CN111577281B - High-gas coal seam coal pillar-free mining and gas control method - Google Patents

High-gas coal seam coal pillar-free mining and gas control method Download PDF

Info

Publication number
CN111577281B
CN111577281B CN202010439584.8A CN202010439584A CN111577281B CN 111577281 B CN111577281 B CN 111577281B CN 202010439584 A CN202010439584 A CN 202010439584A CN 111577281 B CN111577281 B CN 111577281B
Authority
CN
China
Prior art keywords
working face
roadway
gas
mining
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010439584.8A
Other languages
Chinese (zh)
Other versions
CN111577281A (en
Inventor
袁永
朱成
陈忠顺
王文苗
陈大广
张村
王沉
朱德福
李波
王圣志
钟慧伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN202010439584.8A priority Critical patent/CN111577281B/en
Publication of CN111577281A publication Critical patent/CN111577281A/en
Application granted granted Critical
Publication of CN111577281B publication Critical patent/CN111577281B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a method for high-gas coal seam non-pillar mining and gas control, which is suitable for being used under a coal mine. Firstly, excavating mining roadways on two sides of a working face A and a transportation roadway of a working face B, excavating bedding drill holes on the side of the roadway during excavating to pre-pump coal seam gas, and continuously excavating and penetrating the excavating cutting holes of the two working faces; at the moment, the working face A belongs to a Y + L-shaped ventilation system, the ventilation quantity of the working face is larger, the gas at the upper corner can be diluted and discharged, and the problem of gas accumulation at the upper corner is solved. The air inlet lane of the working face A is reserved in a gob-side entry retaining mode during mining of the working face A, the air return lane of the working face B is arranged in an approach mining lane, the working face B is used for mining after mining of the working face A, the W-shaped fully-mechanized caving face is sequentially used for replacing the Y + L-shaped fully-mechanized caving face, and the roadway protection coal pillar between the two working faces is recovered in a belt mining mode during mining of the working face B, so that coal pillar-free mining is realized, the mining rate of a mine is effectively improved, and the problem of upper corner gas control in a high-gas working face is solved.

Description

High-gas coal seam coal pillar-free mining and gas control method
Technical Field
The invention relates to a method for pillar-free mining and gas control of a high-gas coal seam, belonging to the technical field of coal mining.
Background
The coal resource reserves in the Luan mining area are rich, the 3# coal seam is mainly mined at present, the average thickness of the coal seam is 5-7 m, lean coal and lean coal are mainly used, and the gas content of the coal seam is 10.13-26.01 m3T, permeability generally less than 0.5X 10-15m2Belongs to a thick coal seam with low permeability and high gas. At present, a 3# coal seam is mined by mainly adopting a fully mechanized top coal caving process, but the following problems are faced: (1) the absolute gas emission amount of the coal seam during the roadway driving is larger, the influence of a single-head roadway ventilation mode is realized, and the tunneling speed is slower; (2) the working face has high yield, high propelling speed, high mining strength and continuous tension of the working face; (3) roadway protection coal pillars with the width of 30-50 m are generally reserved between adjacent working faces, the mining rate of the working faces is reduced, and high-quality coal resources are seriously wasted; (4) in order to solve the problem that the gas at the upper corner is easy to exceed the limit, the air supply quantity of a working face is generally increased, so that the concentration of ventilation air methane of a mine is low, the ventilation air methane cannot be effectively utilized, and the emission of greenhouse gas is increased.
Disclosure of Invention
The invention aims to solve the problem of high gas coal seam mining and provides a method for high gas coal seam non-pillar mining and gas control, which has simple steps and good mining effect.
In order to achieve the purpose, the method for high-gas coal seam non-pillar mining and gas treatment comprises the following specific steps:
firstly, excavating coal roadways serving as transportation roadways, coal roadways serving as air inlet roadways and rock roadways serving as high-suction roadways in a roof on two sides of a working face A, synchronously excavating coal roadways serving as transportation roadways of a working face B, during excavation of each coal roadway, drilling bedding holes in the coal bodies to be mined from the roadway side part by using a drilling machine on the following excavation working face, and pre-pumping gas in the un-excavated coal bodies of the two working faces through the bedding holes to reduce the gas content of the mined coal bed;
b, after the arrangement of the roadways is finished, continuously excavating the cutting holes of the working face A and the working face B, and arranging a connecting roadway to communicate the cutting holes of the two working faces; after the two working faces cut the eyes and the arrangement of the communication lane is completed, the working face A is provided with a two-in one-back ventilation system: the transport lane and the air intake lane of the working face A are both used as air intake lanes, the transport lane of the working face B is used as an air return lane, and the mining can be started after the arrangement of the related fully mechanized mining equipment of the working face A is finished; and during the stoping period, the transportation lane of the working face A is abandoned along with the stoping, the air inlet lane is reserved in a gob-side entry retaining mode, and the top plate high-level pumping lane performs high-level pumping and discharging on the gas of the working face A. At the moment, the working face A transportation lane-the working face A air inlet lane form a Y-shaped ventilation system, the working face B hole cutting-the working face B transportation lane form an L-shaped air return system, so that the working face A is a Y + L-shaped ventilation system at the moment, the stoping lanes on two sides of the working face A are air inlet lanes at the moment, the ventilation volume is large, gas at the upper corner is diluted and discharged, and the problem of gas accumulation at the upper corner is solved;
c, during the mining of the working face A, arranging the working face B as a coal roadway of a return airway in a manner of heading towards the mining and excavating lane, and also arranging gas in a bedding drilling pre-extraction working face B pre-extraction coal body at the side part of the coal roadway during the excavating lane, and excavating a rock roadway serving as a high-extraction lane in a working face B top plate during the excavating period of the working face B return airway in order to ensure the surrounding rock stability of the working face B return airway and the working face A air inlet airway;
d, after excavation of the roadway is finished, mining equipment required by the working face B can be arranged, the working face A can immediately replace the working face B after recovery of the working face A is finished, the replacement time of the adjacent working face is greatly shortened, during the recovery period of the working face B, the air inlet roadway of the working face A reserved in a gob-side entry retaining mode is used as the air inlet roadway of the working face B, the transportation roadway of the working face B is used as the other air inlet roadway, the air return roadway of the working face B is used as the air return roadway, the ventilation system of the working face B belongs to partial W-shaped two-inlet one-return ventilation, and the problem of gas accumulation at the corner angle on the working face B is solved because the recovery roadways on the two sides of the working face B are both air inlet roadways at the moment;
and (e) recovering the roadway-protecting coal pillars in a belt mining mode during the stoping period of the working face B, really realizing the non-pillar mining between two adjacent high-gas working faces, improving the mining rate of the working faces and avoiding the waste of coal resources.
And recovering the lane protecting coal pillar with the width of 70m between the return airway of the working face B and the air inlet airway of the working face A in a belt mining mode during the stoping period of the working face B. During mining roadway serving as a transport roadway and an air inlet roadway on two sides of a digging working face A and transport roadway and air return roadway of a working face B, bedding drill holes are respectively arranged in the roadways, and gas accumulated in coal layers of the working face A and the working face B is pre-pumped; gas high-position drainage is respectively carried out through high drainage tunnels of the top plates of the working face A and the working face B, so that the gas concentration in the working face stoping process is reduced; and (3) transporting the coal bed gas extracted through the bedding drilling and the high-level pumping roadway to a ground oxidation power station through a pipeline, and carrying out oxidation power generation after mixing with ventilation air discharged from the air return vertical shaft.
Has the advantages that:
arranging a stoping roadway adjacent to the fully-mechanized caving face in advance in a manner of heading to the mining roadway to ensure quick replacement of the adjacent fully-mechanized caving face; the roadway protection coal pillars between adjacent high-gas fully mechanized caving faces are recovered in a belt mining mode, so that non-pillar mining is realized, the mining rate of a working face is improved, and high-quality coal resources are prevented from being wasted; the method comprises the steps of 'ventilation in two-inlet and one-return, drilling hole pre-pumping and mining while pumping', gas in a coal layer to be mined is pre-pumped through reasonable roadway arrangement, the gas pre-pumping time is longer and the gas pumping effect is better for a working face to be replaced, meanwhile, two-inlet and one-return ventilation systems are constructed in two adjacent high gas fully mechanized faces, the problem of gas accumulation at the upper corner is effectively solved by increasing the ventilation amount of the working face, and the safe and efficient mining of a mine is ensured; the ventilation air methane and the extracted gas in the air return well are mixed and then oxidized to generate electricity, so that the low-concentration gas in the ventilation air methane is effectively utilized, the gas discharge amount of a mine is reduced, and the green mining of a high-gas coal bed is realized.
And excavating a return airway of the working face B in a mode of facing to an excavating airway during the stoping period of the working face A, and reserving coal pillars for ensuring the stability of the two airways. During stoping of the working face B, the roadway is arranged in a W-shaped mode, the reserved coal pillars are located inside the working face, and the coal pillars can be directly recovered during stoping of the working face, so that coal pillar-free mining is realized. The method has the advantages that the method for quickly filling the goaf is not utilized to recover the roadway-protecting coal pillars, and a supporting structure is not additionally established.
Drawings
FIG. 1 is a schematic flow chart of the method for pillar-free mining and gas control of the high-gas coal seam according to the invention;
FIG. 2 is a schematic diagram of a mining roadway, a high suction roadway and a working face B transportation roadway which are used as a transportation roadway and an air inlet roadway on two sides of a digging working face A and are provided with bedding drill holes;
FIG. 3 is a schematic illustration of the cutting and communication lanes of the invention for the excavation face A and face B;
FIG. 4 is a schematic view of the ventilation system during recovery of working face A of the present invention;
FIG. 5 is a schematic view of the ventilation system during recovery of working face B of the present invention;
FIG. 6 is a schematic diagram of a working face B with mining roadway-protecting coal pillar to achieve pillar-free mining.
Detailed Description
The embodiments of the present invention will be further described with reference to the accompanying drawings.
As shown in fig. 1 to 5, the method for high-gas coal seam non-pillar mining and gas treatment is characterized by comprising the following specific steps:
firstly, excavating coal roadways serving as transportation roadways, coal roadways serving as air inlet roadways and rock roadways serving as high-suction roadways in a roof on two sides of a working face A, synchronously excavating coal roadways serving as transportation roadways of a working face B, during excavation of each coal roadway, drilling bedding holes in the coal bodies to be mined from the roadway side part by using a drilling machine on the following excavation working face, and pre-pumping gas in the un-excavated coal bodies of the two working faces through the bedding holes to reduce the gas content of the mined coal bed;
b, after the arrangement of the roadways is finished, continuously excavating the cutting holes of the working face A and the working face B, and arranging a connecting roadway to communicate the cutting holes of the two working faces; after the two working faces cut the eyes and the arrangement of the communication lane is completed, the working face A is provided with a two-in one-back ventilation system: the transport lane and the air intake lane of the working face A are both used as air intake lanes, the transport lane of the working face B is used as an air return lane, and the mining can be started after the arrangement of the related fully mechanized mining equipment of the working face A is finished; and during the stoping period, the transportation lane of the working face A is abandoned along with the stoping, the air inlet lane is reserved in a gob-side entry retaining mode, and the top plate high-level pumping lane performs high-level pumping and discharging on the gas of the working face A. At the moment, the working face A transportation lane-the working face A air inlet lane form a Y-shaped ventilation system, the working face B hole cutting-the working face B transportation lane form an L-shaped air return system, so that the working face A is a Y + L-shaped ventilation system at the moment, the stoping lanes on two sides of the working face A are air inlet lanes at the moment, the ventilation volume is large, gas at the upper corner is diluted and discharged, and the problem of gas accumulation at the upper corner is solved;
c, during the mining of the working face A, arranging the working face B as a coal roadway of a return airway in a manner of heading towards the mining and excavating lane, and also arranging gas in a bedding drilling pre-extraction working face B pre-extraction coal body at the side part of the coal roadway during the excavating lane, and excavating a rock roadway serving as a high-extraction lane in a working face B top plate during the excavating period of the working face B return airway in order to ensure the surrounding rock stability of the working face B return airway and the working face A air inlet airway;
d, after excavation of the roadway is finished, mining equipment required by the working face B can be arranged, the working face A can immediately replace the working face B after recovery of the working face A is finished, the replacement time of the adjacent working face is greatly shortened, during the recovery period of the working face B, the air inlet roadway of the working face A reserved in a gob-side entry retaining mode is used as the air inlet roadway of the working face B, the transportation roadway of the working face B is used as the other air inlet roadway, the air return roadway of the working face B is used as the air return roadway, the ventilation system of the working face B belongs to partial W-shaped two-inlet one-return ventilation, and the problem of gas accumulation at the corner angle on the working face B is solved because the recovery roadways on the two sides of the working face B are both air inlet roadways at the moment;
and (e) recovering the roadway-protecting coal pillars in a belt mining mode during the stoping period of the working face B, really realizing the non-pillar mining between two adjacent high-gas working faces, improving the mining rate of the working faces and avoiding the waste of coal resources. And recovering the tunnel-protecting coal pillar with the width of 70m between the return airway of the working face B and the air inlet airway of the working face A in a belt mining mode during the stoping period of the working face B.
During mining roadway serving as a transport roadway and an air inlet roadway on two sides of a digging working face A and transport roadway and air return roadway of a working face B, bedding drill holes are respectively arranged in the roadways, and gas accumulated in coal layers of the working face A and the working face B is pre-pumped; gas high-position drainage is respectively carried out through high drainage tunnels of the top plates of the working face A and the working face B, so that the gas concentration in the working face stoping process is reduced; and (3) transporting the coal bed gas extracted through bedding drilling and high-level pumping to a ground oxidation power station through a pipeline, and carrying out oxidation power generation after mixing with ventilation air methane discharged from a return air vertical shaft, so as to realize the efficient utilization of low-concentration gas in the ventilation air methane.

Claims (2)

1. A method for high-gas coal seam non-pillar mining and gas treatment is characterized by comprising the following specific steps:
firstly, excavating coal roadways serving as transportation roadways, coal roadways serving as air inlet roadways and rock roadways serving as high-suction roadways in a roof on two sides of a working face A, synchronously excavating coal roadways serving as transportation roadways of a working face B, during excavation of each coal roadway, drilling bedding holes in the coal bodies to be mined from the roadway side part by using a drilling machine on the following excavation working face, and pre-pumping gas in the un-excavated coal bodies of the two working faces through the bedding holes to reduce the gas content of the mined coal bed;
b, after the arrangement of the roadways is finished, continuously excavating the cutting holes of the working face A and the working face B, and arranging a connecting roadway to communicate the cutting holes of the two working faces; after the two working faces cut the eyes and the arrangement of the communication lane is completed, the working face A is provided with a two-in one-back ventilation system: the transport lane and the air intake lane of the working face A are both used as air intake lanes, the transport lane of the working face B is used as an air return lane, and the mining can be started after the arrangement of the related fully mechanized mining equipment of the working face A is finished; during the stoping period, the transport lane of the working face A is abandoned along with the mining, the air inlet lane is reserved in a way of retaining a lane along the sky, the gas of the working face A is subjected to high-position drainage by the top plate high-drainage lane, the Y-shaped ventilation system is formed by the working face A transport lane, the working face A air inlet lane and the working face A air inlet lane, the L-shaped air return system is formed by the working face B cut hole and the working face B transport lane, the working face A is the Y + L-shaped ventilation system, the stoping lanes on two sides of the working face A are air inlet lanes, the ventilation volume is large, the gas at the upper corner is diluted and discharged, and the problem of gas accumulation at the upper corner is solved;
c, during the mining of the working face A, arranging the working face B as a coal roadway of a return airway in a manner of heading towards the mining and excavating lane, and also arranging gas in a bedding drilling pre-extraction working face B pre-extraction coal body at the side part of the coal roadway during the excavating lane, and excavating a rock roadway serving as a high-extraction lane in a working face B top plate during the excavating period of the working face B return airway in order to ensure the surrounding rock stability of the working face B return airway and the working face A air inlet airway;
d, after excavation of the roadway is finished, mining equipment required by the working face B can be arranged, the working face A can immediately replace the working face B after recovery of the working face A is finished, the replacement time of the adjacent working face is greatly shortened, during the recovery period of the working face B, the air inlet roadway of the working face A reserved in a gob-side entry retaining mode is used as the air inlet roadway of the working face B, the transportation roadway of the working face B is used as the other air inlet roadway, the air return roadway of the working face B is used as the air return roadway, the ventilation system of the working face B belongs to partial W-shaped two-inlet one-return ventilation, and the problem of gas accumulation at the corner angle on the working face B is solved because the recovery roadways on the two sides of the working face B are both air inlet roadways at the moment;
the roadway-protecting coal pillars are recovered in a belt mining mode during the stoping period of the working face B, so that the non-coal-pillar mining between two adjacent high-gas working faces is really realized, the mining rate of the working face is improved, and the waste of coal resources is avoided;
arranging bedding drill holes in the mining roadway serving as a transport roadway and an air inlet roadway on two sides of the excavation working face A and arranging bedding drill holes in the transportation roadway and the air return roadway of the working face B during excavation, and pre-pumping gas accumulated in coal layers of the working face A and the working face B; gas high-position drainage is respectively carried out through high drainage tunnels of the top plates of the working face A and the working face B, so that the gas concentration in the working face stoping process is reduced; and (3) transporting the coal bed gas extracted through the bedding drilling and the high-level pumping roadway to a ground oxidation power station through a pipeline, and carrying out oxidation power generation after mixing with ventilation air discharged from the air return vertical shaft.
2. The method for pillar-free mining and gas control of the high-gas coal seam according to claim 1, wherein the method comprises the following steps: and recovering the lane protecting coal pillar with the width of 70m between the return airway of the working face B and the air inlet airway of the working face A in a belt mining mode during the stoping period of the working face B.
CN202010439584.8A 2020-05-22 2020-05-22 High-gas coal seam coal pillar-free mining and gas control method Active CN111577281B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010439584.8A CN111577281B (en) 2020-05-22 2020-05-22 High-gas coal seam coal pillar-free mining and gas control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010439584.8A CN111577281B (en) 2020-05-22 2020-05-22 High-gas coal seam coal pillar-free mining and gas control method

Publications (2)

Publication Number Publication Date
CN111577281A CN111577281A (en) 2020-08-25
CN111577281B true CN111577281B (en) 2021-07-30

Family

ID=72113703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010439584.8A Active CN111577281B (en) 2020-05-22 2020-05-22 High-gas coal seam coal pillar-free mining and gas control method

Country Status (1)

Country Link
CN (1) CN111577281B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502765B (en) * 2020-10-23 2022-05-06 中煤科工能源科技发展有限公司 Method and system for recovering and ventilating open-pit mine side coal of' wind guide hole + return airway
CN113513359B (en) * 2021-08-09 2023-03-14 太原理工大学 Fully-mechanized coal mining coal seam high-position roadway one-roadway dual-purpose gas extraction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392642A (en) * 2011-11-02 2012-03-28 王晓利 Method for arranging roadways on coal-pillar-free stope
CN202690072U (en) * 2012-02-15 2013-01-23 山西汾西矿业(集团)有限责任公司 Mining roadway structure capable of preventing corner gas on coal mining work face from accumulating
CN103670496A (en) * 2013-12-12 2014-03-26 中国矿业大学 Gob-side entry retaining and sectional coal seam gas pre-extracting method for single low-permeability outburst coal seam
CN107725097A (en) * 2017-10-31 2018-02-23 中国矿业大学(北京) Method is controlled altogether without coal pillar mining gas and coal spontaneous combustion in a kind of Qie Dingcheng lanes

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392642A (en) * 2011-11-02 2012-03-28 王晓利 Method for arranging roadways on coal-pillar-free stope
CN202690072U (en) * 2012-02-15 2013-01-23 山西汾西矿业(集团)有限责任公司 Mining roadway structure capable of preventing corner gas on coal mining work face from accumulating
CN103670496A (en) * 2013-12-12 2014-03-26 中国矿业大学 Gob-side entry retaining and sectional coal seam gas pre-extracting method for single low-permeability outburst coal seam
CN107725097A (en) * 2017-10-31 2018-02-23 中国矿业大学(北京) Method is controlled altogether without coal pillar mining gas and coal spontaneous combustion in a kind of Qie Dingcheng lanes

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《"Y"型通风无煤柱开采模式在高河矿井的应用研究》;赵汉楚;《西部探矿工程》;20200315;正文第143页,图4 *

Also Published As

Publication number Publication date
CN111577281A (en) 2020-08-25

Similar Documents

Publication Publication Date Title
CN105221179B (en) A kind of highly gassy mine Y type method of ventilations
CN110130899B (en) Coal mining method without coal pillar, roadway and tunneling in whole mining area
CN104481578B (en) A kind of high gas layer large-mining-height working surface mash gas harnessing method
CN110886611B (en) Gob-side entry driving process for high-gas large-mining-height working face
CN111577281B (en) High-gas coal seam coal pillar-free mining and gas control method
CN110424966B (en) Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method
CN111828007B (en) Stoping method for residual studs in underground mine goaf
CN102392642A (en) Method for arranging roadways on coal-pillar-free stope
CN101182783A (en) Method of combined mining caving face using false dipping after high drainage roadway treating gas in beginning mining
US11994027B2 (en) Dendritic reverse underground mining method for thin coal seam at end slope of strip mine
CN109209382A (en) No coal column is without pick lane Z-type working face extraction method
CN110410076A (en) A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf
CN109630112B (en) N00 mining method of cut top filling
WO2023272587A1 (en) Fluidized coal mining method for implementing co2 underground storage
CN107503790B (en) Fast extraction fully mechanized coal face comprehensive gas drainage arranges administering method
CN111255455B (en) Non-divided mining area, non-entry driving and non-pillar mining and construction method for coal mine field
CN112593940A (en) Arrangement process for remaining coal pillars and processing ground gangue by stope-type coal mining method
CN108952725A (en) A kind of low dilution mining methods suitable for slight slope and thin ore body
CN109973094B (en) Mine resource same-face full-mining local-filling mining method
CN109838237B (en) Close-distance coal seam up-down successive-replacing collaborative mining method
CN103850690A (en) Concrete block and anchor rope roof cutting matching god-side entry retaining method for coal mining without pillars
CN114961728B (en) Method for mining area without coal pillars for comprehensively preventing and controlling rock burst and gas
CN114592866A (en) Residual coal resource mining area full mining method with paste partially filled
CN112593938A (en) Intelligent mining-based large-section roadway prefabricated wall body coal-pillar-free mining method
CN111852544A (en) Near outburst coal seam rock roadway tunneling, drilling and transporting integrated tunneling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant