CN111608049A - Concrete vibration maintenance auxiliary device for road construction - Google Patents

Concrete vibration maintenance auxiliary device for road construction Download PDF

Info

Publication number
CN111608049A
CN111608049A CN202010483708.2A CN202010483708A CN111608049A CN 111608049 A CN111608049 A CN 111608049A CN 202010483708 A CN202010483708 A CN 202010483708A CN 111608049 A CN111608049 A CN 111608049A
Authority
CN
China
Prior art keywords
construction
supporting
adjusting
concrete
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010483708.2A
Other languages
Chinese (zh)
Other versions
CN111608049B (en
Inventor
叶小土
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Tongda Highway Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010483708.2A priority Critical patent/CN111608049B/en
Publication of CN111608049A publication Critical patent/CN111608049A/en
Application granted granted Critical
Publication of CN111608049B publication Critical patent/CN111608049B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/03Arrangements for curing paving; Devices for applying curing means; Devices for laying prefabricated underlay, e.g. sheets, membranes; Protecting paving under construction or while curing, e.g. use of tents

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a concrete oscillation maintenance auxiliary device for road construction, which comprises a supporting mechanism, wherein a supporting table is arranged in the middle of the supporting mechanism, a first supporting and adjusting device and a second supporting and adjusting device are rotatably arranged at the bottoms of two ends of the supporting table, a supporting and connecting plate is arranged at the front end of the first supporting and adjusting device, a rotating clamping shaft is fixedly connected to the middle of the upper end face of the supporting and connecting plate, a fixing frame is fixedly connected to the tail end of the supporting and connecting plate, an extending plate is symmetrically and fixedly connected to the upper part of one end, far away from the supporting and connecting plate, of the fixing frame, and pedals are uniformly and fixedly arranged between the upper end of the inner. The invention can conveniently and quickly carry out oscillation and floating treatment on the concrete above the concrete in the using process, can carry out watering maintenance on the constructed concrete, and is convenient to use and adjust, time-saving and labor-saving in the using process.

Description

Concrete vibration maintenance auxiliary device for road construction
Technical Field
The invention relates to the technical field of road construction, in particular to a concrete oscillation maintenance auxiliary device for road construction.
Background
The in-process of road construction needs the pouring concrete, need oscillate it after the concrete pouring and pave, consequently, it is inconvenient to the concrete oscillation with the operating personnel operation when paving in the foundation ditch to great area pouring concrete, will build various support frame and construct and operate in the concrete top, hard and use the regulation inconvenient, consequently need a concrete oscillation maintenance auxiliary device for road construction to solve above-mentioned problem, and can maintain the concrete of laying well through this device urgently.
Disclosure of Invention
The invention aims to provide a concrete oscillation maintenance auxiliary device for road construction, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a concrete oscillation maintenance auxiliary device for road construction comprises a supporting mechanism, wherein a supporting table is arranged in the middle of the supporting mechanism, a first supporting adjusting device and a second supporting adjusting device are installed at the bottoms of the two ends of the supporting table in a rotating mode, a supporting connecting plate is installed at the front end of the first supporting adjusting device, a rotating clamping shaft is fixedly connected to the middle of the upper end face of the supporting connecting plate, a fixing frame is fixedly connected to the tail end of the supporting connecting plate, an extending plate is symmetrically and fixedly connected to the upper portion of one end, far away from the supporting connecting plate, of the fixing frame, a pedal is uniformly and fixedly installed between the upper end of the inner side of the fixing frame and the extending plate, a fastening bolt is inserted in the symmetrical thread of one end, far away from the supporting connecting plate, of the fixing frame, an adjusting insertion plate is movably inserted in, the outer end face of the front part of the fastening threaded rod is fixedly connected with the fastening threaded rod, one side of the upper end face of the supporting table is symmetrically and fixedly provided with a vertical plate, the outer end face of the vertical plate is uniformly and fixedly provided with a push-pull handle, the other side of the upper end face of the supporting table is rotatably provided with a working main body, the bottom of the working main body is provided with a supporting base, the middle part of the supporting base is rotatably clamped with a rotating connecting shaft, the front end of the rotating connecting shaft is fixedly provided with a first construction maintenance device and a second construction maintenance device in a 45-degree crossed manner, the side end faces of the first construction maintenance device and the second construction maintenance device are rotatably clamped with an adjusting device, the outer parts of the adjusting devices are respectively provided with a supporting frame, the upper part of the front end of the supporting frame is rotatably provided with a, the utility model discloses a construction pedal, including support frame, adjusting device, regulation footboard, regulation device, the even symmetrical screw thread in end of support frame rotates to peg graft and has installed fixing bolt, regulation device's middle part fixed mounting has the regulation card wheel, the regulation device is kept away from the one end both sides fixedly connected with regulation handle of regulation card wheel, install the construction footboard among the first construction curing means, the even fixed nozzle of pegging graft in one side upper end of construction footboard, the regulation slip draw-in.
Preferably, the connecting pipe is embedded in a water conveying pipe inside the construction pedal and communicated with the nozzle.
Preferably, the first support adjusting device and the second support adjusting device have the same structure and specification, and the first construction maintenance device and the second construction maintenance device have the same structure and specification.
Preferably, the adjusting rod is movably inserted in the limiting clamping ring, the adjusting clamping wheel is rotatably clamped in the adjusting sliding clamping groove, and the tail end of the construction pedal is fixedly connected with the rotating connecting shaft.
Preferably, the upper end surface of the pedal is fixedly embedded with an anti-skid rubber gasket.
Preferably, the side of universal wheel all rotates and installs the service brake board, fastening bolt's bottom can be with the extrusion contact of the up end of adjusting the picture peg.
Preferably, the rotating clamping shaft is rotatably clamped inside the bottom end of the supporting table, and the bottom end face of the rotating connecting shaft is welded with the upper end face of the supporting table.
Compared with the prior art, the invention has the following beneficial effects:
firstly, the working main body in the device is integrally moved to the position above concrete needing oscillation by pushing the push-pull handle through the universal wheel, construction and operating personnel can oscillate and trowel the concrete above the concrete through the construction pedal, the adjusting rod is stretched in the limiting snap ring through the external force push-pull adjusting handle in the construction process, the bottom end of the limiting snap ring is rotatably connected with the support frame through the rotating adjusting shaft, so that the adjusting rod can be stretched in the limiting snap ring and the limiting snap ring rotates through the push-pull adjusting handle, the adjusting snap wheel rotatably arranged at the front end of the adjusting rod can be clamped and rotated in the adjusting sliding snap groove and moves along the adjusting sliding snap groove, and push-pull force can be generated on the outer side of the construction pedal when the adjusting snap wheel rotates and moves, so that the construction pedal can be controlled to rotate by taking the rotating connecting shaft as an axis, because the structural specifications of the first construction maintenance device and the second construction maintenance device are the same and the first construction maintenance device and the second construction maintenance device are distributed at an included angle of 45 degrees, the construction pedals in the first construction maintenance device and the second construction maintenance device can be rapidly rotated in a labor-saving way by simultaneously pushing and pulling the adjusting handles in the first construction maintenance device and the second construction maintenance device, the construction site and the position can be rapidly changed in the rotating process of the construction pedals, the operation area is greatly increased, the position of the construction pedals can be rapidly adjusted and changed, constructors can conveniently pass over the constructed concrete in the construction process through the construction pedals, and the device can be moved and fixed through universal wheels, so that the vibration and trowelling work of the concrete at different positions can be rapidly realized through the device, great saving the time and the manpower of laying the construction rack, and the concrete is connected with the connecting pipe through outside raceway in the maintenance stage of watering, the clear water alright spray to the concrete on through the nozzle this moment, the in-process that sprays is sprayed the position and can be carried out quick regulation and control through push-and-pull adjustment handle and mobile device, run through on the construction footboard and seted up the sluicing groove, can make the clear water of spraying quick flow out on by the construction footboard through the sluicing groove, ponding on the construction footboard has been prevented, thereby make construction operating personnel can not skid when stepping on to carry out the construction on the construction footboard.
Secondly, the bottoms of the two ends of the supporting platform are respectively and rotatably provided with a first supporting and adjusting device and a second supporting and adjusting device, the structural specifications of the first supporting and adjusting device and the second supporting and adjusting device are the same, the front ends of the fixing frames in the first supporting and adjusting device and the second supporting and adjusting device are respectively and movably inserted and provided with an adjusting inserting plate, the extruding force of a fastening bolt on the upper end surface of the adjusting inserting plate is controlled by screwing the fastening bolt, the adjusting inserting plate can be stretched and contracted in the fixing frame through a fastening threaded rod, so that the whole lengths of the fixing frame and the adjusting inserting plate can be rapidly adjusted and controlled, the fixing is carried out through the fastening bolt, the whole first supporting and adjusting device and the second supporting and adjusting device can be rotated below the supporting platform through rotating clamping shafts, and the devices can be erected above concrete with different widths and lengths for construction operation, erect position and convenient regulation of angle to even fixed mounting has the footboard between the extension board that mount and mount front end are connected, and the up end of footboard is all fixed to be inlayed and is had anti-skidding rubber gasket, thereby makes things convenient for construction and operating personnel to step on the up end of brace table and by the smooth construction operation of stepping on the footboard of being under construction on the brace table through the footboard.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
FIG. 2 is a schematic structural diagram of the supporting mechanism of the present invention;
FIG. 3 is a schematic structural diagram of a first support adjustment device according to the present invention;
FIG. 4 is a schematic structural diagram of the working body of the present invention;
FIG. 5 is a schematic view of the supporting frame of the present invention;
FIG. 6 is a schematic view of the structure of the adjusting device of the present invention;
FIG. 7 is a schematic structural view of a first construction maintenance device according to the present invention.
In the figure: 1-vertical plate, 2-supporting mechanism, 3-push-pull handle, 4-working main body, 5-first supporting and adjusting device, 6-supporting table, 7-second supporting and adjusting device, 8-pedal, 9-rotating clamping shaft, 10-supporting connecting plate, 11-fixing frame, 12-fastening bolt, 13-extending plate, 14-adjusting inserting plate, 15-fastening threaded rod, 16-universal wheel, 17-first construction and maintenance device, 18-second construction and maintenance device, 19-supporting base, 20-rotating connecting shaft, 21-supporting frame, 22-adjusting device, 23-limiting clamping ring, 24-rotating adjusting shaft, 25-mounting and fixing bolt, 26-adjusting clamping wheel, 27-adjusting rod, 28-limiting rotating shaft, 5-first supporting and adjusting device, 6-supporting table, 7-second supporting and adjusting device, 8-pedal, 9-rotating clamping shaft, 29-adjusting handle, 30-adjusting sliding clamping groove, 31-nozzle, 32-connecting pipe, 33-construction pedal and 34-drainage groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, an embodiment of the present invention is shown: a concrete oscillation maintenance auxiliary device for road construction comprises a supporting mechanism 2, a supporting table 6 is mounted in the middle of the supporting mechanism 2, a first supporting adjusting device 5 and a second supporting adjusting device 7 are rotatably mounted at the bottoms of the two ends of the supporting table 6, a supporting connecting plate 10 is mounted at the front end of the first supporting adjusting device 5, a rotating clamping shaft 9 is fixedly connected in the middle of the upper end face of the supporting connecting plate 10, a fixing frame 11 is fixedly connected at the tail end of the supporting connecting plate 10, an extending plate 13 is symmetrically and fixedly connected at the upper part of one end, far away from the supporting connecting plate 10, of the fixing frame 11, pedals 8 are uniformly and fixedly mounted between the upper end of the inner side of the fixing frame 11 and the extending plate 13, a fastening bolt 12 is rotatably inserted at one end, far away from the supporting connecting plate 10, an adjusting inserting plate 14 is movably inserted in the front end of the fixing frame 11, the outer end face of the front part of the fastening threaded rod 15 is fixedly connected with the fastening threaded rod 15, one side of the upper end face of the supporting table 6 is symmetrically and fixedly provided with a vertical plate 1, the outer end face of the vertical plate 1 is uniformly and fixedly provided with a push-pull handle 3, the other side of the upper end face of the supporting table 6 is rotatably provided with a working main body 4, the bottom of the working main body 4 is provided with a supporting base 19, the middle part of the supporting base 19 is rotatably clamped with a rotating connecting shaft 20, the front end of the rotating connecting shaft 20 is fixedly provided with a first construction maintenance device 17 and a second construction maintenance device 18 in a 45-degree crossed manner, the side end faces of the first construction maintenance device 17 and the second construction maintenance device 18 are rotatably clamped with an adjusting device 22, the outer part of the adjusting device 22 is provided with a supporting frame 21, the upper part of the front end of the supporting, the tail end of the support frame 21 is uniformly and symmetrically screwed and inserted with a mounting and fixing bolt 25, the middle part of the adjusting device 22 is fixedly provided with an adjusting rod 27, the tail end of the adjusting rod 27 is rotatably clamped and mounted with a limiting rotating shaft 28, the limiting rotating shaft 28 is fixedly provided with an adjusting clamping wheel 26, two sides of one end of the adjusting rod 27 far away from the adjusting clamping wheel 26 are fixedly connected with adjusting handles 29, a construction pedal 33 is arranged in the first construction maintenance device 17, the upper end of one side of the construction pedal 33 is uniformly and fixedly inserted with a nozzle 31, the middle part of the outer side end face of the construction pedal 33 is provided with an adjusting sliding clamping groove 30, the bottom of the construction pedal 33 is symmetrically penetrated and provided with a water drainage groove 34, the inner end of the outer end face of the construction pedal 33 is fixedly provided with a connecting pipe 32, the bottoms of two ends of the support table 6 are both rotatably provided with the first support adjusting device, the front ends of fixed frames 11 in the first supporting and adjusting device 5 and the second supporting and adjusting device 7 are movably inserted with adjusting spiles 14, the pressing force of the fastening bolts 12 on the upper end surfaces of the adjusting spiles 14 can be controlled by screwing the fastening bolts 12, the adjusting spiles 14 can be stretched in the fixed frames 11 through fastening threaded rods 15, the overall lengths of the fixed frames 11 and the adjusting spiles 14 can be rapidly adjusted and controlled, the fixing is carried out through the fastening bolts 12, the whole of the first supporting and adjusting device 5 and the second supporting and adjusting device 7 can rotate below the supporting table 6 through rotating clamping shafts 9, the device can be erected above concrete with different widths and lengths for construction operation, the erection position and the angle are convenient to adjust, and pedals 8 are uniformly and fixedly installed between the fixed frames 11 and extending plates 13 connected with the front ends of the fixed frames 11, the upper end face of the pedal 8 is fixedly inlaid with an anti-slip rubber gasket, so that construction and operation of operators can conveniently ascend to the upper end face of the support platform 6 through the pedal 8 and smoothly ascend to the construction pedal 33 on the support platform 6.
The water pipe of the connecting pipe 32 embedded in the construction pedal 33 is communicated with the nozzle 31, the first support adjusting device 5 and the second support adjusting device 7 have the same structure and specification, the first construction curing device 17 and the second construction curing device 18 have the same structure and specification, the adjusting rod 27 is movably inserted in the limiting snap ring 23, the adjusting snap wheel 26 is rotatably clamped in the adjusting sliding clamping groove 30, the tail end of the construction pedal 33 is fixedly connected with the rotating connecting shaft 20, the upper end surface of the pedal 8 is fixedly embedded with an anti-slip rubber gasket, the side end of the universal wheel 16 is rotatably provided with a foot brake plate, so that the device can be stably stopped in situ in the construction process, the bottom end of the fastening bolt 12 can be in extrusion contact with the upper end surface of the adjusting plug board 14, the rotating snap shaft 9 is rotatably clamped in the bottom end of the supporting platform 6, the bottom end surface of the rotating connecting shaft 20 is welded with the upper end surface of the supporting platform, the working main body 4 in the device is integrally moved to the position above the concrete to be oscillated by pushing the push-pull handle 3 through the universal wheel 16, construction and operating personnel can oscillate and trowel the concrete above the concrete through the construction pedal 33, the adjusting rod 27 is stretched in the limiting snap ring 23 through pushing and pulling the adjusting handle 29 by external force in the construction process, the bottom end of the limiting snap ring 23 is rotatably connected with the support frame 21 through the rotating adjusting shaft 24, so that the adjusting rod 27 can be stretched in the limiting snap ring 23 and the limiting snap ring 23 rotates through pushing and pulling the adjusting handle 29, the adjusting clamp wheel 26 rotatably mounted at the front end of the adjusting rod 27 can be clamped and rotated in the adjusting slide clamp groove 30 and move along the adjusting slide clamp groove 30, and push-pull force can be generated on the outer side of the construction pedal 33 when the adjusting clamp wheel 26 rotates and moves, therefore, the construction pedal 33 can be controlled to rotate by taking the rotating connecting shaft 20 as an axis, because the structural specifications of the first construction maintenance device 17 and the second construction maintenance device 18 are the same and the first construction maintenance device 17 and the second construction maintenance device 18 are distributed at an included angle of 45 degrees, the construction pedal 33 in the first construction maintenance device 17 and the second construction maintenance device 18 can be rapidly rotated in a labor-saving manner by simultaneously pushing and pulling the adjusting handle 29 in the first construction maintenance device 17 and the second construction maintenance device 18, the construction site and the construction position can be rapidly changed in the rotating process of the construction pedal 33, the operation area is greatly increased, the position of the construction pedal 33 can be rapidly adjusted and changed, and a constructor can conveniently pass over the constructed concrete through the construction pedal 33 in the construction process, in addition, the device itself can remove and fix through universal wheel 16, consequently, realization that can be quick through this device is to the concrete of different positions vibrate and the going on of floating work, great time and the manpower of laying the construction rack have been saved, and the concrete is connected with connecting pipe 32 through outside raceway in the maintenance stage of watering, the clear water alright spray to the concrete through nozzle 31 this moment on, the in-process that sprays can carry out quick regulation and control through push-and-pull adjusting handle 29 and mobile device in the position, run through on the construction footboard 33 and seted up sluicing groove 34, can make the clear water that sprays flow out on the construction footboard 33 fast through sluicing groove 34, ponding on the construction footboard 33 has been prevented, thereby make construction operating personnel can not skid when stepping on construction footboard 33 and carrying out the construction.
The working principle is as follows: the bottoms of the two ends of the supporting platform 6 are respectively and rotatably provided with a first supporting and adjusting device 5 and a second supporting and adjusting device 7, the structural specifications of the first supporting and adjusting device 5 and the second supporting and adjusting device 7 are the same, the front ends of the fixing frames 11 in the first supporting and adjusting device 5 and the second supporting and adjusting device 7 are respectively and movably inserted and provided with an adjusting insertion plate 14, the extruding force of the fastening bolts 12 on the upper end surfaces of the adjusting insertion plates 14 is controlled by screwing the fastening bolts 12, the adjusting insertion plates 14 can be stretched in the fixing frames 11 through the fastening threaded rods 15, the overall lengths of the fixing frames 11 and the adjusting insertion plates 14 can be rapidly adjusted and controlled, in addition, the fixing is carried out again through the fastening bolts 12, the whole parts of the first supporting and adjusting device 5 and the second supporting and adjusting device 7 can realize the rotation below the supporting platform 6 through the rotating clamping shafts 9 arranged in, therefore, the device can be erected above concrete with different widths and lengths for construction operation, the erection position and the angle are convenient to adjust, the working site of the device is greatly increased, the pedals 8 are uniformly and fixedly installed between the fixed frame 11 and the extension plate 13 connected with the front end of the fixed frame 11, the upper end surfaces of the pedals 8 are fixedly inlaid with anti-slip rubber gaskets, so that construction and operation personnel can conveniently climb onto the upper end surface of the supporting table 6 through the pedals 8 and smoothly ascend onto the construction pedals 33 on the supporting table 6 for construction operation, the working main body 4 in the device is integrally moved to the position above the concrete needing oscillation by pushing the push-pull handle 3 through the universal wheels 16, the construction and operation personnel can oscillate and trowel the concrete above the concrete through the construction pedals 33, the adjusting rod 27 can extend and retract inside the limit snap ring 23 through the external force push-pull adjusting handle 29 in the construction process, because the bottom end of the limit snap ring 23 is rotatably connected with the support frame 21 by rotating the adjusting shaft 24, the adjusting rod 27 can be stretched in the limit snap ring 23 by pushing and pulling the adjusting handle 29, and the limit snap ring 23 rotates at the moment, the adjusting clamp wheel 26 rotatably mounted at the front end of the adjusting rod 27 can be clamped and rotated in the adjusting slide clamp groove 30 and move along the adjusting slide clamp groove 30 in the rotating process of the adjusting rod 27 stretching the limit snap ring 23, and the adjusting clamp wheel 26 generates a push-pull force on the outer side of the construction pedal 33 when rotating and moving, so that the construction pedal 33 can rotate by taking the rotating connecting shaft 20 as an axis, and because the structural specifications of the first construction maintenance device 17 and the second construction maintenance device 18 are the same and the first construction maintenance device 17 and the second construction maintenance device 18 are distributed at an included angle of 45 degrees, the labor can be saved by simultaneously pushing and pulling the adjusting handle 29 in the first construction maintenance device 17 and the second construction maintenance device 18 The construction pedals 33 in the first construction maintenance device 17 and the second construction maintenance device 18 can be rapidly rotated by taking the rotating connecting shaft 20 as an axis, the construction place and position can be rapidly changed in the rotation process of the construction pedals 33, the working area is greatly increased, and the construction operators can construct slowly adjusting positions while greatly improving the construction effect, the position of the construction pedals 33 can be rapidly adjusted and changed, and the construction operators can conveniently pass any position above the constructed concrete through the construction pedals 33 in the construction process, so that the time of crossing the construction site by the construction operators is greatly shortened, and the devices can be moved and fixed through the universal wheels 16, thereby rapidly realizing the vibration and leveling work of the concrete at different positions through the device, the time and manpower for laying the construction rack are greatly saved, the concrete is connected with the connecting pipe 32 through the external water pipe in the watering maintenance stage, clear water can be sprayed on the concrete through the nozzle 31 at the moment, the spraying position can be quickly adjusted and controlled through the push-pull adjusting handle 29 and the moving device in the spraying process, the water drainage groove 34 is arranged on the construction pedal 33 in a penetrating way, the water discharge groove 34 can make the sprayed clean water flow out from the construction pedal 33 quickly, prevent water from accumulating on the construction pedal 33, so that the construction operator can not skid when stepping on the construction pedal 33 for construction, the invention can conveniently and quickly carry out oscillation and floating treatment on the concrete above the concrete during the use process, and can carry out watering maintenance to the concrete that finishes being under construction, the in-process of use is adjusted conveniently labour saving and time saving.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a concrete oscillation maintenance auxiliary device for road construction, includes supporting mechanism (2), its characterized in that: a supporting table (6) is mounted in the middle of the supporting mechanism (2), a first supporting and adjusting device (5) and a second supporting and adjusting device (7) are rotatably mounted at the bottoms of the two ends of the supporting table (6), a supporting and connecting plate (10) is mounted at the front end of the first supporting and adjusting device (5), a rotating clamping shaft (9) is fixedly connected to the middle of the upper end face of the supporting and connecting plate (10), a fixing frame (11) is fixedly connected to the tail end of the supporting and connecting plate (10), an extending plate (13) is symmetrically and fixedly connected to the upper portion of one end, far away from the supporting and connecting plate (10), of the fixing frame (11), pedals (8) are uniformly and fixedly mounted between the upper end of the inner side of the fixing frame (11) and the extending plate (13), and fastening bolts (12) are symmetrically screwed and inserted into one end, the utility model discloses a building structure, including mount (11), front end inside activity grafting of mount (11) has regulation picture peg (14), the front end bottom of adjusting picture peg (14) is rotated and is installed universal wheel (16), the anterior outside end face fixedly connected with fastening threaded rod (15) of fastening threaded rod (15), the up end one side symmetry fixed mounting of brace table (6) has riser (1), the even fixed mounting of outside end face of riser (1) has push-and-pull handle (3), the up end opposite side of brace table (6) is rotated and is installed work main part (4), support base (19) are installed to the bottom of work main part (4), the middle part of support base (19) is rotated the joint and is rotated connecting axle (20), the front end of rotating connecting axle (20) is 45 crossing fixed mounting and is first construction curing means (17) and second construction curing means (18), the side end faces of the first construction maintenance device (17) and the second construction maintenance device (18) are all rotationally clamped with an adjusting device (22), a support frame (21) is installed outside the adjusting device (22), a rotation adjusting shaft (24) is installed on the upper portion of the front end of the support frame (21) in a rotating mode, a limiting clamping ring (23) is fixedly connected to the upper end face of the rotation adjusting shaft (24), an installation fixing bolt (25) is inserted into the end of the support frame (21) in a rotating mode through uniform symmetrical threads, an adjusting rod (27) is fixedly installed in the middle of the adjusting device (22), a limiting rotating shaft (28) is installed in the end of the adjusting rod (27) in a rotating mode, an adjusting clamping wheel (26) is fixedly installed on the limiting rotating shaft (28), and an adjusting handle (29) is fixedly connected to two sides of one end, far away from the adjusting clamping wheel (26), of, install construction footboard (33) in first construction curing means (17), one side upper end of construction footboard (33) is evenly fixed to be pegged graft and is had nozzle (31), regulation slip draw-in groove (30) have been seted up at the outside terminal surface middle part of construction footboard (33), the bottom symmetry of construction footboard (33) is run through and is seted up sluicing groove (34), the inner fixed mounting of outer terminal surface of construction footboard (33) has connecting pipe (32).
2. The concrete oscillation curing auxiliary device for road construction according to claim 1, characterized in that: the connecting pipe (32) is embedded in a water delivery pipe inside the construction pedal (33) and communicated with the nozzle (31).
3. The concrete oscillation curing auxiliary device for road construction according to claim 1, characterized in that: the first supporting and adjusting device (5) and the second supporting and adjusting device (7) are identical in structure and specification, and the first construction maintenance device (17) and the second construction maintenance device (18) are identical in structure and specification.
4. The concrete oscillation curing auxiliary device for road construction according to claim 1, characterized in that: the adjusting rod (27) is movably inserted in the limiting clamping ring (23), the adjusting clamping wheel (26) is rotatably clamped in the adjusting sliding clamping groove (30), and the tail end of the construction pedal (33) is fixedly connected with the rotating connecting shaft (20).
5. The concrete oscillation curing auxiliary device for road construction according to claim 1, characterized in that: the upper end surface of the pedal (8) is fixedly embedded with an anti-skid rubber gasket.
6. The concrete oscillation curing auxiliary device for road construction according to claim 1, characterized in that: the side of universal wheel (16) all rotates and installs the service brake board, the bottom of fastening bolt (12) can be crowded press with the up end of adjusting picture peg (14) and contact.
7. The concrete oscillation curing auxiliary device for road construction according to claim 1, characterized in that: the rotary clamping shaft (9) is rotatably clamped inside the bottom end of the supporting table (6), and the bottom end face of the rotary connecting shaft (20) is welded with the upper end face of the supporting table (6).
CN202010483708.2A 2020-06-01 2020-06-01 Concrete vibration maintenance auxiliary device for road construction Active CN111608049B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010483708.2A CN111608049B (en) 2020-06-01 2020-06-01 Concrete vibration maintenance auxiliary device for road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010483708.2A CN111608049B (en) 2020-06-01 2020-06-01 Concrete vibration maintenance auxiliary device for road construction

Publications (2)

Publication Number Publication Date
CN111608049A true CN111608049A (en) 2020-09-01
CN111608049B CN111608049B (en) 2021-04-16

Family

ID=72198159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010483708.2A Active CN111608049B (en) 2020-06-01 2020-06-01 Concrete vibration maintenance auxiliary device for road construction

Country Status (1)

Country Link
CN (1) CN111608049B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962364A (en) * 2020-08-29 2020-11-20 陈建军 Water spraying device for concrete curing
CN114941275A (en) * 2022-06-29 2022-08-26 浙江广川工程咨询有限公司 Hydraulic engineering is curing means for construction concrete

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19900637A1 (en) * 1998-07-09 2000-01-13 Heilit & Woerner Bau Ag Protection/finishing method for concrete roadways etc. uses coating material suspension of water and fiber material sprayed on concrete surface
EP1234914A2 (en) * 2001-02-24 2002-08-28 CMI Corporation Concrete curing machine
CN107721461A (en) * 2017-11-15 2018-02-23 中铁十局集团第工程有限公司 High-speed railway bridge floor series concrete high-pressure spraying is atomized curing system
CN107724216A (en) * 2017-10-17 2018-02-23 蒋昌霞 A kind of concrete road curing means
CN207888871U (en) * 2017-12-30 2018-09-21 江苏三联环境建设有限公司 A kind of concrete preparation concrete curing device
CN208594557U (en) * 2018-06-26 2019-03-12 浙江省正邦水电建设有限公司 A kind of remarkable platform of water conservancy and hydropower foundation grouting
CN210031522U (en) * 2019-04-09 2020-02-07 宁莉 Foundation structure curing means is used in road and bridge construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19900637A1 (en) * 1998-07-09 2000-01-13 Heilit & Woerner Bau Ag Protection/finishing method for concrete roadways etc. uses coating material suspension of water and fiber material sprayed on concrete surface
EP1234914A2 (en) * 2001-02-24 2002-08-28 CMI Corporation Concrete curing machine
CN107724216A (en) * 2017-10-17 2018-02-23 蒋昌霞 A kind of concrete road curing means
CN107721461A (en) * 2017-11-15 2018-02-23 中铁十局集团第工程有限公司 High-speed railway bridge floor series concrete high-pressure spraying is atomized curing system
CN207888871U (en) * 2017-12-30 2018-09-21 江苏三联环境建设有限公司 A kind of concrete preparation concrete curing device
CN208594557U (en) * 2018-06-26 2019-03-12 浙江省正邦水电建设有限公司 A kind of remarkable platform of water conservancy and hydropower foundation grouting
CN210031522U (en) * 2019-04-09 2020-02-07 宁莉 Foundation structure curing means is used in road and bridge construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962364A (en) * 2020-08-29 2020-11-20 陈建军 Water spraying device for concrete curing
CN114941275A (en) * 2022-06-29 2022-08-26 浙江广川工程咨询有限公司 Hydraulic engineering is curing means for construction concrete
CN114941275B (en) * 2022-06-29 2022-11-18 浙江广川工程咨询有限公司 Hydraulic engineering is curing means for construction concrete

Also Published As

Publication number Publication date
CN111608049B (en) 2021-04-16

Similar Documents

Publication Publication Date Title
US3970405A (en) Slipform paving apparatus
CN111608049B (en) Concrete vibration maintenance auxiliary device for road construction
KR100350730B1 (en) Sprinkler for Curing of Tunnel Lining Concrete
CN107988860B (en) A kind of rubber-tyred subway changes paving machine and its becomes across method
CN111962364A (en) Water spraying device for concrete curing
CN203939225U (en) Floor concrete casting operation platform is built in room
CN205714217U (en) Two lining concrete curing trolleys
CN212957668U (en) House concrete placement platform convenient to control
CN108678366B (en) Self-angle-changing large column formwork system
CN209861850U (en) Novel sprinkling irrigation device
CN115749332A (en) Building construction concrete tectorial membrane curing means
CN114382305A (en) Energy-saving concrete pouring and curing device and method
CN213681622U (en) Equipment is laid to petroleum asphalt waterproofing membrane
CN212801116U (en) A shakeout device for concrete paving road surface
CN211440513U (en) A curing means for reinforced concrete drain pipe
CN106761827B (en) A kind of tunnel-liner closure mould bases
CN206329349U (en) A kind of tunnel-liner closure mould bases
CN215210959U (en) Leveling equipment for highway construction
CN110886372A (en) Automatic cement mortar smearing machine
CN218466988U (en) Leveling device for plastering gypsum mortar
CN116371627B (en) Be used for road and bridge tunnel lining maintenance equipment
CN113931190B (en) Power station inclined plane construction slip form safety platform
CN221186993U (en) Grouting device for reinforced concrete top pipe
CN220789358U (en) Maintenance device for hydraulic engineering construction concrete
CN217841675U (en) Tunnel lining maintenance trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210329

Address after: No.97 Minfu Road, government district, Shuangshan street, Zhangqiu District, Jinan City, Shandong Province

Applicant after: JINAN TONGDA HIGHWAY ENGINEERING Co.,Ltd.

Address before: 313000 Lingtong road facilities Co., Ltd., No.2 chuangqiang Road, shangqiang industrial functional zone, Daixi Town, Huzhou City, Zhejiang Province

Applicant before: Ye Xiaotu

GR01 Patent grant
GR01 Patent grant