CN1115348A - 复合桩基 - Google Patents
复合桩基 Download PDFInfo
- Publication number
- CN1115348A CN1115348A CN 95110893 CN95110893A CN1115348A CN 1115348 A CN1115348 A CN 1115348A CN 95110893 CN95110893 CN 95110893 CN 95110893 A CN95110893 A CN 95110893A CN 1115348 A CN1115348 A CN 1115348A
- Authority
- CN
- China
- Prior art keywords
- pile
- pile foundation
- composite pile
- foundation
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
复合桩基,建筑基础处理中的一种成桩方法,包括有两种或三种构成,上部为现浇混凝土桩,下部分别是硬性构件(混凝土预制件)、夯实的硬性材料(建筑垃圾)或二者的结合,能适应复杂的工程地质条件,单桩承载力高,施工方便,造价低,施工噪音低,有效利用建筑垃圾,有宜环境。
Description
建筑物基础处理,涉及一种成桩的方法,复合桩基。
目前建筑工程的基础施工,基础处理中,打桩是最常用的方法,较常用的桩基有钢筋混凝土预制桩,板桩,钢管桩,木桩及混凝土和钢筋混凝土灌注桩等,其中灌注桩又有泥浆护壁成孔,干作业成孔,套管成孔,爆扩成孔和人工控孔等桩,最普通的,量大面广的还是钢筋混凝土预制桩及干作业成孔中的洛阳铲挖孔灌注桩和套管成孔中的锤击沉管灌注桩、振动沉管灌注桩。这些桩在施工时,存在或噪音严重,污染环境或受地质条件影响、局限性大、或单桩承载能力较低等缺点。单一的桩基不适应变化万千的地质环境,常造成大量的浪费,使建筑成本造价提高,在城市中施工时,越来越多的建筑垃圾是一大公害,如何充分利用建筑垃圾也是基础处理中的难题。
本发明的目的是提出一种成本低,施工方便,能合理有效利用建筑垃圾,适应不同地质条件下施工,特别适合需求最多的,城市建筑在8层以下的,单桩承载力在150KN~300KN的地基处理的成桩技术。
本发明提出的复合桩基是新型现浇刚碎硬复合桩,简称XGSY复合桩,其特征在于复合桩由两种或三种结构材料组成,包括有现浇混凝土桩,硬质构件和夯实的硬性材料(建筑垃圾,碎石料等),复合桩的上部是现浇混凝土桩,下部分别是硬质构件(如混凝土预制件等)、夯实的硬性材料或夯实的硬性材料与硬质构件的结合,即复合桩有三种组合方式,其一,上部为现浇混凝土桩,下部为硬质构件(混凝土预制件)、其二,上部为现浇混凝土桩,下部是夯实的硬性材料,如建筑垃圾,碎石料等,其三,上部为现浇混凝土桩,下部是夯实的硬性材料(建筑垃圾)和硬质构件(混凝土预制件)的结合。
本发明提出的复合桩基可根据建筑基础的地质情况选择其一,复合桩基可以适用于有地下水,流砂等复杂工程地质条件下的桩基处理,复合桩基的一般处理方法:首先用传统的洛阳铲桩机挖土成孔,先放入适量高标号混凝土,再将准备好的硬制构件,如混凝土预制件置于桩孔底部中心,用平底夯锤夯至所需达到的位置,然后用干硬性混凝土填充夯实,后填加经选择破碎处理的建筑垃圾,用劈力较大的夯锤(质量为600公斤)冲夯,并拌加少量胶结物至一定高度,最后在上部放置钢筋笼,浇注混凝土成型。
本发明提出的复合桩基,桩的下部既可达到坚固的老土,落于持力层,也可只到一段的粘性土、黄土或人工回填土层中,而无需“持力层”,整个桩挤摩,嵌固在较松软的上层里。能有效、可靠地解决洛阳铲遇地下水,流砂等特殊地质情况时难于处理的问题,复合桩的设计和成型更符合桩基的受力机理和特征,它能根据上、中、下不同受力的情况而分别采用不同的材料,不同的方法,充用、合理地利用不同的力学性能,满足了桩的承载。在设计单桩承载力不很高的情况下,大量利用建筑垃圾作为桩身材料,既可处理建筑垃圾这一令人头痛的公害,又节省了建筑材料,变废为宝,降低了基础处理工程的造价,也减少了环境的噪音污染。
实施例1:长发精密铸造有限公司消失模铸造车间基础处理,复合桩31根,其中4根在防空洞顶以上的10.5米素填土中,下部2.5米成孔后,用建筑垃圾拌少量水泥粉强夯成桩,上部6米为混凝土加钢筋笼成桩;11根在21米厚的素填土中,下部6米成孔后用建筑垃圾拌少量水泥粉强夯成桩,上部6是为混凝土加钢筋笼成桩;其他16根,上部为素填土,桩底落在强风化泥质板岩上,成孔后底部0.5米用卵石拌少量水泥粉强夯,上部为混凝土加钢筋笼成桩。施工完毕,由建设方指定时其中25#、23#和、10#工程桩,采用小应变动测法进行无损检测试验,用堆载法进行垂直静载荷试验,测试结果,桩身完整性好,单桩轴向容许承载力均满足设计要求,且桩顶累计沉降量较小。
实施例2:某8层居民楼,其基础上部为素填土,中部为粘土,下部为含水饱和软塑淤泥土,复合桩采用,洛阳铲成孔后,用350公斤平底锤打下长1.2米,断面为正方形、底部为45°尖桩的混凝土预制件,上接混凝土钢筋笼,浇注混凝土成桩。
本发明提出的复合桩基使用了部分建筑垃圾、节省了投资,降低了造价,单位深度桩的造价分别是预制桩、洛阳铲、锤击(振动)桩的40%、70%,和66%。复合桩的承载能力根据其成桩方法可达到150KN-300KN,而洛阳铲则一般只能达到180KN-200KN。复合桩基施工操作方便,无需预制桩,锤击(振动)桩必须的大型机械设备,噪音小,干扰少,场地要求低,易于掌握和实施。能解决地下水、流砂、淤泥等特珠地质条件的基础处理。
Claims (4)
1、复合桩基,其特征在于由两种或三种结构材料组成,包括有现浇混凝土桩,硬制构件和夯实的硬性材料,复合桩的上部是现浇混凝土桩,下部分别是硬质构件、夯实的硬性材料或夯实的硬性材料与硬质构件的结合。
2、据权利要求1所述的复合桩基其特征是复合桩基的上部是现浇混凝土桩,下部是硬性材料构件,如混凝土预制件。
3、据权利要求1所述的复合桩基,其特征在于复合桩基的上部是现浇混凝土桩,下部是夯实的硬性材料,如建筑垃圾,碎石料等。
4、据权利要求1所述的复合桩其特征在于复合桩基的上部为现浇混凝土桩,下部接有夯实的硬性材料(建筑垃圾,碎石料),下接硬质构件(混凝土预制件)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN95110893A CN1035960C (zh) | 1995-08-04 | 1995-08-04 | 复合桩基施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN95110893A CN1035960C (zh) | 1995-08-04 | 1995-08-04 | 复合桩基施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1115348A true CN1115348A (zh) | 1996-01-24 |
CN1035960C CN1035960C (zh) | 1997-09-24 |
Family
ID=5078225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN95110893A Expired - Fee Related CN1035960C (zh) | 1995-08-04 | 1995-08-04 | 复合桩基施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1035960C (zh) |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4293242A (en) * | 1977-04-29 | 1981-10-06 | Stanley Merjan | Piles |
US4397588A (en) * | 1981-01-23 | 1983-08-09 | Vibroflotation Foundation Company | Method of constructing a compacted granular or stone column in soil masses and apparatus therefor |
GB2135361B (en) * | 1983-01-17 | 1986-01-22 | Cementation Piling & Found | Ground treatment |
JPS61233118A (ja) * | 1985-04-10 | 1986-10-17 | Kajima Corp | 既製杭根固め工法 |
CN85104918B (zh) * | 1985-06-28 | 1988-12-21 | 冶金工业部勘察科学技术研究所 | 砂衬桩灌震器 |
CN87105352B (zh) * | 1987-08-07 | 1988-11-02 | 中国建筑科学研究院地基基础研究所 | 混凝土灌注桩成桩设备 |
CN1061728C (zh) * | 1995-01-06 | 2001-02-07 | 张荣久 | 一种变径灌注桩制造工艺及其专用设备 |
-
1995
- 1995-08-04 CN CN95110893A patent/CN1035960C/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1035960C (zh) | 1997-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Smoltczyk | Geotechnical Engineering Handbook, Procedures | |
Barksdale et al. | Design and construction of stone columns, vol. I. | |
KR100634261B1 (ko) | 짧은 골재 피어 기술 | |
AU2012315417B2 (en) | Retaining wall construction using site compaction and excavation | |
KR100762991B1 (ko) | 고강도 몰탈을 충진하는 기성말뚝 매입공법 | |
CN111794216A (zh) | 抗拔载体桩的施工方法 | |
Ranjan | Ground treated with granular piles and its response under load | |
CN104762956B (zh) | 一种基于建筑垃圾再生骨料桩的成桩方法 | |
Munfakh | Ground improvement engineering–the state of the US practice: part 1. Methods | |
Mishra | A study on ground improvement techniques and its applications | |
Holtz et al. | Soil improvement | |
WO2023131936A2 (en) | Bioinspired skirted footing and its method of installation | |
CN1115348A (zh) | 复合桩基 | |
Bathurst et al. | Earth retaining structures and reinforced slopes | |
Kempfert et al. | Pile foundation | |
CN2283679Y (zh) | 夯锤 | |
CN217105190U (zh) | 一种适用于复杂地质条件的劈裂注浆岩石锚桩基础 | |
Yin | Analysis on Foundation Treatment Process and Engineering Visa Scheme of Special Karst Stratum | |
Beuße et al. | Solving challenges of operational areas for renewable energy infrastructure | |
CN116427407A (zh) | 可控刚度高承载力复合地基的施工方法 | |
Chrimes | CONCRETE FOUNDATIONS AND SUBSTRUCTURES: A HISTORICAL REVIEW. | |
JP2004197474A (ja) | 防振盛土構造 | |
CN118814852A (zh) | 一种用于黄土地区输电线路铁塔的短柱板桩复合基础结构及施工方法 | |
Datye | Simpler technique for ground improvements | |
CN116716876A (zh) | 一种应用于含负摩阻地层的复合桩基及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |