CN111646292A - A bobbin lifting device used in power grid construction - Google Patents

A bobbin lifting device used in power grid construction Download PDF

Info

Publication number
CN111646292A
CN111646292A CN202010449176.0A CN202010449176A CN111646292A CN 111646292 A CN111646292 A CN 111646292A CN 202010449176 A CN202010449176 A CN 202010449176A CN 111646292 A CN111646292 A CN 111646292A
Authority
CN
China
Prior art keywords
support
support ring
power grid
lifting device
grid construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010449176.0A
Other languages
Chinese (zh)
Inventor
高志明
郭炳佐
刁建军
徐宁
王艳亮
林述玲
焦艳玲
于炟
李春晓
唐兴涛
仲丽娜
吴红岩
杨发亮
逄峻
王毓英
郭乃萌
张佳
郭蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN202010449176.0A priority Critical patent/CN111646292A/en
Publication of CN111646292A publication Critical patent/CN111646292A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/32Stands or frameworks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/24Rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/32Stands or frameworks
    • B65H49/324Constructional details
    • B65H49/325Arrangements or adaptations for supporting the shafts, e.g. saddle type shaft bearings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/36Securing packages to supporting devices

Landscapes

  • Jib Cranes (AREA)

Abstract

本发明公开了一种用于电网建设中的线轴升降装置,包括底板,所述底板的一侧表面两端均固定焊接有支柱,所述支柱的两端均固定焊接有中间杆,所述支柱的表面设有内部插孔,所述支柱的表面一端滑动安装有第一支撑环,所述第一支撑环的一侧表面固定焊接有第一支撑板,所述第一支撑板位于支柱的一侧位置,所述第一支撑板的表面固定安装有液压千斤顶,所述液压千斤顶的轴端固定安装有第二支撑板,所述第二支撑板的两端均固定焊接有第二支撑环,所述第二支撑环的侧面滑动安装于立柱的表面,所述第一支撑环和第二支撑环的两侧表面均设有外部插孔,这样能够大大提高使用的便利性和稳定性,保证升降和转运的安全高效性。

Figure 202010449176

The invention discloses a spool lifting device used in power grid construction, comprising a bottom plate, two ends of one side surface of the bottom plate are fixedly welded with pillars, both ends of the pillars are fixedly welded with intermediate rods, and the pillars are fixed and welded. The surface of the pillar is provided with an internal socket, one end of the surface of the pillar is slidably installed with a first support ring, and one side surface of the first support ring is fixedly welded with a first support plate, and the first support plate is located on one side of the pillar. In the lateral position, a hydraulic jack is fixedly installed on the surface of the first support plate, a second support plate is fixedly installed on the shaft end of the hydraulic jack, and a second support ring is fixedly welded on both ends of the second support plate, The side surfaces of the second support ring are slidably installed on the surface of the upright column, and both sides of the first support ring and the second support ring are provided with external sockets, which can greatly improve the convenience and stability of use and ensure that Safe and efficient lifting and transfer.

Figure 202010449176

Description

一种用于电网建设中的线轴升降装置A bobbin lifting device used in power grid construction

技术领域technical field

本发明涉及电力装置领域,更具体地说,涉及一种用于电网建设中的线轴升降装置。The invention relates to the field of electric power devices, and more particularly, to a bobbin lifting device used in power grid construction.

背景技术Background technique

在电网建设过程中,需要进行排线作业,就是将成卷的电线展开,而为了方便操作,需要使用线轴对电线卷筒进行支撑,利于转动展开,这样就需要使用到升降装置来进行支撑定位。In the process of power grid construction, it is necessary to carry out the wiring operation, that is, to unwind the coiled wires. In order to facilitate the operation, it is necessary to use the spool to support the wire reel, which is convenient for rotation and unwinding, so it is necessary to use a lifting device for support and positioning.

但是现有的线轴升降装置多是简单的支撑框架结构,操作时需要通过起吊设备将电线卷筒起吊和放置到上端定位,操作比较麻烦,而且还不利于转运使用,同时针对不同的卷筒,需要的使用高度不同,现有的结构不利于调节,适应性差,有待提出一种新的升降装置。However, most of the existing spool lifting devices are simple supporting frame structures. During operation, the wire reel needs to be lifted and placed to the upper end by lifting equipment, which is troublesome to operate, and is not conducive to transfer and use. At the same time, for different reels, The required use heights are different, the existing structure is not conducive to adjustment, and the adaptability is poor, so a new lifting device needs to be proposed.

发明内容SUMMARY OF THE INVENTION

针对现有技术中存在的问题,本发明的目的在于提供一种用于电网建设中的线轴升降装置,通过在底座上焊接两个支柱,进而通过第一支撑板连接液压千斤顶和第二支撑板,结合两端的支撑环进行导向,结构简单可靠,利于操作进行升降调节,方便稳定,同时通过在两侧安装滚轮,能够倾倒放置后推动,利于转运,这样能够大大提高使用的便利性和稳定性,保证升降和转运的安全高效性。In view of the problems existing in the prior art, the purpose of the present invention is to provide a spool lifting device used in power grid construction, by welding two pillars on the base, and then connecting the hydraulic jack and the second support plate through the first support plate , Combined with the support rings at both ends for guidance, the structure is simple and reliable, which is convenient for operation, lifting adjustment, convenient and stable, and at the same time, by installing rollers on both sides, it can be pushed after being dumped and placed, which is conducive to transfer, which can greatly improve the convenience and stability of use , to ensure the safety and efficiency of lifting and transfer.

为解决上述问题,本发明采用如下的技术方案。In order to solve the above problems, the present invention adopts the following technical solutions.

一种用于电网建设中的线轴升降装置,包括底板,所述底板的一侧表面两端均固定焊接有支柱,所述支柱的两端均固定焊接有中间杆,所述支柱的表面设有内部插孔,所述支柱的表面一端滑动安装有第一支撑环,所述第一支撑环的一侧表面固定焊接有第一支撑板,所述第一支撑板位于支柱的一侧位置,所述第一支撑板的表面固定安装有液压千斤顶,所述液压千斤顶的轴端固定安装有第二支撑板,所述第二支撑板的两端均固定焊接有第二支撑环,所述第二支撑环的侧面滑动安装于立柱的表面,所述第一支撑环和第二支撑环的两侧表面均设有外部插孔,所述外部插孔的侧面滑动插接有连接杆,所述连接杆的表面滑动连接于内部插孔的侧面。A spool lifting device used in power grid construction, comprising a bottom plate, two ends of one side surface of the bottom plate are fixedly welded with pillars, both ends of the pillars are fixedly welded with intermediate rods, and the surface of the pillars is provided with An internal jack, a first support ring is slidably installed on one end of the surface of the support, a first support plate is fixedly welded on one side surface of the first support ring, and the first support plate is located on one side of the support, so The surface of the first support plate is fixedly installed with a hydraulic jack, the shaft end of the hydraulic jack is fixedly installed with a second support plate, and both ends of the second support plate are fixedly welded with a second support ring, and the second support ring is fixedly welded on both ends of the second support plate. The side surface of the support ring is slidably installed on the surface of the upright column, the two side surfaces of the first support ring and the second support ring are provided with external sockets, and the sides of the external sockets are slidably inserted with connecting rods, and the connection The surface of the rod is slidably attached to the side of the internal socket.

进一步的,所述连接杆为U型结构,且直径为三厘米至四厘米,通过采用U型结构的连接杆,利于定位支撑,避免脱落,方便稳定。Further, the connecting rod is of a U-shaped structure and has a diameter of three to four centimeters. By adopting the connecting rod of the U-shaped structure, it is convenient for positioning and support, avoiding falling off, and being convenient and stable.

进一步的,所述第一支撑环和第二支撑环的两端表面均固定连接有定位块,所述定位块的侧面设有定位孔,所述定位孔的侧面滑动套接于连接杆的另一端表面,通过定位插接到定位孔内部,可以辅助定位,避免转动错位,提高定位支撑的安全性。Further, the two end surfaces of the first support ring and the second support ring are fixedly connected with positioning blocks, the sides of the positioning blocks are provided with positioning holes, and the sides of the positioning holes are slidably sleeved on the other side of the connecting rod. The surface of one end is inserted into the positioning hole by positioning, which can assist positioning, avoid rotation dislocation, and improve the safety of positioning support.

进一步的,所述第二支撑板的另一侧表面固定焊接有支撑座,所述第二支撑座的侧面设有弧形支撑槽,通过在支撑座上设置弧形支撑槽,可以对横向杆定位连接,方便转动,利于使用。Further, a support seat is fixedly welded on the other side surface of the second support plate, and the side surface of the second support seat is provided with an arc-shaped support groove. Positioning connection, easy to rotate and easy to use.

进一步的,所述弧形支撑槽的侧面滑动连接有横向杆,所述横向杆的两端均设有限位通孔,通过安装横向杆,利于对电线卷筒进行支撑定位,方便转动展开,稳定高效。Further, a lateral rod is slidably connected to the side of the arc-shaped support groove, and both ends of the lateral rod are provided with limit through holes. By installing the lateral rod, it is beneficial to support and position the wire reel, facilitate rotation and deployment, and stabilize the wire reel. Efficient.

进一步的,所述限位通孔的侧面滑动安装有限位螺栓,所述限位螺栓的侧面位于支撑座的侧面位置,通过在横向杆两端安装限位螺栓,可以在支撑座两端限位,避免窜动,保证支撑的稳定性。Further, a limit bolt is slidably installed on the side of the limit through hole, and the side of the limit bolt is located at the side of the support seat. By installing limit bolts at both ends of the transverse rod, the limit bolts can be limited at both ends of the support seat , to avoid movement and ensure the stability of the support.

进一步的,所述底板的一侧表面两端固定连接有倾斜座,所述倾斜座的另一端转动安装有第一滚轮,通过在底板两侧安装第一滚轮,可以辅助支撑,方便转运移动。Further, two ends of one side surface of the bottom plate are fixedly connected with a tilting seat, and the other end of the tilting seat is rotatably installed with a first roller. By installing the first roller on both sides of the bottom plate, it can assist support and facilitate transfer and movement.

进一步的,所述中间杆的两端均固定连接有辅助杆,所述辅助杆的另一端转动安装有第二滚轮,通过辅助杆安装第二滚轮,能够从另一端支撑,利于平衡,保证稳定性。Further, both ends of the middle rod are fixedly connected with auxiliary rods, the other end of the auxiliary rod is rotatably installed with a second roller, and the second roller is installed through the auxiliary rod, which can be supported from the other end, which is conducive to balance and ensures stability. sex.

进一步的,所述立柱有两个,且对称焊接于底板的两侧表面。Further, there are two said uprights, and they are symmetrically welded to the two side surfaces of the bottom plate.

相比于现有技术,本发明的优点在于:Compared with the prior art, the advantages of the present invention are:

(1)本方案通过在底座上焊接两个支柱,进而通过第一支撑板连接液压千斤顶和第二支撑板,结合两端的支撑环进行导向,结构简单可靠,利于操作进行升降调节,方便稳定。(1) In this scheme, two pillars are welded on the base, and then the hydraulic jack and the second support plate are connected through the first support plate, combined with the support rings at both ends for guidance.

(2)通过采用U型结构的连接杆,利于定位支撑,避免脱落,方便稳定。(2) By adopting the connecting rod of U-shaped structure, it is conducive to positioning and support, avoiding falling off, and being convenient and stable.

(3)通过定位插接到定位孔内部,可以辅助定位,避免转动错位,提高定位支撑的安全性。(3) By positioning and inserting into the positioning hole, it can assist positioning, avoid rotation dislocation, and improve the safety of positioning support.

(4)通过在支撑座上设置弧形支撑槽,可以对横向杆定位连接,方便转动,利于使用。(4) By setting the arc-shaped support groove on the support seat, the horizontal rod can be positioned and connected, which is convenient for rotation and use.

(5)通过安装横向杆,利于对电线卷筒进行支撑定位,方便转动展开,稳定高效。(5) By installing the horizontal rod, it is beneficial to support and position the wire reel, which is convenient to rotate and unfold, and is stable and efficient.

(6)通过在横向杆两端安装限位螺栓,可以在支撑座两端限位,避免窜动,保证支撑的稳定性。(6) By installing limit bolts at both ends of the transverse rod, the position of the support seat can be limited at both ends to avoid movement and ensure the stability of the support.

(7)通过在底板两侧安装第一滚轮,可以辅助支撑,方便转运移动。(7) By installing the first rollers on both sides of the bottom plate, it can assist the support and facilitate the transfer and movement.

(8)通过辅助杆安装第二滚轮,能够从另一端支撑,利于平衡,保证稳定性。(8) The second roller is installed through the auxiliary rod, which can be supported from the other end, which is beneficial to balance and ensure stability.

附图说明Description of drawings

图1为本发明的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present invention;

图2为本发明的连接杆插接定位的横截面示意图;FIG. 2 is a schematic cross-sectional view of the plug-in positioning of the connecting rod of the present invention;

图3为本发明的图1中横向杆连接的A处放大图;Fig. 3 is the enlarged view of the A part of the transverse rod connection in Fig. 1 of the present invention;

图4为本发明的第一滚轮连接的局部侧面示意图。FIG. 4 is a partial side view of the connection of the first roller according to the present invention.

图中标号说明:Description of the labels in the figure:

1底板、11立柱、12中间杆、13内部插孔、14第一支撑环、15第一支撑板、16液压千斤顶、17第二支撑板、18第二支撑环、2外部插孔、21连接杆、22定位块、23定位孔、24支撑座、25弧形支撑槽、26横向杆、27限位通孔、28限位螺栓、3倾斜座、31第一滚轮、32辅助杆、33第二滚轮。1 bottom plate, 11 column, 12 middle rod, 13 inner socket, 14 first support ring, 15 first support plate, 16 hydraulic jack, 17 second support plate, 18 second support ring, 2 external socket, 21 connection Rod, 22 positioning block, 23 positioning hole, 24 support seat, 25 arc support groove, 26 transverse rod, 27 limit through hole, 28 limit bolt, 3 tilt seat, 31 first roller, 32 auxiliary rod, 33 first Two rollers.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述;显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例,基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. The embodiments of the present invention, and all other embodiments obtained by those of ordinary skill in the art without creative work, fall within the protection scope of the present invention.

请参阅图1-4,一种用于电网建设中的线轴升降装置,包括底板1,请参阅图1和图2,底板1的一侧表面两端均固定焊接有支柱11,支柱11的两端均固定焊接有中间杆12,增强结构强度,保证两个支柱1连接的稳定性,支柱11的表面设有内部插孔13,支柱11的表面一端滑动安装有第一支撑环14,第一支撑环14的一侧表面固定焊接有第一支撑板15,可以进行稳定支撑,方便升降调节使用,第一支撑板15位于支柱11的一侧位置,第一支撑板15的表面固定安装有液压千斤顶16,可以手动操作进行升降,利于操作使用,液压千斤顶16的轴端固定安装有第二支撑板17,第二支撑板17的两端均固定焊接有第二支撑环18,能够进行导向定位,方便稳定,利于调节使用,第二支撑环18的侧面滑动安装于立柱11的表面,第一支撑环14和第二支撑环18的两侧表面均设有外部插孔2,外部插孔2的侧面滑动插接有连接杆21,连接杆21的表面滑动连接于内部插孔13的侧面,第一支撑环14和第二支撑环18的两端表面均固定连接有定位块22,通过定位孔23连接U型结构的连接杆21,利于辅助定位,避免转动错位,安全稳定,定位块22的侧面设有定位孔23,定位孔23的侧面滑动套接于连接杆21的另一端表面。Please refer to Figures 1-4, a spool lifting device used in power grid construction, including a bottom plate 1, please refer to Figures 1 and 2, a column 11 is fixedly welded on both ends of one side surface of the bottom plate 1, and two sides of the column 11 are fixed and welded. Both ends are fixedly welded with an intermediate rod 12, which enhances the structural strength and ensures the stability of the connection between the two pillars 1. The surface of the pillar 11 is provided with an internal socket 13, and one end of the surface of the pillar 11 is slidably installed with a first support ring 14. One side surface of the support ring 14 is fixedly welded with a first support plate 15, which can be stably supported and is convenient for lifting and adjusting use. The first support plate 15 is located on one side of the pillar 11, and a hydraulic The jack 16 can be lifted and lowered by manual operation, which is convenient for operation and use. The shaft end of the hydraulic jack 16 is fixedly installed with a second support plate 17, and both ends of the second support plate 17 are fixedly welded with a second support ring 18, which can be guided and positioned. , convenient and stable, easy to adjust and use, the side surface of the second support ring 18 is slidably installed on the surface of the column 11, the two side surfaces of the first support ring 14 and the second support ring 18 are provided with an external socket 2, and the external socket 2 A connecting rod 21 is slidably inserted into the side of the connecting rod 21, the surface of the connecting rod 21 is slidably connected to the side of the inner socket 13, and the two end surfaces of the first support ring 14 and the second support ring 18 are fixedly connected with positioning blocks 22. The hole 23 is connected to the connecting rod 21 of the U-shaped structure, which is conducive to auxiliary positioning, avoids rotational dislocation, and is safe and stable.

请参阅图1和图3,第二支撑板17的另一侧表面固定焊接有支撑座24,第二支撑座24的侧面设有弧形支撑槽25,弧形支撑槽25的侧面滑动连接有横向杆26,横向杆26的两端均设有限位通孔27,限位通孔27的侧面滑动安装有限位螺栓28,限位螺栓28的侧面位于支撑座24的侧面位置,可以将横向杆26穿过电线卷筒,然后放置弧形定位槽25内部,再两端连接限位螺栓28进行限位,避免轴向窜动,方便稳定,进而对电线卷筒进行稳定支撑,利于转动展开,方便排线,提高电网建设的安全高效性。Please refer to FIG. 1 and FIG. 3 , a support seat 24 is fixedly welded on the other side surface of the second support plate 17 , the side surface of the second support seat 24 is provided with an arc-shaped support groove 25 , and the side surface of the arc-shaped support groove 25 is slidably connected with a The transverse rod 26, the two ends of the transverse rod 26 are provided with limit through holes 27, the side of the limit through hole 27 is slidably installed with a limit bolt 28, and the side of the limit bolt 28 is located on the side of the support seat 24. 26 passes through the wire reel, and then is placed inside the arc-shaped positioning groove 25, and the limit bolts 28 are connected at both ends to limit the position to avoid axial movement and facilitate stability. It is convenient to arrange cables and improve the safety and efficiency of power grid construction.

请参阅图1和图4,底板1的一侧表面两端固定连接有倾斜座3,倾斜座3的另一端转动安装有第一滚轮31,中间杆12的两端均固定连接有辅助杆32,辅助杆32的另一端转动安装有第二滚轮33,正常使用时不会干涉,而转运时可以倾倒放置,通过第一滚轮31和第二滚轮33支撑,利于移动位置,方便使用。Please refer to FIG. 1 and FIG. 4 , two ends of one side surface of the bottom plate 1 are fixedly connected with a tilting seat 3 , the other end of the tilting seat 3 is rotatably mounted with a first roller 31 , and both ends of the middle rod 12 are fixedly connected with auxiliary rods 32 , the other end of the auxiliary rod 32 is rotatably installed with a second roller 33, which will not interfere during normal use, but can be tilted and placed during transport, supported by the first roller 31 and the second roller 33, which is convenient for moving position and convenient for use.

使用时,可以将两个底板1配对使用,相对放置到平整路面上,然后可以将横向杆26穿过电线卷筒,然后放置弧形定位槽25内部,再两端连接限位螺栓28进行限位,避免轴向窜动,方便稳定,进而对电线卷筒进行稳定支撑,利于转动展开,方便排线,提高电网建设的安全高效性,接着可以将U型结构的连接杆插入到第一支撑环14的外部插孔内部,能够稳定连接进行支撑,操作液压千斤顶16伸出,可以推动第二支撑板17和第二支撑环18升高,也就可以带着横向杆26和卷筒升高,然后使用另外的连接杆插入第二支撑环18固定高度,松开第一支撑环14内部的连接杆21,控制液压千斤顶16泄压收缩,可以带着第一支撑板15升高一格高度,再次锁定第一支撑环14,这样循环操作,可以持续升高,反向操作可以降低,利于使用,驱动结构简单高效,安全稳定。When in use, the two base plates 1 can be paired and placed on a flat road opposite to each other, and then the transverse rod 26 can be passed through the wire reel, and then placed inside the arc-shaped positioning groove 25, and then the limit bolts 28 are connected at both ends for limiting. Positioning, avoiding axial movement, convenient and stable, and then stably supporting the wire reel, which is conducive to rotation and deployment, facilitates wiring, and improves the safety and efficiency of power grid construction. Then, the connecting rod of the U-shaped structure can be inserted into the first support. The inside of the outer socket of the ring 14 can be stably connected for support, and the hydraulic jack 16 can be operated to extend, which can push the second support plate 17 and the second support ring 18 to rise, and can also take the transverse rod 26 and the reel to rise. , and then use another connecting rod to insert the second support ring 18 to fix the height, loosen the connecting rod 21 inside the first support ring 14, control the hydraulic jack 16 to release the pressure and contract, and the first support plate 15 can be raised by one grid height , and lock the first support ring 14 again, so that the cyclic operation can continue to rise, and the reverse operation can be lowered, which is convenient for use, and the driving structure is simple, efficient, safe and stable.

以上所述,仅为本发明较佳的具体实施方式;但本发明的保护范围并不局限于此。任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其改进构思加以等同替换或改变,都应涵盖在本发明的保护范围内。The above description is only a preferred embodiment of the present invention; however, the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical scope of the present invention, according to the technical solution of the present invention and its improvement concept, equivalently replaces or changes, should be covered within the protection scope of the present invention.

Claims (9)

1.一种用于电网建设中的线轴升降装置,包括底板(1),其特征在于:所述底板(1)的一侧表面两端均固定焊接有支柱(11),所述支柱(11)的两端均固定焊接有中间杆(12),所述支柱(11)的表面设有内部插孔(13),所述支柱(11)的表面一端滑动安装有第一支撑环(14),所述第一支撑环(14)的一侧表面固定焊接有第一支撑板(15),所述第一支撑板(15)位于支柱(11)的一侧位置,所述第一支撑板(15)的表面固定安装有液压千斤顶(16),所述液压千斤顶(16)的轴端固定安装有第二支撑板(17),所述第二支撑板(17)的两端均固定焊接有第二支撑环(18),所述第二支撑环(18)的侧面滑动安装于立柱(11)的表面,所述第一支撑环(14)和第二支撑环(18)的两侧表面均设有外部插孔(2),所述外部插孔(2)的侧面滑动插接有连接杆(21),所述连接杆(21)的表面滑动连接于内部插孔(13)的侧面。1. A spool lifting device used in power grid construction, comprising a bottom plate (1), characterized in that: the two ends of one side surface of the bottom plate (1) are fixedly welded with pillars (11), and the pillars (11) ) are fixedly welded with intermediate rods (12), the surface of the strut (11) is provided with an inner socket (13), and one end of the surface of the strut (11) is slidably installed with a first support ring (14) , a first support plate (15) is fixedly welded on one side surface of the first support ring (14), the first support plate (15) is located at one side of the pillar (11), and the first support plate (15) A hydraulic jack (16) is fixedly installed on the surface of (15), a second support plate (17) is fixedly installed on the shaft end of the hydraulic jack (16), and both ends of the second support plate (17) are fixedly welded There is a second support ring (18), the side surface of the second support ring (18) is slidably mounted on the surface of the column (11), and the two sides of the first support ring (14) and the second support ring (18) The surfaces are provided with external jacks (2), the sides of the external jacks (2) are slidably inserted with connecting rods (21), and the surfaces of the connecting rods (21) are slidably connected to the inner jacks (13). side. 2.根据权利要求1所述的一种用于电网建设中的线轴升降装置,其特征在于:所述连接杆(21)为U型结构,且直径为三厘米至四厘米。2 . The bobbin lifting device used in power grid construction according to claim 1 , wherein the connecting rod ( 21 ) is a U-shaped structure and has a diameter of three to four centimeters. 3 . 3.根据权利要求1所述的一种用于电网建设中的线轴升降装置,其特征在于:所述第一支撑环(14)和第二支撑环(18)的两端表面均固定连接有定位块(22),所述定位块(22)的侧面设有定位孔(23),所述定位孔(23)的侧面滑动套接于连接杆(21)的另一端表面。3. A bobbin lifting device used in power grid construction according to claim 1, characterized in that: both end surfaces of the first support ring (14) and the second support ring (18) are fixedly connected with A positioning block (22) is provided with a positioning hole (23) on the side surface of the positioning block (22), and the side surface of the positioning hole (23) is slidably sleeved on the other end surface of the connecting rod (21). 4.根据权利要求1所述的一种用于电网建设中的线轴升降装置,其特征在于:所述第二支撑板(17)的另一侧表面固定焊接有支撑座(24),所述第二支撑座(24)的侧面设有弧形支撑槽(25)。4. A bobbin lifting device for power grid construction according to claim 1, characterized in that a support seat (24) is fixedly welded on the other side surface of the second support plate (17), and the The side surface of the second support seat (24) is provided with an arc-shaped support groove (25). 5.根据权利要求4所述的一种用于电网建设中的线轴升降装置,其特征在于:所述弧形支撑槽(25)的侧面滑动连接有横向杆(26),所述横向杆(26)的两端均设有限位通孔(27)。The bobbin lifting device used in power grid construction according to claim 4, characterized in that: a lateral rod (26) is slidably connected to the side of the arc-shaped support groove (25), and the lateral rod ( Both ends of 26) are provided with limit through holes (27). 6.根据权利要求5所述的一种用于电网建设中的线轴升降装置,其特征在于:所述限位通孔(27)的侧面滑动安装有限位螺栓(28),所述限位螺栓(28)的侧面位于支撑座(24)的侧面位置。The bobbin lifting device used in power grid construction according to claim 5, characterized in that: a limit bolt (28) is slidably installed on the side of the limit through hole (27), and the limit bolt The side of (28) is located at the side of the support seat (24). 7.根据权利要求1所述的一种用于电网建设中的线轴升降装置,其特征在于:所述底板(1)的一侧表面两端固定连接有倾斜座(3),所述倾斜座(3)的另一端转动安装有第一滚轮(31)。7 . The bobbin lifting device used in power grid construction according to claim 1 , characterized in that: two ends of one side surface of the bottom plate ( 1 ) are fixedly connected with inclined seats ( 3 ), and the inclined seats The other end of (3) is rotatably installed with a first roller (31). 8.根据权利要求1所述的一种用于电网建设中的线轴升降装置,其特征在于:所述中间杆(12)的两端均固定连接有辅助杆(32),所述辅助杆(32)的另一端转动安装有第二滚轮(33)。8. The bobbin lifting device used in power grid construction according to claim 1, characterized in that: both ends of the intermediate rod (12) are fixedly connected with auxiliary rods (32), and the auxiliary rods ( The other end of 32) is rotatably installed with a second roller (33). 9.根据权利要求1所述的一种用于电网建设中的线轴升降装置,其特征在于:所述立柱(1)有两个,且对称焊接于底板(1)的两侧表面。9 . The bobbin lifting device used in power grid construction according to claim 1 , characterized in that: there are two said uprights ( 1 ), which are symmetrically welded to both side surfaces of the bottom plate ( 1 ). 10 .
CN202010449176.0A 2020-05-25 2020-05-25 A bobbin lifting device used in power grid construction Pending CN111646292A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010449176.0A CN111646292A (en) 2020-05-25 2020-05-25 A bobbin lifting device used in power grid construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010449176.0A CN111646292A (en) 2020-05-25 2020-05-25 A bobbin lifting device used in power grid construction

Publications (1)

Publication Number Publication Date
CN111646292A true CN111646292A (en) 2020-09-11

Family

ID=72344718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010449176.0A Pending CN111646292A (en) 2020-05-25 2020-05-25 A bobbin lifting device used in power grid construction

Country Status (1)

Country Link
CN (1) CN111646292A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101789570A (en) * 2010-03-30 2010-07-28 中国第一冶金建设有限责任公司 Methods for manufacturing and using cable-laying tool for cable coil in construction site
CN204400314U (en) * 2015-01-22 2015-06-17 株洲电力勘测设计科研有限责任公司 A kind of interval distribution equipment
CN106241487A (en) * 2016-08-31 2016-12-21 国网河南襄城县供电公司 Electrical lead actinobacillus device
US20180170706A1 (en) * 2016-12-20 2018-06-21 Sonoco Development Incorporated Devices for lifting, maneuvering, winding and unwinding reels
CN208135600U (en) * 2018-03-29 2018-11-23 洛阳龙键变压器有限公司 A kind of large size wire and cable spiral wheeled support device
CN109484912A (en) * 2018-10-19 2019-03-19 杭州大弘科技有限公司 A kind of spiral feed carrier of textile machinery
CN208631793U (en) * 2018-05-23 2019-03-22 洛阳锐亿自动化工程技术有限公司 A kind of cable unwinding device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101789570A (en) * 2010-03-30 2010-07-28 中国第一冶金建设有限责任公司 Methods for manufacturing and using cable-laying tool for cable coil in construction site
CN204400314U (en) * 2015-01-22 2015-06-17 株洲电力勘测设计科研有限责任公司 A kind of interval distribution equipment
CN106241487A (en) * 2016-08-31 2016-12-21 国网河南襄城县供电公司 Electrical lead actinobacillus device
US20180170706A1 (en) * 2016-12-20 2018-06-21 Sonoco Development Incorporated Devices for lifting, maneuvering, winding and unwinding reels
CN208135600U (en) * 2018-03-29 2018-11-23 洛阳龙键变压器有限公司 A kind of large size wire and cable spiral wheeled support device
CN208631793U (en) * 2018-05-23 2019-03-22 洛阳锐亿自动化工程技术有限公司 A kind of cable unwinding device
CN109484912A (en) * 2018-10-19 2019-03-19 杭州大弘科技有限公司 A kind of spiral feed carrier of textile machinery

Similar Documents

Publication Publication Date Title
JP2016210622A (en) Method of operating crane, and crane
CN116062604A (en) Crane capable of preventing horizontal shaking
CN206865086U (en) A kind of vertical type pay off rack mounting auxiliary
CN203877789U (en) Lifting and conveying device for power equipment
CN115924652A (en) Cable pay-off device and method of use
CN216662306U (en) Tool for mounting outdoor transformer
CN111646292A (en) A bobbin lifting device used in power grid construction
JP2002097819A (en) Transmission tower assembling method and transmission tower assembling apparatus
CN116281546B (en) A lifting device for steel cage
CN116873778A (en) Industrial factory steel structure hoisting device and its construction method
CN106379829A (en) Material lifting system for construction machinery
CN215326564U (en) Support hoisting device
CN115881397A (en) Large transformer bushing installation equipment and installation method
CN115504384A (en) Indoor substation equipment maintenance gallows
CN211004327U (en) Portable pole wire lifter
CN223561054U (en) Auxiliary lifting device for lifter and lifter
CN223047206U (en) Cable well lid lifts up device
CN118723838B (en) Light pole movable mounting table and use method
CN115613881B (en) Pole-lifting device and its usage method
CN219287025U (en) Portable electric power insulating support
JP3218531B2 (en) Supporting method of lifting type receiving stage, lifting type receiving stage device, and lifting method of lifting type receiving stage device
CN217600089U (en) A cable pay-off device
CN220223314U (en) Industrial factory steel structure lifting device
CN219906793U (en) Detachable fixed elevator
CN116002504B (en) Equipment installation lifting machine on electric wire supporting circuit column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200911

RJ01 Rejection of invention patent application after publication