical problems.
In the existing method for river regulation, the garbage in the river is generally cleaned and salvaged manually for the narrow river channel, the interception net is built to intercept the garbage in the river, the garbage intercepted by the interception net can be cleaned manually, but because a certain width is formed between the river channels, people often cannot clean the garbage intercepted by the other end of the interception net when standing at one end of the interception net in the cleaning process, and the difficulty in cleaning the garbage by people cannot be reduced.
In order to achieve the purpose, the invention provides the following technical scheme:
a rubbish interception net for clearing up a river channel comprises interception net positioning rods, supporting ropes, rubbish collecting plates and traction ropes, wherein the number of the interception net positioning rods is two, an interception net body is fixedly connected between the interception net positioning rods, a first reinforcing rod is fixedly connected at the top of each interception net positioning rod, two symmetrically distributed supporting rods are fixedly connected with the outer wall of the first reinforcing rod, a positioning ring is fixedly connected with the outer wall of the bottom of each interception net positioning rod, and a connecting rod is fixedly connected onto the positioning ring, when the garbage collecting device is used, garbage drifting from the upstream of a river channel can be intercepted through the intercepting net body, workers can periodically salvage the intercepted garbage, and can stand at one end of the intercepting net body to pull the traction rope to drive the garbage collecting plate to move to the workers when cleaning the garbage far away from the workers, so that the intercepted garbage at the other end of the intercepting net body is brought to the workers through the garbage collecting plate, then clear up rubbish again, it collects the board and resets to drive rubbish at the pulling haulage rope at last, the degree of difficulty that people's clearance was intercepted rubbish has been reduced, and hold back the net body when using a period, common alga in its surface can cover the one deck river, the staff can regularly stimulate the haulage rope and drive rubbish and retrieve the board round trip movement, thereby it clears up to holding back adnexed alga on the net body to come through the cleaning brush on the rubbish collection board, can avoid holding back the jam that net body surface attached to too much alga caused river course rivers.
As a still further scheme of the invention: fixedly connected with second stiffener between the bracing piece holds back the broken awl of net locating lever bottom fixedly connected with, inserts the broken awl of holding back net locating lever below in the earth of river course both sides, can play a fixed effect to holding back the net locating lever.
As a still further scheme of the invention: intercept net body bottom and outside river course block, the size of intercepting the last filtration pore of net body is two centimetres, and intercepts net body bottom and insert five centimetres of river course surface of water, through the block of intercepting net body bottom and outside river course, can prevent that rubbish in the river from flowing to low reaches through the gap of intercepting between net body and the river course.
As a still further scheme of the invention: the two ends of the supporting rope are fixedly connected with installation threaded rods, one end of the installation seat close to the supporting rope is fixedly connected with an installation sleeve, the supporting rope is fixed with the installation sleeve through the installation threaded rods in a screwed mode, the installation seat is provided with installation bolts, the installation seat on the supporting rod is fixed with the supporting rod through the installation bolts in a screwed mode, the installation threaded rods can be screwed into the installation sleeve during installation, the installation threaded rods can be screwed out of the installation sleeve during disassembly, so that installation and disassembly between the supporting rope and the installation seat are achieved, the installation bolts can penetrate through the installation seat and can be screwed into the supporting rod during installation, the installation bolts can be screwed out of the supporting rod during disassembly, so that installation and disassembly between the installation seat and the supporting rod are achieved, during installation, the mounting bolt can penetrate through the mounting seat and be screwed into the connecting rod, and the mounting bolt is screwed out of the connecting rod during disassembly, so that the mounting and disassembly between the mounting seat and the connecting rod are realized.
As a still further scheme of the invention: the one end fixedly connected with guard plate of holding back the net body is kept away from to rubbish collection board, and the material of rubbish collection board and guard plate is plastics, can drag when holding back rubbish removal at rubbish collection board through the guard plate, avoids some rubbish to be extruded rubbish collection board's the scope of dragging.
As a still further scheme of the invention: the rubbish is received the board and is close to the one end fixedly connected with cleaning brush of holding back the net body, cleaning brush with hold back the contact of net body, and cleaning brush's material is the steel wire, can play the effect of a clearance to holding back adnexed alga on the net body through cleaning brush.
As a still further scheme of the invention: the material of sliding sleeve is the stainless steel, and the material of haulage rope is the nylon rope, and sliding sleeve can play the effect of protection rubbish collection board, avoids producing the friction between rubbish collection board and the haulage rope, and the cost of nylon rope is lower moreover, can reduce the manufacturing cost of device.
As a still further scheme of the invention: carry over pinch rolls both ends fixedly connected with connecting rod, the connecting seat is close to the one end fixedly connected with connecting sleeve of carry over pinch rolls, the carry over pinch rolls passes through connecting rod and is fixed with the connecting sleeve spiro union, be equipped with connecting bolt on the connecting seat, the connecting seat passes through connecting bolt and rubbish collects the board and can dismantle and be connected, in the installation, can be with connecting rod screw in to connecting sleeve's inside, can screw out connecting sleeve with connecting rod when dismantling inside, thereby realize the installation and the dismantlement between carry over pinch rolls and the connecting seat, in the installation, can run through inside connecting seat screw in rubbish collection inboard with connecting bolt, screw out rubbish collection board to connecting bolt when dismantling, thereby realize the installation and the dismantlement between connecting seat and the rubbish collection board.
Compared with the prior art, the invention has the beneficial effects that:
1. when the garbage collecting device is used, garbage drifting down from the upstream of a river channel can be intercepted through the intercepting net body, a worker can periodically salvage the intercepted garbage, and when the worker cleans the garbage far away from the worker, the worker can stand at one end of the intercepting net body to pull the traction rope to drive the garbage collecting plate to move towards the worker, so that the intercepted garbage at the other end of the intercepting net body is brought towards the worker through the garbage collecting plate, then the garbage is cleaned, and finally the traction rope is pulled to drive the garbage collecting plate to reset, so that the difficulty of people in cleaning the intercepted garbage is reduced.
2. Intercept net body when using a period, its surface can cover the alga in the one deck river, and the staff can regularly stimulate the haulage rope and drive rubbish and retrieve the board round trip movement to come to clear up the adnexed alga on intercepting net body through the cleaning brush on the rubbish is retrieved the board, can avoid intercepting net body surface to adhere to too much alga and cause the jam of river course rivers.
Drawings
FIG. 1 is a schematic structural view of a trash holding net for river cleaning;
FIG. 2 is a schematic structural view of a positioning rod of a retention net, a supporting rope and a garbage collecting plate in the garbage retention net for cleaning a river;
FIG. 3 is an enlarged view of portion A of FIG. 1;
FIG. 4 is an enlarged view of portion B of FIG. 1;
FIG. 5 is a schematic structural view of a positioning rod of a trash holding net, a trash collecting plate and a pulling rope in the trash holding net for cleaning a river;
fig. 6 is a schematic structural view of a garbage collecting plate and a pulling rope in a garbage interception net for river cleaning.
In the figure: 1. a retaining net positioning rod; 11. a first reinforcement bar; 111. a support bar; 112. a second reinforcement bar; 12. a positioning ring; 121. a connecting rod; 13. a soil breaking cone; 14. a fixing ring; 15. a retention net body; 2. a support line; 21. mounting a threaded rod; 22. a mounting seat; 221. installing a sleeve; 222. installing a bolt; 3. a garbage collection plate; 31. a slip ring; 32. a sliding sleeve; 33. a protection plate; 34. a cleaning brush; 4. a hauling rope; 41. connecting a threaded rod; 42. a connecting seat; 421. a connecting sleeve; 422. and connecting the bolts.
Detailed Description
Referring to fig. 1 to 6, in the embodiment of the invention, a garbage interception net for clearing up a river comprises two interception net positioning rods (1), two supporting ropes (2), two garbage collecting plates (3) and a traction rope (4), an interception net body (15) is fixedly connected between the two interception net positioning rods (1), a first reinforcing rod (11) is fixedly connected to the top of each interception net positioning rod (1), two symmetrically distributed supporting rods (111) are fixedly connected to the outer wall of the first reinforcing rod (11), a positioning ring (12) is fixedly connected to the outer wall of the bottom of each interception net positioning rod (1), a connecting rod (121) is fixedly connected to each positioning ring (12), a fixing ring (14) is fixedly connected to the outer wall of each interception net positioning rod (1), mounting seats (22) are detachably connected to two ends of each supporting rope (2), and the mounting seats (22) on the supporting rods (111) are detachably connected to the supporting rods (111), the mounting seat (22) on the connecting rod (121) is detachably connected with the connecting rod (121), the top of the garbage collecting plate (3) is fixedly connected with a sliding ring (31), the sliding ring (31) is slidably connected with a supporting rope (2) close to the supporting rod (111), the bottom of the garbage collecting plate (3) is fixedly connected with a sliding sleeve (32), the sliding sleeve (32) is slidably connected with the supporting rope (2) close to the connecting rod (121), the traction rope (4) penetrates through the fixing ring (14), connecting seats (42) are detachably connected to two ends of the traction rope (4), and the two connecting seats (42) are detachably connected with the outer walls of two sides of the garbage collecting plate (3).
In fig. 1, 2, 3 and 4: the number of the intercepting net positioning rods (1) is two, an intercepting net body (15) is fixedly connected between the intercepting net positioning rods (1), a first reinforcing rod (11) is fixedly connected to the top of each intercepting net positioning rod (1), two symmetrically distributed supporting rods (111) are fixedly connected to the outer wall of each first reinforcing rod (11), a second reinforcing rod (112) is fixedly connected between the supporting rods (111), a positioning ring (12) is fixedly connected to the outer wall of the bottom of each intercepting net positioning rod (1), a connecting rod (121) is fixedly connected to the positioning ring (12), a ground breaking cone (13) is fixedly connected to the bottom end of each intercepting net positioning rod (1), when the device is used, an intercepting net body (15) suitable for the width of a river channel is firstly manufactured, then the ground breaking cones (13) below the intercepting net positioning rods (1) are inserted into soil on two sides of the river channel, and the intercepting net, can play a limiting role through the positioning ring (12), avoid intercepting the net locating lever (1) and inserting into the earth, intercept net locating lever (1) outer wall fixedly connected with solid fixed ring (14), intercept net body (15) bottom and outside river course block, intercept the size of the filtration pore on the net body (15) and be two centimetres, and intercept net body (15) bottom and insert the river course surface of water five centimetres, through intercepting the block of net body (15) bottom and outside river course, can prevent the rubbish in the river from flowing to the low reaches through the gap between intercepting net body (15) and the river course, support the both ends of the rope (2) and detachably connect with mount pad (22), mount pad (22) and bracing piece (111) on the bracing piece (111) can be dismantled and connected, mount pad (22) and connecting rod (121) on the connecting rod (121) can be dismantled and connected, support the both ends of the rope (2) fixedly connected with the installation threaded rod (21, one end of the mounting seat (22) close to the support rope (2) is fixedly connected with a mounting sleeve (221), the support rope (2) is fixed with the mounting sleeve (221) in a threaded manner through a mounting threaded rod (21), the mounting threaded rod (21) can be screwed into the mounting sleeve (221) during mounting, the mounting threaded rod (21) can be screwed out of the mounting sleeve (221) during dismounting, mounting and dismounting between the support rope (2) and the mounting seat (22) are achieved, a mounting bolt (222) is arranged on the mounting seat (22), the mounting seat (22) on the support rod (111) is fixed with the support rod (111) in a threaded manner through the mounting bolt (222), the mounting bolt (222) can penetrate through the mounting seat (22) and be screwed into the support rod (111) during mounting, the mounting bolt (222) is screwed out of the support rod (111) during dismounting, thereby realize the installation and the dismantlement between mount pad (22) and bracing piece (111), mount pad (22) that is located on connecting rod (121) passes through construction bolt (222) and connecting rod (121) spiro union is fixed, in the installation, can run through mount pad (22) with construction bolt (222) and screw in the inside of connecting rod (121), unscrew construction bolt (222) connecting rod (121) in the dismantlement, thereby realize the installation and the dismantlement between mount pad (22) and connecting rod (121).
In fig. 1, 5 and 6: the top of the garbage collecting plate (3) is fixedly connected with a sliding ring (31), the sliding ring (31) is in sliding connection with a supporting rope (2) close to a supporting rod (111), the bottom of the garbage collecting plate (3) is fixedly connected with a sliding sleeve (32), the sliding sleeve (32) is in sliding connection with the supporting rope (2) close to a connecting rod (121), one end, far away from the intercepting net body (15), of the garbage collecting plate (3) is fixedly connected with a protective plate (33), the garbage collecting plate (3) and the protective plate (33) are made of plastics, when the garbage collecting plate (3) drags the intercepted garbage to move, the dragging range of the garbage collecting plate (3) is prevented from being extruded out of the garbage collecting plate, one end, close to the intercepting net body (15), of the garbage collecting plate (3) is fixedly connected with a cleaning brush (34), and the cleaning brush (34) is in contact with the intercepting net body (15), the cleaning brush (34) is made of steel wires, the traction rope (4) penetrates through the fixing ring (14), the sliding sleeve (32) is made of stainless steel, the traction rope (4) is made of nylon ropes, the two ends of the traction rope (4) are detachably connected with the connecting seats (42), the two connecting seats (42) are detachably connected with the outer walls of the two sides of the garbage collecting plate (3), when the cleaning brush is used, garbage drifting down from the upstream of a river channel can be intercepted through the intercepting net body (15), workers can periodically salvage the intercepted garbage, and can stand at one end of the intercepting net body (15) to pull the traction rope (4) to drive the garbage collecting plate (3) to move towards themselves when cleaning the garbage far away from themselves, so that the intercepted garbage at the other end of the intercepting net body (15) is brought towards themselves through the garbage collecting plate (3), then the garbage is cleaned, finally the traction rope (4) is pulled to drive the garbage collecting plate (3) to reset, the difficulty of cleaning the intercepted garbage by people is reduced, when the intercepting net body (15) is used for a period of time, the surface of the intercepting net body (15) can be covered with a layer of common algae in rivers, workers can regularly pull the traction rope (4) to drive the garbage collecting plate (3) to move back and forth, so that the algae attached to the intercepting net body (15) can be cleaned through a cleaning brush (34) on the garbage collecting plate (3), the blockage of river water flow caused by the excessive algae attached to the surface of the intercepting net body (15) can be avoided, the two ends of the traction rope (4) are fixedly connected with connecting threaded rods (41), one end of the connecting seat (42) close to the traction rope (4) is fixedly connected with a connecting sleeve (421), the traction rope (4) is fixedly connected with the connecting sleeve (421) through the connecting threaded rods (41), in the installation, can be with connecting threaded rod (41) screw in to the inside of connecting sleeve (421), can screw out connecting sleeve (421) with connecting threaded rod (41) inside in the time of the dismantlement, thereby realize installation and dismantlement between haulage rope (4) and connecting seat (42), be equipped with connecting bolt (422) on connecting seat (42), connecting seat (42) are passed through connecting bolt (422) and are dismantled with rubbish collection board (3) and be connected, in the installation, can run through inside connecting bolt (422) screw in rubbish collection board (3) connecting seat (42), screw out rubbish collection board (3) connecting bolt (422) in the time of the dismantlement, thereby realize installation and the dismantlement between connecting seat (42) and rubbish collection board (3).
The working principle of the invention is as follows: when the device is used, firstly, the interception net body (15) suitable for the width of a river channel is manufactured, then the soil breaking cone (13) below the interception net positioning rod (1) is inserted into soil on two sides of the river channel, so that the interception net body (15) is fixed, a limiting effect can be achieved through the positioning ring (12), the interception net positioning rod (1) is prevented from being inserted into the soil, then the rubbish drifting down from the upper part of the river channel is intercepted through the interception net body (15), a worker can regularly salvage the intercepted rubbish, when the worker cleans the rubbish far away from the worker, the worker can stand at one end of the interception net body (15) to pull the traction rope (4) to drive the rubbish collection plate (3) to move to the worker, so that the intercepted rubbish at the other end of the interception net body (15) is brought to the worker through the rubbish collection plate (3), then clear up rubbish again, drive rubbish and receive board (3) and reset at pulling haulage rope (4) at last, the degree of difficulty that people's clearance was intercepted rubbish has been reduced, and hold back net body (15) when using a period, common alga in its surface can cover the one deck river, staff can regularly stimulate haulage rope (4) and drive rubbish and receive board (3) round trip movement, thereby come to clear up the adnexed alga on holding back net body (15) through cleaning brush (34) on rubbish is retrieved board (3), can avoid holding back net body (15) surface and adhere to too much alga and cause the jam of river course rivers.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention are equivalent to or changed within the technical scope of the present invention.

Claims (9)

1. A rubbish interception net for clearing up a river channel comprises interception net positioning rods, supporting ropes, rubbish collecting plates and traction ropes, and is characterized in that the number of the interception net positioning rods is two, an interception net body is fixedly connected between the interception net positioning rods, a first reinforcing rod is fixedly connected to the top of each interception net positioning rod, two symmetrically-distributed supporting rods are fixedly connected to the outer wall of each first reinforcing rod, a positioning ring is fixedly connected to the outer wall of the bottom of each interception net positioning rod, a connecting rod is fixedly connected to each positioning ring, and a fixing ring is fixedly connected to the outer wall of each interception net positioning rod;
the supporting rope is detachably connected with mounting seats at two ends, the mounting seats on the supporting rods are detachably connected with the supporting rods, and the mounting seats on the connecting rods are detachably connected with the connecting rods.
2. The trash holding net for cleaning the river channel as claimed in claim 1, wherein a sliding ring is fixedly connected to the top of the trash collecting plate and is slidably connected to the supporting rope near the supporting rod, a sliding sleeve is fixedly connected to the bottom of the trash collecting plate and is slidably connected to the supporting rope near the connecting rod, the pulling rope passes through the fixing ring, and connecting seats are detachably connected to both ends of the pulling rope and are detachably connected to the outer walls of both sides of the trash collecting plate.
3. The trash interception net for river channel cleaning according to claim 1, wherein a second reinforcing rod is fixedly connected between the supporting rods, and a ground breaking cone is fixedly connected to the bottom end of the positioning rod of the interception net.
4. The trash holding net for cleaning the river channel according to claim 1, wherein the bottom of the holding net body is engaged with the external river channel, the size of the filtering holes on the holding net body is two centimeters, and the bottom of the holding net body is inserted into five centimeters on the surface of the river channel.
5. The trash interception net for clearing up river channels of claim 1, wherein installation threaded rods are fixedly connected to two ends of the supporting rope, an installation sleeve is fixedly connected to one end, close to the supporting rope, of the installation seat, the supporting rope is fixed to the installation sleeve in a threaded mode through the installation threaded rods, an installation bolt is arranged on the installation seat, the installation seat on the supporting rod is fixed to the supporting rod in a threaded mode through the installation bolt, and the installation seat on the connecting rod is fixed to the connecting rod in a threaded mode through the installation bolt.
6. The trash interception net for cleaning riverways according to claim 1, wherein a protection plate is fixedly connected to one end of the trash collection plate far away from the interception net body, and the trash collection plate and the protection plate are made of plastic.
7. The trash interception net for cleaning riverways according to claim 1, wherein a cleaning brush is fixedly connected to one end of the trash collection plate close to the interception net body, the cleaning brush is in contact with the interception net body, and the cleaning brush is made of steel wires.
8. The trash holding net for cleaning up river channels of claim 1, wherein the sliding sleeve is made of stainless steel and the pulling rope is made of nylon rope.
9. The trash holding net for cleaning the river channel as claimed in claim 1, wherein a connecting threaded rod is fixedly connected to both ends of the pulling rope, a connecting sleeve is fixedly connected to one end of the connecting base, which is close to the pulling rope, the pulling rope is fixed to the connecting sleeve by screwing through the connecting threaded rod, a connecting bolt is arranged on the connecting base, and the connecting base is detachably connected to the trash collecting plate by the connecting bolt.
CN202010609976.4A 2020-06-30 2020-06-30 River course clearance is held back net with rubbish Withdrawn CN111663508A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010609976.4A CN111663508A (en) 2020-06-30 2020-06-30 River course clearance is held back net with rubbish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010609976.4A CN111663508A (en) 2020-06-30 2020-06-30 River course clearance is held back net with rubbish

Publications (1)

Publication Number Publication Date
CN111663508A true CN111663508A (en) 2020-09-15

Family

ID=72390540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010609976.4A Withdrawn CN111663508A (en) 2020-06-30 2020-06-30 River course clearance is held back net with rubbish

Country Status (1)

Country Link
CN (1) CN111663508A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160294A (en) * 2020-10-06 2021-01-01 安徽省萧县黄河故道园艺场 Small-size reservoir dam rubbish cleaning device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160294A (en) * 2020-10-06 2021-01-01 安徽省萧县黄河故道园艺场 Small-size reservoir dam rubbish cleaning device

Similar Documents

Publication Publication Date Title
CN207314304U (en) A kind of sewage blocking device for river
CN111663508A (en) River course clearance is held back net with rubbish
CN105756017B (en) A kind of trash rack system
CN211472435U (en) River channel garbage intercepting device
CN106677134B (en) A kind of intelligence trash rack structure
CN206396735U (en) A kind of hydraulic engineering fence of removing contamination
CN115054958A (en) Continuous type filter equipment that titanate preparation of environmental protection safety was used
CN210917284U (en) River course ecological management device
CN212612922U (en) Water supply and drainage equipment with anti-blocking function
CN210395278U (en) Interception fence with function of decontaminating
CN220789809U (en) Anti-slip slope building structure
CN220789641U (en) Electric discharging station dirt blocking structure
CN219690456U (en) Drainage grating for hydraulic engineering
CN107859150B (en) Catch basin system
CN216236570U (en) Ecological self-supporting adjusting device
CN206492616U (en) A kind of equipment on hydraulic flotation machine
CN213328949U (en) Hydraulic engineering cistern is with device of decontaminating
CN216275560U (en) River channel intercepting debris device for environmental protection
CN215758919U (en) Intercepting device for hydraulic engineering convenient to installation
CN112807794B (en) Dull and stereotyped grid that scarfing cinder is convenient
CN108217978B (en) Comprehensive water pollution prevention and control equipment
CN220483253U (en) Flat plate type washing machine
CN214033632U (en) Device suitable for synchronous clearance of river course rubbish and oil slick
CN219886739U (en) Urban river floating garbage cleaning system
CN220328073U (en) Municipal administration water supply and drainage filter equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20200915

WW01 Invention patent application withdrawn after publication