CN111554425A - Method for coping with extremely-small-break water loss accident of pressurized water reactor nuclear power plant - Google Patents

Method for coping with extremely-small-break water loss accident of pressurized water reactor nuclear power plant Download PDF

Info

Publication number
CN111554425A
CN111554425A CN202010412152.8A CN202010412152A CN111554425A CN 111554425 A CN111554425 A CN 111554425A CN 202010412152 A CN202010412152 A CN 202010412152A CN 111554425 A CN111554425 A CN 111554425A
Authority
CN
China
Prior art keywords
safety injection
water level
state
pressure
main system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010412152.8A
Other languages
Chinese (zh)
Other versions
CN111554425B (en
Inventor
党高健
丁书华
冉旭
吴清
冷贵君
刘昌文
陈伟
吴丹
钱立波
申亚欧
李仲春
蒋孝蔚
何晓强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nuclear Power Institute of China
Original Assignee
Nuclear Power Institute of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nuclear Power Institute of China filed Critical Nuclear Power Institute of China
Priority to CN202010412152.8A priority Critical patent/CN111554425B/en
Publication of CN111554425A publication Critical patent/CN111554425A/en
Application granted granted Critical
Publication of CN111554425B publication Critical patent/CN111554425B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/04Safety arrangements
    • G21D3/06Safety arrangements responsive to faults within the plant
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses a method for coping with a minimal breach water loss accident of a pressurized water reactor nuclear power plant, which comprises the following steps: detecting a main system supercooling state, a secondary side heat trap state, a main system pressure state and a voltage stabilizer water level state of the pressurized water reactor nuclear power plant; judging whether the safety injection stopping criterion is met or not according to the detection result, and when the safety injection stopping criterion is met, sequentially stopping the operation of the safety injection pump; monitoring the supercooling state of a main system and the water level state of a voltage stabilizer in real time in the process of executing the operation of the shutdown safety injection pump, and starting the shutdown safety injection pump if the supercooling state of the main system or the water level state of the voltage stabilizer does not meet the safety injection stopping criterion; and repeating the steps until all the safety injection pumps stop running. According to the invention, by setting an effective safety injection termination criterion, formulating a reasonable safety injection termination step and the like, the safety injection can be effectively terminated and the nuclear power plant can be maintained in a safe and stable state after a primary circuit minimum breach accident occurs.

Description

Method for coping with extremely-small-break water loss accident of pressurized water reactor nuclear power plant
Technical Field
The invention relates to an accident handling scheme of a pressurized water reactor nuclear power plant (pressurized water reactor nuclear power plant), in particular to a handling method of a minimum break loss accident of the pressurized water reactor nuclear power plant.
Background
The pressurized water reactor nuclear power plant has a tiny breach water loss accident which causes reactor shutdown and enables the upper charge flow to compensate the breach flow after the reactor shutdown. For the accident, after the break occurs, the pressure of the main system is very high, and the flow of the break is larger than the upper charging flow, so that the pressure of the main system and the water level of the pressure stabilizer are continuously reduced, and the reactor shutdown and the safety injection pump are triggered to be put into operation. After the shutdown, along with the reduction of the pressure of the main system, when the crevasse flow is lower than the upper charging flow, the safety injection pump does not need to continue to operate, and the crevasse flow can be compensated only by the upper charging flow. In this case, if the safety injection pump continues to operate, the pressure of the main system may continuously rise, and the overpressure protection valve of the pressure stabilizer is triggered to open, so that the loss of coolant accident with more serious consequences is caused. Therefore, it is necessary to select the right time and take reasonable measures to stop the operation of the safety injection pump and maintain the nuclear power plant in a stable state so as to ensure the safety of the reactor.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the safety injection pump continues to operate to cause more serious loss of coolant accidents when minimum break loss of coolant accidents occur, and the aim is to provide a method for coping the minimum break loss of coolant accidents of a pressurized water reactor nuclear power plant.
The invention is realized by the following technical scheme:
a coping method for a minimal breach water loss accident of a pressurized water reactor nuclear power plant comprises the following steps: s1: detecting an operating condition of a pressurized water reactor nuclear power plant, the operating condition comprising: a main system supercooling state, a secondary side heat trap state, a main system pressure state and a voltage stabilizer water level state; s2: judging whether the running states of the pressurized water reactor nuclear power plant meet safety injection stopping criteria or not according to the detection result of the step S1, and when the running states meet the safety injection stopping criteria, sequentially stopping the safety injection pumps; s3: monitoring the main system supercooling state and the voltage stabilizer water level state in real time in the process of executing the operation of the shutdown safety injection pump, and starting the shutdown safety injection pump if the main system supercooling state or the voltage stabilizer water level state does not meet the safety injection stopping criterion; s4: and repeating the steps S1-S4 until all the safety injection pumps stop running.
The invention monitors the main system supercooling state, the secondary side heat trap state, the main system pressure state and the water level state of the pressure stabilizer in real time, judges whether the four states all meet the safety injection stopping criterion, and when all the states meet the safety injection stopping criterion, only an upper charge pump compensates the loss of the coolant at the breach, and stops operating the safety injection pump in sequence. And in the process of stopping the operation of the safety injection pump, after one safety injection pump is stopped, the supercooled state of the main system and the water level state of the pressure stabilizer are detected again. And when the main system is in the supercooled state or the water level state of the pressure stabilizer does not meet the safety injection stopping criterion, restarting the safety injection pump which stops running in the last step. And repeating the steps until all the safety injection pumps stop running. The method monitors the main system supercooling state, the secondary side heat trap state, the main system pressure state and the water level state of the pressure stabilizer of the pressurized water reactor nuclear power plant in the whole process, and adopts corresponding different corresponding measures (stopping the safety injection pump or restarting the safety injection pump) through judging the four states in different periods, so that the safe and stable operation of the pressurized water reactor nuclear power plant is guaranteed.
Further, the method also comprises the following steps: s5: detecting the main system supercooling state and the voltage stabilizer water level state; s6: if the main system supercooling state does not meet the safety injection stopping criterion, restarting the stopped safety injection pump; if the water level state of the voltage stabilizer does not meet the safety injection stopping criterion, the water level of the voltage stabilizer is maintained by controlling the upper charging flow, and if the water level of the voltage stabilizer cannot be maintained by adjusting the upper charging flow, the stopped safety injection pump is restarted.
When all safety injection pumps stop operating, the main system supercooling state and the water level state of the pressure stabilizer are detected again, any one state does not meet the safety injection stopping criterion, corresponding different measures are taken, and the safe and stable operation of the pressurized water reactor nuclear power plant is further guaranteed.
Further, the method also comprises the following steps: s7: and if the main system supercooling state and the water level state of the pressure stabilizer meet the safety injection stopping criterion, controlling the pressure, the temperature and the water level of a loop.
When all safety injection pumps stop operating, the main system supercooling state and the pressure stabilizer water level state are detected again, and when the two states meet the safety injection stopping criterion, the safe and stable operation of the pressurized water reactor nuclear power plant is guaranteed by controlling the pressure, the temperature and the water level of a loop.
Further, the pressure of the primary loop is the pressure of the pressure stabilizer, the temperature of the primary loop is the temperature of the main system, and the water level of the primary loop is the water level of the pressure stabilizer and the water level of the steam generator.
Further, the pressure of the voltage stabilizer is stabilized by controlling the electric heater of the voltage stabilizer and normal spraying; stabilizing the water level of the voltage stabilizer by controlling the upper charging and lower discharging flow; stabilizing the temperature of the main system by controlling the steam discharge; the steam generator level is stabilized by the auxiliary feedwater flow.
Further, the stopping safety injection criterion comprises: main system supercooled state: the supercooling degree of the reactor core outlet is greater than the temperature threshold value; secondary side hot trap state: the total flow of the steam generator is greater than a flow threshold or the narrow-range water level of the steam generator is greater than a first water level threshold; primary system pressure state: the main system pressure is at steady or rising; the water level state of the voltage stabilizer: the water level of the voltage stabilizer is greater than the second water level threshold value.
The most appropriate time for stopping the safety injection pump is judged by setting a specific safety injection stopping criterion, namely setting a precondition for stopping the safety injection pump.
Further, the supercooling degree of the reactor core outlet is greater than a temperature threshold value, and the temperature threshold value range is 15-25 ℃; the total flow of the steam generator is larger than a flow threshold value, and the range of the flow threshold value is 80m3/h-100m3H; the water level of the steam generator in the narrow range is greater than a first water level threshold, and the first water level threshold is 10% -20%; the water level of the voltage stabilizer is greater than a second water level threshold value, and the second water level threshold value is 20% -40%.
Further, the safety injection pump comprises a plurality of high-pressure safety injection pumps and a plurality of low-pressure safety injection pumps. And after the plurality of high-pressure safety injection pumps are stopped to operate in sequence, the plurality of low-pressure safety injection pumps are stopped to operate in sequence. The plurality of high-pressure safety injection pumps are two high-pressure safety injection pumps, and the plurality of low-pressure safety injection pumps are two low-pressure safety injection pumps.
Compared with the prior art, the invention has the following advantages and beneficial effects:
1. the invention can determine the accurate safety injection termination time, namely the accurate time for stopping the safety injection pump through the safety injection termination criterion;
2. the operation steps set by the invention can safely and effectively stop the safety injection pump;
3. the heat removal means adopted by the invention can smoothly lead out the waste heat of the reactor core, and ensure that the nuclear power plant is controlled in a stable state when a primary circuit minimum break accident occurs.
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. In the drawings:
FIG. 1 is a schematic flow chart of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to examples and accompanying drawings, and the exemplary embodiments and descriptions thereof are only used for explaining the present invention and are not meant to limit the present invention.
Example 1
The embodiment is a coping method for a minimal breach water loss accident of a pressurized water reactor nuclear power plant, which comprises the following steps:
(1) detecting the operating state of a pressurized water reactor nuclear power plant, wherein the operating state comprises the following steps: a main system supercooling state, a secondary side heat trap state, a main system pressure state and a voltage stabilizer water level state;
(2) judging whether the running state of the pressurized water reactor nuclear power plant meets the safety injection stopping criterion or not according to the detection result in the step (1), and when the running states meet the safety injection stopping criterion, sequentially stopping the safety injection pumps;
the safety notice stopping criteria comprise:
the main system is in a supercooled state: the super-cooling degree of the reactor core outlet is more than 15 ℃;
there are enough secondary side hot traps: the total flow of the steam generator is more than 80m3The water level of the narrow range of the steam generator is more than 5 percent;
the main system pressure is at steady or rising: the main system pressure is at steady or rising;
the water level of the voltage stabilizer is more than 20 percent.
(3) Monitoring the supercooling state of a main system and the water level state of a voltage stabilizer in real time in the process of executing the operation of the shutdown safety injection pump, and starting the shutdown safety injection pump if the supercooling state of the main system or the water level state of the voltage stabilizer does not meet the safety injection stopping criterion;
(4) repeating the steps until all the safety injection pumps stop running;
(5) detecting a main system supercooling state and a voltage stabilizer water level state;
(6) if the supercooling state of the main system does not meet the safety injection stopping criterion, restarting the safety injection pump which is stopped; if the water level state of the voltage stabilizer does not meet the safety injection stopping criterion, the water level of the voltage stabilizer is maintained by controlling the upper charging flow, and if the water level of the voltage stabilizer cannot be maintained by adjusting the upper charging flow, the stopped safety injection pump is restarted.
(7) And if the supercooling state of the main system and the water level state of the pressure stabilizer meet the safety injection stopping criterion, controlling the pressure of the pressure stabilizer, the temperature of the main system, the water level of the pressure stabilizer and the water level of the steam generator of the loop.
Stabilizing the pressure of the voltage stabilizer by controlling an electric heater of the voltage stabilizer and normally spraying; stabilizing the water level of the voltage stabilizer by controlling the upper charging and lower discharging flow; stabilizing the temperature of the main system by controlling the steam discharge; the steam generator level is stabilized by the auxiliary feedwater flow.
Example 2:
the embodiment is a coping method for a minimal breach water loss accident of a pressurized water reactor nuclear power plant, which comprises the following steps:
(1) detecting the operating state of a pressurized water reactor nuclear power plant, wherein the operating state comprises the following steps: a main system supercooling state, a secondary side heat trap state, a main system pressure state and a voltage stabilizer water level state;
(2) judging whether the running state of the pressurized water reactor nuclear power plant meets the safety injection stopping criterion or not according to the detection result in the step (1), and when the running states meet the safety injection stopping criterion, sequentially stopping the safety injection pumps;
the safety notice stopping criteria comprise:
the main system is in a supercooled state: the super-cooling degree of the reactor core outlet is more than 25 ℃;
there are enough secondary side hot traps: the total flow of the steam generator is more than 100m3The water level of the narrow range of the steam generator is more than 20 percent;
the main system pressure is at steady or rising: the main system pressure is at steady or rising;
the water level of the voltage stabilizer is more than 40 percent.
(3) Monitoring the supercooling state of a main system and the water level state of a voltage stabilizer in real time in the process of executing the operation of the shutdown safety injection pump, and starting the shutdown safety injection pump if the supercooling state of the main system or the water level state of the voltage stabilizer does not meet the safety injection stopping criterion;
(4) repeating the steps until all the safety injection pumps stop running;
(5) detecting a main system supercooling state and a voltage stabilizer water level state;
(6) if the supercooling state of the main system does not meet the safety injection stopping criterion, restarting the safety injection pump which is stopped; if the water level state of the voltage stabilizer does not meet the safety injection stopping criterion, the water level of the voltage stabilizer is maintained by controlling the upper charging flow, and if the water level of the voltage stabilizer cannot be maintained by adjusting the upper charging flow, the stopped safety injection pump is restarted.
(7) And if the supercooling state of the main system and the water level state of the pressure stabilizer meet the safety injection stopping criterion, controlling the pressure of the pressure stabilizer, the temperature of the main system, the water level of the pressure stabilizer and the water level of the steam generator of the loop.
Stabilizing the pressure of the voltage stabilizer by controlling an electric heater of the voltage stabilizer and normally spraying; stabilizing the water level of the voltage stabilizer by controlling the upper charging and lower discharging flow; stabilizing the temperature of the main system by controlling the steam discharge; the steam generator level is stabilized by the auxiliary feedwater flow.
Example 3
The embodiment is an accident countermeasure of a pressurized water reactor nuclear power plant, and provides that when a primary circuit minimum breach loss of coolant accident occurs, the nuclear power plant is controlled in a safe and stable state by setting an effective safety injection termination criterion, formulating a reasonable safety injection termination step and adopting a reliable residual heat derivation means.
The invention is used for controlling and recovering the state of a nuclear power plant after a pressurized water reactor nuclear power plant has a minimal breach loss of coolant accident, and the specific content is as follows:
(1) the method for establishing the safety injection stopping rule according to the important state parameters and the main equipment state of the nuclear power plant comprises the following steps: the main system is in an overcooling state, enough secondary side heat traps exist, the pressure of the main system is stable or rises, and the water level of the voltage stabilizer is in an indication range. Wherein:
the main system is in a supercooled state: the super-cooling degree of the reactor core outlet is more than 20 ℃;
there are enough secondary side hot traps: the total flow of the steam generator is more than 90m3The water level of the narrow range of the steam generator is more than 15 percent;
the main system pressure is at steady or rising: the main system pressure is at steady or rising;
the water level of the voltage stabilizer is in the range of the indicating range: the water level of the voltage stabilizer is more than 30 percent.
(2) And after the condition judgment of the power plant confirms that the criterion of stopping safety injection is met, stopping the operation of the safety injection pump according to corresponding steps, and only compensating the loss of the breach coolant by the upper charge pump. And when the safety injection pump is stopped, confirming the state of the main system again. And if the supercooling degree of the main system or the water level of the pressure stabilizer does not meet the requirement, indicating that the safety injection should not be terminated, and manually restarting the safety injection pump.
(3) After the safety injection is ended, the heat of the primary circuit is led out through the secondary side heat trap, and parameters such as pressure, temperature and water level of the primary circuit are stabilized by adopting corresponding measures, so that the power plant is maintained in a controllable state.
The operation process related in the embodiment does not need to add new systems and equipment of the nuclear power plant, and only needs to use the existing related equipment of the nuclear power plant, and mainly comprises main temperature, water level and pressure measuring devices of the nuclear power plant, an auxiliary water supply system and a steam by-pass discharging system of a steam generator, an upper charge pump, a safety injection system and other related control systems.
Example 4
After a primary circuit minimal breach loss of coolant accident happens and before an operator does not intervene, a reactor emergency shutdown signal generated in the accident process triggers a reactor emergency shutdown, and a starting signal of a special safety facility triggers a safety system comprising a safety injection system and an auxiliary water supply system to be put into operation.
Following operator intervention, the operation is performed according to a specific operating procedure of the invention, as detailed below:
(1) judging whether the following safety note termination criteria are met: the main system is in a supercooled state, enough secondary side heat traps exist to lead out waste heat of the reactor core, the pressure of the main system is stable or rises, and the water level of the voltage stabilizer is within an indication range. The satisfaction of the combination conditions indicates that the main system is in a safe state, the reactor core is sufficiently cooled, and the safety of the nuclear power plant is not endangered when the safety injection flow is stopped.
(2) When the criterion of stopping the safety injection is satisfied, firstly, the charging pump is ensured to operate and provide reliable charging flow, and then the operation of stopping the safety injection is executed. In the process of stopping the safety injection, two running high (medium) pressure safety injection pumps are stopped in sequence, and the supercooling degree of a main system and the water level state of a pressure stabilizer need to be checked after one high (medium) pressure safety injection pump is stopped each time. If the supercooling degree of the main system is lost or the water level of the pressure stabilizer is uncontrollably reduced, the residual safety injection flow cannot compensate the breach flow, the safety injection flow cannot be reduced continuously, and the stopped high (medium) pressure safety injection pump is restarted. If the main system supercooling degree and the pressure stabilizer water level meet the requirements, the residual safety injection flow can compensate the crevasse flow, the safety injection flow can be continuously reduced until the two high (medium) pressure safety injection pumps stop running, and the crevasse flow can be compensated only by depending on the upper charging flow. If the high (medium) pressure safety injection pump can be stopped, the operator can also stop the low pressure safety injection pump. The high-pressure pump cut-off pressure in example 4 was 17MPa, and the low-pressure pump cut-off pressure was 1.5 MPa.
(3) When all the safety injection pumps stop operating, the operator needs to check the main system supercooling degree and the pressure stabilizer water level again to confirm that the safety injection is no longer needed. And if the supercooling degree of the main system is lower than the required value, manually restarting the safety injection pump. If the pressurizer water level is lower than the required value, the pressurizer water level is maintained by controlling the upper charging flow. However, if the water level of the pressure stabilizer cannot be maintained by adjusting the upper charging flow, the safety injection pump needs to be manually restarted.
(4) When the safety injection is no longer needed, an operator stabilizes the pressure of the pressure stabilizer by controlling the electric heater of the pressure stabilizer and normally spraying; the water level of the voltage stabilizer is stabilized by controlling the upper charging flow and the lower discharging flow; the nuclear power plant is maintained in a safe state by controlling steam discharge and auxiliary feedwater flow to stabilize the main system temperature and steam generator level.
Example 5
After a primary circuit minimal breach loss of coolant accident happens and before an operator does not intervene, a reactor emergency shutdown signal generated in the accident process triggers a reactor emergency shutdown, and a starting signal of a special safety facility triggers a safety system comprising a safety injection system and an auxiliary water supply system to be put into operation.
Following operator intervention, the operation is performed according to a specific operating procedure of the invention, as detailed below:
(1) judging whether the following safety note termination criteria are met: the main system is in a supercooled state, enough secondary side heat traps exist to lead out waste heat of the reactor core, the pressure of the main system is stable or rises, and the water level of the voltage stabilizer is within an indication range. The satisfaction of the combination conditions indicates that the main system is in a safe state, the reactor core is sufficiently cooled, and the safety of the nuclear power plant is not endangered when the safety injection flow is stopped.
When the criterion of stopping the safety injection is satisfied, firstly, the charging pump is ensured to operate and provide reliable charging flow, and then the operation of stopping the safety injection is executed. And in the process of stopping the safety injection, two running medium-pressure safety injection pumps are stopped in sequence, and the supercooling degree of the main system and the water level state of the pressure stabilizer need to be checked after one medium-pressure safety injection pump is stopped each time. If the supercooling degree of the main system is lost or the water level of the pressure stabilizer is uncontrollably reduced, the residual safety injection flow cannot compensate the breach flow, the safety injection flow cannot be reduced continuously, and the stopped medium-pressure safety injection pump is restarted. If the main system supercooling degree and the pressure stabilizer water level meet the requirements, the residual safety injection flow can compensate the crevasse flow, the safety injection flow can be continuously reduced until the two medium-pressure safety injection pumps stop running, and the crevasse flow can be compensated only by the upper charging flow. If the medium pressure safety injection pump can be stopped, the operator can also stop the low pressure safety injection pump. The cut-off pressure of the medium-pressure pump in example 5 was 10MPa, and the cut-off pressure of the low-pressure pump was 1.5 MPa.
(3) When all the safety injection pumps stop operating, the operator needs to check the main system supercooling degree and the pressure stabilizer water level again to confirm that the safety injection is no longer needed. And if the supercooling degree of the main system is lower than the required value, manually restarting the safety injection pump. If the pressurizer water level is lower than the required value, the pressurizer water level is maintained by controlling the upper charging flow. However, if the water level of the pressure stabilizer cannot be maintained by adjusting the upper charging flow, the safety injection pump needs to be manually restarted.
(4) When the safety injection is no longer needed, an operator stabilizes the pressure of the pressure stabilizer by controlling the electric heater of the pressure stabilizer and normally spraying; the water level of the voltage stabilizer is stabilized by controlling the upper charging flow and the lower discharging flow; the nuclear power plant is maintained in a safe state by controlling steam discharge and auxiliary feedwater flow to stabilize the main system temperature and steam generator level.
The above-mentioned embodiments are intended to illustrate the objects, technical solutions and advantages of the present invention in further detail, and it should be understood that the above-mentioned embodiments are merely exemplary embodiments of the present invention, and are not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (10)

1. A coping method for a minimal breach water loss accident of a pressurized water reactor nuclear power plant is characterized by comprising the following steps:
s1: detecting an operating condition of a pressurized water reactor nuclear power plant, the operating condition comprising: a main system supercooling state, a secondary side heat trap state, a main system pressure state and a voltage stabilizer water level state;
s2: judging whether the running states of the pressurized water reactor nuclear power plant meet safety injection stopping criteria or not according to the detection result of the step S1, and when the running states meet the safety injection stopping criteria, sequentially stopping the safety injection pumps;
s3: monitoring the main system supercooling state and the voltage stabilizer water level state in real time in the process of executing the operation of the shutdown safety injection pump, and starting the shutdown safety injection pump if the main system supercooling state or the voltage stabilizer water level state does not meet the safety injection stopping criterion;
s4: and repeating the steps S1-S4 until all the safety injection pumps stop running.
2. The method for coping with minimal break loss of coolant accident of pressurized water reactor nuclear power plant according to claim 1, further comprising the steps of:
s5: detecting the main system supercooling state and the voltage stabilizer water level state;
s6: if the main system supercooling state does not meet the safety injection stopping criterion, restarting the stopped safety injection pump; if the water level state of the voltage stabilizer does not meet the safety injection stopping criterion, the water level of the voltage stabilizer is maintained by controlling the upper charging flow, and if the water level of the voltage stabilizer cannot be maintained by adjusting the upper charging flow, the stopped safety injection pump is restarted.
3. The method for coping with minimal break loss of coolant accident of pressurized water reactor nuclear power plant according to claim 2, further comprising the steps of:
s7: and if the main system supercooling state and the water level state of the pressure stabilizer meet the safety injection stopping criterion, controlling the pressure, the temperature and the water level of a loop.
4. The method according to claim 3, wherein the pressure of the primary loop is a pressurizer pressure, the temperature of the primary loop is a primary system temperature, and the water level of the primary loop is a pressurizer water level and a steam generator water level.
5. The method for responding to the minimal breach loss of coolant accident of the pressurized water reactor nuclear power plant according to claim 4,
stabilizing the pressure of the voltage stabilizer by controlling an electric heater of the voltage stabilizer and normally spraying;
stabilizing the water level of the voltage stabilizer by controlling the upper charging and lower discharging flow;
stabilizing the temperature of the main system by controlling the steam discharge;
the steam generator level is stabilized by the auxiliary feedwater flow.
6. The method for handling the minimal breach loss of coolant accident of the pressurized water reactor nuclear power plant according to claim 1, wherein the safety injection stopping criterion comprises:
main system supercooled state: the supercooling degree of the reactor core outlet is greater than the temperature threshold value;
secondary side hot trap state: the total flow of the steam generator is greater than a flow threshold or the narrow-range water level of the steam generator is greater than a first water level threshold;
primary system pressure state: the main system pressure is at steady or rising;
the water level state of the voltage stabilizer: the water level of the voltage stabilizer is greater than the second water level threshold value.
7. The method for coping with the loss of coolant accident of the pressurized water reactor nuclear power plant with the minimum breach as set forth in claim 6, wherein the degree of supercooling at the core outlet is greater than a temperature threshold value, and the temperature threshold value ranges from 15 ℃ to 25 ℃;
the total flow of the steam generator is larger than a flow threshold value, and the range of the flow threshold value is 80m3/h-100m3/h;
The water level of the steam generator in the narrow range is greater than a first water level threshold, and the first water level threshold is 5% -20%;
the water level of the voltage stabilizer is greater than a second water level threshold value, and the second water level threshold value is 20% -40%.
8. The method for handling the minimal breach loss of coolant accident of the pressurized water reactor nuclear power plant as recited in claim 1, wherein the safety injection pump comprises a plurality of high pressure safety injection pumps and a plurality of low pressure safety injection pumps.
9. The method for handling the minimal breach loss of coolant accident of the pressurized water reactor nuclear power plant as recited in claim 1, wherein the operation of the low-pressure safety injection pumps is stopped after the operation of the high-pressure safety injection pumps is stopped in sequence.
10. The method for handling the minimal breach loss of coolant accident of the pressurized water reactor nuclear power plant as recited in claim 8, wherein the plurality of high-pressure safety injection pumps are two high-pressure safety injection pumps, and the plurality of low-pressure safety injection pumps are two low-pressure safety injection pumps.
CN202010412152.8A 2020-05-15 2020-05-15 Method for coping with extremely-small-break water loss accident of pressurized water reactor nuclear power plant Active CN111554425B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010412152.8A CN111554425B (en) 2020-05-15 2020-05-15 Method for coping with extremely-small-break water loss accident of pressurized water reactor nuclear power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010412152.8A CN111554425B (en) 2020-05-15 2020-05-15 Method for coping with extremely-small-break water loss accident of pressurized water reactor nuclear power plant

Publications (2)

Publication Number Publication Date
CN111554425A true CN111554425A (en) 2020-08-18
CN111554425B CN111554425B (en) 2022-02-11

Family

ID=72008187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010412152.8A Active CN111554425B (en) 2020-05-15 2020-05-15 Method for coping with extremely-small-break water loss accident of pressurized water reactor nuclear power plant

Country Status (1)

Country Link
CN (1) CN111554425B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112863719A (en) * 2021-01-12 2021-05-28 中国核电工程有限公司 Design method for continuous steps in digital operation procedure of nuclear power plant
CN112908500A (en) * 2021-01-14 2021-06-04 中广核研究院有限公司 Volume control method for non-condensable gas at top of pressure container
CN113421662A (en) * 2021-06-18 2021-09-21 中国核动力研究设计院 Natural circulation cooling method under failure of liquid level indication of pressure vessel of nuclear power plant
CN113421663A (en) * 2021-06-18 2021-09-21 中国核动力研究设计院 Natural circulation cooling method suitable for pressurized water reactor nuclear power plant
CN113421670A (en) * 2021-06-18 2021-09-21 中国核动力研究设计院 Nuclear power plant accident regulation quantitative analysis method and system
CN113421676A (en) * 2021-06-18 2021-09-21 中国核动力研究设计院 Method and device for determining accident procedure setting value of nuclear power plant
CN113593739A (en) * 2021-07-22 2021-11-02 中国核动力研究设计院 Control method for dealing with water supply flow loss accident of nuclear power plant
CN113972016A (en) * 2021-10-26 2022-01-25 中国核动力研究设计院 Method, device, equipment and medium for coping loss of coolant accident outside containment of nuclear power plant

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53148694A (en) * 1977-05-31 1978-12-25 Toshiba Corp Emergency cooling system of reactor core
EP0036332A1 (en) * 1980-03-19 1981-09-23 Hitachi, Ltd. Monitoring system for monitoring the state of nuclear reactor core
FR2619950A1 (en) * 1987-08-24 1989-03-03 Framatome Sa METHOD FOR PROTECTING A PRESSURIZED WATER NUCLEAR REACTOR AGAINST EMERGENCY STOP DEVICE FAILURES
JP2005024280A (en) * 2003-06-30 2005-01-27 Mitsubishi Heavy Ind Ltd Small loca safety evaluation method
KR20090032374A (en) * 2007-09-27 2009-04-01 한국전력공사 Analysis method to determine limit time of the operator action during loss of coolant accident
CN102543234A (en) * 2011-12-19 2012-07-04 中国核电工程有限公司 Accident analysis method for digital control diversity protection system of million-kilowatt nuclear power station
US20140016734A1 (en) * 2012-07-13 2014-01-16 Korea Atomic Energy Research Institute Passive safety system of integral reactor
CN103548093A (en) * 2010-11-23 2014-01-29 西屋电气有限责任公司 Full spectrum LOCA evaluation model and analysis methodology
CN103700411A (en) * 2013-12-15 2014-04-02 中广核工程有限公司 Method and system for dealing with loss of coolant accident (LOCA) of nuclear power station
KR101463441B1 (en) * 2013-05-31 2014-11-21 한국원자력연구원 High concentration boron injection system and safety injection system having the same
CN104332207A (en) * 2013-07-22 2015-02-04 中国核动力研究设计院 Method for automatically stopping coolant pump under reactor coolant loss accident condition
CN104950854A (en) * 2015-06-17 2015-09-30 中国核动力研究设计院 LOCA (Loss of Coolant Accident) monitoring system of nuclear power plant
CN104979020A (en) * 2015-05-20 2015-10-14 中国核动力研究设计院 Hydrogen risk control system and control method for small-power nuclear reactor containment
CN106205754A (en) * 2016-07-14 2016-12-07 中广核工程有限公司 A kind of apparatus and method for detecting nuclear power plant reactor pressure vessel water level
CN106537513A (en) * 2014-07-22 2017-03-22 BWXT m动力股份有限公司 Integral isolation valve systems and methods of operating same for loss of coolant accident (loca) protection
CN109243641A (en) * 2018-10-18 2019-01-18 中国核动力研究设计院 Reactor pressure vessel for presurized water reactor loss of-coolant accident (LOCA) tests analogue body
CN110718312A (en) * 2019-09-18 2020-01-21 上海电力大学 System and method for stopping safety injection in heat transfer pipe rupture accident

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53148694A (en) * 1977-05-31 1978-12-25 Toshiba Corp Emergency cooling system of reactor core
EP0036332A1 (en) * 1980-03-19 1981-09-23 Hitachi, Ltd. Monitoring system for monitoring the state of nuclear reactor core
FR2619950A1 (en) * 1987-08-24 1989-03-03 Framatome Sa METHOD FOR PROTECTING A PRESSURIZED WATER NUCLEAR REACTOR AGAINST EMERGENCY STOP DEVICE FAILURES
JP2005024280A (en) * 2003-06-30 2005-01-27 Mitsubishi Heavy Ind Ltd Small loca safety evaluation method
KR20090032374A (en) * 2007-09-27 2009-04-01 한국전력공사 Analysis method to determine limit time of the operator action during loss of coolant accident
CN103548093A (en) * 2010-11-23 2014-01-29 西屋电气有限责任公司 Full spectrum LOCA evaluation model and analysis methodology
CN102543234A (en) * 2011-12-19 2012-07-04 中国核电工程有限公司 Accident analysis method for digital control diversity protection system of million-kilowatt nuclear power station
US20140016734A1 (en) * 2012-07-13 2014-01-16 Korea Atomic Energy Research Institute Passive safety system of integral reactor
KR101463441B1 (en) * 2013-05-31 2014-11-21 한국원자력연구원 High concentration boron injection system and safety injection system having the same
CN104332207A (en) * 2013-07-22 2015-02-04 中国核动力研究设计院 Method for automatically stopping coolant pump under reactor coolant loss accident condition
CN103700411A (en) * 2013-12-15 2014-04-02 中广核工程有限公司 Method and system for dealing with loss of coolant accident (LOCA) of nuclear power station
CN106537513A (en) * 2014-07-22 2017-03-22 BWXT m动力股份有限公司 Integral isolation valve systems and methods of operating same for loss of coolant accident (loca) protection
CN104979020A (en) * 2015-05-20 2015-10-14 中国核动力研究设计院 Hydrogen risk control system and control method for small-power nuclear reactor containment
CN104950854A (en) * 2015-06-17 2015-09-30 中国核动力研究设计院 LOCA (Loss of Coolant Accident) monitoring system of nuclear power plant
CN106205754A (en) * 2016-07-14 2016-12-07 中广核工程有限公司 A kind of apparatus and method for detecting nuclear power plant reactor pressure vessel water level
CN109243641A (en) * 2018-10-18 2019-01-18 中国核动力研究设计院 Reactor pressure vessel for presurized water reactor loss of-coolant accident (LOCA) tests analogue body
CN110718312A (en) * 2019-09-18 2020-01-21 上海电力大学 System and method for stopping safety injection in heat transfer pipe rupture accident

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
TONG, LILI: "Experimental Study on Flow Instability during Gravity-driven Reflooding", 《PROCEEDINGS OF THE 26TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2018, VOL 7》 *
刘佩琪: "压水堆不同尺寸的破口失水事故分析", 《核技术》 *
张龙飞: "压水堆大破口失水事故高压安注的缓解能力研究", 《核动力工程》 *
黄涛: "先进反应堆系统分析程序(ARSAC)LOCA类整体性效应实验验证", 《第十六届全国反应堆热工流体学术会议暨中核核反应堆热工水力技术重点实验室2019年学术年会》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112863719A (en) * 2021-01-12 2021-05-28 中国核电工程有限公司 Design method for continuous steps in digital operation procedure of nuclear power plant
CN112863719B (en) * 2021-01-12 2023-12-22 中国核电工程有限公司 Design method for continuous steps in digital operation regulations of nuclear power plant
CN112908500A (en) * 2021-01-14 2021-06-04 中广核研究院有限公司 Volume control method for non-condensable gas at top of pressure container
CN112908500B (en) * 2021-01-14 2024-05-10 中广核研究院有限公司 Volume control method for non-condensable gas at top of pressure vessel
CN113421676B (en) * 2021-06-18 2022-05-10 中国核动力研究设计院 Method and device for determining accident procedure setting value of nuclear power plant
CN113421676A (en) * 2021-06-18 2021-09-21 中国核动力研究设计院 Method and device for determining accident procedure setting value of nuclear power plant
CN113421663B (en) * 2021-06-18 2022-04-15 中国核动力研究设计院 Natural circulation cooling method suitable for pressurized water reactor nuclear power plant
CN113421670A (en) * 2021-06-18 2021-09-21 中国核动力研究设计院 Nuclear power plant accident regulation quantitative analysis method and system
CN113421670B (en) * 2021-06-18 2022-05-13 中国核动力研究设计院 Nuclear power plant accident regulation quantitative analysis method and system
CN113421663A (en) * 2021-06-18 2021-09-21 中国核动力研究设计院 Natural circulation cooling method suitable for pressurized water reactor nuclear power plant
CN113421662A (en) * 2021-06-18 2021-09-21 中国核动力研究设计院 Natural circulation cooling method under failure of liquid level indication of pressure vessel of nuclear power plant
CN113593739A (en) * 2021-07-22 2021-11-02 中国核动力研究设计院 Control method for dealing with water supply flow loss accident of nuclear power plant
CN113972016A (en) * 2021-10-26 2022-01-25 中国核动力研究设计院 Method, device, equipment and medium for coping loss of coolant accident outside containment of nuclear power plant
CN113972016B (en) * 2021-10-26 2024-01-26 中国核动力研究设计院 Method, device, equipment and medium for coping with water loss accident outside containment of nuclear power plant

Also Published As

Publication number Publication date
CN111554425B (en) 2022-02-11

Similar Documents

Publication Publication Date Title
CN111554425B (en) Method for coping with extremely-small-break water loss accident of pressurized water reactor nuclear power plant
CN111540483B (en) Method for coping with small-sized crevasse loss of coolant accident in pressurized water reactor nuclear power plant
CN104538068B (en) A kind of method that steam generator spill-over is prevented under shape pipe breaking accident operating mode of conducting heat
CN111540487B (en) Cooling treatment method for reactor after steam generator heat transfer pipe failure accident
RU2562340C2 (en) Steam turbine control system and steam turbine operation mode at high unsteady exhaust pressure
CN104299661A (en) Transient test control method and system used in debugging and starting process of nuclear power station
CN109524140B (en) Nuclear power station primary loop abnormal state tracking and monitoring method and system
US20130070887A1 (en) Reactor adapted for mitigating loss-of-coolant accident and mitigation method thereof
CN109903863B (en) Safe injection system and nuclear power system
CN113299417B (en) Safety injection triggering method, device and system for nuclear power plant under shutdown condition during operation of main pump
CN103985421A (en) Method for improving security of nuclear power unit during failure of emergency shut-down of reactor
CN103700411A (en) Method and system for dealing with loss of coolant accident (LOCA) of nuclear power station
CN113593739A (en) Control method for dealing with water supply flow loss accident of nuclear power plant
CN111681794B (en) Full-range SGTR accident handling method and system for pressurized water reactor nuclear power plant
JPH08170998A (en) Reinforcement protective system against transient excessive output
WO2014090107A1 (en) Method for extending time before steam generator overflows under accident condition
CN113421662B (en) Natural circulation cooling method under failure of liquid level indication of pressure vessel of nuclear power plant
CN210403221U (en) Reactor water injection and heat removal device
Nishino et al. INTERNAL EVENT LEVEL-1 PRA FOR SODIUM-COOLED FAST REACTOR CONSIDERING SAFETY MEASURES OF DEFENSE-IN-DEPTH LEVEL 1 TO 4
CN115274169A (en) Accident handling method and system for pressure abnormity of small pressurized water reactor containment vessel
Lutz Jr et al. FLEX loss of instrumentation guidance for PWRs enhances severe accident diagnostics
Wang et al. Study on identification of design extension conditions without significant fuel degradation and safety features of nuclear power plant
JPH06230177A (en) Boiling water reactor
Ma et al. Study on Measures During Loss of Normal Feedwater Accident for AP1000 NPP in Lower Power Operation
JP2695905B2 (en) Boiling water reactor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant