CN111596355A - 一种零偏移距vsp时频分析划分地层及层速度确定方法 - Google Patents

一种零偏移距vsp时频分析划分地层及层速度确定方法 Download PDF

Info

Publication number
CN111596355A
CN111596355A CN202010488214.3A CN202010488214A CN111596355A CN 111596355 A CN111596355 A CN 111596355A CN 202010488214 A CN202010488214 A CN 202010488214A CN 111596355 A CN111596355 A CN 111596355A
Authority
CN
China
Prior art keywords
time
depth
zero offset
tfvsp
offset vsp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010488214.3A
Other languages
English (en)
Other versions
CN111596355B (zh
Inventor
李建国
吴俊军
王熙明
夏淑君
黄建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BGP Inc
Optical Science and Technology Chengdu Ltd of CNPC
Original Assignee
Optical Science and Technology Chengdu Ltd of CNPC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Optical Science and Technology Chengdu Ltd of CNPC filed Critical Optical Science and Technology Chengdu Ltd of CNPC
Priority to CN202010488214.3A priority Critical patent/CN111596355B/zh
Publication of CN111596355A publication Critical patent/CN111596355A/zh
Application granted granted Critical
Publication of CN111596355B publication Critical patent/CN111596355B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. for interpretation or for event detection
    • G01V1/30Analysis
    • G01V1/306Analysis for determining physical properties of the subsurface, e.g. impedance, porosity or attenuation profiles
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. for interpretation or for event detection
    • G01V1/30Analysis
    • G01V1/303Analysis for determining velocity profiles or travel times
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/62Physical property of subsurface
    • G01V2210/622Velocity, density or impedance
    • G01V2210/6222Velocity; travel time
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/62Physical property of subsurface
    • G01V2210/624Reservoir parameters

Landscapes

  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明提出了一种零偏移距VSP时频分析划分地层及层速度确定方法,该方法根据零偏移距VSP走廊的时频特征划分时间域地层,利用零偏移距VSP时深关系转换到深度域分层,计算分层的层速度。本发明充分结合了地层的旋回特征,从地震尺度提出地层划分方案,为综合地质解释提供依据;对比发现,该方法划分的地层与岩性剖面一致;利用零偏移距VSP时深关系计算的分层层速度更精确。

Description

一种零偏移距VSP时频分析划分地层及层速度确定方法
技术领域
本发明涉及地球物理勘探中地震数据分析技术领域,属于垂直地震解释技术范畴,是一种零偏移距VSP时频分析划分地层及层速度确定方法。
背景技术
零偏移距VSP技术已问世近70年,主要用于地震层位标定、提供准确的时深关系和层速度。零偏移距VSP,是指检波器沉放在井中、炮点偏离井口很小的人工地震观测方式。一般零偏移距VSP偏离井口的距离在50米以内,可以近似认为地震射线垂直穿过地层。
一般深度域地层划分是通过测井资料进行的,测井分层的时间是不准的、分层资料的频带是几千赫兹;利用地震资料旋回分析划分地层是时间域的,其深度是不准的。
发明内容
本发明提出了一种零偏移距VSP时频分析划分地层及层速度确定方法,该方法根据零偏移距VSP走廊的时频特征划分时间域地层,利用零偏移距VSP时深关系转换到深度域分层,计算分层的层速度。对比发现,该方法划分的地层与岩性剖面一致。
本发明目的在于利用零偏移距VSP走廊剖面时频特征划分地层及计算分层的层速度,从地震尺度提出地层划分方案,为综合地质解释提供依据。
具体技术方案为:
一种零偏移距VSP时频分析划分地层及层速度确定方法,包括以下步骤:
(1)输入零偏移距VSP时间域走廊、零偏移距VSP走廊时频剖面、零偏移距VSP时深关系H和T、零偏移距VSP层速度;
其中,H是深度,T是时间,Hi是深度点对应的第i个时间点为Ti,i∈[1,N],N是时深对的个数;
(2)用步骤(1)的零偏移距VSP时深关系将步骤(1)的零偏移距VSP时间域走廊转换到深度域;
(3)用步骤(1)的零偏移VSP时间域走廊和零偏移距VSP走廊时频剖面划分时间域地层;
(3.1)拾取零偏移距VSP走廊时频剖面能量团的峰值ttf
(3.2)调整(3.1)的峰值位置为步骤(1)的零偏移VSP时间域走廊的最近波峰(或者波谷)位置,即为时间域分层ttfvsp
(4)用步骤(3)的时间域分层、步骤(2)的深度域走廊、步骤(1)的时深关系,得到深度域的分层;
dtfvsp=Interp(T,H,ttfvsp)
其中,H是深度,T是时间,ttfvsp是时间域分层,dtfvsp是深度域分层,Interp是插值函数;
(5)用步骤(4)深度域分层和步骤(3)的时间域分层计算分层层速度;
vj=2·(dtfvsp,j-dtfvsp,j-1)/(ttfvsp,j-ttfvsp,j-1)
其中,vj是第j个分层的层速度,dtfvsp,j、dtfvsp,j-1是第j、j-1深度域分层,ttfvsp,j、ttfvsp,j-1第j、j-1时间域分层,j∈[1,M],M分层的层数。
本发明,采用分层资料是地震频带的几十赫兹;零偏移距VSP走廊具有准确的时深关系,频带是几十赫兹,利用其时频剖面指定分层具有明显的优势。
本发明提出了一种零偏移距VSP时频分析划分地层及层速度确定方法,充分结合了地层的旋回特征,从地震尺度提出地层划分方案,为综合地质解释提供依据;对比发现,该方法划分的地层与岩性剖面一致;利用零偏移距VSP时深关系计算的分层层速度更精确。
附图说明
图1为实施例的输入零偏移距VSP走廊;横坐标为道号(单位:无);纵坐标为时间(单位:毫秒);
图2为实施例的输入零偏移距VSP走廊的时频剖面;横坐标为频率(单位:赫兹);纵坐标为时间(单位:毫秒);
图3为实施例的零偏移距VSP时深关系;横坐标为双程时(单位:毫秒);纵坐标为深度(单位:米);
图4为实施例的零偏移距VSP层速度;横坐标为速度(单位:米/秒);纵坐标为深度(单位:米);
图5为实施例的零偏移距VSP时间域走廊和深度域走廊;横坐标为时间域走廊、深度域走廊(单位:无);纵坐标分别为时间(单位:毫秒)、深度(单位:米);
图6为实施例的时间域地层划分;横坐标为时频剖面、时间域走廊(单位:无);纵坐标为时间(单位:毫秒);
图7为实施例的深度域地层划分;横坐标为时频剖面、时间域走廊、深度域走廊(单位:无);纵坐标为时间(单位:毫秒)、深度(单位:米);
图8为实施例的深度域分层层速度;横坐标为时频剖面、时间域走廊、深度域走廊、深度域分层层速度(单位:无);纵坐标为时间(单位:毫秒)、深度(单位:米);
图9为实施例的深度域分层与岩性剖面;横坐标为岩性剖面、深度域走廊、深度域分层层速度(单位:无);纵坐标为深度(单位:米)。
具体实施方式
结合实施例说明本发明的具体技术方案。
一种零偏移距VSP时频分析划分地层及层速度确定方法,包括以下步骤:
(1)输入零偏移距VSP时间域走廊、零偏移距VSP走廊时频剖面、零偏移距VSP时深关系H和T、零偏移距VSP层速度。
其中,H是深度,T是时间,Hi是深度点对应的第i个时间点为Ti,i∈[1,N],N是时深对的个数。
输入零偏移距VSP时间域走廊,如图1所示。
输入的零偏移距VSP走廊时频剖面,如图2所示。
输入的零偏移距VSP时深关系,如图3所示。
输入的零偏移距VSP层速度,如图4所示。
(2)用步骤(1)的零偏移距VSP时深关系将步骤(1)的零偏移距VSP时间域走廊转换到深度域。
零偏移距VSP时间域走廊转深度域,如图5所示。
(3)用步骤(1)的零偏移VSP时间域走廊和零偏移距VSP走廊时频剖面划分时间域地层。
(3.1)拾取零偏移距VSP走廊时频剖面能量团的峰值ttf
(3.2)调整(3.2)的峰值位置为步骤(1)的零偏移VSP时间域走廊的最近波峰(或者波谷)位置,即为时间域分层ttfvsp
时间域地层划分,如图6所示。
(4)用步骤(3)的时间域分层、步骤(2)的深度域走廊、步骤(1)的时深关系,得到深度域的分层;
dtfvsp=Interp(T,H,ttfvsp)
其中,H是深度,T是时间,ttfvsp是时间域分层,dtfvsp是深度域分层,Interp是插值函数。
深度域地层划分,如图7所示。
(5)用步骤(4)深度域分层和步骤(3)的时间域分层计算分层层速度。
vj=2·(dtfvsp,j-dtfvsp,j-1)/(ttfvsp,j-ttfvsp,j-1)
其中,vj是第j个分层的层速度,dtfvsp,j、dtfvsp,j-1是第j、j-1深度域分层,ttfvsp,j、ttfvsp,j-1第j、j-1时间域分层,j∈[1,M],M分层的层数。
深度域分层及层速度,如图8所示。深度域分层与岩性剖面对比,如图9所示。

Claims (2)

1.一种零偏移距VSP时频分析划分地层及层速度确定方法,其特征在于,包括以下步骤:
(1)输入零偏移距VSP时间域走廊、零偏移距VSP走廊时频剖面、零偏移距VSP时深关系H和T、零偏移距VSP层速度;
其中,H是深度,T是时间,Hi是深度点对应的第i个时间点为Ti,i∈[1,N],N是时深对的个数;
(2)用步骤(1)的零偏移距VSP时深关系将步骤(1)的零偏移距VSP时间域走廊转换到深度域;
(3)用步骤(1)的零偏移VSP时间域走廊和零偏移距VSP走廊时频剖面划分时间域地层;
(4)用步骤(3)的时间域分层、步骤(2)的深度域走廊、步骤(1)的时深关系,得到深度域的分层;
dtfvsp=Interp(T,H,ttfvsp)
其中,H是深度,T是时间,ttfvsp是时间域分层,dtfvsp是深度域分层,Interp是插值函数;
(5)用步骤(4)深度域分层和步骤(3)的时间域分层计算分层层速度;
vj=2·(dtfvsp,j-dtfvsp,j-1)/(ttfvsp,j-ttfvsp,j-1)
其中,vj是第j个分层的层速度,dtfvsp,j、dtfvsp,j-1是第j、j-1深度域分层,ttfvsp,j、ttfvsp,j-1第j、j-1时间域分层,j∈[1,M],M分层的层数。
2.根据权利要求1所述的一种零偏移距VSP时频分析划分地层及层速度确定方法,其特征在于,步骤(3)具体包括以下子步骤:
(3.1)拾取零偏移距VSP走廊时频剖面能量团的峰值ttf
(3.2)调整(3.1)的峰值位置为步骤(1)的零偏移VSP时间域走廊的最近波峰或者波谷位置,即为时间域分层ttfvsp
CN202010488214.3A 2020-06-02 2020-06-02 一种零偏移距vsp时频分析划分地层及层速度确定方法 Active CN111596355B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010488214.3A CN111596355B (zh) 2020-06-02 2020-06-02 一种零偏移距vsp时频分析划分地层及层速度确定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010488214.3A CN111596355B (zh) 2020-06-02 2020-06-02 一种零偏移距vsp时频分析划分地层及层速度确定方法

Publications (2)

Publication Number Publication Date
CN111596355A true CN111596355A (zh) 2020-08-28
CN111596355B CN111596355B (zh) 2022-04-01

Family

ID=72189895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010488214.3A Active CN111596355B (zh) 2020-06-02 2020-06-02 一种零偏移距vsp时频分析划分地层及层速度确定方法

Country Status (1)

Country Link
CN (1) CN111596355B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112987098A (zh) * 2021-04-02 2021-06-18 中油奥博(成都)科技有限公司 基于vsp的微地震速度模型优化方法

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5982706A (en) * 1997-03-04 1999-11-09 Atlantic Richfield Company Method and system for determining normal moveout parameters for long offset seismic survey signals
EP1320768A1 (en) * 2000-07-27 2003-06-25 Services Petroliers Schlumberger A method of processing seismic data
CN101071175A (zh) * 2006-05-11 2007-11-14 中国石油集团东方地球物理勘探有限责任公司 零井源距垂直地震剖面纵横波数据深度域走廊叠加剖面处理方法
US20100128562A1 (en) * 2008-11-25 2010-05-27 Baker Hughes Incorporated Anisotropic Parameter Determination
US20100133010A1 (en) * 2008-12-02 2010-06-03 Baker Hughes Incorporated Anisotropic Depth Velocity Model Estimation Above the Receiver Array in Walkaway or 3D VSP Data
GB201106844D0 (en) * 2010-04-30 2011-06-01 Schlumberger Holdings Multicomponent seismic inversion of VSP data
CN102156299A (zh) * 2011-04-08 2011-08-17 中国石油化工股份有限公司 一种各向异性速度模型建立的方法
CN102914792A (zh) * 2011-08-05 2013-02-06 中国石油化工股份有限公司 一种提高非零偏移距vsp三分量资料的成像效果的方法
CN104502965A (zh) * 2014-12-22 2015-04-08 中国石油天然气集团公司 一种振幅补偿因子的反演方法
CN104656142A (zh) * 2013-11-19 2015-05-27 中国石油天然气集团公司 一种利用垂直地震剖面与测井联合的地震层位标定方法
WO2015100544A1 (zh) * 2013-12-30 2015-07-09 中国石油天然气股份有限公司 基于零偏垂直地震剖面数据估计品质因子的方法和装置
CN105259581A (zh) * 2015-10-22 2016-01-20 中国石油化工股份有限公司 一种地震资料时深转换方法
CN106094032A (zh) * 2016-08-30 2016-11-09 中国石油集团川庆钻探工程有限公司地球物理勘探公司 一种构建地层速度模型的方法
CN107765306A (zh) * 2016-08-19 2018-03-06 中国石油化工股份有限公司 一种vsp初始速度建模方法及装置

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5982706A (en) * 1997-03-04 1999-11-09 Atlantic Richfield Company Method and system for determining normal moveout parameters for long offset seismic survey signals
EP1320768A1 (en) * 2000-07-27 2003-06-25 Services Petroliers Schlumberger A method of processing seismic data
US20040008578A1 (en) * 2000-07-27 2004-01-15 Leaney Scott Walter Method of processing seismic data
CN101071175A (zh) * 2006-05-11 2007-11-14 中国石油集团东方地球物理勘探有限责任公司 零井源距垂直地震剖面纵横波数据深度域走廊叠加剖面处理方法
US20100128562A1 (en) * 2008-11-25 2010-05-27 Baker Hughes Incorporated Anisotropic Parameter Determination
US20100133010A1 (en) * 2008-12-02 2010-06-03 Baker Hughes Incorporated Anisotropic Depth Velocity Model Estimation Above the Receiver Array in Walkaway or 3D VSP Data
GB201106844D0 (en) * 2010-04-30 2011-06-01 Schlumberger Holdings Multicomponent seismic inversion of VSP data
CN102156299A (zh) * 2011-04-08 2011-08-17 中国石油化工股份有限公司 一种各向异性速度模型建立的方法
CN102914792A (zh) * 2011-08-05 2013-02-06 中国石油化工股份有限公司 一种提高非零偏移距vsp三分量资料的成像效果的方法
CN104656142A (zh) * 2013-11-19 2015-05-27 中国石油天然气集团公司 一种利用垂直地震剖面与测井联合的地震层位标定方法
WO2015100544A1 (zh) * 2013-12-30 2015-07-09 中国石油天然气股份有限公司 基于零偏垂直地震剖面数据估计品质因子的方法和装置
CN104502965A (zh) * 2014-12-22 2015-04-08 中国石油天然气集团公司 一种振幅补偿因子的反演方法
CN105259581A (zh) * 2015-10-22 2016-01-20 中国石油化工股份有限公司 一种地震资料时深转换方法
CN107765306A (zh) * 2016-08-19 2018-03-06 中国石油化工股份有限公司 一种vsp初始速度建模方法及装置
CN106094032A (zh) * 2016-08-30 2016-11-09 中国石油集团川庆钻探工程有限公司地球物理勘探公司 一种构建地层速度模型的方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴志强: "大陆架科学钻探CSDP-2井的垂直地震剖面测量", 《地球物理学报》 *
李建国: "VSP测井在大型陆相沉积煤田勘探中应用效果", 《中国煤炭地质》 *
赵海英: "基于VSP的地震层位综合标定方法", 《石油地球物理勘探》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112987098A (zh) * 2021-04-02 2021-06-18 中油奥博(成都)科技有限公司 基于vsp的微地震速度模型优化方法
CN112987098B (zh) * 2021-04-02 2022-07-01 中油奥博(成都)科技有限公司 基于vsp的微地震速度模型优化方法

Also Published As

Publication number Publication date
CN111596355B (zh) 2022-04-01

Similar Documents

Publication Publication Date Title
CN111239802B (zh) 基于地震反射波形和速度谱的深度学习速度建模方法
CN107121699B (zh) 一种地震相控制下的沉积微相识别方法
CN102053270B (zh) 一种基于沉积地层单元的地震相分析方法
AU2009200446B2 (en) Method for three dimensional seismic travel time tomography in transversely isotropic media
CN108442882B (zh) 基于二维地震资料的页岩气大位移水平井随钻地质导向方法
CN103576200B (zh) 低信噪比区浅层波阻抗界面静校正方法
CN105388518A (zh) 一种质心频率与频谱比联合的井中地震品质因子反演方法
CN109884710B (zh) 针对激发井深设计的微测井层析成像方法
CN101487898A (zh) 采用纵波地震勘探叠后资料进行油气水识别的方法
CN103901465A (zh) 全息三维地震勘探观测系统的设计方法
CN104820242B (zh) 一种面向叠前反演的道集振幅分频补偿方法
CN105093306A (zh) 一种地球物理勘探中储层自动解释与厚度求取方法
CN109470187A (zh) 基于地震三属性的储层厚度预测方法
CN111596355B (zh) 一种零偏移距vsp时频分析划分地层及层速度确定方法
CN109100792A (zh) 基于台站与三维地震联合采集资料的速度反演方法
CN106526671A (zh) 一种碳酸盐岩储层地震波响应特征分析方法
Al-Khazraji et al. Uncertainty analysis to assess depth conversion accuracy: A case study of Subba Oilfield, Southern Iraq
CN102053269A (zh) 一种对地震资料中速度分析方法
CN111624649B (zh) 一种零偏移距vsp建立横向变速层速度模型的方法和装置
CN109143335B (zh) 一种合成地震记录的制作方法、系统、介质及设备
CN111413737A (zh) 一种密井网区地震层位解释到沉积单元的方法
CN106990433B (zh) 一种隆起区微小侵蚀沟槽的识别方法
CN111999768B (zh) 一种钻井分层设计中基于构造模型的构造海拔确定方法
CN113589375B (zh) 基于倾斜层约束旅行时计算的vsp层速度反演方法
CN110989034B (zh) 一种回归-分形插值法反演测井横波时差方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201124

Address after: 072750 No. 189 Yang Xi Road, Zhuozhou, Hebei, Baoding

Applicant after: BGP Inc., China National Petroleum Corp.

Applicant after: ZHONGYOU AOBO (CHENGDU) TECHNOLOGY Co.,Ltd.

Address before: No.704, 7th floor, building 2, No.200 Tianquan Road, high tech Zone, Chengdu, Sichuan Province

Applicant before: ZHONGYOU AOBO (CHENGDU) TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant