CN111600246A - Well low voltage distribution network construction stringing auxiliary device - Google Patents
Well low voltage distribution network construction stringing auxiliary device Download PDFInfo
- Publication number
- CN111600246A CN111600246A CN202010451415.6A CN202010451415A CN111600246A CN 111600246 A CN111600246 A CN 111600246A CN 202010451415 A CN202010451415 A CN 202010451415A CN 111600246 A CN111600246 A CN 111600246A
- Authority
- CN
- China
- Prior art keywords
- wall
- fixed
- screws
- sliding
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/12—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for removing insulation or armouring from cables, e.g. from the end thereof
- H02G1/1202—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for removing insulation or armouring from cables, e.g. from the end thereof by cutting and withdrawing insulation
- H02G1/1248—Machines
- H02G1/1251—Machines the cutting element not rotating about the wire or cable
- H02G1/126—Machines the cutting element not rotating about the wire or cable making a longitudinal cut
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F1/00—Bending wire other than coiling; Straightening wire
- B21F1/02—Straightening
- B21F1/026—Straightening and cutting
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/005—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for cutting cables or wires, or splicing
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Electric Cable Installation (AREA)
Abstract
本发明属于电网建设技术领域,尤其是一种中低压配电网建设架线辅助装置,针对不能对电缆线进行剥皮和拉直的问题,现提出以下方案,包括工作台,所述工作台的顶部外壁通过螺钉固定有箱体,所述箱体的两边内壁通过螺钉固定有同一块剥皮板,所述剥皮板的一侧外壁开有第二滑孔,所述第二滑孔的内壁通过螺钉固定有第二滑轨,第二滑轨的内壁滑动连接有剥皮块,所述剥皮块的一侧外壁开有固定孔,所述固定孔的内壁通过螺钉固定有剥皮管,所述箱体顶部外壁的两边均通过螺钉固定有安装板,两块所述安装板相对一侧内壁通过轴承连接有第二转杆。本发明第一转杆和第二转杆可以对电缆线进行拉直,结构合理,功能齐全。
The invention belongs to the technical field of power grid construction, in particular to an auxiliary device for wiring construction of a medium and low voltage distribution network. Aiming at the problem that the cables cannot be stripped and straightened, the following solutions are proposed, including a workbench, and the workbench has a The outer wall of the top is fixed with a box body, the inner walls of both sides of the box body are fixed with the same peeling plate by screws, and the outer wall of one side of the peeling plate is provided with a second sliding hole, and the inner wall of the second sliding hole is fixed by screws. A second slide rail is fixed, the inner wall of the second slide rail is slidably connected with a peeling block, a fixing hole is opened on one side of the outer wall of the peeling block, and the inner wall of the fixing hole is fixed with a peeling tube by screws. Both sides of the outer wall are fixed with mounting plates by screws, and the inner walls on the opposite sides of the two mounting plates are connected with a second rotating rod through bearings. The first rotating rod and the second rotating rod of the present invention can straighten the cable, have reasonable structure and complete functions.
Description
技术领域technical field
本发明涉及电网建设技术领域,尤其涉及一种中低压配电网建设架线辅助装置。The invention relates to the technical field of power grid construction, in particular to an auxiliary device for wiring construction of a medium and low voltage distribution network.
背景技术Background technique
在经济发展迅速的现代社会,电力建设对我国经济有着很大的拉动作用,但我国经济快速发展,因此电力的供应较为紧张。为了满足我国经济发展的需求,国家一度加快电力建设的力度。In the modern society with rapid economic development, power construction has a great pulling effect on my country's economy, but my country's economy is developing rapidly, so the supply of electricity is relatively tight. In order to meet the needs of my country's economic development, the country once accelerated the power construction.
现有的电网建设架线辅助装置存在以下不足:在电网建设中,都需要用到架线辅助装置,而现有的架线辅助装置一般都是将电缆线圈直接放置到一个可移动小车上,使用时再将电缆线圈取出使用,不能对电缆线进行剥皮与拉直,当需要将电缆线进行拉直或者是剥皮,还需要工人使用其他设备,因此现有的架线辅助装置显然已经不能满足人们的使用需求。The existing power grid construction wiring auxiliary device has the following shortcomings: in the power grid construction, the wiring auxiliary device needs to be used, and the existing wiring auxiliary device generally places the cable coil directly on a movable trolley, When using, the cable coil is taken out for use, and the cable cannot be stripped or straightened. When the cable needs to be straightened or stripped, workers need to use other equipment, so the existing wiring auxiliary device is obviously not enough. people's needs.
发明内容SUMMARY OF THE INVENTION
基于现有的架线辅助装置结构简单、功能单一、使用不方便的技术问题,本发明提出了一种中低压配电网建设架线辅助装置。Based on the technical problems of simple structure, single function and inconvenient use of the existing wiring auxiliary device, the present invention proposes a wiring auxiliary device for medium and low voltage distribution network construction.
本发明提出的一种中低压配电网建设架线辅助装置,包括工作台,所述工作台的顶部外壁通过螺钉固定有箱体,所述箱体的两边内壁通过螺钉固定有同一块剥皮板,所述剥皮板的一侧外壁开有第二滑孔,所述第二滑孔的内壁通过螺钉固定有第二滑轨,第二滑轨的内壁滑动连接有剥皮块,所述剥皮块的一侧外壁开有固定孔,所述固定孔的内壁通过螺钉固定有剥皮管,所述箱体顶部外壁的两边均通过螺钉固定有安装板,两块所述安装板相对一侧内壁通过轴承连接有第二转杆,安装板的顶部外壁通过螺钉固定有固定板,所述固定板的底部外壁通过螺钉固定有第一电动伸缩杆,所述第一电动伸缩杆活塞杆的一端通过螺钉固定有推箱。A medium and low voltage distribution network construction erection auxiliary device proposed by the present invention includes a workbench, the top outer wall of the workbench is fixed with a box body by screws, and the inner walls of both sides of the box body are fixed with the same peeling plate by screws , the outer wall of one side of the peeling plate is provided with a second sliding hole, the inner wall of the second sliding hole is fixed with a second sliding rail by screws, and the inner wall of the second sliding rail is slidably connected with a peeling block. The outer wall of one side is provided with a fixing hole, the inner wall of the fixing hole is fixed with a peeling tube by screws, both sides of the outer wall of the top of the box are fixed with mounting plates by screws, and the inner walls of the two mounting plates are connected by bearings on the opposite side. There is a second rotating rod, the top outer wall of the mounting plate is fixed with a fixing plate by screws, the bottom outer wall of the fixing plate is fixed with a first electric telescopic rod by screws, and one end of the piston rod of the first electric telescopic rod is fixed by screws with a screw. push the box.
优选地,所述推箱的两边外壁通过轴承连接有第一转杆,且安装板的一边外壁通过螺钉固定有第二电机,第二电机的输出轴通过联轴器连接有拉直杆,两块安装板相对一侧外壁均开有第三滑槽,第三滑槽的内壁通过螺钉固定有第三滑轨,第一转杆的两端均通过轴承连接有滑块,滑块的外壁与第三滑轨的内壁形成滑动配合。Preferably, the two outer walls of the push box are connected with a first rotating rod through bearings, and one outer wall of the mounting plate is fixed with a second motor through screws, and the output shaft of the second motor is connected with a straightening rod through a coupling, and the two The outer wall of the opposite side of the block mounting plate is provided with a third chute, and the inner wall of the third chute is fixed with a third sliding rail by screws. The inner wall of the third slide rail forms a sliding fit.
优选地,所述工作台底部外壁的四角处均通过螺钉固定有液压杆,且液压杆活塞杆的一端通过螺钉固定有支撑板。Preferably, the four corners of the outer wall of the bottom of the workbench are fixed with hydraulic rods by screws, and one end of the piston rod of the hydraulic rod is fixed with a support plate by screws.
优选地,所述工作台底部外壁的四角处均通过螺钉固定有减震箱,且减震箱的顶部内壁通过螺钉固定有减震弹簧,减震弹簧的底端通过螺钉固定有减震板,减震板的底部外壁通过螺钉固定有万向轮,减震板的两侧外壁均通过螺钉固定有滑动块,减震箱的两侧内壁均开有第一滑槽,第一滑槽的内壁通过螺钉固定有第一滑轨,滑动块的外壁与第一滑轨的内壁形成滑动配合。Preferably, shock-absorbing boxes are fixed at the four corners of the outer wall of the bottom of the worktable by screws, and shock-absorbing springs are fixed on the top inner wall of the shock-absorbing box by screws, and shock-absorbing plates are fixed at the bottom ends of the shock-absorbing springs by screws. The bottom outer wall of the shock-absorbing plate is fixed with a universal wheel by screws, the outer walls of both sides of the shock-absorbing plate are fixed with sliding blocks by screws, and the inner walls of both sides of the shock-absorbing box are provided with a first chute, and the inner wall of the first chute The first sliding rail is fixed with screws, and the outer wall of the sliding block forms a sliding fit with the inner wall of the first sliding rail.
优选地,所述箱体的一边外壁通过螺钉固定有第一电机,且第一电机的输出轴通过联轴器连接有第一转板,第一转板的一边外壁通过螺钉固定有等距离分布的栓接杆。Preferably, the first motor is fixed on one side of the outer wall of the box body by screws, and the output shaft of the first motor is connected with a first rotating plate through a coupling, and the outer wall of one side of the first rotating plate is fixed with an equidistant distribution by screws. the bolted rod.
优选地,所述栓接杆远离第一电机的一端通过螺钉固定有第二转板,且第二转板通过轴承连接与箱体相连接。Preferably, the end of the bolting rod away from the first motor is fixed with a second rotating plate by screws, and the second rotating plate is connected to the box body through a bearing connection.
优选地,所述箱体的一侧外壁开有插接孔,且插接孔的内壁插接有连接管。Preferably, an outer wall of one side of the box body is provided with an insertion hole, and an inner wall of the insertion hole is inserted with a connecting pipe.
优选地,所述箱体的顶部外壁通过螺钉固定有电缆皮储存箱,且剥皮块的一边外壁通过螺钉固定有拉杆。Preferably, the outer wall of the top of the box body is fixed with a cable sheath storage box by screws, and the outer wall of one side of the peeling block is fixed with a tie rod by screws.
优选地,所述箱体的一边外壁开有通孔,且通孔的内壁与拉杆的外壁形成滑动配合,拉杆的一端通过螺钉固定有把手。Preferably, an outer wall of one side of the box body is provided with a through hole, and the inner wall of the through hole forms a sliding fit with the outer wall of the pull rod, and one end of the pull rod is fixed with a handle by a screw.
优选地,所述安装板的一侧外壁通过螺钉固定有连接板,且连接板的底部外壁通过螺钉固定有第二电动伸缩杆,第二电动伸缩杆活塞杆的一端通过螺钉固定有斩断块,工作台的顶部外壁通过螺钉固定有斩断座。Preferably, one side outer wall of the mounting plate is fixed with a connecting plate by screws, and the bottom outer wall of the connecting plate is fixed with a second electric telescopic rod by screws, and one end of the piston rod of the second electric telescopic rod is fixed with a cutting block by screws , the top outer wall of the workbench is fixed with a cutting seat by screws.
本发明中的有益效果为:The beneficial effects in the present invention are:
1、通过设置有剥皮管、第一转杆和第二转杆,通过第一电机带动第一转板转动,第一转板带动栓接杆转动,栓接杆可以将电缆线圈从剥皮管中拉出来,剥皮管对电缆线进行剥皮处理,而第一转杆和第二转杆可以对电缆线进行拉直,结构合理,功能齐全。1. By being provided with a peeling tube, a first rotating rod and a second rotating rod, the first rotating plate is driven to rotate by the first motor, and the first rotating plate drives the bolting rod to rotate, and the bolting rod can remove the cable coil from the peeling pipe. Pulled out, the stripping tube strips the cable, and the first rotating rod and the second rotating rod can straighten the cable, the structure is reasonable and the function is complete.
2、通过设置有万向轮和液压杆,通过万向轮可以比较轻松的将装置移动到指定的工作区域,而通过液压杆可以将装置牢牢地固定在地面上,从而为接下来的剥皮和拉直工作提供稳定的工作环境。2. By setting the universal wheel and hydraulic rod, the device can be easily moved to the designated working area through the universal wheel, and the device can be firmly fixed on the ground through the hydraulic rod, so as to be used for the next peeling. And straightening work provides a stable working environment.
3、通过设置有把手和拉杆,通过把手拉动拉杆,拉杆拉动剥皮块在第二滑轨内壁前后移动,剥皮块带动剥皮板前后移动,从而可以控制电缆线在栓接杆上面均匀的绕线,防止电缆线在栓接杆上面绕线杂乱,从而导致电缆线缠绕在一起。3. By providing a handle and a pull rod, the pull rod is pulled through the handle, and the pull rod pulls the peeling block to move back and forth on the inner wall of the second slide rail, and the peeling block drives the peeling plate to move back and forth, so that the cable can be controlled evenly on the bolting rod. Prevents cables from cluttering around the bolting rods, causing the cables to become tangled.
4、通过设置有第二电机和拉直杆,第二电机带动拉直杆转动,剥皮后的电缆线缠绕在拉直杆上,从而可以进一步的加速电缆线的拉直速度,提升了架线工作的效率。4. By setting a second motor and a straightening rod, the second motor drives the straightening rod to rotate, and the stripped cable is wound on the straightening rod, so that the straightening speed of the cable can be further accelerated and the wire is improved. work efficiency.
5、通过设置有斩断块、第二电动伸缩杆和斩断座,通过第二电动伸缩杆带动斩断块接近斩断座,斩断块和斩断座配合使用可以快速的将电缆线斩断,无需另外使用工具对电缆线进行斩断,实用性较强。5. By setting the cutting block, the second electric telescopic rod and the cutting seat, the second electric telescopic rod drives the cutting block to approach the cutting block, and the cutting block and the cutting block can be used together to quickly cut the cable. There is no need to use additional tools to cut off the cable, which is highly practical.
附图说明Description of drawings
图1为本发明实施例1提出的一种中低压配电网建设架线辅助装置的整体结构示意图;1 is a schematic diagram of the overall structure of an auxiliary device for construction of a medium and low voltage distribution network proposed in Embodiment 1 of the present invention;
图2为本发明提出的一种中低压配电网建设架线辅助装置的立体结构图;Fig. 2 is a three-dimensional structure diagram of a medium and low voltage distribution network construction wiring auxiliary device proposed by the present invention;
图3为本发明提出的一种中低压配电网建设架线辅助装置的剥皮管立体结构图;3 is a three-dimensional structural view of a peeling pipe of a medium and low voltage distribution network construction wiring auxiliary device proposed by the present invention;
图4为本发明提出的一种中低压配电网建设架线辅助装置的栓接杆立体结构图;FIG. 4 is a three-dimensional structural diagram of a bolted rod of a medium and low voltage distribution network construction wiring auxiliary device proposed by the present invention;
图5为本发明提出的一种中低压配电网建设架线辅助装置的内部结构图;FIG. 5 is an internal structure diagram of a medium and low voltage distribution network construction wiring auxiliary device proposed by the present invention;
图6为本发明提出的一种中低压配电网建设架线辅助装置的俯视图;FIG. 6 is a top view of an auxiliary device for construction of a medium and low voltage distribution network proposed by the present invention;
图7为本发明实施例2提出的一种中低压配电网建设架线辅助装置的整体结构图。FIG. 7 is an overall structural diagram of a wiring auxiliary device for medium and low voltage distribution network construction proposed in
图中:1剥皮板、2电缆皮储存箱、3减震板、4液压杆、5减震箱、6万向轮、7第一滑轨、8减震弹簧、9安装板、10第一电动伸缩杆、11第一转板、12箱体、13把手、14第一电机、15剥皮块、16剥皮管、17栓接杆、18固定板、19拉直杆、20推箱、21第二电机、22第一转杆、23第二转杆、24拉杆、25工作台、26连接管、27斩断块、28第二电动伸缩杆、29连接板、30斩断座。In the picture: 1 peeling plate, 2 cable leather storage box, 3 shock absorption plate, 4 hydraulic rod, 5 shock absorption box, 6 universal wheel, 7 first slide rail, 8 shock absorption spring, 9 installation plate, 10 first Electric telescopic rod, 11 first turning plate, 12 box body, 13 handle, 14 first motor, 15 peeling block, 16 peeling tube, 17 bolting rod, 18 fixing plate, 19 straightening rod, 20 push box, 21th Two motors, 22 the first rotating rod, 23 the second rotating rod, 24 tie rods, 25 worktables, 26 connecting pipes, 27 cutting blocks, 28 second electric telescopic rods, 29 connecting plates, 30 cutting blocks.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments.
实施例1:Example 1:
参照图1-6,一种中低压配电网建设架线辅助装置,包括工作台25,工作台25的顶部外壁通过螺钉固定有箱体12,箱体12的两边内壁通过螺钉固定有同一块剥皮板161,剥皮板161的一侧外壁开有第二滑孔,第二滑孔的内壁通过螺钉固定有第二滑轨,第二滑轨的内壁滑动连接有剥皮块15,剥皮块15的一侧外壁开有固定孔,固定孔的内壁通过螺钉固定有剥皮管,箱体12顶部外壁的两边均通过螺钉固定有安装板9,两块安装板9相对一侧内壁通过轴承连接有第二转杆23,安装板9的顶部外壁通过螺钉固定有固定板18,固定板18的底部外壁通过螺钉固定有第一电动伸缩杆10,第一电动伸缩杆10活塞杆的一端通过螺钉固定有推箱20。1-6, a medium and low voltage power distribution network construction wiring auxiliary device, including a
本发明中,推箱20的两边外壁通过轴承连接有第一转杆22,且安装板9的一边外壁通过螺钉固定有第二电机21,第二电机21的输出轴通过联轴器连接有拉直杆19,两块安装板9相对一侧外壁均开有第三滑槽,第三滑槽的内壁通过螺钉固定有第三滑轨,第一转杆22的两端均通过轴承连接有滑块,滑块的外壁与第三滑轨的内壁形成滑动配合。In the present invention, the two outer walls of the
本发明中,工作台25底部外壁的四角处均通过螺钉固定有液压杆4,且液压杆4活塞杆的一端通过螺钉固定有支撑板。In the present invention, the four corners of the bottom outer wall of the
本发明中,工作台25底部外壁的四角处均通过螺钉固定有减震箱5,且减震箱5的顶部内壁通过螺钉固定有减震弹簧8,减震弹簧8的底端通过螺钉固定有减震板3,减震板3的底部外壁通过螺钉固定有万向轮6,减震板3的两侧外壁均通过螺钉固定有滑动块,减震箱5的两侧内壁均开有第一滑槽,第一滑槽的内壁通过螺钉固定有第一滑轨7,滑动块的外壁与第一滑轨7的内壁形成滑动配合。In the present invention, the four corners of the bottom outer wall of the
本发明中,箱体12的一边外壁通过螺钉固定有第一电机14,且第一电机14的输出轴通过联轴器连接有第一转板11,第一转板11的一边外壁通过螺钉固定有等距离分布的栓接杆17。In the present invention, the
本发明中,栓接杆17远离第一电机14的一端通过螺钉固定有第二转板,且第二转板通过轴承连接与箱体12相连接。In the present invention, one end of the bolting
本发明中,箱体12的一侧外壁开有插接孔,且插接孔的内壁插接有连接管26。In the present invention, an outer wall of one side of the
本发明中,箱体12的顶部外壁通过螺钉固定有电缆皮储存箱2,且剥皮块15的一边外壁通过螺钉固定有拉杆24。In the present invention, the outer wall of the top of the
本发明中,箱体12的一边外壁开有通孔,且通孔的内壁与拉杆24的外壁形成滑动配合,拉杆24的一端通过螺钉固定有把手13。In the present invention, an outer wall of one side of the
使用时,先通过万向轮6将装置移动到指定的工作区域,然后降下液压杆4带动支撑板将装置牢牢地固定在地面上,从而为接下来的剥皮和拉直工作提供稳定的工作环境,然后将电缆线的接头通过剥皮管16拴接在栓接杆17上,启动第一电机14带动第一转板11转动,第一转板11带动栓接杆17转动,从而可以将电缆线圈上面的电缆线全部都转移到栓接杆17上面,在电缆线圈缠绕在栓接杆17上的同时,剥皮管16对电缆线进行剥皮,电缆线皮掉落在电缆皮储存箱2中,方便进行集中处理,需要使用电缆线时,找出线头,将线头出国连接管26,然后在拉直杆19上缠绕一圈,拉住线头,启动第二电机21,第二电机21带动拉直杆19转动,拉直杆19带动电缆线脱离栓接杆17到装置之外,启动第一电动伸缩杆10带动推箱20向下移动,同时第一转杆22和第二转杆23将电缆线夹在中间,在第二电机21的带动下,第一转杆22和第二转杆23配合对电缆线进行拉直,从而可以直接使用电缆线进行架线工作。When in use, first move the device to the designated working area through the
实施例2:Example 2:
参照图7,一种塑料瓶回收用破碎装置,包括工作台25,工作台25的顶部外壁通过螺钉固定有箱体12,箱体12的两边内壁通过螺钉固定有同一块剥皮板161,剥皮板161的一侧外壁开有第二滑孔,第二滑孔的内壁通过螺钉固定有第二滑轨,第二滑轨的内壁滑动连接有剥皮块15,剥皮块15的一侧外壁开有固定孔,固定孔的内壁通过螺钉固定有剥皮管,箱体12顶部外壁的两边均通过螺钉固定有安装板9,两块安装板9相对一侧内壁通过轴承连接有第二转杆23,安装板9的顶部外壁通过螺钉固定有固定板18,固定板18的底部外壁通过螺钉固定有第一电动伸缩杆10,第一电动伸缩杆10活塞杆的一端通过螺钉固定有推箱20。7 , a crushing device for recycling plastic bottles includes a
本发明中,推箱20的两边外壁通过轴承连接有第一转杆22,且安装板9的一边外壁通过螺钉固定有第二电机21,第二电机21的输出轴通过联轴器连接有拉直杆19,两块安装板9相对一侧外壁均开有第三滑槽,第三滑槽的内壁通过螺钉固定有第三滑轨,第一转杆22的两端均通过轴承连接有滑块,滑块的外壁与第三滑轨的内壁形成滑动配合。In the present invention, the two outer walls of the
本发明中,工作台25底部外壁的四角处均通过螺钉固定有液压杆4,且液压杆4活塞杆的一端通过螺钉固定有支撑板。In the present invention, the four corners of the bottom outer wall of the
本发明中,工作台25底部外壁的四角处均通过螺钉固定有减震箱5,且减震箱5的顶部内壁通过螺钉固定有减震弹簧8,减震弹簧8的底端通过螺钉固定有减震板3,减震板3的底部外壁通过螺钉固定有万向轮6,减震板3的两侧外壁均通过螺钉固定有滑动块,减震箱5的两侧内壁均开有第一滑槽,第一滑槽的内壁通过螺钉固定有第一滑轨7,滑动块的外壁与第一滑轨7的内壁形成滑动配合。In the present invention, the four corners of the bottom outer wall of the
本发明中,箱体12的一边外壁通过螺钉固定有第一电机14,且第一电机14的输出轴通过联轴器连接有第一转板11,第一转板11的一边外壁通过螺钉固定有等距离分布的栓接杆17。In the present invention, the
本发明中,栓接杆17远离第一电机14的一端通过螺钉固定有第二转板,且第二转板通过轴承连接与箱体12相连接。In the present invention, one end of the bolting
本发明中,箱体12的一侧外壁开有插接孔,且插接孔的内壁插接有连接管26。In the present invention, an outer wall of one side of the
本发明中,箱体12的顶部外壁通过螺钉固定有电缆皮储存箱2,且剥皮块15的一边外壁通过螺钉固定有拉杆24。In the present invention, the outer wall of the top of the
本发明中,箱体12的一边外壁开有通孔,且通孔的内壁与拉杆24的外壁形成滑动配合,拉杆24的一端通过螺钉固定有把手13。In the present invention, an outer wall of one side of the
相较于实施例1,安装板9的一侧外壁通过螺钉固定有连接板29,且连接板29的底部外壁通过螺钉固定有第二电动伸缩杆28,第二电动伸缩杆28活塞杆的一端通过螺钉固定有斩断块27,工作台25的顶部外壁通过螺钉固定有斩断座30。Compared with Embodiment 1, the connecting
使用时,通过第二电动伸缩杆28带动斩断块27接近斩断座30,斩断块27和斩断座30配合使用可以快速的将电缆线斩断,从而可以实现对电缆线的快速斩断。When in use, the cutting
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. The equivalent replacement or change of the inventive concept thereof shall be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010451415.6A CN111600246B (en) | 2020-05-25 | 2020-05-25 | A kind of auxiliary device for construction of medium and low voltage distribution network |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010451415.6A CN111600246B (en) | 2020-05-25 | 2020-05-25 | A kind of auxiliary device for construction of medium and low voltage distribution network |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111600246A true CN111600246A (en) | 2020-08-28 |
| CN111600246B CN111600246B (en) | 2021-09-07 |
Family
ID=72189393
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010451415.6A Active CN111600246B (en) | 2020-05-25 | 2020-05-25 | A kind of auxiliary device for construction of medium and low voltage distribution network |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111600246B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112436664A (en) * | 2020-11-16 | 2021-03-02 | 肖云 | Strong magnetic power generator |
| CN113097933A (en) * | 2021-03-31 | 2021-07-09 | 广东电网有限责任公司 | Wire stripping device |
Citations (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001210154A (en) * | 2000-01-31 | 2001-08-03 | Shin Meiwa Ind Co Ltd | Automatic wire changer |
| FR2837128A1 (en) * | 2002-03-18 | 2003-09-19 | Jean Claude Brosse | SELECTIVE HELICOID CUTTING TOOL |
| CN205016939U (en) * | 2015-08-24 | 2016-02-03 | 国家电网公司 | Adjustable cable shield layer cuts and shells ware |
| CN207115284U (en) * | 2017-06-29 | 2018-03-16 | 新昌县城关宾立机械厂 | A kind of computer host box easy to remove |
| CN207320698U (en) * | 2017-08-29 | 2018-05-04 | 贾娟 | A kind of cable is pulled strings straightening device |
| CN207494471U (en) * | 2017-11-20 | 2018-06-15 | 湖州汇丰电工科技有限公司 | A kind of enamel-cover System of HS-WEDM |
| CN208190138U (en) * | 2018-04-29 | 2018-12-04 | 厦门科方圆工贸有限公司 | A kind of cable stripping device |
| CN208753848U (en) * | 2018-08-28 | 2019-04-16 | 徐州市永拓机械科技有限公司 | A kind of harness processing harness apparatus for peeling off |
| CN208806551U (en) * | 2018-08-31 | 2019-04-30 | 无锡胜维电气有限公司 | A kind of wire stripper |
| CN208923736U (en) * | 2018-10-26 | 2019-05-31 | 江苏众诚电子科技有限公司 | A kind of harness clipping and stripping machine |
| CN209156995U (en) * | 2018-11-05 | 2019-07-26 | 国家电网有限公司 | A kind of power construction shear |
| CN110265933A (en) * | 2019-08-02 | 2019-09-20 | 安徽天明电缆有限公司 | A kind of cable laying installation cutting peeling equipment |
| CN110649519A (en) * | 2019-09-18 | 2020-01-03 | 安徽长远机电股份有限公司 | Be applied to outdoor electric power construction and shell device with cable |
| CN110912034A (en) * | 2019-12-19 | 2020-03-24 | 王毅 | Power cable peeling device for electrical engineering |
| CN210350639U (en) * | 2019-07-17 | 2020-04-17 | 广州市声鑫电子有限公司 | Device for peeling and rolling communication cable |
| CN210404574U (en) * | 2019-08-01 | 2020-04-24 | 江西益博电力设备制造有限公司 | Cable stripping and recycling device |
| CN210577443U (en) * | 2019-10-15 | 2020-05-19 | 江西饶光电线电缆有限公司 | Cutting device for cable connection |
-
2020
- 2020-05-25 CN CN202010451415.6A patent/CN111600246B/en active Active
Patent Citations (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001210154A (en) * | 2000-01-31 | 2001-08-03 | Shin Meiwa Ind Co Ltd | Automatic wire changer |
| FR2837128A1 (en) * | 2002-03-18 | 2003-09-19 | Jean Claude Brosse | SELECTIVE HELICOID CUTTING TOOL |
| CN205016939U (en) * | 2015-08-24 | 2016-02-03 | 国家电网公司 | Adjustable cable shield layer cuts and shells ware |
| CN207115284U (en) * | 2017-06-29 | 2018-03-16 | 新昌县城关宾立机械厂 | A kind of computer host box easy to remove |
| CN207320698U (en) * | 2017-08-29 | 2018-05-04 | 贾娟 | A kind of cable is pulled strings straightening device |
| CN207494471U (en) * | 2017-11-20 | 2018-06-15 | 湖州汇丰电工科技有限公司 | A kind of enamel-cover System of HS-WEDM |
| CN208190138U (en) * | 2018-04-29 | 2018-12-04 | 厦门科方圆工贸有限公司 | A kind of cable stripping device |
| CN208753848U (en) * | 2018-08-28 | 2019-04-16 | 徐州市永拓机械科技有限公司 | A kind of harness processing harness apparatus for peeling off |
| CN208806551U (en) * | 2018-08-31 | 2019-04-30 | 无锡胜维电气有限公司 | A kind of wire stripper |
| CN208923736U (en) * | 2018-10-26 | 2019-05-31 | 江苏众诚电子科技有限公司 | A kind of harness clipping and stripping machine |
| CN209156995U (en) * | 2018-11-05 | 2019-07-26 | 国家电网有限公司 | A kind of power construction shear |
| CN210350639U (en) * | 2019-07-17 | 2020-04-17 | 广州市声鑫电子有限公司 | Device for peeling and rolling communication cable |
| CN210404574U (en) * | 2019-08-01 | 2020-04-24 | 江西益博电力设备制造有限公司 | Cable stripping and recycling device |
| CN110265933A (en) * | 2019-08-02 | 2019-09-20 | 安徽天明电缆有限公司 | A kind of cable laying installation cutting peeling equipment |
| CN110649519A (en) * | 2019-09-18 | 2020-01-03 | 安徽长远机电股份有限公司 | Be applied to outdoor electric power construction and shell device with cable |
| CN210577443U (en) * | 2019-10-15 | 2020-05-19 | 江西饶光电线电缆有限公司 | Cutting device for cable connection |
| CN110912034A (en) * | 2019-12-19 | 2020-03-24 | 王毅 | Power cable peeling device for electrical engineering |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112436664A (en) * | 2020-11-16 | 2021-03-02 | 肖云 | Strong magnetic power generator |
| CN113097933A (en) * | 2021-03-31 | 2021-07-09 | 广东电网有限责任公司 | Wire stripping device |
| CN113097933B (en) * | 2021-03-31 | 2022-04-22 | 广东电网有限责任公司 | Wire stripping device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111600246B (en) | 2021-09-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111600246A (en) | Well low voltage distribution network construction stringing auxiliary device | |
| CN214706850U (en) | Secondary scaffold of transformer substation | |
| CN214706852U (en) | Multifunctional secondary scaffold for transformer substation | |
| CN214527457U (en) | Hydraulic and hydroelectric engineering is with device of sunkening cord | |
| CN219535304U (en) | Drawer cabinet convenient for disassembling components | |
| CN112886447B (en) | Substation secondary construction vehicle | |
| CN205466100U (en) | Can become solar energy toolbox of simple and easy workstation | |
| CN112886448B (en) | Multifunctional substation secondary construction vehicle | |
| CN211296493U (en) | Generator dismouting platform | |
| CN208862482U (en) | A kind of high-efficient electric engineering punck-down block | |
| CN206820366U (en) | Secondary cable lays servicing unit | |
| CN112952640A (en) | Multifunctional substation secondary cable construction tool chair | |
| CN222601585U (en) | Inverter power supply convenient to wiring | |
| CN221836460U (en) | A cable retracting device for electromechanical engineering | |
| CN211594644U (en) | Wire bundle winding and unwinding device for electric power engineering | |
| CN221836499U (en) | A cable storage structure for high-voltage distribution cabinet | |
| CN221597355U (en) | Bus plate fixing device for electrical engineering | |
| CN213005224U (en) | Distribution network overhauls uses toolbox | |
| CN222224923U (en) | A new type of building equipment storage device | |
| CN221995287U (en) | A direct drive stator coil pushing device | |
| CN211830138U (en) | Cable protection pipe | |
| CN221810111U (en) | Loading attachment that wire and cable raw and other materials processing was used | |
| CN221759460U (en) | A protective safety device for equipment installation | |
| CN221639385U (en) | Cable cutting device for electric power construction | |
| CN218261379U (en) | Traction device for overhead power transmission line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |