CN111636658A - Construction device and construction method for building decoration wall surface - Google Patents

Construction device and construction method for building decoration wall surface Download PDF

Info

Publication number
CN111636658A
CN111636658A CN202010486699.2A CN202010486699A CN111636658A CN 111636658 A CN111636658 A CN 111636658A CN 202010486699 A CN202010486699 A CN 202010486699A CN 111636658 A CN111636658 A CN 111636658A
Authority
CN
China
Prior art keywords
construction
frame
wall surface
guide rails
steel frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010486699.2A
Other languages
Chinese (zh)
Other versions
CN111636658B (en
Inventor
吴宇恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhanyi Decoration Group Co ltd
Original Assignee
Shenzhen Zhanyi Decoration Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhanyi Decoration Group Co ltd filed Critical Shenzhen Zhanyi Decoration Group Co ltd
Priority to CN202010486699.2A priority Critical patent/CN111636658B/en
Publication of CN111636658A publication Critical patent/CN111636658A/en
Application granted granted Critical
Publication of CN111636658B publication Critical patent/CN111636658B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a building decoration wall surface construction device and a construction method thereof, and relates to the technical field of building decoration. The calibration line is attached to the decorative plate in the lifting process of the decorative plate, so that the possibility of rotation of the decorative plate can be effectively reduced, the lifting process is more stable, meanwhile, a constructor divides the position of the wall surface through the calibration line, and can quickly and accurately install the decorative plate on the wall surface by referring to the position of the calibration line, and the use is more convenient.

Description

Construction device and construction method for building decoration wall surface
Technical Field
The invention relates to the technical field of building decoration, in particular to a building decoration wall surface construction device and a construction method thereof.
Background
In order to protect the main structure of the building, improve the use function of the building and beautify the building, the decoration materials or ornaments are adopted to carry out various treatment processes on the inner surface, the outer surface and the space of the building, a new decoration surface is covered on the existing building main body, the further design of the space effect of the existing building is also a means for improving and making up the shortages of the building space, and the building space meets the use requirements and is more personalized. The architectural decoration can enable the building to meet the visual and tactile enjoyment of people, and further improves the space quality of the building, so the architectural decoration becomes an indispensable part of modern architectural engineering.
In the interior wall decoration and finishing process, all need use the hoist and mount system, in traditional hoist and mount system, owing to lack the location auxiliary component, when decorative board or other wall embellishments installation, the staff relies on experience installation decorative board mostly, hardly guarantees the installation accuracy of decorative board, and when current hoist and mount system hoisted the decorative board simultaneously, the decorative board was rotatory easily, has increased the range of rocking of decorative board, has great potential safety hazard.
Disclosure of Invention
In order to solve the problems in the prior art, the invention aims to provide a building decoration wall surface construction device and a construction method thereof.
In order to achieve the purpose, the invention provides the following technical scheme:
a building decoration wall surface construction device comprises a main body steel frame, a keel frame, a suspension device and a construction platform, wherein the keel frame is fixedly installed on the main body steel frame through screws, one side of the keel frame extends to the outer side of the main body steel frame, the suspension device is arranged on one side, protruding out of the main body steel frame, of the keel frame, the construction platform is arranged on the inner side of the main body steel frame in a lifting mode, a traction device is arranged at the top of the main body steel frame, and the traction device drives the construction platform to move in the vertical direction;
the suspension device includes two sets of transverse distribution's first guide rail, a set of vertical distribution's second guide rail and electric hoist, the setting of second guide rail slidability is on two sets of first guide rails, and the second guide rail can slide along the extending direction of first guide rail, the setting of electric hoist slidability is on the second guide rail, and the electric hoist can slide along the extending direction of second guide rail, the bottom of first guide rail still is provided with U type frame, the one end of second guide rail extends to inside the U type frame, and the inner wall contactless of second guide rail and U type frame, U type frame fixed mounting has the third guide rail bottom of first guide rail, be provided with the slide mechanism of a plurality of quantities on the third guide rail, the equal fixedly connected with calibration line in slide mechanism's bottom, the perpendicular downward distribution of calibration line and bottom are provided with the counterweight.
As a further scheme of the invention: bolt fixedly connected with supporting steel plate is passed through to keel frame's bottom, supporting steel plate pass through the fix with screw on the main part steelframe, the inner wall top of main part steelframe is provided with the screw rod, the bottom and the supporting steel plate threaded connection of screw rod, and the surperficial threaded connection of screw rod has lock nut.
As a still further scheme of the invention: draw gear includes axis of rotation, drive case and traction cable, the traction cable run through the main part steelframe and with construction platform fixed connection, the axis of rotation runs through the drive case and rotates with the drive case to be connected, the inside of drive case is provided with brake motor, the equal fixedly connected with intermeshing's in surface of brake motor's output shaft and axis of rotation gear, the both ends of axis of rotation all are provided with the wire reel that is used for receiving and releasing the traction cable, the traction cable coils on the wire reel.
As a still further scheme of the invention: the transmission mechanism is characterized in that a polish rod is further arranged inside the driving box, brake teeth are in clearance fit with the surface of the polish rod, an electric push rod is arranged on one side inside the driving box, the electric push rod is fixedly connected with the brake teeth and used for pushing the brake teeth to move, the brake teeth are clamped with the adjacent gears, and the brake teeth are used for braking the rotating shaft.
As a still further scheme of the invention: the inner wall of the brake tooth is provided with a raised key, the surface of the polish rod is provided with a key groove matched with the raised key, and the raised key is clamped inside the key groove.
As a still further scheme of the invention: the two sides of the construction platform are provided with two clamping plates, and the clamping plates are clamped on the vertical beams of the main steel frame.
As a still further scheme of the invention: the sliding mechanism comprises a sliding frame clamped on the third guide rail, rollers moving along the third guide rail are arranged inside the sliding frame, a servo motor is arranged on one side of the sliding frame, and an output shaft of the servo motor penetrates through the third guide rail and is fixedly connected with one of the rollers.
As a still further scheme of the invention: the counterweight is one of a plumb bob or a locking steel plate.
As a still further scheme of the invention: the second guide rail is also connected with the first guide rail in a sliding mode through a sliding mechanism.
The invention also provides a construction method for the wall surface construction of building decoration, which comprises the following steps:
s1, selecting a position close to a wall surface, erecting a main steel frame, and installing a suspension device, a traction device and a construction platform on the main steel frame;
s2, installing a base keel on the wall surface;
s3, adjusting the positions of the plurality of calibration lines, and fixing the calibration lines to enable the distance between every two adjacent calibration lines to be equal to the width of the wall decoration plate;
s4, driving the construction platform to move by a traction device, so that the construction platform moves to the height of the wall surface where the decorative plate needs to be installed;
s5, next, using a suspension device to lift the decorative plate and move the decorative plate to a position needing to be installed, and then installing the decorative plate on the keel of the base layer by a constructor through a calibration line;
and S6, repeating the steps S4-S5 until all the decorative boards on the wall surface are installed.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, a plurality of calibration lines are additionally arranged on the third guide rail, in the construction process, the distance between adjacent calibration lines is adjusted according to the width of the decorative plate, so that the decorative plate is matched with the width of the plate, then the calibration lines are straightened through the counterweight, when the decorative plate is lifted, the decorative plate is driven to move through the electric hoist, so that the decorative plate is attached to the calibration lines, then the electric hoist pulls the decorative plate upwards in the working process, the calibration lines are attached to the decorative plate, the possibility of rotation of the decorative plate can be effectively reduced, the lifting process is more stable, meanwhile, constructors divide the position of the wall surface through the calibration lines, and the decorative plate can be quickly and accurately installed on the wall surface by referring to the position of the calibration lines, so that the decorative plate is more convenient to use;
2. according to the invention, the screw rod is arranged on the support steel plate, the screw rod is limited through the top of the main steel frame, the support steel plate is pressed by the screw rod, the overall stability of the keel frame is improved, and the keel frame cannot be stressed to incline or deflect when the decorative plate is lifted;
3. according to the invention, the brake teeth are arranged in the driving box, when the traction device drives the construction platform to move to the set height, the brake motor stops, the brake teeth are pushed by the electric push rod to move, and the brake teeth are clamped at the gear clamping teeth adjacent to the brake teeth for locking the gear, so that the effect of fixing the rotating shaft is achieved by fixing the gear, and the possibility that the construction platform suddenly falls in the use process is effectively avoided.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the suspension apparatus of the present invention;
FIG. 3 is a schematic structural view of the traction device of the present invention;
FIG. 4 is a schematic structural view of the sliding mechanism of the present invention;
FIG. 5 is a cross-sectional view of the drive housing of the present invention;
FIG. 6 is a distribution diagram of the gear and brake teeth of the present invention;
FIG. 7 is an enlarged view taken at A of FIG. 1 in accordance with the present invention;
FIG. 8 is an enlarged view taken at C of FIG. 2 in accordance with the present invention;
fig. 9 is an enlarged view of the invention at B in fig. 2.
In the figure: 1. a main steel frame; 2. a keel frame; 3. a traction device; 301. a rotating shaft; 302. a drive box; 303. a traction cable; 304. a brake motor; 305. a gear; 306. a polish rod; 307. a brake tooth; 308. an electric push rod; 309. a wire spool; 4. a support steel plate; 5. a screw; 6. a first guide rail; 7. a second guide rail; 8. an electric hoist; 9. a U-shaped frame; 10. a third guide rail; 11. a sliding mechanism; 1101. a carriage; 1102. a roller; 1103. a servo motor; 12. calibrating the line; 13. a counterweight; 14. and (4) clamping the board.
Detailed Description
The invention is described in further detail below with reference to the accompanying drawings
Example 1
Referring to fig. 1 to 9, in the embodiment of the invention, a building decoration wall surface construction device comprises a main body steel frame 1, a keel frame 2, a suspension device and a construction platform, wherein the keel frame 2 is fixedly installed on the main body steel frame 1 through screws, one side of the keel frame 2 extends to the outer side of the main body steel frame 1, the suspension device is arranged on one side of the keel frame 2 protruding out of the main body steel frame 1, the construction platform is arranged on the inner side of the main body steel frame 1 in a lifting manner, a traction device 3 is arranged at the top of the main body steel frame 1, and the traction device 3 drives the construction platform to move along the vertical direction;
referring to fig. 9, the suspension device includes two sets of first guide rails 6 distributed transversely, a set of second guide rails 7 distributed vertically, and an electric hoist 8, the second guide rails 7 are slidably disposed on the two sets of first guide rails 6, the second guide rails 7 are slidable along the extending direction of the first guide rails 6, the electric hoist 8 is slidably disposed on the second guide rails 7, the electric hoist 8 is slidable along the extending direction of the second guide rails 7, a U-shaped frame 9 is further disposed at the bottom of the first guide rails 6, one end of the second guide rails 7 extends into the U-shaped frame 9, the second guide rails 7 are not in contact with the inner wall of the U-shaped frame 9, so as to prevent the U-shaped frame 9 from obstructing the movement of the second guide rails 7, a third guide rail 10 is fixedly mounted at the bottom of the first guide rails 6 through the U-shaped frame 9, a plurality of sliding mechanisms 11 are disposed on the third guide rails 10, the bottoms of the sliding mechanisms 11 are all fixedly connected with calibration lines 12, the calibration line 12 is vertically distributed downwards, the bottom end of the calibration line is provided with a counterweight 13, the electric hoist 8 moves on the second guide rail 7, the vertical movement in the hoisting process is realized, and meanwhile, the second guide rail 7 moves transversely through the sliding mechanism 11, so that the effect of adjusting the transverse position of the decorative plate can be achieved.
Referring to fig. 1, fig. 7, bolt fixedly connected with supporting steel plate 4 is passed through to keel frame 2's bottom, supporting steel plate 4 passes through the fix with screw on main part steelframe 1, main part steelframe 1's inner wall top is provided with screw rod 5, screw rod 5's bottom and supporting steel plate 4 threaded connection, and screw rod 5's surperficial threaded connection has lock nut, set up screw rod 5 on supporting steel plate 4, it is spacing to screw rod 5 through main part steelframe 1 top, push down supporting steel plate 4 with the help of screw rod 5, and lock nut is used for receiving supporting steel plate 4's pressure to screw rod 5 and shares, reduce the loss of the screw thread on screw rod 5 surface, keel frame 2 holistic stability has been improved, when lifting by crane the decorative board, keel frame 2 atre.
Referring to fig. 3 and 5, the traction device 3 includes a rotation shaft 301, a driving box 302 and a traction cable 303, the traction cable 303 penetrates through the main steel frame 1 and is fixedly connected with the construction platform, the rotation shaft 301 penetrates through the driving box 302 and is rotatably connected with the driving box 302, a brake motor 304 is arranged inside the driving box 302, gears 305 engaged with each other are fixedly connected to the output shaft of the brake motor 304 and the surface of the rotation shaft 301, wire reels 309 for storing the traction cable 303 are arranged at both ends of the rotation shaft 301, the traction cable 303 is wound on the wire reels 309, when the height of the construction platform is adjusted, one of the gears 305 is driven to rotate by the brake motor 304, the rotation shaft 301 is driven to rotate by the other gear 305, and when the rotation shaft 301 rotates, the traction cable 303 is loosened or released by the wire reels 309, so that the traction cable 303 drives the construction platform to ascend and;
further, main part steelframe 1 is last still to be provided with the bearing frame, and the bearing frame cover is established on the surface of axis of rotation 301 for carry on spacingly to axis of rotation 301, have good supporting effect simultaneously.
Referring to fig. 5 and 6, a polish rod 306 is further arranged inside the driving box 302, a brake tooth 307 is in clearance fit with the surface of the polish rod 306, an electric push rod 308 is arranged on one side inside the driving box 302, the electric push rod 308 is fixedly connected with the brake tooth 307 and used for pushing the brake tooth 307 to move, the brake tooth 307 is clamped with an adjacent gear 305, the brake tooth 307 is used for braking the rotating shaft 301, and when the construction platform is lifted to a set height through the brake tooth 307 arranged on the polish rod 306, the electric push rod 308 pushes the brake tooth 307 to move along the direction of the polish rod 306, so that the gear 305 can be clamped, the rotation of the gear 305 is avoided, and the effect of limiting the position of the construction platform is achieved.
Referring to fig. 5 and 6, a raised key is arranged on the inner wall of the brake tooth 307, a key groove used in cooperation with the raised key is formed in the surface of the polish rod 306, the raised key is clamped inside the key groove, and when the electric push rod 308 pushes the brake tooth 307, the raised key is clamped inside the key groove and used for limiting the position of the brake tooth 307, so that the brake tooth 307 cannot rotate, and the position of the gear 305 can be limited.
Referring to fig. 3, the two sides of the construction platform are provided with two clamping plates 14, the clamping plates 14 are clamped on the vertical beam of the main steel frame 1, the position of the construction platform is limited through the clamping plates 14, and therefore large shaking cannot occur in the lifting process.
Referring to fig. 4 and 8, the sliding mechanism 11 includes a sliding frame 1101 clamped on the third guide rail 10, a roller 1102 moving along the third guide rail 10 is disposed inside the sliding frame 1101, a servo motor 1103 is disposed on one side of the sliding frame 1101, an output shaft of the servo motor 1103 penetrates through the third guide rail 10 and is fixedly connected with one of the rollers 1102, and the servo motor 1103 operates to drive one of the rollers 1102 to roll, so that the roller 1102 moves along the inside of the third guide rail 10, and the sliding frame 1101 can be driven to move, thereby adjusting the position of the calibration line 12.
Referring to fig. 3, the weight 13 is one of a plumb bob or a locking steel plate, the plumb bob is used to straighten the calibration line 12 and keep it in a vertical state, and the locking steel plate is used to fix the calibration line 12 on the ground and keep it in a tensioned state, so that the position of the plate can be limited and the plate can rotate during the lifting process of the decorative plate.
Referring to fig. 9, the second guide rail 7 is also connected with the first guide rail 6 in a sliding manner through the sliding mechanism 11, and the sliding mechanism 11 is adopted to drive the second guide rail 7 to move, so that the second guide rail 7 can move along the first guide rail 6, thereby realizing the transverse displacement in the lifting process of the plate and facilitating the adjustment of the position of the decorative plate.
The working principle of the embodiment of the invention is as follows: the electric hoist 8 moves on the second guide rail 7 to realize vertical movement in the hoisting process, meanwhile, the second guide rail 7 realizes transverse movement through the sliding mechanism 11, so that the effect of adjusting the transverse position of the decorative plate can be achieved, then the height of the construction platform is adjusted according to the actual operation position, when the height of the construction platform is adjusted, the brake motor 304 works to drive one gear 305 to rotate, the other gear 305 drives the rotating shaft 301 to rotate, the rotating shaft 301 rolls or releases the traction cable 303 through the wire reel 309 when rotating, so that the traction cable 303 drives the construction platform to ascend and descend, when the construction platform ascends and descends to the set height, the electric push rod 308 pushes the brake tooth 307 to move along the direction of the polish rod 306, so that the gear 305 can be clamped, the gear 305 is prevented from rotating, and the effect of limiting the position of the construction platform is achieved; add a plurality of calibration lines 12 on third guide rail 10, in the work progress, according to the distance between the adjacent calibration line 12 of width adjustment of decorative board, make its width phase-match with panel, then through the counterweight 13 straightening calibration line 12, when lifting by crane the decoration panel, drive the decorative board through electric hoist 8 and remove, make the decorative board paste on calibration line 12, then electric hoist 8 work draws the decorative board upwards, in this process, calibration line 12 pastes on the decorative board, can effectually reduce the rotatory possibility of decorative board, it is more steady to make it lift by crane the process, constructor divides the position of wall through calibration line 12 simultaneously, position through reference calibration line 12, can be fast accurate install the decorative board on the wall, it is more convenient to use.
Example 2
The invention also provides a construction method for the wall surface construction of building decoration, which comprises the following steps:
s1, selecting a position close to a wall surface, erecting a main steel frame 1, and installing a suspension device, a traction device 3 and a construction platform on the main steel frame 1;
s2, installing a base keel on the wall surface;
s3, adjusting the positions of the plurality of calibration lines 12, and fixing the calibration lines so that the distance between two adjacent calibration lines 12 is equal to the width of the wall decoration plate;
s4, driving the construction platform to move by the traction device 3, so that the construction platform moves to the height of the wall surface where the decorative plate needs to be installed;
s5, next, using a suspension device to lift the decorative plate and move the decorative plate to a position needing to be installed, and then installing the decorative plate on the keel of the base layer by the constructor by means of the calibration line 12;
and S6, repeating the steps S4-S5 until all the decorative boards on the wall surface are installed.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention are equivalent to or changed within the technical scope of the present invention.

Claims (10)

1. The building decoration wall surface construction device is characterized by comprising a main body steel frame (1), a keel frame (2), a suspension device and a construction platform, wherein the keel frame (2) is fixedly installed on the main body steel frame (1) through screws, one side of the keel frame (2) extends to the outer side of the main body steel frame (1), the suspension device is arranged on one side, protruding out of the main body steel frame (1), of the keel frame (2), the construction platform is arranged on the inner side of the main body steel frame (1) in a lifting mode, the top of the main body steel frame (1) is provided with a traction device (3), and the traction device (3) drives the construction platform to move in the vertical direction;
the suspension device comprises two groups of first guide rails (6) which are transversely distributed, a group of second guide rails (7) which are vertically distributed and an electric hoist (8), wherein the second guide rails (7) can be arranged on the two groups of first guide rails (6) in a sliding manner, the second guide rails (7) can slide along the extending direction of the first guide rails (6), the electric hoist (8) can be arranged on the second guide rails (7) in a sliding manner, the electric hoist (8) can slide along the extending direction of the second guide rails (7), a U-shaped frame (9) is further arranged at the bottom of the first guide rails (6), one end of each second guide rail (7) extends into the U-shaped frame (9), the second guide rails (7) are not in contact with the inner wall of the U-shaped frame (9), third guide rails (10) are fixedly arranged at the bottom of the first guide rails (6) through the U-shaped frames (9), and a plurality of sliding mechanisms (11) are arranged on the third guide rails (10), the bottom of the sliding mechanism (11) is fixedly connected with a calibration line (12), the calibration line (12) is vertically distributed downwards, and a counterweight (13) is arranged at the bottom end of the calibration line.
2. The building decoration wall surface construction device and the construction method thereof according to claim 1, wherein a supporting steel plate (4) is fixedly connected to the bottom of the keel frame (2) through bolts, the supporting steel plate (4) is fixed to the main body steel frame (1) through screws, a screw rod (5) is arranged on the top of the inner wall of the main body steel frame (1), the bottom end of the screw rod (5) is in threaded connection with the supporting steel plate (4), and a locking nut is in threaded connection with the surface of the screw rod (5).
3. The building decoration wall construction device and the construction method thereof according to claim 1, wherein the traction device (3) comprises a rotating shaft (301), a driving box (302) and a traction cable (303), the traction cable (303) penetrates through the main body steel frame (1) and is fixedly connected with the construction platform, the rotating shaft (301) penetrates through the driving box (302) and is rotatably connected with the driving box (302), a brake motor (304) is arranged inside the driving box (302), the output shaft of the brake motor (304) and the surface of the rotating shaft (301) are fixedly connected with gears (305) which are meshed with each other, two ends of the rotating shaft (301) are respectively provided with a wire spool (309) for winding and unwinding the traction cable (303), and the traction cable (303) is wound on the wire spool (309).
4. The building finishing wall surface construction device and the construction method thereof according to claim 3, wherein a polish rod (306) is further arranged inside the driving box (302), a braking tooth (307) is in clearance fit with the surface of the polish rod (306), an electric push rod (308) is arranged on one side inside the driving box (302), the electric push rod (308) is fixedly connected with the braking tooth (307) and used for pushing the braking tooth (307) to move, the braking tooth (307) is clamped with the adjacent gear (305), and the braking tooth (307) is used for braking the rotating shaft (301).
5. The building decoration wall surface construction device and the construction method thereof according to claim 4, wherein the inner wall of the brake tooth (307) is provided with a convex key, the surface of the polish rod (306) is provided with a key groove matched with the convex key, and the convex key is clamped inside the key groove.
6. The building finishing wall construction device and the construction method thereof according to claim 1, wherein two clamping plates (14) are arranged on both sides of the construction platform, and the clamping plates (14) are clamped on the vertical beams of the main steel frame (1).
7. A building finishing wall construction device and a construction method thereof according to claim 1, wherein the sliding mechanism (11) comprises a sliding frame (1101) clamped on a third guide rail (10), rollers (1102) moving along the third guide rail (10) are arranged inside the sliding frame (1101), a servo motor (1103) is arranged on one side of the sliding frame (1101), and an output shaft of the servo motor (1103) penetrates through the third guide rail (10) and is fixedly connected with one of the rollers (1102).
8. The apparatus and method for building and wall finishing as claimed in claim 7, wherein the weight member (13) is one of a plumb bob and a locking steel plate.
9. A building finishing wall construction device and construction method thereof according to claim 7, characterized in that the second guide rail (7) is also connected with the first guide rail (6) in a sliding way through a sliding mechanism (11).
10. A construction method of a building-finished wall surface construction for constructing a wall surface using the building-finished wall surface construction apparatus as set forth in any one of claims 1 to 9, comprising the steps of:
s1, selecting a position close to a wall surface, erecting a main steel frame (1), and installing a suspension device, a traction device (3) and a construction platform on the main steel frame (1);
s2, installing a base keel on the wall surface;
s3, adjusting the positions of the plurality of calibration lines (12) and fixing the calibration lines to ensure that the distance between two adjacent calibration lines (12) is equal to the width of the wall decoration plate;
s4, driving the construction platform to move by the traction device (3) so that the construction platform moves to the height of the wall surface where the decorative plate needs to be installed;
s5, next, using a suspension device to lift the decorative plate and move the decorative plate to a position needing to be installed, and then installing the decorative plate on the keel of the base layer by the constructor through the calibration line (12);
and S6, repeating the steps S4-S5 until all the decorative boards on the wall surface are installed.
CN202010486699.2A 2020-06-01 2020-06-01 Construction device and construction method for building decoration wall surface Active CN111636658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010486699.2A CN111636658B (en) 2020-06-01 2020-06-01 Construction device and construction method for building decoration wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010486699.2A CN111636658B (en) 2020-06-01 2020-06-01 Construction device and construction method for building decoration wall surface

Publications (2)

Publication Number Publication Date
CN111636658A true CN111636658A (en) 2020-09-08
CN111636658B CN111636658B (en) 2021-12-14

Family

ID=72327879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010486699.2A Active CN111636658B (en) 2020-06-01 2020-06-01 Construction device and construction method for building decoration wall surface

Country Status (1)

Country Link
CN (1) CN111636658B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115288410A (en) * 2022-08-17 2022-11-04 海通建设集团有限公司 External hanging protection device for construction of exterior wall decorative plate
CN117907435A (en) * 2024-03-20 2024-04-19 深圳市中科建设集团有限公司 Crack detection device for building outer wall
CN117907435B (en) * 2024-03-20 2024-05-28 深圳市中科建设集团有限公司 Crack detection device for building outer wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3430488B2 (en) * 2000-11-06 2003-07-28 新日軽株式会社 Floor slab construction method for multi-story buildings
CN105298150A (en) * 2015-09-30 2016-02-03 郭城樟 Multifunctional hanging device for mounting building construction formwork
CN206859702U (en) * 2017-06-14 2018-01-09 马林 Assembled architecture assembly platform
CN208310258U (en) * 2018-05-31 2019-01-01 龙泉市永达建设工程有限公司 A kind of construction accurate wrap attachment of building a wall
CN209894172U (en) * 2019-06-28 2020-01-03 中国建筑第五工程局有限公司 Quick detection device of spiral formula aluminum mould board straightness that hangs down
CN110805247A (en) * 2019-11-11 2020-02-18 华北理工大学 Indoor large-scale wall design and fitment auxiliary device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3430488B2 (en) * 2000-11-06 2003-07-28 新日軽株式会社 Floor slab construction method for multi-story buildings
CN105298150A (en) * 2015-09-30 2016-02-03 郭城樟 Multifunctional hanging device for mounting building construction formwork
CN206859702U (en) * 2017-06-14 2018-01-09 马林 Assembled architecture assembly platform
CN208310258U (en) * 2018-05-31 2019-01-01 龙泉市永达建设工程有限公司 A kind of construction accurate wrap attachment of building a wall
CN209894172U (en) * 2019-06-28 2020-01-03 中国建筑第五工程局有限公司 Quick detection device of spiral formula aluminum mould board straightness that hangs down
CN110805247A (en) * 2019-11-11 2020-02-18 华北理工大学 Indoor large-scale wall design and fitment auxiliary device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115288410A (en) * 2022-08-17 2022-11-04 海通建设集团有限公司 External hanging protection device for construction of exterior wall decorative plate
CN115288410B (en) * 2022-08-17 2023-10-13 海通建设集团有限公司 External protective device for outer wall decoration board construction
CN117907435A (en) * 2024-03-20 2024-04-19 深圳市中科建设集团有限公司 Crack detection device for building outer wall
CN117907435B (en) * 2024-03-20 2024-05-28 深圳市中科建设集团有限公司 Crack detection device for building outer wall

Also Published As

Publication number Publication date
CN111636658B (en) 2021-12-14

Similar Documents

Publication Publication Date Title
CN209778076U (en) Rigid rectangular tube gantry convenient to install
CN111302238B (en) Building material lifting machine
CN210239058U (en) Adjustable base of elevator frame
CN111636658B (en) Construction device and construction method for building decoration wall surface
CN210396177U (en) Overhanging type discharging platform
CN211283599U (en) Assembled wallboard installation fork truck
CN216764174U (en) Hoist equipment for building stability
JP3025124B2 (en) Wall moving device
CN213171218U (en) Material lifting device for building decoration
CN212700560U (en) Three-dimensional Weiya device
CN219971584U (en) Overhead hoist is used in installation of building engineering electromechanical device
CN210915213U (en) Vehicle-mounted elevator
CN217578091U (en) Gantry crane
CN219058351U (en) Elevator for building engineering construction
CN115680248A (en) Construction method for high-altitude installation of large bamboo formwork wallboard
CN220098329U (en) Hoisting construction tool capable of sliding for curtain wall
CN216997458U (en) Lift for construction
CN217350181U (en) Automatic coiling device for cables
CN218375377U (en) Installation system of bamboo formwork wallboard
CN217498565U (en) Auxiliary mounting equipment for air conditioner
CN214456643U (en) Rail-moving type electric hanging basket
CN217106047U (en) Support frame for high-altitude building anticorrosion construction
CN214243574U (en) Elevator car is with equipment platform device convenient to adjust
CN114275698B (en) Tension winch with guide structure for large-scale ship
CN213537045U (en) Hoisting accessory for mechanical engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant