CN111576830A - Structure is assembled with scaffold frame to piping lane installation - Google Patents

Structure is assembled with scaffold frame to piping lane installation Download PDF

Info

Publication number
CN111576830A
CN111576830A CN202010535887.XA CN202010535887A CN111576830A CN 111576830 A CN111576830 A CN 111576830A CN 202010535887 A CN202010535887 A CN 202010535887A CN 111576830 A CN111576830 A CN 111576830A
Authority
CN
China
Prior art keywords
wall
fixed
rods
supporting rods
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010535887.XA
Other languages
Chinese (zh)
Inventor
李东生
栗亮
吴丽颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN202010535887.XA priority Critical patent/CN111576830A/en
Publication of CN111576830A publication Critical patent/CN111576830A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/34Scaffold constructions able to be folded in prismatic or flat parts or able to be turned down
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a scaffold assembling structure for mounting a pipe gallery, which comprises four first supporting rods, wherein four fixing plates are fixed on the outer walls of the bottoms of the four first supporting rods through bolts respectively, four brake rods are connected to the outer walls of one sides of the four fixing plates through bearings respectively, two connecting plates are fixed on the outer walls of the bottoms of the four fixing plates through bolts respectively, four universal wheels are connected to one sides of the two connecting plates through bearings respectively, one ends of the four brake rods are connected to one sides of the four universal wheels through bearings respectively, and two fixing supports are fixed on the outer walls of one sides of the four first supporting rods through bolts respectively. According to the invention, the rubber pad, the baffle, the slide rail, the telescopic rod and the buffer spring are arranged, so that the height of the scaffold can be adjusted when the scaffold is assembled, the scaffold can be suitable for different working environments, and the rubber pad and the buffer spring play a role in buffering.

Description

Structure is assembled with scaffold frame to piping lane installation
Technical Field
The invention relates to the technical field of pipe gallery installation, in particular to a scaffold splicing structure for pipe gallery installation.
Background
Pipe gallery, i.e. the corridor of the pipeline. Many of the pipes in chemical and related plants are grouped together and arranged along the outside of the plant or building, typically in the air, supported by supports, forming a similar appearance to a corridor, and a few pipe corridors are located underground.
Scaffold frame usually need be used when installing the piping lane, and current scaffold frame can not accomodate scaffold frame when using after work is accomplished, has occupied a large amount of area, is unfavorable for the make full use of space to can not adjust scaffold frame's height when assembling, be unfavorable for being applicable to different operational environment.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides a scaffold splicing structure for mounting a pipe gallery.
In order to achieve the purpose, the invention adopts the following technical scheme:
a scaffold assembling structure for mounting a pipe gallery comprises four first supporting rods, four first supporting rods are respectively fixed with four fixing plates at the bottom outer walls through bolts, four fixing plates are respectively fixed with two connecting plates at the bottom outer walls through bolts, one side of each connecting plate is respectively connected with four universal wheels through bearings, four first supporting rods are respectively fixed with two fixing supports at one side outer wall through bolts, inserting rods distributed at equal intervals are respectively fixed at one side outer walls of the four first supporting rods, four first fixing rods are respectively connected with the outer wall at one side of each first supporting rod, a rectangular groove is respectively formed at one side of each two first fixing rods, the inserting rods are connected onto the inner wall of the rectangular groove, four second supporting rods are respectively connected with the outer wall at the top of each first supporting rod, and two second fixing rods are respectively rotatably connected with the outer wall at one side of each second supporting rod, two first dead lever top and two second dead lever bottoms are respectively through the bolt fastening have two cat ladders, two second dead lever top outer wall is respectively through the bolt fastening have two backup pads, two backup pad one side all is connected with the hinge.
Preferably, two outer walls of the tops of the support plates are respectively fixed with two anti-slip pads through bolts, and the outer wall of one side of the tops of the two anti-slip pads is respectively fixed with two storage boxes through bolts.
Preferably, the outer walls of the two sides of the four first supporting rods and the outer walls of the two sides of the four second supporting rods are both provided with threaded holes, and the inner walls of the threaded holes are in threaded connection with adjusting screws.
Preferably, the outer wall of one side of each of the four first support rods is fixed with a locking ring through a bolt, the inner wall of each locking ring is in threaded connection with one end of each adjusting screw rod, and the inner walls of the four first support rods are fixed with baffles through bolts.
Preferably, four the inner walls of the first supporting rods are all fixed with rubber pads through bolts, threaded holes penetrate through the rubber pads, four the outer walls of the second supporting rods are connected to the outer walls of the rubber pads in a sliding mode, and the bottoms of the rubber pads are fixed to the outer wall of the top of the baffle through bolts.
Preferably, four the first bracing piece inner wall all is fixed with the slide rail through the bolt, and the equal sliding connection of four second bracing piece outer walls is on the slide rail inner wall, the screw hole runs through in the slide rail.
Preferably, baffle top outer wall has telescopic link and buffer spring through the bolt fastening, and buffer spring cup joints on the telescopic link outer wall, telescopic link and buffer spring top are fixed respectively on four second bracing piece bottom outer walls.
The invention has the beneficial effects that:
1. this structure is assembled with scaffold frame to piping lane installation is through being provided with the fixed bolster to be provided with the hinge in the backup pad, can fold the scaffold frame and accomodate, avoid occupying a large amount of ground area when inoperative, make the space can obtain more abundant utilization.
2. This structure is assembled to scaffold frame for piping lane installation through being provided with rubber pad, baffle, slide rail, telescopic link and buffer spring, can be when assembling the scaffold frame, the height of adjustment scaffold frame for can be applicable to different operational environment, rubber pad and buffer spring have played the effect of buffering simultaneously, and the adjustment is accomplished the back, stabilizes through screw hole, adjusting screw and the locking ring that sets up.
3. This structure is assembled with scaffold frame to piping lane installation through being provided with the inserted bar on first bracing piece, has seted up the rectangular channel on first dead lever to second dead lever and second bracing piece rotate to be connected, thereby carry out fixed connection to the cat ladder, provide convenience for the height of adjustment scaffold frame.
Drawings
Fig. 1 is a schematic perspective view of a scaffold splicing structure for installing a pipe gallery according to the present invention;
fig. 2 is an enlarged structural schematic diagram of a position a of the scaffold splicing structure for mounting a pipe gallery, which is provided by the invention;
fig. 3 is a schematic cross-sectional structural view of a first support rod of an embodiment of a scaffold splicing structure for installation of a pipe gallery according to the present invention;
fig. 4 is a schematic cross-sectional structural view of a second first support rod of the scaffold splicing structure for installing a pipe gallery according to the embodiment of the invention.
In the figure: the device comprises a first supporting rod 1, a fixing plate 2, a universal wheel 3, an inserting rod 4, a fixing support 5, a first fixing rod 6, a second fixing rod 7, a crawling ladder 8, a second supporting rod 9, a supporting plate 10, a non-slip mat 11, a hinge 12, a storage box 13, a threaded hole 14, an adjusting screw 15, a locking ring 16, a rubber mat 17, a baffle 18, a sliding rail 19, a telescopic rod 20 and a buffer spring 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Example one
Referring to fig. 1-2, a scaffold splicing structure for installation of a pipe gallery comprises four first supporting rods 1, four fixing plates 2 are respectively fixed on the outer walls of the bottoms of the four first supporting rods 1 through bolts, two connecting plates are respectively fixed on the outer walls of the bottoms of the four fixing plates 2 through bolts, one sides of the two connecting plates are respectively connected with four universal wheels 3 through bearings, two fixing brackets 5 are respectively fixed on the outer walls of one sides of the four first supporting rods 1 through bolts, inserting rods 4 which are equidistantly distributed are respectively fixed on the outer walls of one sides of the four first supporting rods 1 through bearings, two first fixing rods 6 are respectively connected with the outer walls of one sides of the four first supporting rods 1, rectangular grooves are respectively formed on one sides of the two first fixing rods 6, the inserting rods 4 are connected on the inner walls of the rectangular grooves, and four second supporting rods 9 are respectively connected with the outer walls of the, the outer wall of one side of each of four second supporting rods 9 is respectively and rotatably connected with two second fixing rods 7, the tops of the two first fixing rods 6 and the bottoms of the two second fixing rods 7 are respectively and fixedly provided with two crawling ladders 8 through bolts, the outer wall of the tops of the two second fixing rods 7 is respectively and fixedly provided with two supporting plates 10 through bolts, one side of each of the two supporting plates 10 is connected with a hinge 12, a scaffold can be folded and stored, the outer walls of the tops of the two supporting plates 10 are respectively and fixedly provided with two anti-skidding pads 11 through bolts, the outer wall of one side of the tops of the two anti-skidding pads 11 is respectively and fixedly provided with two storage boxes 13 through bolts, the outer walls of two sides of each of the four first supporting rods 1 and the outer walls of two sides of the four second supporting rods 9 are respectively provided with threaded holes 14, the inner walls of the threaded holes 14 are in threaded, baffle 18 is all fixed through the bolt to four 1 inner walls of first bracing piece, and rubber pad 17 is all fixed through the bolt to four 1 inner walls of first bracing piece, and screw hole 14 runs through in rubber pad 17, and the equal sliding connection of four 9 outer walls of second bracing piece is on the 17 outer walls of rubber pad, and the 17 bottoms of rubber pad pass through the bolt fastening on the 18 top outer walls of baffle, can adjust the height of scaffold frame.
Example two
Referring to fig. 1 and 3, a scaffold splicing structure for installation of a pipe gallery comprises four first supporting rods 1, four fixing plates 2 are respectively fixed on the outer walls of the bottoms of the four first supporting rods 1 through bolts, two connecting plates are respectively fixed on the outer walls of the bottoms of the four fixing plates 2 through bolts, four universal wheels 3 are respectively connected on one sides of the two connecting plates through bearings, two fixing brackets 5 are respectively fixed on the outer walls of one sides of the four first supporting rods 1 through bolts, inserting rods 4 which are distributed equidistantly are respectively fixed on the outer walls of one sides of the four first supporting rods 1 through bearings, two first fixing rods 6 are respectively connected on the outer walls of one sides of the four first supporting rods 1, rectangular grooves are respectively formed on one sides of the two first fixing rods 6, the inserting rods 4 are connected on the inner walls of the rectangular grooves, and four second supporting rods 9 are respectively connected on the outer walls of the, the outer wall of one side of each of four second supporting rods 9 is respectively and rotatably connected with two second fixing rods 7, the tops of the two first fixing rods 6 and the bottoms of the two second fixing rods 7 are respectively and fixedly provided with two crawling ladders 8 through bolts, the outer wall of the tops of the two second fixing rods 7 is respectively and fixedly provided with two supporting plates 10 through bolts, one side of each of the two supporting plates 10 is connected with a hinge 12, a scaffold can be folded and stored, the outer walls of the tops of the two supporting plates 10 are respectively and fixedly provided with two anti-skidding pads 11 through bolts, the outer wall of one side of the tops of the two anti-skidding pads 11 is respectively and fixedly provided with two storage boxes 13 through bolts, the outer walls of two sides of each of the four first supporting rods 1 and the outer walls of two sides of the four second supporting rods 9 are respectively provided with threaded holes 14, the inner walls of the threaded holes 14 are in threaded, the inner walls of the four first supporting rods 1 are all fixed with baffle plates 18 through bolts, the inner walls of the four first supporting rods 1 are all fixed with slide rails 19 through bolts, the outer walls of the four second supporting rods 9 are all connected to the inner walls of the slide rails 19 in a sliding mode, the threaded holes 14 penetrate through the slide rails 19, telescopic rods 20 and buffer springs 21 are fixed to the outer walls of the tops of the baffle plates 18 through bolts, the buffer springs 21 are sleeved on the outer walls of the telescopic rods 20, and the tops of the telescopic rods 20 and the buffer springs 21 are fixed to the outer walls of the bottoms of the four second supporting rods 9 respectively, so that the height of.
The working principle is as follows: when the scaffold is used, the scaffold is moved to a proper position through the arranged universal wheels 3, a worker climbs onto the supporting plate 10 through the ladder stand 8, the phenomenon that a sole slips during working can be avoided through the arranged anti-slip mat 11, then required tools are placed in the storage box 13 to avoid the tools from falling to the ground, when the scaffold is not needed during working, the scaffold is folded and stored through the arranged fixed supports 5 and the hinge hinges 12, the fixed supports 5 are connected through the bearings, the scaffold can be prevented from occupying a large ground area during non-working, space can be more fully utilized, when the scaffold is assembled, the height of the scaffold can be adjusted through the rubber pads 17, the baffle 18, the slide rails 19, the telescopic rods 20 and the buffer springs 21 arranged inside the first supporting rods 1, so that the scaffold can be suitable for different working environments, rubber pad 17 and buffer spring 21 have played the effect of buffering simultaneously, the adjustment is accomplished the back, through the screw hole 14 that sets up, adjusting screw 15 and locking ring 16 stabilize first bracing piece 1 and second bracing piece 9, improve firm effect, through be provided with peg graft pole 4 on first bracing piece 1, the rectangular channel has been seted up on first dead lever 6, and second dead lever 7 and second bracing piece 9 rotate to be connected, thereby carry out fixed connection to cat ladder 8, it is convenient to provide for the height of adjustment scaffold frame.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (7)

1. A scaffold assembling structure for mounting a pipe gallery comprises four first supporting rods (1) and is characterized in that four fixing plates (2) are respectively fixed on the outer wall of the bottom of the four first supporting rods (1), two connecting plates are respectively fixed on the outer wall of the bottom of the four fixing plates (2), one side of each connecting plate is respectively connected with four universal wheels (3), two fixing supports (5) are respectively fixed on the outer wall of one side of the four first supporting rods (1), inserting rods (4) distributed at equal intervals are respectively fixed on the outer wall of one side of the four first supporting rods (1), two first fixing rods (6) are respectively connected with the outer wall of one side of the four first supporting rods (1), rectangular grooves are respectively formed in one sides of the two first fixing rods (6), the inserting rods (4) are connected onto the inner wall of the rectangular grooves, and four second supporting rods (9) are respectively connected with the outer wall of the top of the four first supporting rods (1), four second bracing piece (9) one side outer wall is connected with two second dead levers (7) respectively, two first dead lever (6) top and two second dead levers (7) bottom are fixed with two cat ladders (8) respectively, two second dead lever (7) top outer wall is fixed with two backup pads (10) respectively, two backup pad (10) one side all is connected with hinge (12).
2. The scaffold splicing structure for mounting the pipe gallery according to claim 1, wherein two anti-slip mats (11) are respectively fixed on the outer walls of the tops of the two support plates (10), and two storage boxes (13) are respectively fixed on the outer walls of one side of the tops of the two anti-slip mats (11).
3. The scaffold splicing structure for pipe gallery installation according to claim 1, wherein threaded holes (14) are formed in the outer walls of two sides of the four first supporting rods (1) and the outer walls of two sides of the four second supporting rods (9), and adjusting screws (15) are screwed on the inner walls of the threaded holes (14).
4. The scaffold assembling structure for piping lane installation according to claim 3, wherein a locking ring (16) is fixed on the outer wall of one side of each of the four first supporting rods (1), the inner wall of each locking ring (16) is screwed at one end of an adjusting screw (15), and baffles (18) are fixed on the inner walls of the four first supporting rods (1).
5. The scaffold assembling structure for pipe gallery installation according to claim 4, wherein four first support rods (1) are fixed with rubber pads (17) on the inner walls, the threaded holes (14) penetrate through the rubber pads (17), the outer walls of the second support rods (9) are connected to the outer walls of the rubber pads (17), and the bottoms of the rubber pads (17) are fixed to the outer wall of the top of the baffle plate (18).
6. The scaffold splicing structure for pipe gallery installation according to claim 3, wherein four inner walls of the first support rods (1) are fixed with slide rails (19), outer walls of four second support rods (9) are connected to the inner walls of the slide rails (19), and the threaded holes (14) penetrate through the slide rails (19).
7. The scaffold splicing structure for pipe gallery installation according to claim 4, wherein a telescopic rod (20) and a buffer spring (21) are fixed to the outer wall of the top of the baffle plate (18), the buffer spring (21) is sleeved on the outer wall of the telescopic rod (20), and the tops of the telescopic rod (20) and the buffer spring (21) are respectively fixed to the outer walls of the bottoms of the four second support rods (9).
CN202010535887.XA 2020-06-12 2020-06-12 Structure is assembled with scaffold frame to piping lane installation Withdrawn CN111576830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010535887.XA CN111576830A (en) 2020-06-12 2020-06-12 Structure is assembled with scaffold frame to piping lane installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010535887.XA CN111576830A (en) 2020-06-12 2020-06-12 Structure is assembled with scaffold frame to piping lane installation

Publications (1)

Publication Number Publication Date
CN111576830A true CN111576830A (en) 2020-08-25

Family

ID=72109961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010535887.XA Withdrawn CN111576830A (en) 2020-06-12 2020-06-12 Structure is assembled with scaffold frame to piping lane installation

Country Status (1)

Country Link
CN (1) CN111576830A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359968A (en) * 2020-11-17 2021-02-12 江西省钢结构网架质量检验中心 Anti-seismic and anti-corrosion adjustable steel structure support for building construction
CN115110737A (en) * 2022-02-09 2022-09-27 佳木斯大学 Civil engineering construction support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359968A (en) * 2020-11-17 2021-02-12 江西省钢结构网架质量检验中心 Anti-seismic and anti-corrosion adjustable steel structure support for building construction
CN115110737A (en) * 2022-02-09 2022-09-27 佳木斯大学 Civil engineering construction support

Similar Documents

Publication Publication Date Title
CN111576830A (en) Structure is assembled with scaffold frame to piping lane installation
CN212562381U (en) Structure is assembled with scaffold frame to piping lane installation
KR20120078548A (en) Folding stairs table
CN201152011Y (en) Combination type scaffold for fitment
CN211257740U (en) Small-span operation platform suitable for high-altitude construction
CN206376506U (en) A kind of assembly type scaffold base
CN210888010U (en) Construction handling frame
CN114263786A (en) Anti-seismic structure frame suitable for urban underground comprehensive pipe gallery
CN209780181U (en) Scaffold frame that building engineering used
CN106108470B (en) Electrical equipment overhauling stool/ladder
AU2011265552A1 (en) Mobile gantry crane
GB2347453A (en) Scaffold system mountable on window sill or ledge
CN219411742U (en) Assembled construction support
CN219196662U (en) Support for protecting outer wall
CN215565869U (en) Energy feedback type oil pumping machine convenient to maintain
JP3354471B2 (en) Scaffolding equipment
CN218758615U (en) Folding building engineering scaffold
CN216007774U (en) Simple and easy adjustable stores pylon device
CN218061328U (en) Scaffold for building construction
CN219261676U (en) Construction engineering scaffold
CN213682505U (en) Safe antidetonation activity board house
CN214995770U (en) Portable scaffold support for constructional engineering
CN217557574U (en) Historical site protection construction table
CN215920391U (en) Tool carrying device for subway construction
CN220319104U (en) Scaffold connecting assembly and scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20200825