CN111576638A CN202010243215.1A CN202010243215A CN111576638A CN 111576638 A CN111576638 A CN 111576638A CN 202010243215 A CN202010243215 A CN 202010243215A CN 111576638 A CN111576638 A CN 111576638A
Authority
CN
China
Prior art keywords
embedded part
template
welding
along
fixed support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010243215.1A
Other languages
Chinese (zh)
Inventor
张少振
翟宏星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202010243215.1A priority Critical patent/CN111576638A/en
Publication of CN111576638A publication Critical patent/CN111576638A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a complete construction method of a wallboard embedded part; the method is characterized in that: determining a horizontal central line of the embedded part along the height direction; along the horizontal central line, a top bracing support with the same wall thickness and length is welded, and a construction line is tied at the end part of the top bracing support (1); the fixed support (2) is connected with the top bracing support (1) in a welding way along the horizontal direction; marking the center position of an embedded part on the fixed support (2), and welding the middle part of the embedded part (3) along the fixed support (2); welding screw rods (4) are uniformly distributed on the fixed support (2); making a hole on the template; closing the template, and fastening the screw (4) outside the reserved template by using a pipe clamp and a screw cap; pouring concrete and vibrating to compact; and (5) removing the formwork after the concrete curing age reaches the standard, cutting the split screw by using a grinder, and recovering the screw at the end part of the pull rod to finish the operation. The method is a construction method which can still ensure the one-time installation qualification rate of the embedded parts even under the condition of large-batch embedded part operation.

Description

Complete construction method for wallboard embedded part
Technical Field
The invention relates to the technical field of concrete construction, in particular to a complete construction method for a wallboard embedded part.
Background
With the continuous improvement of the whole level of national economy and the continuous acceleration of the development speed of industrial buildings in China, the environmental requirements of people on production operation are higher and higher, and pipelines and cable bridge supports which are used for production are inevitably arranged along the inner wall of a building in order to meet the production and installation requirements of various major and provide a larger working face. The installation appearance quality of the pipeline and the bridge frame can be horizontal, flat and vertical, and the acceptance requirement is met. The support fixed to the side wall plays a decisive role. Most of the fixing frames are welded with embedded parts on the side walls, so that the installation positions of the embedded parts are accurate, and the surfaces of the embedded parts are flush with the concrete surface. The installation quality of the pipeline and the bridge can be greatly improved, the construction period is effectively shortened, and the cost is saved.
The common installation method of the wallboard embedded part at the present stage comprises the following steps: after the steel bars are bound, marking the central line of the wallboard in the longitudinal direction and the height direction by using a construction line according to the drawing size, then arranging the single embedded parts according to the drawing size according to the central line, and finally binding the embedded part anchor flukes with the horizontally distributed steel bars of the wallboard. Because the anchor fluke ligature of embedded part is on horizontal distribution muscle, very easily receives the influence of reinforcing bar, at the concrete placement in-process, the vibrating spear touches the reinforcing bar and slightly disturbs and will cause the embedded part sunken, or the skew. The method has high installation speed, but has poor accuracy and large influence on subsequent construction.
The further installation method is as follows: before the embedded part is installed, the embedded part anchor fluke is welded to be equal to the wall thickness, a hole is formed in the center of the embedded part, a small section of counter-pulling screw rod penetrates out of the embedded part hole in advance, a stop block is arranged at the end of the counter-pulling screw rod, the rear part of the embedded part is pulled, and meanwhile later fastening is facilitated. And after positioning and paying off, jacking the embedded anchor fluke to the edge of the template according to the requirements of a drawing, and then sealing the template. And finally, fixing the pre-penetrated counter-pulling screw rod by using the back edge. The installation principle is as follows: the embedded anchor fluke is equal to the wall thickness, so that the inner side of the embedded surface template is ensured to be tightly attached, and the embedded surface template is further reinforced through a reserved counter-pulling screw rod, so that the embedded surface is flush with the concrete side wall surface after the template is removed, and the embedded surface is prevented from sinking. This type of installation adds a significant amount of welding work when the number of wall panel inlays is high. Therefore, the flatness of the embedded part can be well controlled by using the method, but the embedded part has low positioning precision, time and labor are wasted, and extra cost is generated. It is therefore not suitable for cases where the number of inserts is high.
Disclosure of Invention
The invention aims to overcome the defects and provide a construction method which can still ensure the one-time installation yield of embedded parts even under the condition of large-scale embedded part operation.
In order to achieve the above object, the present invention is realized by:
a complete set of construction method for embedded parts of wall boards comprises
Step 1: determining a horizontal central line of the embedded part along the height direction according to the drawing size, and marking the horizontal central line by using a construction line;
step 2: along the horizontal central line, respectively welding a top bracing support with the same wall thickness and length at one end of each of two ends of the horizontal direction of the wallboard, tying a construction line at the end part of each top bracing support, and arranging the top bracing supports at intervals of 2-3 m along the construction line;
and step 3: after the top support bracket and the vertical steel bar of the wall body are welded, the fixed bracket and the top support bracket are welded and connected along the horizontal direction;
and 4, step 4: marking the center position of the embedded part on the fixed support, and welding the middle part of the embedded part along the fixed support after determining that the position is correct;
and 5: when the fixed support and the embedded part are firmly connected by welding, welding screws are uniformly distributed on the fixed support;
step 6: punching holes on the template to ensure that the counter-pulling screw rod and the welding screw rod on the fixed support can penetrate out of the template;
and 7: closing the template, and fastening the screw rods outside the reserved template by using a pipe clamp and a screw cap;
and 8: after the template is further checked to be reinforced stably, concrete is poured and vibrated to be compact;
and step 9: and (4) removing the formwork after the concrete curing age reaches the standard, cutting the counter-pulling screw rod by using a grinding machine, and recovering the screw rod at the end part of the pull rod so as to be conveniently used next time and finish the operation.
Thewallboard embedded part complete construction method effectively solves the problem that the accuracy cannot be guaranteed when the quantity of the wallboard embedded parts is large. The method has the core idea that originally independent embedded parts are positioned in a mode of welding and fixing a support, and meanwhile, the embedded parts are connected to form a whole set for reinforcing. Compared with a single installation and fixation method of arranging each embedded part fluke to be equal to the wall thickness and forming a hole in the middle of the embedded part. The construction is more convenient and fast while the accuracy is ensured, the workload is greatly reduced, and the time is saved.
Compared with the traditional construction method for directly welding the embedded part and the horizontal rib, the method has the advantages that the installation accuracy is higher, and the phenomenon that the embedded part is not concave and uneven can not occur. Secondary reworking is effectively avoided, cost is saved, and construction period is shortened.
Meanwhile, the screws used in the wallboard embedded part complete construction method are all waste materials of the end parts of the counter-pulling screws cut during concrete form removal, so that the material value is fully exerted, and the wall plate embedded part can be repeatedly used.
Drawings
FIG. 1 is a first schematic diagram of the complete construction of a wallboard embedded part by using the construction method.
FIG. 2 is a schematic diagram II of the complete construction of the wallboard embedded part by adopting the construction method.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1 and 2, a wallboard embedded part complete construction method includes:
1. after finishing binding of reinforcing steel bars of the wallboard, firstly welding a top bracing support 1 which is as long as the thickness of the wallboard at two ends of the horizontal direction of the wallboard respectively, then marking a central line of the horizontal direction of an embedded part on a tensioning construction line of the top bracing support 1, welding a fixing support 2 with the top bracing support 1 along the central line of the horizontal direction, and connecting the top bracing supports 1 at two ends with the fixing support 2.
2. And then, marking the specific position of each embedded part 3 on the fixed support 2 by using a steel ruler according to the drawing size. And the middle part of the embedded part 3 is welded with the fixed bracket 2.
3. After the welding is finished, the opposite-penetrating screw rods 4 are welded on the fixed support 2 at the interval of 460 and 920mm, and after the integral welding is finished, the welding position and the stability are confirmed again. The positions of the opposite penetrating screw rods 4 are arranged on the template at intervals of 460mm in advance, and holes are drilled. And (5) sealing the template after no error occurs.
4. And erecting steel pipes up and down on the screw rods 4 of the reserved templates, fixing the steel pipes by using pipe clamps, and screwing by using bolts to ensure that the fixing support 2 at the back of the embedded part (one side of the fluke) can pull the embedded part 1 to be tightly attached to the templates and no concave unevenness occurs after the embedded part is removed from the templates. Meanwhile, the through screw 4 can also play a role in reinforcing the template.
5. And after the whole template is reinforced, checking the verticality of the wallboard and whether the supporting system is fastened. After all the concrete is ready, concrete is poured, vibration is guaranteed to be in place in the pouring process, and the honeycomb pitted surface is avoided.
6. And (5) after concrete pouring is finished and the formwork stripping condition is achieved, removing the fastening screw cap by using an electric wrench, and stripping the formwork. And cutting the oppositely-pulled screw rods exposed out of the concrete surface by adopting a grinder, collecting the cut screw rods, and reinforcing the fixed support for the next time.

Claims (1)

1. A wallboard embedded part complete construction method is characterized by comprising the following steps: comprises that
Step 1: determining a horizontal central line of the embedded part along the height direction according to the drawing size, and marking the horizontal central line by using a construction line;
step 2: along the horizontal central line, welding a top bracing support (1) with the same wall thickness and length at each of two ends of the wallboard in the horizontal direction, tying a construction line at the end part of the top bracing support (1), and arranging the top bracing supports (1) at intervals of 2-3 m along the construction line;
and step 3: after the top support bracket (1) is welded with the vertical steel bar of the wall body, the fixed bracket (2) is welded with the top support bracket (1) along the horizontal direction;
and 4, step 4: marking the center position of the embedded part on the fixed support (2), and welding the middle part of the embedded part (3) along the fixed support (2) after the position is determined to be correct;
and 5: after the fixed support (2) and the embedded parts (3) are firmly connected by welding, welding screw rods (4) are uniformly distributed on the fixed support (2);
step 6: punching holes on the template to ensure that the counter-pulling screw rod and the welding screw rod (4) on the fixed support can penetrate out of the template;
and 7: closing the template, and fastening the screw (4) outside the reserved template by using a pipe clamp and a screw cap;
and 8: after the template is further checked to be reinforced stably, concrete is poured and vibrated to be compact;
and step 9: and (4) removing the formwork after the concrete curing age reaches the standard, cutting the counter-pulling screw rod by using a grinding machine, and recovering the screw rod at the end part of the pull rod so as to be conveniently used next time and finish the operation.
CN202010243215.1A 2020-03-31 2020-03-31 Complete construction method for wallboard embedded part Pending CN111576638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010243215.1A CN111576638A (en) 2020-03-31 2020-03-31 Complete construction method for wallboard embedded part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010243215.1A CN111576638A (en) 2020-03-31 2020-03-31 Complete construction method for wallboard embedded part

Publications (1)

Publication Number Publication Date
CN111576638A true CN111576638A (en) 2020-08-25

Family

ID=72089653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010243215.1A Pending CN111576638A (en) 2020-03-31 2020-03-31 Complete construction method for wallboard embedded part

Country Status (1)

Country Link
CN (1) CN111576638A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112240059A (en) * 2020-10-26 2021-01-19 吕梁学院 Detachable building structure and component

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1659007A1 (en) * 1967-04-28 1970-10-01 Wayss & Freytag Ag Device for connecting reinforced concrete components to wall-like reinforced concrete components produced in wall formwork
JP2001055793A (en) * 1999-08-18 2001-02-27 Tsuchiya Two By Home Co Ltd Fixing structure for foundation, sill, floor and wall in building, and sill reinforcing fitting
CN202925679U (en) * 2012-11-08 2013-05-08 中国建筑第八工程局有限公司 Concrete embedded part structure
CN204098231U (en) * 2014-09-05 2015-01-14 中冶天工上海十三冶建设有限公司 A kind of installation of embedded parts frock
CN106592775A (en) * 2016-12-22 2017-04-26 中国核工业二四建设有限公司 High-precision embedded part reinforcing and mounting device and method and purpose
CN107882344A (en) * 2017-11-16 2018-04-06 北京首钢建设集团有限公司 A kind of installation of embedded parts bolt fixing means
CN108468388A (en) * 2018-03-29 2018-08-31 中建八局第二建设有限公司 A kind of built-in fitting and its construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1659007A1 (en) * 1967-04-28 1970-10-01 Wayss & Freytag Ag Device for connecting reinforced concrete components to wall-like reinforced concrete components produced in wall formwork
JP2001055793A (en) * 1999-08-18 2001-02-27 Tsuchiya Two By Home Co Ltd Fixing structure for foundation, sill, floor and wall in building, and sill reinforcing fitting
CN202925679U (en) * 2012-11-08 2013-05-08 中国建筑第八工程局有限公司 Concrete embedded part structure
CN204098231U (en) * 2014-09-05 2015-01-14 中冶天工上海十三冶建设有限公司 A kind of installation of embedded parts frock
CN106592775A (en) * 2016-12-22 2017-04-26 中国核工业二四建设有限公司 High-precision embedded part reinforcing and mounting device and method and purpose
CN106592775B (en) * 2016-12-22 2019-11-12 中国核工业二四建设有限公司 A kind of high-accuracy built-in fitting reinforces mounting device and method, purposes
CN107882344A (en) * 2017-11-16 2018-04-06 北京首钢建设集团有限公司 A kind of installation of embedded parts bolt fixing means
CN108468388A (en) * 2018-03-29 2018-08-31 中建八局第二建设有限公司 A kind of built-in fitting and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112240059A (en) * 2020-10-26 2021-01-19 吕梁学院 Detachable building structure and component

Similar Documents

Publication Publication Date Title
CN107083804B (en) A kind of wall structure column joint bar construction method
CN206220489U (en) Concrete post formwork for placing tightening device
CN103161313A (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN111576638A (en) Complete construction method for wallboard embedded part
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN110700319A (en) Comprehensive pipe gallery is with unilateral formwork frock
CN202831624U (en) Template for deformation joint of shear wall
CN115354846A (en) Auxiliary post-pouring device for assembled type superimposed shear wall structure and using method thereof
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN212359123U (en) Concrete form fixing device for building and civil construction
CN109914800B (en) Accurate pre-installation structure and construction method for civil building line-connecting and line-arranging pipes
CN112482636A (en) Underground assembly type station cast-in-place beam formwork-free structure and construction method thereof
CN210421927U (en) Cast-in-place linkage segment template strutting arrangement of instrument formula concrete superimposed sheet
CN212176097U (en) Temporary fixing system for embedded steel plates on surface of wall
CN111002432A (en) Prefabricated constructional column template and using method thereof
CN216239744U (en) Pre-buried positioning tool of high-rise building pipeline well sleeve pipe
JPH06316939A (en) Positioning jig for construction work, and construction of building therewith
CN217027823U (en) Installation device for embedded part of stair railing made of aluminum die technology
CN219342852U (en) Accurate positioner of bridge support rag bolt preformed hole
CN220133511U (en) Aluminum and wood pattern control offset fixing device
CN217150329U (en) External corner formwork for overhanging part of basic raft
CN109138407A (en) Skyscraper early tears aluminium alloy inset stencil plate form bracing system construction technology open
CN219006422U (en) Prefabricated cushion cap template of foam concrete
CN211058144U (en) Integral prefabricating and forming structure for embedded part and core cylinder reinforcing mesh of tower crane
CN219548376U (en) Side form formwork device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination