CN111591852A - Construction method for additionally installing elevator and application thereof - Google Patents

Construction method for additionally installing elevator and application thereof Download PDF

Info

Publication number
CN111591852A
CN111591852A CN202010499829.6A CN202010499829A CN111591852A CN 111591852 A CN111591852 A CN 111591852A CN 202010499829 A CN202010499829 A CN 202010499829A CN 111591852 A CN111591852 A CN 111591852A
Authority
CN
China
Prior art keywords
elevator
layer
installing
waiting
hall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010499829.6A
Other languages
Chinese (zh)
Inventor
伊喜和
夏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Chunxu Elevator Engineering Co ltd
Original Assignee
Shanghai Chunxu Elevator Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Chunxu Elevator Engineering Co ltd filed Critical Shanghai Chunxu Elevator Engineering Co ltd
Priority to CN202010499829.6A priority Critical patent/CN111591852A/en
Publication of CN111591852A publication Critical patent/CN111591852A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Abstract

The invention relates to the field of elevator installation, in particular to a construction method for installing an elevator and application thereof. The method comprises the following steps: installation of a base layer, framework installation of an elevator shaft and a waiting elevator hall, decoration of the elevator shaft and the waiting elevator hall, and installation and debugging of an elevator. The invention provides a construction method for additionally installing an elevator, which can reduce the pollution of noise, dust and the like caused by installing a derrick on a construction site and improve the efficiency by integrally installing the derrick; the applicant implants the steel bars into the old foundation in a chemical bar planting mode, and can provide more stable connection through the connection of the reinforced concrete and the new foundation; and the applicant can reduce deformation, cracking and even damage caused by temperature, humidity, load, vibration and the like through the structural design of the elevator shaft and the elevator waiting hall, and improve the use safety and the service life.

Description

Construction method for additionally installing elevator and application thereof
Technical Field
The invention relates to the field of elevator installation, in particular to a construction method for installing an elevator and application thereof.
Background
In order to make residents in old communities comfortable and convenient to live without investing a large amount of capital, a large amount of municipal works choose to install outdoor elevators outside the existing buildings. In the process of installing the outdoor elevator additionally, an elevator basic member needs to be additionally arranged, and then a steel structure and the elevator can be paved on the elevator basic member. For most areas, the construction sequence of the elevator foundation components is on-site pit digging, pile driving, pouring and maintenance to form a foundation pit, and after the elevator foundation components reach corresponding strength, the superstructure is additionally installed, so that the period of the whole construction process is very long, the elevator foundation components are greatly influenced by the natural environment, and the construction period is longer under the condition of storm. In addition, current elevator foundation member need be under construction at the scene, can bring noise pollution and environmental pollution for the resident of old district in the whole work progress, can influence the living environment of old district, and especially to the old man, whole work progress is decocting and intolerable.
Disclosure of Invention
In order to solve the above problems, a first aspect of the present invention provides a construction method for installing an elevator, including the steps of: installation of a base layer, framework installation of an elevator shaft and a waiting elevator hall, decoration of the elevator shaft and the waiting elevator hall, and installation and debugging of an elevator.
As a preferable technical scheme, the base layer installation comprises the steps of defense line slotting, cushion layer pouring, bar planting, concrete pouring, maintenance, pile pressing, pile sealing and earthwork backfilling.
As a preferable technical scheme, in the framework installation of the elevator shaft and the elevator waiting hall, the derrick is welded, polished, shot-blasted and painted, and then is integrally transported to a construction site for integrated installation.
As a preferred technical solution of the present invention, in the decoration of the elevator shaft and the elevator waiting hall, an outer wall and a window are installed outside the elevator waiting hall and the elevator shaft, and a platform is installed at the bottom of each floor of the elevator waiting hall.
As a preferable technical scheme, the platform comprises a floor tile layer, a bonding layer, a leveling layer and a substrate from top to bottom.
As a preferred embodiment of the present invention, the shape of the substrate is selected from one of a wave shape, a fold line shape, and a straight line shape.
In a preferable technical scheme of the invention, steel plates and eaves pressing walls are arranged at the tops of the elevator shaft and the elevator waiting hall in the decoration of the elevator shaft and the elevator waiting hall.
As a preferable technical scheme of the invention, the elevator shaft and the elevator waiting hall are respectively connected with the building through expansion joints.
In a preferred embodiment of the present invention, in the elevator installation, a hook is installed in the middle of the top of the elevator shaft, and the elevator is installed by the hook.
The second aspect of the invention provides application of the construction method for installing the elevator, which is used for building the elevator.
Compared with the prior art, the invention has the following beneficial effects: the invention provides a construction method for additionally installing an elevator, which can reduce the pollution of noise, dust and the like caused by installing a derrick on a construction site and improve the efficiency by integrally installing the derrick; the applicant implants the steel bars into the old foundation in a chemical bar planting mode, and can provide more stable connection through the connection of the reinforced concrete and the new foundation; and the applicant can reduce deformation, cracking and even damage caused by temperature, humidity, load, vibration and the like through the structural design of the elevator shaft and the elevator waiting hall, and improve the use safety and the service life.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic plan view of an additional elevator structure obtained by the construction method for the additional elevator.
Fig. 2 is a schematic plan view of an elevator-adding structure obtained by the elevator-adding construction method.
FIG. 3 is a cross-sectional view of the platform.
Fig. 4 shows an embodiment of the expansion joint.
Fig. 5 shows an embodiment of the expansion joint.
Wherein, 1-base course, 2-lift well, 3-waiting hall, 5-corning wall, 6-derrick, 301-platform, 3011-base, 3012-leveling layer, 3013-bonding layer, 3014-floor brick layer, 701-expansion joint I, 702-expansion joint II, 7011-heat preservation layer I, 7012-water stopping layer, 7013-base I, 7021-heat preservation layer II, 7022-rubber layer, 7023-base II and 7024-rubber layer.
Detailed Description
The disclosure may be understood more readily by reference to the following detailed description of preferred embodiments of the invention and the examples included therein. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. In case of conflict, the present specification, including definitions, will control.
The term "prepared from …" as used herein is synonymous with "comprising". The terms "comprises," "comprising," "includes," "including," "has," "having," "contains," "containing," or any other variation thereof, as used herein, are intended to cover a non-exclusive inclusion. For example, a composition, process, method, article, or apparatus that comprises a list of elements is not necessarily limited to only those elements but may include other elements not expressly listed or inherent to such composition, process, method, article, or apparatus.
When a parameter is expressed as a range, preferred range, or as a range defined by a list of upper preferable values and lower preferable values, this is to be understood as specifically disclosing all ranges formed from any pair of any upper range limit or preferred value and any lower range limit or preferred value, regardless of whether ranges are separately disclosed. For example, when a range of "1 to 5" is disclosed, the described range should be interpreted to include the ranges "1 to 4", "1 to 3", "1 to 2 and 4 to 5", "1 to 3 and 5", and the like. When a range of values is described herein, unless otherwise stated, the range is intended to include the endpoints thereof and all integers and fractions within the range.
The singular forms "a", "an" and "the" include plural referents unless the context clearly dictates otherwise. "optional" or "any" means that the subsequently described event or events may or may not occur, and that the description includes instances where the event occurs and instances where it does not.
In addition, the indefinite articles "a" and "an" preceding an element or component of the invention are not intended to limit the number requirement (i.e., the number of occurrences) of the element or component. Thus, "a" or "an" should be read to include one or at least one, and the singular form of an element or component also includes the plural unless the stated number clearly indicates that the singular form is intended.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings or the orientations or positional relationships that the products of the present invention are conventionally placed in use, and are only used for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used solely to distinguish one from another and are not to be construed as indicating or implying relative importance.
Furthermore, the terms "horizontal", "vertical", "overhang" and the like do not imply that the components are required to be absolutely horizontal or overhang, but may be slightly inclined. For example, "horizontal" merely means that the direction is more horizontal than "vertical" and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The present invention is illustrated by the following specific embodiments, but is not limited to the specific examples given below.
The first aspect of the invention provides a construction method for additionally installing an elevator, which comprises the following steps: installation of a base layer, framework installation of an elevator shaft and a waiting elevator hall, decoration of the elevator shaft and the waiting elevator hall, and installation and debugging of an elevator.
In one embodiment, the base layer installation comprises wire grooving, bedding layer pouring, bar planting, concrete pouring and curing, pile pressing, pile sealing and earthwork backfilling; further, the base layer installation comprises the steps of line defense grooving, cushion layer pouring, rib planting, formwork erecting, concrete pouring, formwork dismantling, concrete curing for 15-25 days, pile pressing, pile sealing and earthwork backfilling.
In one embodiment, the bonded steel bars are chemical bonded steel bars. The embedded steel bar is also called as a seed steel bar, is a connection technology of steel bar post-anchoring and utilizing the holding force effect of a structural adhesive locking key in the earthquake-resistant reinforcement engineering of a building structure, and is the best choice for the application of structural embedded steel bar reinforcement and heavy load fastening. The chemical bar planting is that drilling is carried out on base materials such as concrete, wall rock and the like, then high-strength bar planting glue is injected, reinforcing steel bars or section bars are inserted, and the reinforcing steel bars and the base materials are bonded into a whole after the glue is solidified.
In one embodiment, in the framework installation of the elevator shaft and the elevator waiting hall, the derrick is welded, polished, shot-blasted and painted, and then the whole derrick is transported to a construction site for integrated installation.
In one embodiment, in the decoration of the elevator shaft and the elevator waiting hall, an outer wall and a window are installed outside the elevator waiting hall and the elevator shaft, and a platform is installed at the bottom of each elevator waiting hall.
In one embodiment, the number of the elevator waiting halls is the same as the number of the floors of the building. The applicant sets a platform to be connected with each floor, and after coming out of an elevator door, a resident can enter each floor through the platform and return to a corresponding house.
In one embodiment, the platform comprises, from top to bottom, a layer of floor tiles, a bonding layer, a leveling layer, and a substrate.
In one embodiment, the shape of the substrate is selected from one of a wave shape, a fold line shape, and a straight line shape; furthermore, the substrate is wavy, the wave width of the wave is 90-120 mm, the thickness of the top end of the leveling layer from the wave crest of the substrate is 15-25 mm, the thickness of the bonding layer is 15-25 mm, and the thickness of the floor tile layer is 8-12 mm; furthermore, the shape of the substrate is wavy, the wave width of the wavy wave is 100mm, the thickness of the top end of the leveling layer from the wave crest of the base layer is 20mm, the thickness of the bonding layer is 20mm, and the thickness of the floor tile layer is 10 mm.
The wave width is the distance between the wave crest and the wave trough of the wave shape.
In one embodiment, the material of the bonding layer is a bonding mortar. The adhesive mortar is prepared by mixing cement, quartz sand, polymer adhesive and various additives uniformly by a machine.
In one embodiment, the material of the leveling layer is cement mortar. The cement mortar is prepared from cement, sand and water, namely cement, sand and water, according to the requirements; further, the weight ratio of cement to sand in the cement mortar is 1: (2-3); further, the weight ratio of cement to sand in the cement mortar is 1: 3.
in one embodiment, the material of the substrate is selected from one of steel, iron, copper, aluminum; further, the base layer is made of steel; further, the material of the substrate is a profiled steel sheet. The profiled steel sheet is formed by rolling and cold-bending a coating plate or a plating plate and forming a corrugated section along the width direction of the plate.
In one embodiment, in the decoration of the elevator shaft and the elevator waiting hall, a steel plate and a pressure eaves wall are installed at the top of the elevator shaft and the elevator waiting hall.
In one embodiment, the eave pressing wall comprises a cement mortar layer with the thickness of 8-12 mm, an isolation layer with the thickness of 8-12 mm, a waterproof layer with the thickness of 4-8 mm, a cement mortar layer with the thickness of 8-12 mm and a concrete layer with the thickness of 18-22 mm from top to bottom; further, the eaves pressing wall from top to bottom includes that thickness is 10 mm's cement mortar layer, 10 mm's isolation layer, 6 mm's waterproof layer, 10 mm's cement mortar layer, 20 mm's concrete layer.
In one embodiment, the cement to sand weight ratio in the cement mortar layer is 1: (2-3); further, the weight ratio of cement to sand in the cement mortar layer is 1: 3.
in one embodiment, the material of the isolation layer is mortar. Mortar is a bonding substance used for building bricks on buildings, and is formed by adding water into sand and cementing materials (cement, lime paste, clay and the like) according to a certain proportion, and is also called mortar and also used as mortar. The present invention is not particularly limited to mortar.
In one embodiment, the waterproof layer comprises one or more of an asphalt waterproof layer, an SBS modified asphalt waterproof layer, and a polyurethane waterproof layer.
In one embodiment, the waterproof layer comprises an SBS modified asphalt waterproof layer and a polyurethane waterproof layer from top to bottom, and the thickness ratio of the SBS modified asphalt waterproof layer to the polyurethane waterproof layer is (1.5-2.5): 1; further, the thickness ratio of the SBS modified asphalt waterproof layer to the polyurethane waterproof layer is 2: 1.
in one embodiment, the elevator shaft and the elevator waiting hall are respectively connected with the building through expansion joints; furthermore, the distances between the elevator shaft and the side surfaces of the elevator waiting hall and the building are respectively 170-190 mm, and the elevator shaft and the side surfaces of the elevator waiting hall are connected with the building through expansion joints; further, the distances from the side surfaces of the elevator shaft and the elevator waiting hall to the building are respectively 180 mm; furthermore, the side surface of the elevator waiting hall is connected with the building through a second expansion joint; further, the side surface of the elevator shaft is connected with a building through a first expansion joint.
In one embodiment, the expansion joint I comprises a first insulating layer, a first waterproof layer and a first base from right to left, and the shape of the first waterproof layer comprises one of a straight line shape, an arc shape and a wave shape; further, the waterproof layer is arc-shaped; further, the material of the first heat insulation layer is selected from one of rock wool, vitrified micro bubbles and glass wool; further, the first heat insulation layer is made of rock wool; further, the material of the first base is selected from one of aluminum alloy, copper, zinc, lead and magnesium; further, the first base is made of aluminum alloy. The material of the water stop layer is not particularly limited in the present invention, and may be rubber well known in the art.
In one embodiment, the second expansion joint comprises a second insulating layer, a second rubber layer, a second base and a second rubber layer from left to right, and the shape of the second rubber layer comprises one of a zigzag shape, an arc shape and a wave shape; further, the shape of the rubber layer is a fold line shape; further, the material of the rubber layer is thermoplastic rubber; further, the material of the second heat insulation layer is selected from one of rock wool, vitrified micro bubbles and glass wool; further, the second heat insulation layer is made of rock wool; further, the material of the second base is selected from one of aluminum alloy, copper, zinc, lead and magnesium; further, the second base is made of aluminum alloy.
The material of the adhesive layer is not particularly limited, and polystyrene, polycarbonate, polyamide, polypropylene, polyethylene, and polyurethane may be mentioned.
In one embodiment, the elevator installation is performed by installing a hook in the middle of the top of the elevator shaft and installing the elevator by means of the hook.
In one embodiment, a canopy is arranged on the side surface of the second floor of the elevator waiting hall; furthermore, a slope is arranged below the canopy, and the slope is communicated with the first floor of the elevator waiting hall.
By arranging the slope, residents can enter the first elevator waiting hall through the slope, and the phenomena of water immersion and the like can be avoided by providing a certain gradient; in addition, the applicant can also bring convenience to the residents to keep out rain by arranging the rain shed.
In one embodiment, the widths of the elevator shaft and the elevator waiting hall are the same and are both 1.8-2.2 m; furthermore, the widths of the elevator shaft and the elevator waiting hall are the same and are both 2 m.
In one embodiment, the length of the elevator shaft is 1.5-1.9 m, and the length of the elevator waiting hall is 1.3-1.7 m; further, the length of the elevator shaft is 1.7m, and the length of the elevator waiting hall is 1.5 m; furthermore, the width of the rain shed is the same as that of the ladder waiting hall, and the length of the rain shed is 0.8-1 m; further, the length of canopy is 0.9 m.
The second direction of the invention provides an application of the construction method for installing the elevator, which is used for installing the elevator outside the building.
Exemplary embodiments will now be described more fully with reference to the accompanying drawings.
Examples
The present invention will be specifically described below by way of examples. It should be noted that the following examples are only for illustrating the present invention and should not be construed as limiting the scope of the present invention, and that the insubstantial modifications and adaptations of the present invention by those skilled in the art based on the above disclosure are still within the scope of the present invention.
Example 1
As shown in fig. 1 to 5, the present embodiment provides a construction method for installing an elevator, including the steps of: the method comprises the following steps of installing a base layer 1, installing frameworks of an elevator shaft 2 and a waiting elevator hall 3, decorating the elevator shaft 2 and the waiting elevator hall 3, and installing and debugging the elevator, wherein the base layer 1 is installed and comprises a defensive line slotting step, a pouring cushion layer, a steel bar planting step, a supporting template step, concrete pouring, template dismantling, concrete curing for 20 days, pile pressing step, pile sealing step and earthwork backfilling step; in the installation of the frameworks of the elevator hoistway 2 and the elevator waiting hall 3, the derrick 6 is integrally transported to a construction site for integrated installation after welding, polishing, shot blasting and paint spraying treatment; in the decorations of elevator well 2 and waiting hall 3, at the outside installation outer wall and the window of waiting hall 3 and elevator well 2 to at every layer of waiting hall 3 bottom installation platform 301, the number of waiting hall 3 is the same with the floor figure of building, platform 301 from the top down includes ceramic tile layer 3014, tie coat 3013, screed-coat 3012 and basement 3011, the shape of basement 3011 is the wave, and wave width of wave is 90mm, the crest thickness that screed-coat 3012 top apart from the basement is 15mm, tie coat 3013 thickness is 15mm, ceramic tile layer 3014 thickness is mm, the material of 3013 is bonding mortar, the material of screed-coat 3012 is cement mortar, the weight ratio of cement and sand in the cement mortar is 1: 2, the substrate 3011 is made of profiled steel sheet; in elevator well 2 and the 3 decorations of waiting the terraced room, at elevator well 2 and the top installation steel sheet of waiting terraced room 3 and pressure eaves wall 5, pressure eaves wall 5 from the top down includes that thickness is 8 mm's cement mortar layer, 8 mm's isolation layer, 4 mm's waterproof layer, 8 mm's cement mortar layer, 18 mm's concrete layer, the weight ratio of cement and sand is 1 in the cement mortar layer: 2, the material of isolation layer is the mortar, the waterproof layer has from top to bottom including SBS modified asphalt waterproof layer, polyurethane waterproof layer, the thickness ratio of SBS modified asphalt waterproof layer, polyurethane waterproof layer is 1.5: 1; the side surface of the elevator waiting hall 3 is connected with the building through a second expansion joint 702, the side surface of the elevator shaft 2 is connected with the building through a first expansion joint 701, and the distances between the elevator shaft 2 and the side surface of the elevator waiting hall 3 and the building are 170mm respectively; the expansion joint I701 comprises a first insulating layer 7011, a first water stopping layer 7011 and a first base 7013 from right to left, the waterproof layer 7012 is arc-shaped, the first insulating layer 7011 is made of rock wool, and the first base 7013 is made of aluminum alloy; the second expansion joint 702 comprises a second insulating layer 7021, a second rubber layer 7022, a second base 7023 and a rubber layer 7024 from left to right, the rubber layer 7022 is in a zigzag shape, the rubber layer 7022 is made of thermoplastic rubber, the second insulating layer 7021 is made of rock wool, the second base 7023 is made of aluminum alloy, and the rubber layer 7024 is made of polystyrene; in the elevator installation, a lifting hook is installed in the middle of the top of an elevator shaft 2, an elevator is installed through the lifting hook, and a canopy is installed on the side surface of a second-layer elevator waiting hall 3; furthermore, a slope is arranged below the canopy and communicated with the first floor of the elevator waiting hall; elevator well 2 is the same with 3 width in the room of waiting the ladder, is 1.8m, elevator well 2's length is 1.5m, the length of waiting the ladder 3 is 1.3m, the width of canopy is the same with waiting the ladder 3, the length of canopy is 0.8 m.
Example 2
As shown in fig. 1 to 5, the present embodiment provides a construction method for installing an elevator, including the steps of: the method comprises the following steps of installing a base layer 1, installing frameworks of an elevator shaft 2 and a waiting elevator hall 3, decorating the elevator shaft 2 and the waiting elevator hall 3, and installing and debugging the elevator, wherein the base layer 1 is installed and comprises a defensive line slotting step, a pouring cushion layer, a steel bar planting step, a supporting template step, concrete pouring, template dismantling, concrete curing for 20 days, pile pressing step, pile sealing step and earthwork backfilling step; in the installation of the frameworks of the elevator hoistway 2 and the elevator waiting hall 3, the derrick 6 is integrally transported to a construction site for integrated installation after welding, polishing, shot blasting and paint spraying treatment; in the decorations of elevator well 2 and waiting hall 3, at the outside installation outer wall and the window of waiting hall 3 and elevator well 2 to at every layer waiting hall 3 bottom installation platform 301, the number of waiting hall 3 is the same with the floor figure of building, platform 301 from the top down includes ceramic tile layer 3014, tie coat 3013, screed-coat 3012 and basement 3011, the shape of basement 3011 is the wave, and wave width of wave is 120mm, the crest thickness of screed-coat 3012 top apart from the basement is 25mm, tie coat 3013 thickness is 25mm, tile layer 3014 thickness is 12mm, tie coat 3013's material is bonding mortar, screed-coat 3012's material is cement mortar, the weight ratio of cement and sand in the cement mortar is 1: 3, the substrate 3011 is made of profiled steel sheet; in elevator well 2 and 3 decorations of waiting the terraced room, install the steel sheet and press eaves wall 5 at elevator well 2 and the top of waiting terraced room 3, press eaves wall 5 from the top down including cement mortar layer that thickness is 12mm, 12 mm's isolation layer, 8 mm's waterproof layer, 12 mm's cement mortar layer, 22 mm's concrete layer, the weight ratio of cement and sand is 1 in the cement mortar layer: 3, the material of isolation layer is the mortar, the waterproof layer has from top to bottom including SBS modified asphalt waterproof layer, polyurethane waterproof layer, the thickness ratio of SBS modified asphalt waterproof layer, polyurethane waterproof layer is 2.5: 1; the side surface of the elevator waiting hall 3 is connected with the building through a second expansion joint 702, the side surface of the elevator shaft 2 is connected with the building through a first expansion joint 701, and the distances between the elevator shaft 2 and the side surface of the elevator waiting hall 3 and the building are 190mm respectively; the expansion joint I701 comprises a first insulating layer 7011, a first water stopping layer 7011 and a first base 7013 from right to left, the waterproof layer 7012 is arc-shaped, the first insulating layer 7011 is made of rock wool, and the first base 7013 is made of aluminum alloy; the second expansion joint 702 comprises a second insulating layer 7021, a second rubber layer 7022, a second base 7023 and a rubber layer 7024 from left to right, the rubber layer 7022 is in a zigzag shape, the rubber layer 7022 is made of thermoplastic rubber, the second insulating layer 7021 is made of rock wool, the second base 7023 is made of aluminum alloy, and the rubber layer 7024 is made of polystyrene; in the elevator installation, a lifting hook is installed in the middle of the top of an elevator shaft 2, an elevator is installed through the lifting hook, and a canopy is installed on the side surface of a second-layer elevator waiting hall 3; furthermore, a slope is arranged below the canopy and communicated with the first floor of the elevator waiting hall; elevator well 2 is the same with 3 width in the room of waiting the ladder, is 2.2m, elevator well 2's length is 1.9m, it is 1.7m to wait the length in the room of waiting the ladder 3, the width of canopy is the same with the room of waiting the ladder 3, the length of canopy is 1 m.
Example 3
As shown in fig. 1 to 5, the present embodiment provides a construction method for installing an elevator, including the steps of: the method comprises the following steps of installing a base layer 1, installing frameworks of an elevator shaft 2 and a waiting elevator hall 3, decorating the elevator shaft 2 and the waiting elevator hall 3, and installing and debugging the elevator, wherein the base layer 1 is installed and comprises a defensive line slotting step, a pouring cushion layer, a steel bar planting step, a supporting template step, concrete pouring, template dismantling, concrete curing for 20 days, pile pressing step, pile sealing step and earthwork backfilling step; in the installation of the frameworks of the elevator hoistway 2 and the elevator waiting hall 3, the derrick 6 is integrally transported to a construction site for integrated installation after welding, polishing, shot blasting and paint spraying treatment; in the decorations of elevator well 2 and waiting hall 3, at the outside installation outer wall and the window of waiting hall 3 and elevator well 2 to at every layer waiting hall 3 bottom installation platform 301, the number of waiting hall 3 is the same with the floor figure of building, platform 301 from the top down includes ceramic tile layer 3014, tie coat 3013, screed-coat 3012 and basement 3011, the shape of basement 3011 is the wave, and wave width of wave is 100mm, the crest thickness of screed-coat 3012 top apart from the basement is 20mm, tie coat 3013 thickness is 20mm, tile layer 3014 thickness is 10mm, tie coat 3013's material is the bonding mortar, screed-coat 3012's material is cement mortar, the weight ratio of cement and sand in the cement mortar is 1: 3, the substrate 3011 is made of profiled steel sheet; in elevator well 2 and 3 decorations of waiting the terraced room, install the steel sheet and press eaves wall 5 at elevator well 2 and the top of waiting terraced room 3, press eaves wall 5 from the top down including cement mortar layer that thickness is 10mm, 10 mm's isolation layer, 6 mm's waterproof layer, 10 mm's cement mortar layer, 20 mm's concrete layer, the weight ratio of cement and sand is 1 in the cement mortar layer: 3, the material of isolation layer is the mortar, the waterproof layer has from top to bottom including SBS modified asphalt waterproof layer, polyurethane waterproof layer, SBS modified asphalt waterproof layer, polyurethane waterproof layer's thickness ratio is 2: 1; the side surface of the elevator waiting hall 3 is connected with the building through a second expansion joint 702, the side surface of the elevator shaft 2 is connected with the building through a first expansion joint 701, and the distances between the elevator shaft 2 and the side surface of the elevator waiting hall 3 and the building are 180mm respectively; the expansion joint I701 comprises a first insulating layer 7011, a first water stopping layer 7011 and a first base 7013 from right to left, the waterproof layer 7012 is arc-shaped, the first insulating layer 7011 is made of rock wool, and the first base 7013 is made of aluminum alloy; the second expansion joint 702 comprises a second insulating layer 7021, a second rubber layer 7022, a second base 7023 and a rubber layer 7024 from left to right, the rubber layer 7022 is in a zigzag shape, the rubber layer 7022 is made of thermoplastic rubber, the second insulating layer 7021 is made of rock wool, the second base 7023 is made of aluminum alloy, and the rubber layer 7024 is made of polystyrene; in the elevator installation, a lifting hook is installed in the middle of the top of an elevator shaft 2, an elevator is installed through the lifting hook, and a canopy is installed on the side surface of a second-layer elevator waiting hall 3; furthermore, a slope is arranged below the canopy and communicated with the first floor of the elevator waiting hall; elevator well 2 is the same with 3 width in the terraced room of waiting, is 2m, elevator well 2's length is 1.7m, the length of waiting terraced room 3 is 1.5m, the width of canopy is the same with waiting terraced room 3, the length of canopy is 0.9 m.
Example 4
As shown in fig. 1 to 5, the present embodiment provides a construction method for installing an elevator, including the steps of: the method comprises the following steps of installing a base layer 1, installing frameworks of an elevator shaft 2 and a waiting elevator hall 3, decorating the elevator shaft 2 and the waiting elevator hall 3, and installing and debugging the elevator, wherein the base layer 1 is installed and comprises a defensive line slotting step, a pouring cushion layer, a steel bar planting step, a supporting template step, concrete pouring, template dismantling, concrete curing for 20 days, pile pressing step, pile sealing step and earthwork backfilling step; in the installation of the frameworks of the elevator hoistway 2 and the elevator waiting hall 3, the derrick 6 is integrally transported to a construction site for integrated installation after welding, polishing, shot blasting and paint spraying treatment; in the decorations of elevator well 2 and waiting hall 3, at the outside installation outer wall and the window of waiting hall 3 and elevator well 2 to at every layer waiting hall 3 bottom installation platform 301, the number of waiting hall 3 is the same with the floor figure of building, platform 301 from the top down includes ceramic tile layer 3014, tie coat 3013, screed-coat 3012 and basement 3011, the shape of basement 3011 is the wave, and wave width of wave is 100mm, the crest thickness of screed-coat 3012 top apart from the basement is 20mm, tie coat 3013 thickness is 20mm, tile layer 3014 thickness is 10mm, tie coat 3013's material is the bonding mortar, screed-coat 3012's material is cement mortar, the weight ratio of cement and sand in the cement mortar is 1: 3, the substrate 3011 is made of profiled steel sheet; in elevator well 2 and 3 decorations of waiting the terraced room, install the steel sheet and press eaves wall 5 at elevator well 2 and the top of waiting terraced room 3, press eaves wall 5 from the top down including cement mortar layer that thickness is 10mm, 10 mm's isolation layer, 6 mm's waterproof layer, 10 mm's cement mortar layer, 20 mm's concrete layer, the weight ratio of cement and sand is 1 in the cement mortar layer: 3, the material of isolation layer is the mortar, the waterproof layer has from top to bottom including SBS modified asphalt waterproof layer, polyurethane waterproof layer, SBS modified asphalt waterproof layer, polyurethane waterproof layer's thickness ratio is 2: 1; the side surface of the elevator waiting hall 3 is connected with the building through a second expansion joint 702, the side surface of the elevator shaft 2 is connected with the building through a first expansion joint 701, and the distances between the elevator shaft 2 and the side surface of the elevator waiting hall 3 and the building are 180mm respectively; the expansion joint I701 comprises a first insulating layer 7011, a first water stopping layer 7011 and a first base 7013 from right to left, the waterproof layer 7012 is arc-shaped, the first insulating layer 7011 is made of rock wool, and the first base 7013 is made of aluminum alloy; the second expansion joint 702 comprises a second insulating layer 7021, a second rubber layer 7022, a second base 7023 and a rubber layer 7024 from left to right, the rubber layer 7022 is in a zigzag shape, the rubber layer 7022 is made of thermoplastic rubber, the second insulating layer 7021 is made of rock wool, the second base 7023 is made of aluminum alloy, and the rubber layer 7024 is made of polystyrene; in the elevator installation, a lifting hook is installed in the middle of the top of an elevator shaft 2, and an elevator is installed through the lifting hook; the elevator shaft 2 is the same with the 3 width in the room of waiting the terraced, is 2m, the length of elevator shaft 2 is 1.7m, the length of waiting the terraced room 3 is 1.5 m.

Claims (10)

1. A construction method for additionally installing an elevator is characterized by comprising the following steps: installation of a base layer, framework installation of an elevator shaft and a waiting elevator hall, decoration of the elevator shaft and the waiting elevator hall, and installation and debugging of an elevator.
2. The construction method for installing the elevator as claimed in claim 1, wherein the base layer installation comprises wire grooving, bedding layer pouring, bar planting, concrete pouring and curing, pile pressing, pile sealing and earthwork backfilling.
3. The construction method for installing the elevator as claimed in claim 1, wherein during the installation of the frameworks of the elevator well and the elevator waiting hall, the derrick is welded, ground, shot-blasted and painted, and then is transported to a construction site integrally.
4. The construction method for adding the elevator as claimed in any one of claims 1 to 3, wherein in the decoration of the elevator shaft and the elevator waiting hall, an outer wall and a window are installed outside the elevator waiting hall and the elevator shaft, and a platform is installed at the bottom of each elevator waiting hall.
5. The construction method for installing an elevator according to claim 4, wherein the platform comprises a floor tile layer, a bonding layer, a leveling layer and a base from top to bottom.
6. The construction method for installing an elevator according to claim 5, wherein the shape of the base is one selected from a wave shape, a fold line shape, and a straight line shape.
7. The construction method for installing the elevator as claimed in claim 4, wherein in the decoration of the elevator shaft and the elevator waiting hall, a steel plate and a pressing eaves wall are installed on the top of the elevator shaft and the elevator waiting hall.
8. The construction method for installing the elevator as claimed in claim 1, wherein the elevator shaft and the elevator waiting hall are connected to the building through expansion joints, respectively.
9. The method of claim 1, wherein the elevator is installed by installing a hook at the top of the elevator shaft and installing the elevator by the hook.
10. Use of the method according to any of claims 1 to 9 for retrofitting an elevator in a building.
CN202010499829.6A 2020-06-04 2020-06-04 Construction method for additionally installing elevator and application thereof Withdrawn CN111591852A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010499829.6A CN111591852A (en) 2020-06-04 2020-06-04 Construction method for additionally installing elevator and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010499829.6A CN111591852A (en) 2020-06-04 2020-06-04 Construction method for additionally installing elevator and application thereof

Publications (1)

Publication Number Publication Date
CN111591852A true CN111591852A (en) 2020-08-28

Family

ID=72182095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010499829.6A Withdrawn CN111591852A (en) 2020-06-04 2020-06-04 Construction method for additionally installing elevator and application thereof

Country Status (1)

Country Link
CN (1) CN111591852A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113120722A (en) * 2021-03-04 2021-07-16 中建科工集团有限公司 Construction method of steel structure building elevator and steel structure building elevator
CN113697640A (en) * 2021-08-26 2021-11-26 上海市房屋建筑设计院有限公司 Finished hoistway of integrally assembled elevator added in existing multi-story building and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113120722A (en) * 2021-03-04 2021-07-16 中建科工集团有限公司 Construction method of steel structure building elevator and steel structure building elevator
CN113120722B (en) * 2021-03-04 2023-01-13 中建科工集团有限公司 Steel structure building elevator construction method and steel structure building elevator
CN113697640A (en) * 2021-08-26 2021-11-26 上海市房屋建筑设计院有限公司 Finished hoistway of integrally assembled elevator added in existing multi-story building and construction method
CN113697640B (en) * 2021-08-26 2023-11-14 上海市房屋建筑设计院有限公司 Finished well for integrally assembled elevator of existing multi-storey building and construction method

Similar Documents

Publication Publication Date Title
CN107227813B (en) Steel structure keel masonry brick outer curtain wall system and construction method thereof
CN101818539B (en) Assembled integral building and construction method thereof
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN201738600U (en) Assembled integrated type building
CN106013811A (en) Mounting method of prefabricated building
CN102777045A (en) Construction method for assembling light energy-saving composite wallboards on separation wall
CN111926910A (en) Installation method of fabricated building
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN105672664A (en) Integral heat insulation wallboard building system
CN111591852A (en) Construction method for additionally installing elevator and application thereof
WO1984001402A1 (en) Structural members
CN207176990U (en) A kind of steel frame lightweight sandwich boards integrates wall
CN108729692A (en) A kind of method of construction of assembled Low-rise Lightweight system of steel residential structure
CN211523508U (en) Be used for house heat preservation intergral template external wall insulation node
CN217053891U (en) Waterproof anti integration structure that splits of outer wall suitable for steel construction house
RU2107784C1 (en) Method for erection and reconstruction of buildings and production of articles from composite materials mainly concrete for above purposes
CN105401681B (en) A kind of quick-assembling pitched roof and its method of construction based on assembled composite wall structure system
CN210482370U (en) Assembled interior wall of track traffic
CN114763233A (en) Construction method for additionally installing elevator and application thereof
CN209412856U (en) A kind of assembled integral basement structure meeting stability against floating requirement
CN111254937A (en) Installation method of fabricated building
CN112761245A (en) Assembled reinforced concrete building main body structure and installation construction method thereof
CN206245606U (en) A kind of EPS composite heat-insulation roofs
CN111287311A (en) Construction method of cold-formed thin-wall light steel structure building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200828