CN111608363A - Well construction elevator basis - Google Patents
Well construction elevator basis Download PDFInfo
- Publication number
- CN111608363A CN111608363A CN202010628483.5A CN202010628483A CN111608363A CN 111608363 A CN111608363 A CN 111608363A CN 202010628483 A CN202010628483 A CN 202010628483A CN 111608363 A CN111608363 A CN 111608363A
- Authority
- CN
- China
- Prior art keywords
- construction elevator
- drain pipe
- construction
- brick bed
- elevator foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 50
- 239000011449 brick Substances 0.000 claims abstract description 29
- 210000002219 extraembryonic membrane Anatomy 0.000 claims description 12
- 239000004575 stone Substances 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 239000004540 pour-on Substances 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 5
- 238000001125 extrusion Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 abstract description 3
- 230000002093 peripheral effect Effects 0.000 abstract 1
- 239000004576 sand Substances 0.000 description 4
- 238000009435 building construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/005—Lift shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/12—Back-filling of foundation trenches or ditches
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a well construction elevator foundation which comprises an elevator shaft and a water collecting pit arranged on one side of the elevator shaft, wherein a groove is reserved at the bottom of the elevator shaft, a circle of brick bed moulds are built at the corners of the groove, plain concrete is filled in a space enclosed by the brick bed moulds, a drain pipe is pre-buried at the bottom of the brick bed moulds and is used for communicating the space enclosed by the brick bed moulds with the water collecting pit, and extruded sheets are arranged on the peripheral side walls of the groove. According to the invention, the extruded sheets are arranged around the bottom of the elevator shaft, so that the damage to the main structure during later construction of the elevator foundation is avoided; meanwhile, the drain pipe is arranged in the space enclosed by the brick bed film, plain concrete is filled in the space enclosed by the brick bed film, and the top surface of the foundation concrete of the construction elevator is provided with a 2% gradient, so that the drain pipe is effectively prevented from being damaged due to extrusion of the graded gravel backfilled in the use process of the construction elevator on the drain pipe.
Description
Technical Field
The invention relates to a well construction elevator foundation, and belongs to the technical field of main structure construction.
Background
Along with the development of building engineering, the building height is higher and higher, the requirements on the structural safety and the wind grid characteristic of the building engineering are higher and higher, the construction elevator arranged in a hoistway is required to ensure the safety of the foundation structure of the construction elevator under the condition of meeting the requirements on the transportation of building decoration materials and personnel, and the construction method for constructing the foundation of the construction elevator, which is convenient, reliable and cost-saving, with small influence on the main structure is necessary to be found by utilizing the self-condition of a main structure body and meeting the requirement on the running bearing capacity of the construction elevator.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a hoistway construction elevator foundation which is simple in structure, convenient to construct, safe and reliable, so as to achieve the purposes of reducing the potential safety hazard of building construction, improving the construction quality, improving the construction environment and reducing the construction cost.
In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides a well construction elevator basis, include the elevartor shaft and arrange the sump pit in elevartor shaft one side, reserve the recess in the bottom of elevartor shaft, it has round brick fetal membrane to build by laying bricks or stones at the corner of recess, it has plain concrete to fill in the space that covers at the brick fetal membrane, pre-buried drain pipe in the bottom of brick fetal membrane, and the drain pipe with the space and the sump pit intercommunication that the brick fetal membrane covers, install the extruded sheet on the lateral wall all around of recess, it has the level to join in marriage the grit to fill in the bottom of recess, the construction elevator foundation concrete has been pour on the level to join in marriage the grit, fixed mounting has construction elevator foundation base on construction elevator foundation concrete.
Further, the construction elevator foundation concrete is provided with two groups of reinforcing bars.
Further, the top surface of the construction elevator foundation concrete is provided with a 2% gradient, and the top surface of the construction elevator foundation concrete is flush with the top of the brick bed film.
Due to the adoption of the technical scheme, the invention has the following advantages:
1. according to the invention, the extruded sheets are arranged around the bottom of the elevator shaft, so that the damage to the main structure during later construction of the elevator foundation is avoided;
2. according to the invention, the drain pipe is arranged in the space enclosed by the brick bed film, the plain concrete is filled in the space enclosed by the brick bed film, and the top surface of the foundation concrete of the construction elevator is provided with a 2% gradient, so that the phenomenon that the drain pipe is damaged due to extrusion of the graded sand stone backfilled in the use process of the construction elevator on the drain pipe is effectively avoided, and the phenomena of unsmooth drainage, accumulated foundation water, loss of graded sand and foundation settlement and the like are avoided;
3. the backfill thickness control of the graded gravel can reduce the cost, and can also adapt to the requirements of different construction elevator models on the height of the elevator foundation and control the relative elevation between the graded gravel and the structural slab.
Drawings
FIG. 1 is a schematic plan view of a schematic structural diagram in the practice of the present invention;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
fig. 3 is a cross-sectional view of B-B of fig. 1.
Description of reference numerals: 1-drain pipe, 2-brick bed film, 3-extruded sheet, 4-graded sandstone, 5-reinforcement, 6-construction elevator foundation base, 7-plain concrete, 8-construction elevator foundation concrete and 9-water collecting pit.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment of the invention comprises the following steps: please refer to fig. 1-3, a well construction elevator foundation, including the elevartor shaft 10 and arrange at the sump pit 9 of elevartor shaft 10 one side, reserve at the bottom of elevartor shaft 10 and have the recess, it has round brick fetal membrane 2 to build by laying bricks at the corner of recess, it has plain concrete 7 to fill in the space that brick fetal membrane 2 encloses, pre-buried drain pipe 1 in the bottom of brick fetal membrane 2, and drain pipe 1 communicates the space that brick fetal membrane 2 encloses with sump pit 9, install extruded sheet 3 on the lateral wall all around of recess, it has graded grit 4 to fill in the bottom of recess, pour construction elevator foundation concrete 8 on graded grit 4, fixed mounting has construction elevator foundation base 6 on construction elevator foundation concrete 8. And the construction elevator foundation concrete 8 is provided with two groups of reinforcing bars 5. The top surface of the construction elevator foundation concrete 8 is provided with a 2% gradient, and the top surface of the construction elevator foundation concrete 8 is flush with the top of the brick bed film 2.
The extruded sheets 3 are arranged on the periphery of the bottom of the elevator shaft 10, so that damage to a main body structure during later construction elevator foundation removal is avoided; meanwhile, the drain pipe 1 is arranged in a space enclosed by the brick bed film 2, plain concrete 7 is filled in the space enclosed by the brick bed film 2, and the top surface of foundation concrete 8 of the construction elevator is provided with a 2% gradient, so that the phenomenon that the drain pipe 1 is damaged due to extrusion of the graded sand stone 4 backfilled in the use process of the construction elevator on the drain pipe 1 is effectively avoided, and the phenomena of unsmooth drainage, accumulated foundation water, graded sand loss and foundation settlement and the like are avoided; in addition, the backfill thickness control of the graded gravel 4 can reduce the cost, and can also adapt to the requirements of different construction elevator models on the height of the elevator foundation and control the relative elevation between the graded gravel and the structural slab.
Claims (3)
1. A shaft construction elevator foundation comprising an elevator shaft (10) and a pit (9) arranged at one side of the elevator shaft (10), characterized in that: reserve the recess in the bottom of elevartor shaft (10), it has round brick fetal membrane (2) to build by laying bricks or stones in the corner of recess, it has plain concrete (7) to fill in the space that covers at brick fetal membrane (2), pre-buried drain pipe (1) in the bottom of brick fetal membrane (2), and drain pipe (1) with the space and sump pit (9) intercommunication that brick fetal membrane (2) cover, install extruded sheet (3) on the lateral wall all around of recess, it has graded grit (4) to fill in the bottom of recess, it has construction elevator foundation concrete (8) to pour on graded grit (4), fixed mounting has construction elevator foundation base (6) on construction elevator foundation concrete (8).
2. The hoistway construction elevator foundation of claim 1, wherein: the construction elevator foundation concrete (8) is provided with two groups of reinforcing bars (5).
3. The hoistway construction elevator foundation of claim 1, wherein: the top surface of the construction elevator foundation concrete (8) is provided with a 2% gradient, and the top surface of the construction elevator foundation concrete (8) is flush with the top of the brick bed film (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010628483.5A CN111608363B (en) | 2020-07-02 | 2020-07-02 | Hoistway construction elevator foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010628483.5A CN111608363B (en) | 2020-07-02 | 2020-07-02 | Hoistway construction elevator foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111608363A true CN111608363A (en) | 2020-09-01 |
CN111608363B CN111608363B (en) | 2024-05-24 |
Family
ID=72205028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010628483.5A Active CN111608363B (en) | 2020-07-02 | 2020-07-02 | Hoistway construction elevator foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111608363B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104358275A (en) * | 2014-11-19 | 2015-02-18 | 武汉一冶建筑安装工程有限责任公司 | Construction method for deeper elevator well or water collecting well |
CN104963425A (en) * | 2015-06-25 | 2015-10-07 | 中建三局第二建设工程有限责任公司 | Construction method of suspended elevator shaft of seismic isolation system |
CN204982908U (en) * | 2015-09-02 | 2016-01-20 | 中国建筑第七工程局有限公司 | Elevartor shaft deep basal pit seepage prevention structure |
CN210049274U (en) * | 2019-04-01 | 2020-02-11 | 中国建筑第二工程局有限公司 | Foundation bearing structure of construction elevator |
CN212405939U (en) * | 2020-07-02 | 2021-01-26 | 中国建筑第四工程局有限公司 | Well construction elevator foundation structure |
-
2020
- 2020-07-02 CN CN202010628483.5A patent/CN111608363B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104358275A (en) * | 2014-11-19 | 2015-02-18 | 武汉一冶建筑安装工程有限责任公司 | Construction method for deeper elevator well or water collecting well |
CN104963425A (en) * | 2015-06-25 | 2015-10-07 | 中建三局第二建设工程有限责任公司 | Construction method of suspended elevator shaft of seismic isolation system |
CN204982908U (en) * | 2015-09-02 | 2016-01-20 | 中国建筑第七工程局有限公司 | Elevartor shaft deep basal pit seepage prevention structure |
CN210049274U (en) * | 2019-04-01 | 2020-02-11 | 中国建筑第二工程局有限公司 | Foundation bearing structure of construction elevator |
CN212405939U (en) * | 2020-07-02 | 2021-01-26 | 中国建筑第四工程局有限公司 | Well construction elevator foundation structure |
Also Published As
Publication number | Publication date |
---|---|
CN111608363B (en) | 2024-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104060631B (en) | A kind of manhole mouth elevation Dynamic controlling structure | |
CN210066671U (en) | Novel rectangular gallery structure | |
CN109208632A (en) | A kind of precast hollow module block type concrete retaining wall | |
CN212405939U (en) | Well construction elevator foundation structure | |
CN205152883U (en) | Assembly frame -type pier structure | |
CN111608363A (en) | Well construction elevator basis | |
CN114033167A (en) | Post-cast joint structure of laminated slab and construction method | |
CN109356126B (en) | Semi-prefabricated gallery structure and gallery construction method | |
CN101929245A (en) | Thin webbed girder vertical construction method | |
CN209066480U (en) | A kind of precast hollow module block type concrete retaining wall | |
CN101666122B (en) | Construction method of micro distance air crossbeam bottom board | |
CN216973019U (en) | Prefabricated assembled temporary parking lot construction structure | |
CN112045840A (en) | Construction method of assembly type beam storage pedestal for prefabricating high-speed railway box beam | |
CN105839824B (en) | Shed deckhead construction method | |
CN218933184U (en) | Cast-in-situ assembled pit and elevator shaft foundation pit supporting structure | |
CN110847230A (en) | Basement retaining wall concrete pouring construction process | |
CN213352912U (en) | A assembled beam platform seat of depositing for prefabricating high-speed railway case roof beam | |
CN116815837B (en) | Pre-lifting construction method for soft soil geological super-high-rise piled raft foundation | |
CN111021391A (en) | Large-scale exhibition hall pile slab structure terrace in weak soil area | |
CN109024286B (en) | Construction method for cast-in-situ V-shaped pier of concrete support wall | |
CN212896429U (en) | Shaping die for inclined cushion layer of foundation cushion cap under underground garage column | |
CN220100496U (en) | Sinking type toilet contour plate bearing platform structure | |
CN216108909U (en) | Drainage ditch water grate mounting structure | |
CN111119246A (en) | Foundation slab hydrostatic pressure release structure and method | |
CN210597369U (en) | Prefabricated assembled road retaining wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |