CN111648821A - Mobile breakdown van for emergency treatment during tunnel collapse - Google Patents

Mobile breakdown van for emergency treatment during tunnel collapse Download PDF

Info

Publication number
CN111648821A
CN111648821A CN202010546172.4A CN202010546172A CN111648821A CN 111648821 A CN111648821 A CN 111648821A CN 202010546172 A CN202010546172 A CN 202010546172A CN 111648821 A CN111648821 A CN 111648821A
Authority
CN
China
Prior art keywords
filler material
filling material
pipeline
static mixer
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010546172.4A
Other languages
Chinese (zh)
Inventor
李树忱
支斌
袁超
冯现大
王鹏程
王修伟
王凯
马川义
解冬东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
University of Jinan
Original Assignee
Shandong University
University of Jinan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University, University of Jinan filed Critical Shandong University
Priority to CN202010546172.4A priority Critical patent/CN111648821A/en
Publication of CN111648821A publication Critical patent/CN111648821A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F11/00Rescue devices or other safety devices, e.g. safety chambers or escape ways
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Emergency Management (AREA)
  • Pulmonology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a be used for emergency treatment's removal breakdown van when tunnel collapses the chamber, which comprises a carriage body, be provided with filler material bucket I and filler material bucket II on the automobile body, be provided with filler material liquid I in the filler material bucket I, be provided with filler material liquid II in the filler material bucket II, filler material bucket I passes through pipeline I and static mixer's import intercommunication, be provided with pump I on the pipeline I, filler material bucket II passes through pipeline II and static mixer's import intercommunication, be provided with pump II on the pipeline II, static mixer's exit linkage has the conveyer pipe, static mixer's export accessible conveyer pipe is connected with the filler material filling opening of membrane bag, still be provided with the membrane bag storehouse that is used for placing the membrane bag on the automobile body.

Description

Mobile breakdown van for emergency treatment during tunnel collapse
Technical Field
The invention relates to the technical field of emergency treatment of a tunnel collapsed cavity, in particular to a mobile breakdown van for emergency treatment during tunnel collapsed cavity.
Background
With the improvement of comprehensive national strength and the improvement of technological level in China, the construction of underground projects such as subways, tunnels and the like enters an unprecedented development opportunity period, and the construction scale and the construction speed are the first in the world. However, with the development of tunnel construction in China, tunnel engineering construction in unfavorable geological areas is increasing day by day. If the treatment is improper in the construction process, engineering disasters such as collapse, mud burst and water burst, surface subsidence, instability of a hole body and the like are easily caused, and even the life safety of field construction personnel is threatened.
In actual engineering, once a tunnel cavity collapse accident occurs, the existence of the collapsed cavity can suspend the tunnel part in the air, so that the safety and reliability of the tunnel are greatly reduced; the deposits in the collapsed cavity are easy to collapse and sink, so that the structural stability of the tunnel is influenced; if the collapse cavity is rich in water, the liquidity of deposits in the collapse cavity is good, and the construction and safety of the tunnel are seriously affected.
The existing method for treating the collapsed cavity of the tunnel mainly comprises concrete backfill reinforcement and grouting, and the method needs to be used for treating the collapsed cavity of the tunnel
The collapsed cavity is supported and reinforced, however, in the construction process of performing anchor-spraying support on the collapsed cavity, the construction of drilling the anchor rod hole disturbs the broken surrounding rock, so that the surrounding rock is easy to continuously collapse, and the safety of constructors is endangered; the collapsed cavity is required to be completely backfilled with concrete, and the method can change the surrounding rock stress of the tunnel and is also not in line with economic requirements; in the treatment process, collapsed slag bodies need to be removed in time, and the collapsed slag bodies are prevented from continuously flowing in the tunnel, so that the tunnel construction and safety are influenced. This is a disadvantage in the prior art.
Disclosure of Invention
The invention aims to solve the technical problem that the defects of the prior art are overcome, and provides a mobile breakdown van for emergency treatment when a tunnel collapses, wherein corresponding facilities are arranged on the mobile breakdown van to be matched with membrane bags for use, and the mobile breakdown van is used for emergency treatment when the tunnel collapses.
The scheme is realized by the following technical measures: the utility model provides a be used for emergency treatment's removal breakdown van when tunnel collapses the chamber, which comprises a carriage body, fixed filler material bucket I and filler material bucket II of being provided with on the automobile body, be provided with filler material liquid I in the filler material bucket I, be provided with filler material liquid II in the filler material bucket II, filler material bucket I passes through pipeline I and static mixer's import intercommunication, be provided with pump I on the pipeline I, filler material bucket II passes through pipeline II and static mixer's import intercommunication, be provided with pump II on the pipeline II, static mixer's exit linkage has the conveyer pipe, static mixer's export accessible conveyer pipe is connected with the filler material filling opening of membrane bag, still be provided with the membrane bag storehouse that is used for placing the membrane bag on the automobile body.
Preferably, one end of the conveying pipe is connected with an outlet of the static mixer through a quick joint, and the other end of the conveying pipe is connected with a filling material injection opening of the film bag through the quick joint.
Preferably, the pump I and the pump II are connected with a synchronous controller.
Preferably, the filling material liquid I is a filling material liquid A, and the filling material liquid II is a filling material liquid B; the volume ratio of the filling material liquid A to the filling material liquid B is 1: 1; the density of the high-expansion silicate filling material generated by foaming the filling material A liquid and the filling material B liquid is 45kg/m3, the foaming multiplying power is 20-35 times, and the maximum heat release temperature during foaming is less than 70 ℃.
Preferably, the pipeline I and the pipeline II are connected with one end of a pipeline III through a tee joint, and the other end of the pipeline III is connected with an inlet of the static mixer.
Preferably, the static mixer is fixedly arranged on a bracket, and the bracket is fixedly arranged on the vehicle body.
The invention has the following advantages:
(1) the emergency repair vehicle is provided with a filling material barrel I and a filling material barrel II, and the filling material liquid A and the filling material liquid B are foamed by using a static mixer, so that the strength of the foamed filling material is ensured.
(2) The static mixer is connected with the conveying pipe, and the two ends of the conveying pipe are respectively connected with the quick connectors, so that the efficiency of the breakdown van during working is ensured.
(3) Still be provided with membrane bag storehouse on the automobile body, be provided with the membrane bag in the membrane bag storehouse, the membrane bag uses with the cooperation of removal breakdown van, fills filler material in the membrane bag, and then the chamber of collapsing is handled.
(4) The filling material is a high-expansion silicate material which has stable reaction with water and no water, rapid reaction, good injectability, low heat release, flame retardance and better durability, and the material is nontoxic and harmless; the filling material liquid A and the filling material liquid B are both conveyed through the pump, and the synchronous controller is arranged, so that the filling material liquid A and the filling material liquid B can be mixed and reacted according to a set proportion, the foaming ratio is high, and the strength of the obtained material is high.
(5) All required facilities are arranged on the mobile breakdown van, so that breakdown in the collapsed cavity of the tunnel can be facilitated, and the tunnel is rapid and efficient.
Therefore, compared with the prior art, the invention has prominent substantive features and remarkable progress, and the beneficial effects of the implementation are also obvious.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings used in the description will be briefly introduced, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
Fig. 1 is a schematic structural view of a mobile emergency repair vehicle;
in the figure: 1-vehicle body, 2-filling material barrel I, 3-filling material barrel II, 4-pump I, 5-static mixer, 6-conveying pipe, 7-tee joint, 8-bracket, 9-membrane bag, 10-membrane bag bin, 11-pipeline I, 12-pipeline II, 13-pipeline III, 14-pump II.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions of the present invention will be clearly and completely described below with reference to specific embodiments and drawings. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the scope of protection of this patent.
As shown in the figure, a removal breakdown van for emergency treatment when tunnel collapses chamber, including automobile body 1, fixed filler material bucket I2 and the filler material bucket II 3 of being provided with on the automobile 1 body, be provided with filler material liquid I in the filler material bucket I2, be provided with filler material liquid II in the filler material bucket II 3, filler material bucket I2 passes through pipeline I11 and static mixer 5's import intercommunication, be provided with pump I4 on the pipeline I11, filler material bucket II 3 passes through pipeline II12 and static mixer 5's import intercommunication, be provided with pump II14 on pipeline II12, it is specific: the pipeline I11 and the pipeline II12 are connected with one end of a pipeline III 13 through a tee joint 7, and the other end of the pipeline III 13 is connected with an inlet of the static mixer 5.
The outlet of the static mixer 5 is connected with a conveying pipe 6, the outlet of the static mixer 5 can be connected with a filling material injection opening of the membrane bag 9 through the conveying pipe 6, and specifically: one end of the conveying pipe 6 is connected with an outlet of the static mixer 5 through a quick connector, the other end of the conveying pipe 6 is connected with a filling material injection opening of the film bag 9 through a quick connector, and the quick connector is the prior art and is not described herein again. And in the process of flowing the filling material liquid I and the filling material liquid II in the static mixer 5, the filling material liquid I and the filling material liquid II are subjected to multiple times of division, shearing, rotation and recombination to be fully mixed to achieve the optimal foaming state.
The vehicle body 1 is also provided with a film bag bin 10 for placing the film bag 9. The static mixer 5 is fixedly arranged on a support 8, and the support 8 is fixedly arranged on the vehicle body 1. The driver can drive the mobile breakdown van to move.
When a tunnel collapse cavity is processed, a proper number of ton buckets are selected to be linearly placed according to the specific size of the tunnel, and gaps are reserved between the ton buckets and the inner wall of the tunnel and between the ton buckets and the ton bucket; will remove the breakdown van and open to near the tunnel cavity of collapsing membrane bag 9 is all placed in the clearance, will be made by filler material liquid I and filler material liquid II high inflation silicate filler material from the filler material filling opening through conveyer pipe 6 and pour into in membrane bag 9 and the extrusion is closely knit, forms a quick barricade in the tunnel to prevent to collapse the slag body and continue to flow in the tunnel.
Example 2
In this embodiment, the filling material liquid i is a filling material liquid a, and the filling material liquid ii is a filling material liquid B; the volume ratio of the filling material liquid A to the filling material liquid B is 1: 1; the density of the high-expansion silicate filling material generated by foaming the filling material A liquid and the filling material B liquid is 45kg/m3, the foaming multiplying power is 20-35 times, the maximum heat release temperature during foaming is less than 70 ℃, the filling material A liquid and the filling material B liquid are two materials commonly used for preparing the high-expansion silicate filling material in the prior art, preferably, the filling material A liquid and the filling material B liquid can be directly obtained from Shandong Hongtong engineering science and technology Limited company, and are not described herein any more, and the high-expansion silicate filling material is an HSP-2 material.
Example 3
In the present embodiment, a synchronous controller is connected to the pump I4 and the pump II 14. The filling material A liquid and the filling material B liquid are mixed and reacted according to a set proportion, the foaming ratio is high, and the obtained material is high in strength.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features and inventive features disclosed herein.

Claims (7)

1. The utility model provides a be used for emergency treatment's removal breakdown van when tunnel collapses chamber which characterized by: the automobile body, fixed filler material bucket I and the filler material bucket II of being provided with on the automobile body, be provided with filler material liquid I in the filler material bucket I, be provided with filler material liquid II in the filler material bucket II, filler material bucket I passes through pipeline I and static mixer's import intercommunication, be provided with pump I on the pipeline I, filler material bucket II passes through pipeline II and static mixer's import intercommunication, be provided with pump II on the pipeline II, static mixer's exit linkage has the conveyer pipe, static mixer's export accessible conveyer pipe is connected with the filler material filling opening of membrane bag.
2. The mobile emergency repair vehicle for emergency treatment during cavity collapse of the tunnel according to claim 1, wherein: the car body is also provided with a film bag bin for placing film bags.
3. The mobile emergency repair vehicle for emergency treatment during cavity collapse of the tunnel according to claim 1, wherein: one end of the conveying pipe is connected with an outlet of the static mixer through a quick connector, and the other end of the conveying pipe is connected with a filling material injection opening of the film bag through a quick connector.
4. The mobile emergency repair vehicle for emergency treatment during cavity collapse of the tunnel according to claim 1, wherein: the filling material liquid I is filling material liquid A, and the filling material liquid II is filling material liquid B; the volume ratio of the filling material liquid A to the filling material liquid B is 1: 1; the density of the high-expansion silicate filling material generated by foaming the filling material A liquid and the filling material B liquid is 45kg/m3, the foaming multiplying power is 20-35 times, and the maximum heat release temperature during foaming is less than 70 ℃.
5. The mobile emergency repair vehicle for emergency treatment during cavity collapse of the tunnel according to claim 1, wherein: and the pump I and the pump II are connected with a synchronous controller.
6. The mobile emergency repair vehicle for emergency treatment during cavity collapse of the tunnel according to claim 1, wherein: pipeline I, pipeline II are connected with the one end of pipeline III through the tee bend, the other end and the inlet connection of static mixer of pipeline III.
7. The mobile emergency repair vehicle for emergency treatment during cavity collapse of the tunnel according to claim 1, wherein: the static mixer is fixedly arranged on a support, and the support is fixedly arranged on a vehicle body.
CN202010546172.4A 2020-06-16 2020-06-16 Mobile breakdown van for emergency treatment during tunnel collapse Pending CN111648821A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010546172.4A CN111648821A (en) 2020-06-16 2020-06-16 Mobile breakdown van for emergency treatment during tunnel collapse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010546172.4A CN111648821A (en) 2020-06-16 2020-06-16 Mobile breakdown van for emergency treatment during tunnel collapse

Publications (1)

Publication Number Publication Date
CN111648821A true CN111648821A (en) 2020-09-11

Family

ID=72345633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010546172.4A Pending CN111648821A (en) 2020-06-16 2020-06-16 Mobile breakdown van for emergency treatment during tunnel collapse

Country Status (1)

Country Link
CN (1) CN111648821A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201736394U (en) * 2010-08-30 2011-02-09 乌鲁木齐联合恒利建筑节能工程技术有限公司 Supercritical carbon dioxide foaming agent extruding foaming injection system
CN103321228A (en) * 2013-06-21 2013-09-25 中国矿业大学 High-water material ground fissure filling system and filling treatment method
CN203213115U (en) * 2013-04-11 2013-09-25 河南博特工程防护有限公司 Trailer type high polymer grouting system
CN203213116U (en) * 2013-04-11 2013-09-25 河南博特工程防护有限公司 Integrated type high polymer grouting system
CN207620842U (en) * 2017-12-14 2018-07-17 淮南矿业(集团)有限责任公司 A kind of mine high-water material filling bag fixed frame
CN209917648U (en) * 2019-03-08 2020-01-10 南京豪力液压设备有限公司 AB glue conveyor with reserve defeated material end
CN110944738A (en) * 2017-07-28 2020-03-31 汉高知识产权控股有限责任公司 Method for foaming adhesive and related system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201736394U (en) * 2010-08-30 2011-02-09 乌鲁木齐联合恒利建筑节能工程技术有限公司 Supercritical carbon dioxide foaming agent extruding foaming injection system
CN203213115U (en) * 2013-04-11 2013-09-25 河南博特工程防护有限公司 Trailer type high polymer grouting system
CN203213116U (en) * 2013-04-11 2013-09-25 河南博特工程防护有限公司 Integrated type high polymer grouting system
CN103321228A (en) * 2013-06-21 2013-09-25 中国矿业大学 High-water material ground fissure filling system and filling treatment method
CN110944738A (en) * 2017-07-28 2020-03-31 汉高知识产权控股有限责任公司 Method for foaming adhesive and related system
CN207620842U (en) * 2017-12-14 2018-07-17 淮南矿业(集团)有限责任公司 A kind of mine high-water material filling bag fixed frame
CN209917648U (en) * 2019-03-08 2020-01-10 南京豪力液压设备有限公司 AB glue conveyor with reserve defeated material end

Similar Documents

Publication Publication Date Title
CN102425427B (en) Method for constructing tunnel by utilizing shield empty-pushing crossing mine method
CN106121722A (en) A kind of method quickly constructing fire dam
CN104533452A (en) Sectional type grouting reinforcement method for underground coal mine fragmentized coal bodies
CN110821503A (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN102852550A (en) Coal-pillar-free semi-normal-position goaf-side entry retaining method
CN106968676A (en) The method that cavity is passed through in tunnelling
CN104074542B (en) A kind of colliery C0 2concrete formula placement method
CN106837418A (en) A kind of trapezoidal fire dam of mine anti-explosion and its construction method
CN110645005A (en) High-water-rich round gravel stratum earth pressure balance shield rapid tunneling construction method
CN103276735B (en) Integrated form high polymer grouting system
CN102337925B (en) Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving
CN103276736B (en) Trailer-type high polymer grouting system
CN113460562B (en) Method for sealing and storing coal-electricity fly ash in abandoned coal mining space
CN112960942B (en) Thixotropic slurry for earth pressure balance jacking pipe in anhydrous sand layer, preparation method thereof, grouting method and slurry replacement method
CN111648821A (en) Mobile breakdown van for emergency treatment during tunnel collapse
US20230407746A1 (en) Method for filling deformable karst cave
CN206157860U (en) Drainage pipeline
CN111648825A (en) Tunnel collapsed cavity rapid retaining wall and emergency treatment construction process
CN217629927U (en) Steel pipe grout stopping device with steel and flexible combination
CN113217037B (en) Backfill system and backfill method for single shield TBM or behind shield segment wall
CN1047644C (en) Stabilization method for concrete structure pressed and filled by expanded agent cement paste
CN207944990U (en) The quick floodgate wall walling equipment of mine and the quick floodgate wall of mine
CN212200409U (en) Elevation mortar anchor rod
CN203248193U (en) Connecting old lane filling system of underground coal mine
CN114352316B (en) Slurry stirring system for synchronous double-liquid grouting of shield tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200911

RJ01 Rejection of invention patent application after publication