CN111576477B - 一种水轮发电机定子基础板固定、浇注方法 - Google Patents
一种水轮发电机定子基础板固定、浇注方法 Download PDFInfo
- Publication number
- CN111576477B CN111576477B CN202010509833.6A CN202010509833A CN111576477B CN 111576477 B CN111576477 B CN 111576477B CN 202010509833 A CN202010509833 A CN 202010509833A CN 111576477 B CN111576477 B CN 111576477B
- Authority
- CN
- China
- Prior art keywords
- foundation
- stator
- plate
- screw
- pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Motor Or Generator Frames (AREA)
Abstract
本发明公开了一种水轮发电机定子基础板固定、浇注方法,包括如下步骤:1)将地脚螺杆和下部螺母拧紧成一体;2)套入垫圈和地脚螺杆;3)把定子基础板起吊至地脚螺杆上方;4)均匀安装基础垫板和调整楔子板;5)设置漏斗式灌浆管及振动棒;6)将定子基础板落下,并放在调整楔子板上;7)调整定子基础板;8)调整好水平和高层,拉紧定子基础板并点焊牢固;9)将漏斗式灌浆管的下部伸入到地脚螺杆下部;10)待定子基础板固定在基坑风罩内后,将混凝土浆灌入。本发明不但能够使得定子基础板更佳牢固,而且在浇注过程中,保证定子基础板不受混凝土浇注时压力的影响,确保水平和高层,局部区域浇注均匀密实,保证了机组的安全稳定性。
Description
技术领域
本发明涉及一种水轮发电机安装施工方法,特别是一种水轮发电机定子基础板固定、浇注方法。
背景技术
目前,在水轮发电机安装过程中,定子基础板是水轮发电机机组整个推力负荷的承重中心;为了保证其能经受较大的承重负荷,定子基础板是全部埋入混凝土中,其目的是为了保证机组运行的稳定性和安全性。但是,由于水轮发电机在进行发电时,会受到水流冲击产生震动,定子基础板也是机组最容易发生震动的部位,一旦定子基础板由于震动而发生松动,将影响机组的稳定运行及效率。
为了解决这个问题,在现阶段的情况下,电站对于定子基础板松动的情况下采用对局部松动点进行点焊及灌浆的方法来进行固定;但是,由于点焊的固定效果并非最佳,导致在后续的浇注时,受到混凝土的冲击,定子基础板仍然会产生松动,无法保证浇注的混凝土能够全部的将定子基础板内壁包裹住,局部区域仍会留下空隙,固定不牢固。
发明内容
本发明的目的就是提供一种能够使得固定牢固,有效防止松动的水轮且混凝土浇注均匀密实的水轮发电机定子基础板固定、浇注方法。
本发明的目的是通过这样的技术方案实现的,一种水轮发电机定子基础板固定、浇注方法,所述方法包括如下步骤:
1)将地脚螺杆和下部螺母拧紧成一体,调整好位置后与基础内钢筋点焊牢固;
2)套入垫圈和地脚螺杆套管在地脚螺杆上;
3)把定子基础板起吊至地脚螺杆上方,对齐并穿入地脚螺杆;
4)保持定子基础板处于吊起状态,在定子基础板的下方,均匀安装三块基础垫板,再在基础垫板上安装三块调整楔子板;
5)在待安装的定子基础板内壁上设置供浇注混凝土时所用的漏斗式灌浆管及振动棒;
6)将定子基础板落下,并放在三块调整楔子板上;
7)用三块调整楔子板来调整定子基础板的水平和高层;
8)调整好定子基础板的水平和高层后,用地脚螺杆和上部螺母拉紧定子基础板并点焊牢固;
9)将漏斗式灌浆管的下部伸入到地脚螺杆下部;
10)待定子基础板固定在基坑风罩内后,通过漏斗式灌浆管将混凝土浆灌入。
其中,在所述步骤7)中,安装地脚螺杆和上部螺母时需进行对称拉紧。
由于采用了上述技术方案,本发明具有施工方便、成本低廉、使用可靠的优点,采用它不但能够使得定子基础板的固定更佳牢固,而且在对定子基础板的浇注过程中,有效保证定子基础板不受混凝土浇注时压力的影响,确保定子基础板的水平和高层,内壁包裹性好,局部区域浇注均匀密实,保证了机组的安全稳定的运行。
附图说明
本发明的附图说明如下:
图1为本发明的剖视结构示意图;
图2为图1的俯视图。
图3为本发明的浇注结构示意图。
具体实施方式
下面结合附图对本发明的具体实施方式作进一步详细的说明,但本发明并不局限于这些实施方式,任何在本实施例基本精神上的改进或替代,仍属于本发明权利要求所要求保护的范围。
实施例1:如图1、2、3所示,一种水轮发电机定子基础板固定、浇注方法,所述方法包括如下步骤:
1)将地脚螺杆1和下部螺母4拧紧成一体,调整好位置后与基础内钢筋点焊牢固;
2)套入垫圈3和地脚螺杆套管2在地脚螺杆1上;
3)把定子基础板5起吊至地脚螺杆1上方,对齐并穿入地脚螺杆1;
4)保持定子基础板5处于吊起状态,在定子基础板的下方,均匀安装三块基础垫板7,再在基础垫板7上安装三块调整楔子板6;
5)在待安装的定子基础板内壁上设置供浇注混凝土时所用的漏斗式灌浆管及振动棒;
6)将定子基础板5落下,并放在三块调整楔子板6上;
7)用三块调整楔子板6来调整定子基础板5的水平和高层;
8)调整好定子基础板5的水平和高层后,用地脚螺杆1和上部螺母9拉紧定子基础板5并点焊牢固;
9)定子基础板5外部与弧形基础封板8焊成一体,内部有地脚螺杆1刚性支撑,固定了定子基础板5;
10)将漏斗式灌浆管的下部伸入到地脚螺杆下部;
11)待定子基础板固定在基坑风罩内后,通过漏斗式灌浆管将混凝土浆灌入。
其中,为了使得受力均匀,在所述步骤8)中,安装地脚螺杆1和上部螺母4时需进行对称拉紧。
在本发明中,通过上述步骤,能够快速的对定子基础板5进行固定,很好的解决了大推力负荷发电机定子基础板在浇注混凝土过程不受混凝土压力的影响,能够将定子基础板5完全的固定于安装位上,保证了混凝土在浇注过程中不对定子基础板产生不可逆转的影响,保证了机组运行过程中的安全性和稳定性。
在定子基础板固定后,在有限的空间内对定子基础板周围进行混凝土浇注,目的是让定子基础板周围的混凝土浇注均匀密实,不留下未浇注的空洞部分,当混凝土全部将定子基础板5内壁包裹住后,能保证机组运行过程中产生的巨大垂直推力不会影响到定子基础板5。
Claims (2)
1.一种水轮发电机定子基础板固定、浇注方法,其特征是,所述方法包括如下步骤:
1)将地脚螺杆和下部螺母拧紧成一体,调整好位置后与基础内钢筋点焊牢固;
2)套入垫圈和地脚螺杆套管在地脚螺杆上;
3)把定子基础板起吊至地脚螺杆上方,对齐并穿入地脚螺杆;
4)保持定子基础板处于吊起状态,在定子基础板的下方,均匀安装三块基础垫板,再在基础垫板上安装三块调整楔子板;
5)在待安装的定子基础板内壁上设置供浇注混凝土时所用的漏斗式灌浆管及振动棒;
6)将定子基础板落下,并放在三块调整楔子板上;
7)用三块调整楔子板来调整定子基础板的水平和高层;
8)调整好定子基础板的水平和高层后,用地脚螺杆和上部螺母拉紧定子基础板并点焊牢固;
9)将漏斗式灌浆管的下部伸入到地脚螺杆下部;
10)待定子基础板固定在基坑风罩内后,通过漏斗式灌浆管将混凝土浆灌入。
2.如权利要求1所述的水轮发电机定子基础板固定、浇注方法,其特征是:在步骤8)中,安装地脚螺杆和上部螺母时需进行对称拉紧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010509833.6A CN111576477B (zh) | 2020-06-08 | 2020-06-08 | 一种水轮发电机定子基础板固定、浇注方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010509833.6A CN111576477B (zh) | 2020-06-08 | 2020-06-08 | 一种水轮发电机定子基础板固定、浇注方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111576477A CN111576477A (zh) | 2020-08-25 |
CN111576477B true CN111576477B (zh) | 2021-09-24 |
Family
ID=72125640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010509833.6A Active CN111576477B (zh) | 2020-06-08 | 2020-06-08 | 一种水轮发电机定子基础板固定、浇注方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111576477B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU394502A1 (ru) * | 1971-05-13 | 1973-08-22 | Государственный институт проектированию технологии монтажа предпри тий химической промышленности | Способ монтажа оборудования |
GB9022216D0 (en) * | 1990-10-12 | 1990-11-28 | Scott Taggart Raymond P | Improvements relating to bolt hole formers |
CN201747544U (zh) * | 2010-08-26 | 2011-02-16 | 华锐风电科技(集团)股份有限公司 | 风力发电机的安装基座和风力发电机 |
CN203788069U (zh) * | 2014-03-25 | 2014-08-20 | 杭州力源发电设备有限公司 | 一种水轮发电机定子基础板结构 |
CN105862909A (zh) * | 2016-06-02 | 2016-08-17 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种水电站厂房定子基础结构及其浇筑方法 |
CN206723723U (zh) * | 2017-04-11 | 2017-12-08 | 好米动力设备有限公司 | 一种定扭矩固定用盾式地脚螺栓 |
-
2020
- 2020-06-08 CN CN202010509833.6A patent/CN111576477B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU394502A1 (ru) * | 1971-05-13 | 1973-08-22 | Государственный институт проектированию технологии монтажа предпри тий химической промышленности | Способ монтажа оборудования |
GB9022216D0 (en) * | 1990-10-12 | 1990-11-28 | Scott Taggart Raymond P | Improvements relating to bolt hole formers |
CN201747544U (zh) * | 2010-08-26 | 2011-02-16 | 华锐风电科技(集团)股份有限公司 | 风力发电机的安装基座和风力发电机 |
CN203788069U (zh) * | 2014-03-25 | 2014-08-20 | 杭州力源发电设备有限公司 | 一种水轮发电机定子基础板结构 |
CN105862909A (zh) * | 2016-06-02 | 2016-08-17 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种水电站厂房定子基础结构及其浇筑方法 |
CN206723723U (zh) * | 2017-04-11 | 2017-12-08 | 好米动力设备有限公司 | 一种定扭矩固定用盾式地脚螺栓 |
Also Published As
Publication number | Publication date |
---|---|
CN111576477A (zh) | 2020-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5917707B2 (ja) | 風力発電装置の基礎 | |
CN106436748A (zh) | 一种适用于山地光伏组件的岩锚基础结构及其施工方法 | |
CN103114604B (zh) | 预应力混凝土圆筒型风力发电机组基础 | |
CN105155572A (zh) | 现浇式预应力锚索风机基础系统及其施工方法 | |
JP5526001B2 (ja) | 基礎ベースのレベル調整方法および基礎ベースの固定方法 | |
MY191382A (en) | Autonomously buoyant heavyweight foundation for connection to a buoyant offshore plant | |
CN111576477B (zh) | 一种水轮发电机定子基础板固定、浇注方法 | |
CN204858400U (zh) | 倾斜杆塔矫正器 | |
CN202099880U (zh) | 地脚螺栓 | |
CN103956865B (zh) | 水轮发电机定转子同机坑内叠装磁轭工艺方法 | |
JP3242212U (ja) | 海上風力発電単杭基礎の延命服役装置 | |
CN203788069U (zh) | 一种水轮发电机定子基础板结构 | |
CN209082546U (zh) | 一种适用于海上风电场风机的复合基础结构 | |
CN217380778U (zh) | 一种水轮发电机组的安装结构 | |
CN206112408U (zh) | 一种发电机的底座组 | |
RU89543U1 (ru) | Анкерный металлический оголовок железобетонного фундамента | |
CN207727606U (zh) | 一种风力发电机基础锚栓加固结构 | |
CN209243755U (zh) | 一种定日镜支撑装置 | |
CN204532669U (zh) | 一种新型水电站机组大轴中心补气管装置 | |
CN207176727U (zh) | 预制组装式钢混结构光伏发电设备平台 | |
CN206820684U (zh) | 一种安装精度高的光伏螺旋支架 | |
CN110936326B (zh) | 一种核电厂ptr换料水箱地脚螺栓拆除方法 | |
CN205257759U (zh) | 一种后浇设备支撑梁 | |
CN205046571U (zh) | 一种现浇式预应力锚索风机基础装置 | |
CN205857237U (zh) | 一种适用于山地光伏组件的岩锚基础结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |