- CN111539115A CN111539115A CN202010346343.9A CN202010346343A CN111539115A CN 111539115 A CN111539115 A CN 111539115A CN 202010346343 A CN202010346343 A CN 202010346343A CN 111539115 A CN111539115 A CN 111539115A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- module
- building
- matching
- modeling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/14—Pipes
Abstract
The invention discloses a building pipeline arrangement optimizing system based on BIM, which is used for solving the problem that the conventional pipeline comprehensive arrangement system cannot be reasonably arranged according to the size and the material of a pipeline, so that the cost of the pipeline is increased; the pipeline analysis system has the advantages that the problems of resource waste and inconvenience for later-stage purchase of pipeline materials due to the fact that residual pipelines cannot be reused are solved, and the pipeline analysis system comprises a pipeline input module, a BIM modeling module, a collision detection module, a database, a pipeline acquisition module, a pipeline analysis module, a pipeline matching module, a server, a user login module, a display terminal and a pipeline calculation module; the pipeline modeling method carries out modeling value calculation on the pipeline through the pipeline size value, the pipeline material and the pipeline preset value, carries out sequential modeling according to the size of the pipeline modeling value, reduces the collision of the pipeline, preferentially carries out modeling on the pipeline with large pipeline size and good pipeline material, and can reduce the turning of the large pipeline and the pipeline with good material in the pipeline node so as to facilitate more reasonable optimization of pipeline arrangement.
Description
Technical Field
The invention relates to the technical field of building pipeline arrangement of BIM, in particular to a building pipeline arrangement optimization system based on BIM.
Background
The Building Information Model (BIM) is established on the basis of taking various relevant information data of a construction engineering project as a model, and the real information of a building is simulated through digital information simulation; when the pipelines of the building are arranged, the influence of complicated and intricate pipelines is difficult to avoid, the traditional two-dimensional drawing guides the pipeline to be changed, a plurality of defects exist, a large amount of changing information cannot be transmitted, and when the pipeline is communicated with property units of all pipelines, the situations of repeatedly excavating road surfaces, construction conflicts, new and old pipeline intersection and the like easily occur;
in patent CN107657087A, the pipeline comprehensive arrangement method based on the BIM technology is realized, although the pipeline comprehensive arrangement method based on the BIM technology can avoid the situations of repeatedly excavating roads, construction conflicts, crossing new and old pipelines and the like, shorten the construction period and reduce the cost; but have disadvantages; 1. the pipeline cannot be reasonably arranged according to the size and the material of the pipeline, so that the pipeline with large size and good material is changed, and the cost of the pipeline is increased; 2. the length of the pipeline cannot be matched with the residual pipelines of other users for reutilization, so that the pipeline residual is caused by purchasing a standard pipeline, and the resource waste is caused; 3. the optimal manufacturer or user and address and contact telephone number corresponding to the pipeline cannot be displayed, and the pipeline material is inconvenient to purchase at a later stage.
Disclosure of Invention
The invention aims to solve the problems that the existing pipeline comprehensive arrangement system cannot be reasonably arranged according to the size and the material of the pipeline, so that the pipeline with large size and good material is changed, and the cost of the pipeline is increased; the length of the pipeline cannot be matched with the residual pipelines of other users for reutilization, so that the pipeline residual is caused by purchasing a standard pipeline, and the resource waste is caused; the optimal manufacturer or user corresponding to the pipeline, the address and the contact telephone cannot be displayed, and the subsequent purchase of pipeline materials is inconvenient, so that a building pipeline arrangement optimization system based on BIM is provided;
the pipeline modeling method has the advantages that the modeling value of the pipeline is calculated through the pipeline size value, the pipeline material and the preset value of the pipeline, the modeling is sequentially carried out according to the size of the pipeline modeling value, the collision of the pipeline is reduced, meanwhile, the modeling is preferentially carried out on the pipeline with large size and good material, the turning of the large pipeline and the pipeline with good material in the pipeline node can be reduced, and the pipeline arrangement optimization is more reasonable; the selected users matched with the residual pipelines of the unmarked pipelines realize the reutilization of the residual pipelines, and simultaneously can avoid the waste caused by the residual pipelines and the waste caused by purchasing standard pipelines; by marking the pipeline, the corresponding optimal manufacturer or user, address and contact telephone can be conveniently and directly displayed on the building pipeline model; the pipeline material is convenient to purchase when the modeler pipeline is implemented.
The purpose of the invention can be realized by the following technical scheme: a building pipeline arrangement optimization system based on BIM comprises a pipeline input module, a BIM modeling module, a collision detection module, a database, a pipeline acquisition module, a pipeline analysis module, a pipeline matching module, a server, a user login module, a display terminal and a pipeline calculation module;
the pipeline input module is used for inputting building pipeline information by a user and sending the building pipeline information to the BIM modeling module; the building pipeline information comprises a building three-dimensional drawing, the type and the model of the pipeline, the path and the pipeline size value of the corresponding pipeline on the building three-dimensional drawing, the material of the pipeline, the preset value of the pipeline, the preset price of the pipeline and the position of the pipeline used by the building;
the BIM modeling module is used for modeling building pipeline information input by a user, and comprises the following specific modeling steps:
the method comprises the following steps: setting pipeline models as Gi, i being 1, … … and n; n is a positive integer; the value of the size of the pipeline corresponding to the model of the pipeline is recorded as CGi(ii) a The preset value of the pipeline is recorded as YGi;
Step two: setting an integral value corresponding to the pipeline material as J, matching the corresponding integral value according to the pipeline material and marking the integral value as JGi;
Step three: using formulasAcquiring a pipeline modeling value F of the obtained pipeline modelGi(ii) a Wherein λ is an interference factor, and its value is 0.6431347; d1, d2 and d3 are all preset fixed values of proportionality coefficients;
step four: sorting the pipeline models from large to small according to the pipeline modeling value; modeling the pipeline with the maximum pipeline modeling value according to the path of the pipeline on the three-dimensional drawing of the building, and adding colors on the surface of the pipeline; then modeling the pipeline with the second pipeline modeling value according to the path of the pipeline, when the pipeline is intersected with the pipeline with the largest pipeline modeling value, displacing the pipeline with the second pipeline modeling value upwards or downwards to avoid the pipeline with the largest pipeline modeling value, and repeating the steps until the pipeline with the smallest pipeline modeling value is modeled to obtain a building pipeline model;
step five: the BIM modeling module sends the building pipeline model to a collision detection module;
the collision detection module is used for performing collision detection on the building pipeline model and sending the building pipeline model qualified in collision detection to the database for storage;
the pipeline acquisition module is used for acquiring the pipeline length of each section of pipeline in the building pipeline model and the building pipeline information and sending the pipeline length and the building pipeline information to the pipeline analysis module; the pipeline analysis module is used for analyzing and marking pipelines, and comprises the following specific analysis steps:
s1: marking the pipe length of each segment as DjGi(ii) a j is 1, … …, n; setting the corresponding standard production length of the pipeline as BGi;
S2: classifying the pipelines of each section to obtain DjGi>BGiIs marked as a first pipe; will DjGi=BGiIs marked as a second pipeline; will DjGi<BGiIs marked as a third pipeline;
s3: the pipeline analysis module sends the first pipeline, the second pipeline and the third pipeline to a pipeline matching module;
the pipeline matching module is used for matching the first pipeline, the second pipeline and the third pipeline and sending matching results to the database for storage.
Preferably, the matching step of the pipeline matching module matching with the merchant is as follows:
SS 1: marking the first pipe and the third pipe as matching pipes, and using the symbols Pi, i-1, … …, n;
SS 2: subtracting the standard production length corresponding to the pipeline from the pipeline length of the first pipeline to obtain the matching length of the first pipeline; the pipeline length of the third pipeline is the matching length of the third pipeline;
SS 3: matching and combining the matching lengths in pairs to enable the sum of the matching lengths to be equal to the marked production length, and marking the pipelines matched in pairs as intercepted pipelines; marking the pipelines which are not matched as unmarked pipelines;
SS 4: acquiring the model, the size and the length of the unmarked pipeline to a user who stores the pipeline with the same model, the size and the length as the unmarked pipeline in a server;
SS 5: setting the matched user as Ui, i is 1, … … and m, obtaining the position of the matched user and the position of the user needing unmarked pipeline to calculate the distance difference, and marking as GUiSetting the number of unmarked pipelines matched by the user as MUiThe total number of times that the user has matched is recorded as WUi;
SS 6: using formulasObtaining the matching value ZH of the matching userUi(ii) a Wherein e1, e2 and e3 are all preset proportionality coefficients;
SS 7: selecting the matched user with the maximum matching value as the selected user of the unmarked pipeline; simultaneously sending the pipeline model, size and length of the unmarked pipeline and an appointment instruction to the selected user;
SS 8: when the user receives the pipeline model, size and length of the unmarked pipeline and the reservation instruction, the user sends a determination instruction to the pipeline matching module, and the reservation is successful; simultaneously, the number of the matched unmarked pipelines and the total number of matched times of the selected user are increased once;
SS 9: marking the pipe taking address of the selected user and the contact telephone of the selected user on the outer surface of the unmarked pipe; marking the uniformly purchased company address and the contact telephone on the outer surfaces of the second pipeline and the intercepted pipeline;
and the pipeline matching module sends the marks of the unmarked pipeline, the second pipeline and the intercepted pipeline to a database and displays the marks on the pipeline corresponding to the building pipeline model.
Preferably, the display terminal is used for the user to access the database and display the building pipeline model stored in the database.
Preferably, the user login module is used for a user to log in the server and submit user information and residual pipeline information to the server, wherein the residual pipeline information comprises the model, the size, the residual length and the pipe taking address of the residual pipeline; the user information includes name, identification number and contact telephone.
Preferably, the pipeline calculation module is used for matching the second pipeline with a company which intercepts unified purchase of the pipeline; the device comprises a data acquisition unit and a data and data calculation unit; the data acquisition unit is used for acquiring the information of manufacturers corresponding to the pipeline models in real time; the manufacturer information comprises the position of the manufacturer, the price and the sales volume corresponding to the pipeline model; the data acquisition unit sends the manufacturer information acquired in real time to the data calculation unit; the data calculation unit is used for calculating a matching value of a manufacturer; the specific calculation steps are as follows:
the method comprises the following steps: set the manufacturer corresponding to the pipeline as CkGi(ii) a k is 1, 2, … …, n; the price and the sales volume corresponding to the model of the pipeline produced by the manufacturer are respectively recorded as MCkGi、XCkGi;
Step two: obtaining the distance difference SCk according to the position of the building using the pipeline and the position of the manufacturerGi;
Step three: using formulasObtaining the matching value PCk of a manufacturerGi(ii) a Wherein g1, g2 and g3 are all preset fixed values of proportionality coefficients, and MY is the preset price of the pipeline;
step four: marking the manufacturer with the maximum matching value as a company for uniformly purchasing the second pipeline and the intercepted pipeline;
step five: and the pipeline calculation module stores the company sending value database for the unified purchase of the second pipeline and the intercepted pipeline in a database, and marks the company address and the contact telephone for the unified purchase on the outer surface of the pipeline corresponding to the building pipeline model.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the building information input method, a user inputs building pipeline information through a pipeline input module and sends the building pipeline information to a BIM modeling module; the BIM modeling module is used for modeling the information of the pipeline of the building input by a user and obtaining a pipeline modeling value of the pipeline model by using a formula; sorting the pipeline models from large to small according to the pipeline modeling value; modeling the pipeline with the maximum pipeline modeling value according to the path of the pipeline on the three-dimensional drawing of the building, and adding colors on the surface of the pipeline; when the pipeline is intersected with the pipeline with the largest pipeline modeling value, the pipeline with the second pipeline modeling value is dislocated upwards or downwards to avoid the pipeline with the largest pipeline modeling value, the pipeline modeling value is calculated through the pipeline size value, the pipeline material and the pipeline preset value, and sequential modeling is carried out according to the size of the pipeline modeling value, so that the collision of the pipeline is reduced, meanwhile, the pipeline with large pipeline size and good material is preferentially modeled, so that the turning of the large pipeline and the pipeline with good material in the pipeline node can be reduced, and the pipeline arrangement is more reasonably optimized;
2. the pipeline acquisition module is used for acquiring the pipeline length of each section of pipeline in the building pipeline model and the building pipeline information and sending the pipeline length and the building pipeline information to the pipeline analysis module; the pipeline analysis module is used for analyzing and marking the pipelines to obtain a first pipeline, a second pipeline and a third pipeline and sending the first pipeline, the second pipeline and the third pipeline to the pipeline matching module; the pipeline matching module is used for matching the first pipeline, the second pipeline and the third pipeline, marking the first pipeline and the third pipeline as matched pipelines, subtracting the standard production length corresponding to the pipelines from the pipeline length of the first pipeline, and acquiring the pipeline model, size and length of an unmarked pipeline to a user who stores the pipeline with the same model, size and length as the unmarked pipeline in the server; acquiring a matching value of a matching user by using a formula; selecting the matched user with the maximum matching value as the selected user of the unmarked pipeline; marking the pipe taking address of the selected user and the contact telephone of the selected user on the outer surface of the unmarked pipe; marking the uniformly purchased company address and the contact telephone on the outer surfaces of the second pipeline and the intercepted pipeline; the selected users matched with the residual pipelines of the unmarked pipelines realize the reutilization of the residual pipelines, and simultaneously can avoid the waste caused by the residual pipelines and the waste caused by purchasing standard pipelines;
3. the pipeline matching module sends the marks of the unmarked pipeline, the second pipeline and the intercepted pipeline to a database and displays the marks on the pipeline corresponding to the building pipeline model; by marking the pipeline, the corresponding optimal manufacturer or user, address and contact telephone can be conveniently and directly displayed on the building pipeline model; the pipeline material is convenient to purchase when the modeler pipeline is implemented.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic block diagram of the present invention.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, a building pipeline arrangement optimization system based on BIM includes a pipeline input module, a BIM modeling module, a collision detection module, a database, a pipeline collection module, a pipeline analysis module, a pipeline matching module, a server, a user login module, a display terminal and a pipeline calculation module;
the pipeline input module is used for inputting building pipeline information by a user and sending the building pipeline information to the BIM modeling module; the building pipeline information comprises a building three-dimensional drawing, the type and the model of the pipeline, the path and the pipeline size value of the corresponding pipeline on the building three-dimensional drawing, the material of the pipeline, the preset value of the pipeline, the preset price of the pipeline and the position of the pipeline used by the building;
the BIM modeling module is used for modeling the information of the building pipeline input by the user, and comprises the following specific modeling steps:
the method comprises the following steps: setting pipeline models as Gi, i being 1, … … and n; n is a positive integer; the value of the size of the pipeline corresponding to the model of the pipeline is recorded as CGi(ii) a The preset value of the pipeline is recorded as YGi;
Step two: setting an integral value corresponding to the pipeline material as J, matching the corresponding integral value according to the pipeline material and marking the integral value as JGi;
Step three: using formulasAcquiring a pipeline modeling value F of the obtained pipeline modelGi(ii) a Wherein λ is an interference factor, and its value is 0.6431347; d1, d2 and d3 are all preset fixed values of proportionality coefficients;
step four: sorting the pipeline models from large to small according to the pipeline modeling value; modeling the pipeline with the maximum pipeline modeling value according to the path of the pipeline on the three-dimensional drawing of the building, and adding colors on the surface of the pipeline; then modeling the pipeline with the second pipeline modeling value according to the path of the pipeline, when the pipeline is intersected with the pipeline with the largest pipeline modeling value, displacing the pipeline with the second pipeline modeling value upwards or downwards to avoid the pipeline with the largest pipeline modeling value, and repeating the steps until the pipeline with the smallest pipeline modeling value is modeled to obtain a building pipeline model;
step five: the BIM modeling module sends the building pipeline model to a collision detection module;
the collision detection module is used for performing collision detection on the building pipeline model and sending the building pipeline model qualified in collision detection to the database for storage;
the pipeline acquisition module is used for acquiring the pipeline length of each section of pipeline in the building pipeline model and the building pipeline information and sending the pipeline length and the building pipeline information to the pipeline analysis module; the pipeline analysis module is used for analyzing and marking the pipeline, and comprises the following specific analysis steps:
s1: marking the pipe length of each segment as DjGi(ii) a j is 1, … …, n; setting the corresponding standard production length of the pipeline as BGi;
S2: classifying the pipelines of each section to obtain DjGi>BGiIs marked as a first pipe; will DjGi=BGiIs marked as a second pipeline; will DjGi<BGiIs marked as a third pipeline;
s3: the pipeline analysis module sends the first pipeline, the second pipeline and the third pipeline to a pipeline matching module;
the pipeline matching module is used for matching the first pipeline, the second pipeline and the third pipeline and sending matching results to the database for storage.
The matching steps of the pipeline matching module and the matching merchant are as follows:
SS 1: marking the first pipe and the third pipe as matching pipes, and using the symbols Pi, i-1, … …, n;
SS 2: subtracting the standard production length corresponding to the pipeline from the pipeline length of the first pipeline to obtain the matching length of the first pipeline; the pipeline length of the third pipeline is the matching length of the third pipeline;
SS 3: matching and combining the matching lengths in pairs to enable the sum of the matching lengths to be equal to the marked production length, and marking the pipelines matched in pairs as intercepted pipelines; marking the pipelines which are not matched as unmarked pipelines;
SS 4: acquiring the model, the size and the length of the unmarked pipeline to a user who stores the pipeline with the same model, the size and the length as the unmarked pipeline in a server;
SS 5: setting the matched user as Ui, i is 1, … … and m, obtaining the position of the matched user and the position of the user needing unmarked pipeline to calculate the distance difference, and marking as GUiSetting the unmarked pipe matched with the userThe number of tracks is recorded as MUiThe total number of times that the user has matched is recorded as WUi;
SS 6: using formulasObtaining the matching value ZH of the matching userUi(ii) a Wherein e1, e2 and e3 are all preset proportionality coefficients; by passing
SS 7: selecting the matched user with the maximum matching value as the selected user of the unmarked pipeline; simultaneously sending the pipeline model, size and length of the unmarked pipeline and an appointment instruction to the selected user;
SS 8: when the user receives the pipeline model, size and length of the unmarked pipeline and the reservation instruction, the user sends a determination instruction to the pipeline matching module, and the reservation is successful; simultaneously, the number of the matched unmarked pipelines and the total number of matched times of the selected user are increased once;
SS 9: marking the pipe taking address of the selected user and the contact telephone of the selected user on the outer surface of the unmarked pipe; marking the uniformly purchased company address and the contact telephone on the outer surfaces of the second pipeline and the intercepted pipeline;
and the pipeline matching module sends the marks of the unmarked pipeline, the second pipeline and the intercepted pipeline to a database and displays the marks on the pipeline corresponding to the building pipeline model.
And the display terminal is used for the user to access the database and display the building pipeline model stored in the database.
The user login module is used for a user to log in the server and submit user information and residual pipeline information to the server, wherein the residual pipeline information comprises the model, the size, the residual length and the pipe taking address of the residual pipeline; the user information includes name, identification number and contact number.
The pipeline calculation module is used for matching the second pipeline with companies which intercept the unified purchase of the pipelines; the device comprises a data acquisition unit and a data and data calculation unit; the data acquisition unit is used for acquiring the information of manufacturers corresponding to the pipeline models in real time; the manufacturer information comprises the position of the manufacturer, the price and the sales volume corresponding to the pipeline model; the data acquisition unit sends the manufacturer information acquired in real time to the data calculation unit; the data calculation unit is used for calculating a matching value of a manufacturer; the specific calculation steps are as follows:
the method comprises the following steps: set the manufacturer corresponding to the pipeline as CkGi(ii) a k is 1, 2, … …, n; the price and the sales volume corresponding to the model of the pipeline produced by the manufacturer are respectively recorded as MCkGi、XCkGi;
Step two: obtaining the distance difference SCk according to the position of the building using the pipeline and the position of the manufacturerGi;
Step three: using formulasObtaining the matching value PCk of a manufacturerGi(ii) a Wherein g1, g2 and g3 are all preset fixed values of proportionality coefficients, and MY is the preset price of the pipeline; the distance difference obtained by the position of the pipeline used by the building and the position of the manufacturer is smaller, the matching value of the manufacturer is larger, and the probability that the manufacturer marks the outer surface of the second pipeline and the intercepted pipeline is larger; the larger the pipeline sales volume of the finished product is, the larger the matching value of the manufacturer is; the closer the price corresponding to the pipeline model is to the preset price of the pipeline, the larger the matching value of a manufacturer is;
step four: marking the manufacturer with the maximum matching value as a company for uniformly purchasing the second pipeline and the intercepted pipeline;
step five: and the pipeline calculation module stores the company sending value database for the unified purchase of the second pipeline and the intercepted pipeline in a database, and marks the company address and the contact telephone for the unified purchase on the outer surface of the pipeline corresponding to the building pipeline model.
The working principle of the invention is as follows: a user inputs the building pipeline information through the pipeline input module and sends the building pipeline information to the BIM modeling module; the BIM modeling module is used for modeling the building pipeline information input by the user and utilizing a formulaAcquiring a pipeline modeling value F of the obtained pipeline modelGi(ii) a Sorting the pipeline models from large to small according to the pipeline modeling value; modeling the pipeline with the maximum pipeline modeling value according to the path of the pipeline on the three-dimensional drawing of the building, and adding colors on the surface of the pipeline; then modeling the pipeline with the second pipeline modeling value according to the path of the pipeline, when the pipeline is intersected with the pipeline with the largest pipeline modeling value, displacing the pipeline with the second pipeline modeling value upwards or downwards to avoid the pipeline with the largest pipeline modeling value, and repeating the steps until the pipeline with the smallest pipeline modeling value is modeled to obtain a building pipeline model; performing collision detection on the building pipeline model through a collision detection module, and sending the building pipeline model qualified in collision detection to a database for storage; the modeling value of the pipeline is calculated through the pipeline size value, the pipeline material and the pipeline preset value, the modeling is sequentially carried out according to the size of the pipeline modeling value, the collision of the pipeline is reduced, meanwhile, the modeling is preferentially carried out on the pipeline with large pipeline size and good material, the turning of the large pipeline and the pipeline with good material in the pipeline node can be reduced, and the pipeline arrangement optimization is more reasonable; the pipeline acquisition module is used for acquiring the pipeline length of each section of pipeline in the building pipeline model and the building pipeline information and sending the pipeline length and the building pipeline information to the pipeline analysis module; the pipeline analysis module is used for analyzing and marking the pipelines to obtain a first pipeline, a second pipeline and a third pipeline and sending the first pipeline, the second pipeline and the third pipeline to the pipeline matching module; the pipeline matching module is used for matching the first pipeline, the second pipeline and the third pipeline, marking the first pipeline and the third pipeline as matching pipelines, and subtracting the standard production length corresponding to the pipelines from the pipeline length of the first pipeline to obtain the matching length of the first pipeline; the pipeline length of the third pipeline is the matching length of the third pipeline; acquiring the model, the size and the length of the unmarked pipeline to a user who stores the pipeline with the same model, the size and the length as the unmarked pipeline in a server; using formulasObtaining the matching value ZH of the matching userUi(ii) a Selecting the match with the largest matching valueThe user is a selected user of the unmarked pipeline; simultaneously sending the pipeline model, size and length of the unmarked pipeline and an appointment instruction to the selected user; when a user receives the pipeline model, size and length of an unmarked pipeline and a reservation instruction, a determination instruction is sent to the pipeline matching module, the reservation is successful, and the pipe taking address of the selected user and the contact telephone of the selected user are marked on the outer surface of the unmarked pipeline; marking the uniformly purchased company address and the contact telephone on the outer surfaces of the second pipeline and the intercepted pipeline; the selected users matched with the residual pipelines of the unmarked pipelines realize the reutilization of the residual pipelines, and simultaneously can avoid the waste caused by the residual pipelines and the waste caused by purchasing standard pipelines; the pipeline matching module sends the marks of the unmarked pipeline, the second pipeline and the intercepted pipeline to a database and displays the marks on the pipeline corresponding to the building pipeline model; by marking the pipeline, the corresponding optimal manufacturer or user, address and contact telephone can be conveniently and directly displayed on the building pipeline model; the pipeline material is convenient to purchase when the modeler pipeline is implemented.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise forms disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.
Claims (5)
1. A building pipeline arrangement optimization system based on BIM is characterized by comprising a pipeline input module, a BIM modeling module, a collision detection module, a database, a pipeline acquisition module, a pipeline analysis module, a pipeline matching module, a server, a user login module, a display terminal and a pipeline calculation module;
the pipeline input module is used for inputting building pipeline information by a user and sending the building pipeline information to the BIM modeling module; the building pipeline information comprises a building three-dimensional drawing, the type and the model of the pipeline, the path and the pipeline size value of the corresponding pipeline on the building three-dimensional drawing, the material of the pipeline, the preset value of the pipeline, the preset price of the pipeline and the position of the pipeline used by the building;
the BIM modeling module is used for modeling building pipeline information input by a user, and comprises the following specific modeling steps:
the method comprises the following steps: setting pipeline models as Gi, i being 1, … … and n; n is a positive integer; the value of the size of the pipeline corresponding to the model of the pipeline is recorded as CGi(ii) a The preset value of the pipeline is recorded as YGi;
Step two: setting an integral value corresponding to the pipeline material as J, matching the corresponding integral value according to the pipeline material and marking the integral value as JGi;
Step three: using formulasAcquiring a pipeline modeling value F of the obtained pipeline modelGi(ii) a Wherein λ is an interference factor, and its value is 0.6431347; d1, d2 and d3 are all preset fixed values of proportionality coefficients;
step four: sorting the pipeline models from large to small according to the pipeline modeling value; modeling the pipeline with the maximum pipeline modeling value according to the path of the pipeline on the three-dimensional drawing of the building, and adding colors on the surface of the pipeline; then modeling the pipeline with the second pipeline modeling value according to the path of the pipeline, when the pipeline is intersected with the pipeline with the largest pipeline modeling value, displacing the pipeline with the second pipeline modeling value upwards or downwards to avoid the pipeline with the largest pipeline modeling value, and repeating the steps until the pipeline with the smallest pipeline modeling value is modeled to obtain a building pipeline model;
step five: the BIM modeling module sends the building pipeline model to a collision detection module;
the collision detection module is used for performing collision detection on the building pipeline model and sending the building pipeline model qualified in collision detection to the database for storage;
the pipeline acquisition module is used for acquiring the pipeline length of each section of pipeline in the building pipeline model and the building pipeline information and sending the pipeline length and the building pipeline information to the pipeline analysis module; the pipeline analysis module is used for analyzing and marking pipelines, and comprises the following specific analysis steps:
s1: marking the pipe length of each segment as DjGi(ii) a j is 1, … …, n; setting the corresponding standard production length of the pipeline as BGi;
S2: classifying the pipelines of each section to obtain DjGi>BGiIs marked as a first pipe; will DjGi=BGiIs marked as a second pipeline; will DjGi<BGiIs marked as a third pipeline;
s3: the pipeline analysis module sends the first pipeline, the second pipeline and the third pipeline to a pipeline matching module;
the pipeline matching module is used for matching the first pipeline, the second pipeline and the third pipeline and sending matching results to the database for storage.
2. The BIM-based building pipeline arrangement optimization system of claim 1, wherein the matching step of the pipeline matching module matching merchant is as follows:
SS 1: marking the first pipe and the third pipe as matching pipes, and using the symbols Pi, i-1, … …, n;
SS 2: subtracting the standard production length corresponding to the pipeline from the pipeline length of the first pipeline to obtain the matching length of the first pipeline; the pipeline length of the third pipeline is the matching length of the third pipeline;
SS 3: matching and combining the matching lengths in pairs to enable the sum of the matching lengths to be equal to the marked production length, and marking the pipelines matched in pairs as intercepted pipelines; marking the pipelines which are not matched as unmarked pipelines;
SS 4: acquiring the model, the size and the length of the unmarked pipeline to a user who stores the pipeline with the same model, the size and the length as the unmarked pipeline in a server;
SS 5: setting the matched user as Ui, i is 1, … … and m, obtaining the position of the matched user and the position of the user needing unmarked pipeline to calculate the distance difference, and marking as GUiSetting the number of unmarked pipelines matched by the user as MUiThe total number of times that the user has matched is recorded as WUi;
SS 6: using formulasObtaining the matching value ZH of the matching userUi(ii) a Wherein e1, e2 and e3 are all preset proportionality coefficients;
SS 7: selecting the matched user with the maximum matching value as the selected user of the unmarked pipeline; simultaneously sending the pipeline model, size and length of the unmarked pipeline and an appointment instruction to the selected user;
SS 8: when the user receives the pipeline model, size and length of the unmarked pipeline and the reservation instruction, the user sends a determination instruction to the pipeline matching module, and the reservation is successful; simultaneously, the number of the matched unmarked pipelines and the total number of matched times of the selected user are increased once;
SS 9: marking the pipe taking address of the selected user and the contact telephone of the selected user on the outer surface of the unmarked pipe; marking the uniformly purchased company address and the contact telephone on the outer surfaces of the second pipeline and the intercepted pipeline;
and the pipeline matching module sends the marks of the unmarked pipeline, the second pipeline and the intercepted pipeline to a database and displays the marks on the pipeline corresponding to the building pipeline model.
3. The BIM-based building pipeline arrangement optimization system of claim 1, wherein the display terminal is used for a user to access the database and display the building pipeline model stored in the database.
4. The BIM-based building pipeline arrangement optimization system of claim 1, wherein the user login module is configured to log in a server by a user and submit user information and remaining pipeline information to the server, wherein the remaining pipeline information includes a model, a size, a remaining length, and a pipe-taking address of the remaining pipeline; the user information includes name, identification number and contact telephone.
5. The BIM-based building pipeline placement optimization system of claim 1, wherein the pipeline calculation module is for companies that match the unified procurement of second pipelines and intercepted pipelines; the device comprises a data acquisition unit and a data and data calculation unit; the data acquisition unit is used for acquiring the information of manufacturers corresponding to the pipeline models in real time; the manufacturer information comprises the position of the manufacturer, the price and the sales volume corresponding to the pipeline model; the data acquisition unit sends the manufacturer information acquired in real time to the data calculation unit; the data calculation unit is used for calculating a matching value of a manufacturer; the specific calculation steps are as follows:
the method comprises the following steps: set the manufacturer corresponding to the pipeline as CkGi(ii) a k is 1, 2, … …, n; the price and the sales volume corresponding to the model of the pipeline produced by the manufacturer are respectively recorded as MCkGi、XCkGi;
Step two: obtaining the distance difference SCk according to the position of the building using the pipeline and the position of the manufacturerGi;
Step three: using formulasObtaining the matching value PCk of a manufacturerGi(ii) a Wherein g1, g2 and g3 are all preset fixed values of proportionality coefficients, and MY is the preset price of the pipeline;
step four: marking the manufacturer with the maximum matching value as a company for uniformly purchasing the second pipeline and the intercepted pipeline;
step five: and the pipeline calculation module stores the company sending value database for the unified purchase of the second pipeline and the intercepted pipeline in a database, and marks the company address and the contact telephone for the unified purchase on the outer surface of the pipeline corresponding to the building pipeline model.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010346343.9A CN111539115B (en) | 2020-04-27 | 2020-04-27 | Building pipeline arrangement optimization system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010346343.9A CN111539115B (en) | 2020-04-27 | 2020-04-27 | Building pipeline arrangement optimization system based on BIM |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111539115A true CN111539115A (en) | 2020-08-14 |
CN111539115B CN111539115B (en) | 2023-04-18 |
Family
ID=71967670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010346343.9A Active CN111539115B (en) | 2020-04-27 | 2020-04-27 | Building pipeline arrangement optimization system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111539115B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112380661A (en) * | 2020-12-04 | 2021-02-19 | 升维科技有限公司 | Building management pipeline arrangement optimization system based on BIM |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106951083A (en) * | 2017-03-20 | 2017-07-14 | 任芳 | VR methods of exhibiting and system based on BIM |
CN108733863A (en) * | 2017-04-25 | 2018-11-02 | 中国二十冶集团有限公司 | Large size city synthesis Mechatronic Systems installation method based on BIM |
CN110362936A (en) * | 2019-07-18 | 2019-10-22 | 中国能源建设集团安徽电力建设第一工程有限公司 | Power station small pipeline Secondary Design construction method based on BIM technology |
CN110502910A (en) * | 2019-08-07 | 2019-11-26 | 珍岛信息技术(上海)股份有限公司 | A kind of cloud information storage system based on data encryption |
CN110532653A (en) * | 2019-08-15 | 2019-12-03 | 刘德建 | A kind of building pipeline layout optimization system and classification method based on BIM |
CN110689371A (en) * | 2019-09-09 | 2020-01-14 | 珍岛信息技术(上海)股份有限公司 | Intelligent marketing cloud service platform based on AI and big data |
-
2020
- 2020-04-27 CN CN202010346343.9A patent/CN111539115B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106951083A (en) * | 2017-03-20 | 2017-07-14 | 任芳 | VR methods of exhibiting and system based on BIM |
CN108733863A (en) * | 2017-04-25 | 2018-11-02 | 中国二十冶集团有限公司 | Large size city synthesis Mechatronic Systems installation method based on BIM |
CN110362936A (en) * | 2019-07-18 | 2019-10-22 | 中国能源建设集团安徽电力建设第一工程有限公司 | Power station small pipeline Secondary Design construction method based on BIM technology |
CN110502910A (en) * | 2019-08-07 | 2019-11-26 | 珍岛信息技术(上海)股份有限公司 | A kind of cloud information storage system based on data encryption |
CN110532653A (en) * | 2019-08-15 | 2019-12-03 | 刘德建 | A kind of building pipeline layout optimization system and classification method based on BIM |
CN110689371A (en) * | 2019-09-09 | 2020-01-14 | 珍岛信息技术(上海)股份有限公司 | Intelligent marketing cloud service platform based on AI and big data |
Non-Patent Citations (1)
Title |
---|
陈力攀;蒙媚;易永智;: "BIM技术在高层建筑综合管线优化中的应用研究" * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112380661A (en) * | 2020-12-04 | 2021-02-19 | 升维科技有限公司 | Building management pipeline arrangement optimization system based on BIM |
Also Published As
Publication number | Publication date |
---|---|
CN111539115B (en) | 2023-04-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Aibinu et al. | Status of BIM adoption and the BIM experience of cost consultants in Australia | |
Whyte | Innovation and users: virtual reality in the construction sector | |
Liu et al. | Analyzing urban networks through the lens of corporate networks: A critical review | |
CN105117573B (en) | Auto hydraulic model building method based on CAD drainage pipeline networks drawing informations | |
Howick et al. | Building confidence in models for multiple audiences: the modelling cascade | |
Babatunde et al. | An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices | |
US7805284B2 (en) | Simulation model defining system for generating a simulation program for a simulator simulating a behavior of economy or society regarded as a system of phenomena and events | |
Port | The management of CAD for construction | |
CN113449355A (en) | Building house type graph automatic generation method based on artificial intelligence | |
Gao et al. | A data structure for studying 3D modeling design behavior based on event logs | |
CN111539115B (en) | Building pipeline arrangement optimization system based on BIM | |
Jiang et al. | Semantic enrichment for BIM: Enabling technologies and applications | |
Gil et al. | On the discovery of urban typologies | |
Abdalhameed et al. | Based BIM techniques to clash detection for construction projects | |
CN105741009A (en) | Dynamic method for collecting, tracking, storing and reporting development event efforts | |
Li et al. | Visualization of building interior design to reduce rework | |
Clark | A framework for BIM model-based construction cost estimation | |
JP2007207052A (en) | Simulation model generator | |
Al-Roumi et al. | Exploring the rate of adoption and implementation depth of building information modeling (BIM): A case of Kuwait | |
Harty et al. | Facilitating meaningful collaboration in architectural design through the adoption of BIM (Building Information Modelling) | |
Verma et al. | A critical evaluation and comparison of four manufacturing similation softwares | |
CN109034899A (en) | Estimate the method, apparatus and computer readable storage medium of article residual value | |
Balasaheb | Review Paper on Manufacturing System Performance Improvement by Modeling and Simulation | |
Ermolli | Digital flows of information for the operational phase: The Facility Management of Apple Developer Academy | |
CN108664590A (en) | A kind of matrimony vine data identification method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230330 Address after: 528299 Area 404-2, Hantian Science and Technology City Comprehensive Building, Yanping Road, Guicheng, Nanhai District, Foshan City, Guangdong Province Applicant after: Guangdong Dingyao Engineering Technology Co.,Ltd. Address before: 510000 No. 8, 1st lane, sugar factory, Tianmei new village, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province Applicant before: Guangzhou Branch of Hunan Kunpeng construction services Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |