一种井下中深孔爆破悬顶处理方法 Download PDFInfo
- Publication number
- CN111578797B CN111578797B CN202010641807.9A CN202010641807A CN111578797B CN 111578797 B CN111578797 B CN 111578797B CN 202010641807 A CN202010641807 A CN 202010641807A CN 111578797 B CN111578797 B CN 111578797B
- Authority
- CN
- China
- Prior art keywords
- suspended
- blasting
- roof
- suspended roof
- adjacent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Abstract
本发明公开了一种井下中深孔爆破悬顶处理方法,该方法通过测量获知确悬顶位置,获知悬顶周边情况,然后比较回采巷道悬顶处的水平位置与相邻的回采巷道的水平位置进行施工方式的选择,根据悬顶实际情况采用两侧爆破或同时爆破的方式对悬顶进行处理,通过对爆破的方式和顺序进行改进可有效处理掉悬顶,且施工过程中无需额外增加爆破位置,施工方便、高效、安全。
Description
技术领域
本发明属于矿山开采技术领域,具体涉及一种井下中深孔爆破悬顶处理方法。
背景技术
矿场回采作业过程中,有时因地质水平断层等结构面,图纸不准确,或施工位置不准确,造成孔深设计不到位、孔没有打到位,或是装药不到位,导致爆破达不到预期高度,出现顶部矿石未被崩落,形成悬顶现象。
悬顶问题出现后,如果不处理继续回采,会导致采场出现隔板或采场回采高度不达标,造成资源浪费且随时有垮落风险。如果处理不当,又会导致后续处理难度加大,安全隐患范围扩大等诸多问题,甚至停止该采场的回采工作。因此,如何高效安全的处理悬顶问题至关重要。
传统的悬顶处理方法在悬顶位置后施工悬顶处理硐室,由于悬顶硐室采用人工掘凿,存在施工时间长,工程量大,危险性高等缺点。现有技术中,公开有申请号为“201910272685.8”、名称为“一种分段崩落法中的中深孔爆破悬顶处理方法” 的专利文献,其采用单侧爆破方式使悬顶失去支撑,进而处理掉悬顶,该方法虽能处理悬顶问题,但施工难度大、施工要求高。
发明内容
本发明的目的是针对现有技术中存在的不足,提供一种高效、安全、施工简便的井下中深孔爆破悬顶处理方法。
为实现上述目的,本发明采用的技术方案是:
一种井下中深孔爆破悬顶处理方法,包括如下步骤:
S1、测量回采巷道悬顶处的水平位置及悬顶垂直高度,用以确定悬顶位置;
S2、测量与悬顶巷道相邻的回采巷道当前回采水平位置,用以明确悬顶周边情况;
S3、比较回采巷道悬顶处的水平位置与相邻的回采巷道的水平位置;如果相邻回采巷道爆破位置滞后于悬顶处位置,进行S4操作;如果悬顶处位置滞后于相邻回采巷道爆破位置,进行S5操作;
S4、先爆破悬顶处两侧穿脉内深孔,直至两侧回采位置超过悬顶位置一定排数的深孔距离,然后将悬顶处深孔装药爆破,直至将悬顶彻底处理掉;
S5、采用悬顶穿脉与相邻穿脉同时爆破,以增大爆破震动的办法来处理掉悬顶。
进一步,所述S1中,在测量悬顶垂直高度前采用相邻穿爆破法对悬顶拱的稳定性进行确认,确认安全后进行测量。
进一步,所述S4中,两侧回采位置超过悬顶位置应控制超过3-4排深孔。
进一步,所述S4中,悬顶处深孔装药爆破2-3排。
本发明的有益效果是:
本发明在明确悬顶位置以及周边情况后,比较回采巷道悬顶处的水平位置与相邻的回采巷道的水平位置,根据悬顶实际情况采用两侧爆破或同时爆破的方式对悬顶进行处理,通过对爆破的方式和顺序进行改进可有效处理掉悬顶,且施工过程中无需额外增加爆破位置,施工方便、高效、安全。
附图说明
图1为本发明施工顺序图形演示示意图;
其中:1-间柱;2-回采巷;3-悬顶;4-中深孔。
具体实施方式
下面对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明的保护范围。
以下结合附图1并结合镜铁山矿桦树沟Ⅰ矿体为例对本发明优选实施例进行说明:
一种井下中深孔爆破悬顶处理方法,包括如下步骤:
S1、测量回采巷道悬顶处的水平位置及悬顶垂直高度,用以确定悬顶位置。具体是:爆破人员发现镜铁山矿桦树沟Ⅰ矿体2655m水平23穿脉第10排中深孔处发生了悬顶,随即暂停该穿脉及其相邻穿脉爆破,技术人员对悬顶位置进行勘察,同时经测量得到:Ⅰ矿体2655m水平23穿脉悬顶高度为6.5m(悬顶实体至回采巷道顶板距离),23穿脉悬顶处距沿脉中心点距离24m;此时悬顶位置已确定。在测量悬顶垂直高度前必须对悬顶拱的稳定性进行确认,可采用相邻穿爆破法确认,确认方法是:当22穿脉和24穿脉连续爆破3排深孔后,悬顶仍未处理下来,且掉石持续频率较小,则可以确认悬顶拱稳定,可以实时测量;测量悬顶垂直高度可采用便携式激光测距仪测量,人员必须站在安全位置,通过操作杆将激光测距仪伸入悬空区测量。
S2、通过测量获知与23穿脉悬顶处相邻的22穿脉和24穿脉爆破位置距沿脉中心点距离分别为28.6m和30.8m,即相邻穿脉滞后悬顶穿脉4-7m;此时获悉了悬顶周边情况。
S3、技术人员根据相邻回采巷道爆破位置滞后于悬顶处位置的实际情况,综合考虑悬顶高度为6.5m,悬顶较高,悬顶实体厚度4-5m,比较容易处理下来,于是决定采取S4操作处理悬顶;具体操作是:组织爆破人员爆破悬顶处两侧22穿脉和24穿脉的中深孔,使两侧回采位置超过悬顶位置并控制超过3排深孔,然后停止22穿脉和24穿脉爆破,此时23穿脉两侧缺乏支撑,然后对悬顶穿脉深孔装药爆破,悬顶穿脉深孔爆破2排后悬顶被成功处理下来,此时悬顶处理完毕;实际施工过程中,如悬顶穿脉深孔爆破2排后悬顶未被处理掉,可继续对悬顶穿脉深孔爆破1-2排,直至悬顶被成功处理下来。
当遇到悬顶处位置滞后于相邻回采巷道爆破位置是,采用S5操作,具体操作是采用悬顶穿脉与相邻穿脉同时爆破,以增大爆破震动的办法来处理掉悬顶,每次爆破三排直至处理掉悬顶。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明披露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书的保护范围为准。
Claims (3)
1.一种井下中深孔爆破悬顶处理方法,其特征在于,包括如下步骤:
S1、测量回采巷道悬顶处的水平位置及悬顶垂直高度,用以确定悬顶位置;
S2、测量与悬顶巷道相邻的回采巷道当前回采水平位置,用以明确悬顶周边情况;
S3、比较回采巷道悬顶处的水平位置与相邻的回采巷道的水平位置;如果相邻回采巷道爆破位置滞后于悬顶处位置,进行S4操作;如果悬顶处位置滞后于相邻回采巷道爆破位置,进行S5操作;
S4、先爆破悬顶处两侧穿脉内深孔,直至两侧回采位置超过悬顶3排深孔,然后将悬顶处深孔装药爆破,直至将悬顶彻底处理掉;
S5、采用悬顶穿脉与相邻穿脉同时爆破,以增大爆破震动的办法来处理掉悬顶。
2.如权利要求1所述的一种井下中深孔爆破悬顶处理方法,其特征在于,所述S1中,在测量悬顶垂直高度前采用相邻穿爆破法对悬顶拱的稳定性进行确认,确认安全后进行测量。
3.如权利要求1所述的一种井下中深孔爆破悬顶处理方法,其特征在于,所述S4中,悬顶处深孔装药爆破2-3排。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010641807.9A CN111578797B (zh) | 2020-07-06 | 2020-07-06 | 一种井下中深孔爆破悬顶处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010641807.9A CN111578797B (zh) | 2020-07-06 | 2020-07-06 | 一种井下中深孔爆破悬顶处理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111578797A CN111578797A (zh) | 2020-08-25 |
CN111578797B true CN111578797B (zh) | 2022-05-31 |
Family
ID=72124063
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010641807.9A Active CN111578797B (zh) | 2020-07-06 | 2020-07-06 | 一种井下中深孔爆破悬顶处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111578797B (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101737052A (zh) * | 2009-12-28 | 2010-06-16 | 河北邯邢矿冶设计院有限公司 | 一种分段充填采矿方法 |
CN102337893A (zh) * | 2011-09-20 | 2012-02-01 | 鞍钢集团矿业公司 | 上下帮中深孔爆破处理悬顶的方法 |
WO2013102309A1 (zh) * | 2012-01-06 | 2013-07-11 | He Manchao | 一种长壁工作面无煤柱开采方法 |
CN104500078A (zh) * | 2014-12-29 | 2015-04-08 | 中国矿业大学 | 一种巷外施工优化巷道区域应力场的方法 |
CN104847350A (zh) * | 2015-05-15 | 2015-08-19 | 西北矿冶研究院 | 一种中深孔爆破处理悬顶的方法 |
CN109029168A (zh) * | 2018-08-20 | 2018-12-18 | 河北钢铁集团矿业有限公司 | 一种井下悬顶的爆破处理方法 |
CN110173264A (zh) * | 2019-06-13 | 2019-08-27 | 山东科技大学 | 断顶与常规卸压防治坚硬顶板留巷冲击地压方法 |
CN110939466A (zh) * | 2019-12-13 | 2020-03-31 | 贵州大学 | 一种墩柱无爆破切顶沿空掘巷方法 |
-
2020
- 2020-07-06 CN CN202010641807.9A patent/CN111578797B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101737052A (zh) * | 2009-12-28 | 2010-06-16 | 河北邯邢矿冶设计院有限公司 | 一种分段充填采矿方法 |
CN102337893A (zh) * | 2011-09-20 | 2012-02-01 | 鞍钢集团矿业公司 | 上下帮中深孔爆破处理悬顶的方法 |
WO2013102309A1 (zh) * | 2012-01-06 | 2013-07-11 | He Manchao | 一种长壁工作面无煤柱开采方法 |
CN104500078A (zh) * | 2014-12-29 | 2015-04-08 | 中国矿业大学 | 一种巷外施工优化巷道区域应力场的方法 |
CN104847350A (zh) * | 2015-05-15 | 2015-08-19 | 西北矿冶研究院 | 一种中深孔爆破处理悬顶的方法 |
CN109029168A (zh) * | 2018-08-20 | 2018-12-18 | 河北钢铁集团矿业有限公司 | 一种井下悬顶的爆破处理方法 |
CN110173264A (zh) * | 2019-06-13 | 2019-08-27 | 山东科技大学 | 断顶与常规卸压防治坚硬顶板留巷冲击地压方法 |
CN110939466A (zh) * | 2019-12-13 | 2020-03-31 | 贵州大学 | 一种墩柱无爆破切顶沿空掘巷方法 |
Non-Patent Citations (3)
Title |
---|
回采巷道锚索拆除前后状态分析及索具拆除技术;齐明胜等;《煤炭工程》;20030620(第06期);42-44 * |
回采爆破故障的处理与预防;杨兵;《梅山科技》;20170615(第02期);39-41 * |
无底柱分段崩落采矿法悬顶的处理和预防;郝志贤等;《黄金》;20100215(第02期);36-38 * |
Also Published As
Publication number | Publication date |
---|---|
CN111578797A (zh) | 2020-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108661646A (zh) | 一种假顶房柱式留矿嗣后充填采矿法 | |
CN103670412B (zh) | 一种急倾斜矿体开采的采空区处理与卸压开采方法 | |
CN110595308B (zh) | 露天矿超深孔爆破处理采空区的方法 | |
CN103726848B (zh) | 适用于缓倾斜/倾斜薄矿体回采的采矿方法 | |
US20230134275A1 (en) | Mining method | |
CN108104817A (zh) | 一种上盘破碎倾斜薄-中厚矿体的开采方法 | |
CN111608630A (zh) | 一种煤层群高位顶板水力压裂井下施工方法 | |
CN111578797B (zh) | 一种井下中深孔爆破悬顶处理方法 | |
CN204386632U (zh) | 大倾角煤层顶板破碎带人工底板及假顶设施 | |
CN110080774A (zh) | 基于急倾斜矿体垂直中深孔后退式落矿干式充填采矿法 | |
KR101565789B1 (ko) | 주방식하이브리드 채광법 | |
CN110331981A (zh) | 一种井巷分段采掘方法 | |
CN106339546B (zh) | 一种极近距离煤层采空区下工作面支架载荷确定方法及装置 | |
CN112432566A (zh) | 一种大断面隧道全断面快速开挖方法 | |
CN110397439A (zh) | 基于急倾斜矿体垂直中深孔后退式落矿干式充填采矿法 | |
CN113605895B (zh) | 一种安全高效的分段中深孔采场的采矿方法 | |
CN105422101A (zh) | 一种双层矿种倾斜矿体同步开采留矿采矿方法 | |
CN211977724U (zh) | 一种处理切割槽悬顶的扇形回采中深孔 | |
CN114382483A (zh) | 一种遗留煤柱下坚硬顶板工作面开采强矿压防治方法 | |
CN111706386B (zh) | 井下巷道岩爆主动防护方法以及井下巷道掘进方法 | |
Anastasov et al. | Innovative mining technologies with complex geomechanical characteristics | |
RU1639147C (ru) | Способ обнаружения подземных пустот | |
CN109184701A (zh) | 软弱围岩隧道短台阶开挖快速施工工法 | |
CN113982686B (zh) | 近距离煤层群蹬空房柱式采空区采煤方法及系统 | |
SU1535994A1 (ru) | Способ разработки маломощных пологих залежей |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |