CN111520107A - Well flushing process for in-situ leaching uranium mining production well - Google Patents

Well flushing process for in-situ leaching uranium mining production well Download PDF

Info

Publication number
CN111520107A
CN111520107A CN202010332979.8A CN202010332979A CN111520107A CN 111520107 A CN111520107 A CN 111520107A CN 202010332979 A CN202010332979 A CN 202010332979A CN 111520107 A CN111520107 A CN 111520107A
Authority
CN
China
Prior art keywords
well
production well
production
situ leaching
washing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010332979.8A
Other languages
Chinese (zh)
Other versions
CN111520107B (en
Inventor
程威
原渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Research Institute of Chemical Engineering and Metallurgy of CNNC
Original Assignee
Beijing Research Institute of Chemical Engineering and Metallurgy of CNNC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Research Institute of Chemical Engineering and Metallurgy of CNNC filed Critical Beijing Research Institute of Chemical Engineering and Metallurgy of CNNC
Priority to CN202010332979.8A priority Critical patent/CN111520107B/en
Publication of CN111520107A publication Critical patent/CN111520107A/en
Application granted granted Critical
Publication of CN111520107B publication Critical patent/CN111520107B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • E21B37/06Methods or apparatus for cleaning boreholes or wells using chemical means for preventing or limiting, e.g. eliminating, the deposition of paraffins or like substances
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/52Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/28Dissolving minerals other than hydrocarbons, e.g. by an alkaline or acid leaching agent
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Chemical & Material Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Compounds Of Heavy Metals (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention relates to the technical field of in-situ leaching uranium mining, and particularly discloses a well flushing process for an in-situ leaching uranium mining production well, which comprises the following steps: the method comprises the following steps: measuring the sand setting height of the production well by using a logging probe; step two: a well washing pipe is put into the well; step three: preparing a mixed acid well-flushing agent, and pumping the mixed acid well-flushing agent into a production well through a pressurizing pump; step four: sealing the production well, and filling compressed air into the well; step five: releasing the pressure in the well, starting the air compressor to wash the well until the pH value of the well washing water is not less than 5.5, and finishing the well washing. After the well is washed by the process, the pumping and injection liquid amount of the production well is increased remarkably, the average lift is more than 18%, the pumping and injection liquid amount after well washing is maintained for a long time, and the process has good economic benefit and environmental benefit.

Description

Well flushing process for in-situ leaching uranium mining production well
Technical Field
The invention belongs to the technical field of in-situ leaching uranium mining, and particularly relates to a well flushing process for an in-situ leaching uranium mining production well.
Background
The in-situ leaching uranium mining is a sandstone-type uranium ore mining method integrating mining, selecting and smelting, and is widely applied to the development of sandstone-type uranium ore deposits at home and abroad. At present, industrialized mining production is realized in Xinjiang, inner Mongolia and other places in China. In the in-situ leaching uranium mining, drilling is the only underground engineering for disclosing an ore bed, and pumping and injecting liquid are realized through a filter.
Production wells are often plugged to varying degrees during operation. The causes of well plugging are many, mainly chemical plugging, mechanical plugging, gas plugging, and plugging related to ion exchange.
Chemical plugging is most common during acid leaching, and is mainly caused by precipitation of iron and aluminum hydroxides, controlled by the pH of the solution. For example, when the pH of the solution is 4.0-5.0, aluminum hydroxide is precipitated; when the pH value is 2.5-3.5, the ferric hydroxide starts to dissolve; when the pH value is 8.0-9.0, the ferrous hydroxide begins to precipitate.
During neutral leaching, the most common is Ca (Mg) CO3And (4) precipitating. Ca (Mg) CO3The dissolution and precipitation of (A) is influenced by Ca in water2+、Mg2+Ion concentration, bicarbonate ion concentration, and pH. Because the pH value of the underground leaching environment changes, single or mixed insoluble substances can be formed, the well gaps are blocked in the ore bed, and the permeability of the ore bed is reduced.
After chemical precipitation, chemical well washing is usually performed on the in-situ leaching mine by using hydrochloric acid or nitric acid and the like. The common method comprises the steps of directly pouring 1-2 barrels of industrial hydrochloric acid or nitric acid into a production well from a wellhead, soaking for 1-2 days, and then washing out the residual acid by using an air compressor. The main disadvantages of this method are: industrial high concentrations of hydrochloric or nitric acid are prone to formation damage and often result in unnecessary consumption of acid.
Disclosure of Invention
The invention aims to provide a well flushing process for an in-situ leaching uranium production well, which is used for dissolving chemical precipitates and improving the liquid pumping amount and the liquid injection amount of the production well.
The technical scheme of the invention is as follows:
a well flushing process for an in-situ leaching uranium production well comprises the following steps:
the method comprises the following steps: measuring the sand setting height of the production well by using a logging probe;
step two: a well washing pipe is put into the well;
step three: preparing a mixed acid well-flushing agent, and pumping the mixed acid well-flushing agent into a production well through a pressurizing pump;
step four: sealing the production well by using a wellhead device, and filling compressed air into the production well until a pressure gauge on the wellhead device is 1.5-3.0 MPa, and keeping the pressure for 2-16 h;
step five: and opening the wellhead device to release pressure, starting the air compressor to wash the well until the pH value of the well washing water is not less than 5.5, and finishing well washing.
In the first step, if the sand setting height of the production well is measured to be larger than or equal to 1.0m, pretreating the production well by using an air compressor, reducing the sand setting height of the production well to be less than 1.0m, and then performing the second step; and if the measured sand setting height of the production well is less than 1.0m, directly performing the step two.
In the third step, the formula of the mixed acid is as follows: 2-5% of dihydrazine hydrochloride by mass; 0.5-1% of triethanolamine by mass; 1-3% of EDTA sodium salt by mass.
In the third step, the formula of the mixed acid is as follows: 3-5% of sulfamic acid by mass; 0.2-0.5% of citric acid by mass; 0.2-0.4% of acid ammonium fluoride by mass.
In the third step, the addition amount of the mixed acid is in direct proportion to the length of the filter.
In the third step, 0.6-1.0 m of mixed acid is added into each meter of filter3
In the second step, the distance between the bottom end of the lower well washing pipe and the lower end of the filter of the production well is 1.5-2.5 m.
In the second step, the pressure resistance of the well washing pipe is not less than 4.0 MPa.
In the second step, the specification of the well washing pipe is
Figure BDA0002465639680000031
The invention has the following remarkable effects:
after the process disclosed by the invention is adopted for well washing, the pumping and injection liquid amount of a production well is increased remarkably, the average promotion is more than 18%, the pumping and injection liquid amount after well washing is maintained for a long time, and the process has good economic benefits and environmental benefits and is applied to the test and production of a certain uranium deposit.
Detailed Description
The present invention will be described in further detail with reference to specific examples.
A well flushing process for an in-situ leaching uranium production well comprises the following steps:
the method comprises the following steps: measuring the sand setting height of the production well by using a logging probe;
if the measured sand setting height of the production well is not less than 1.0m, pretreating the production well by using an air compressor, reducing the sand setting height of the production well to be less than 1.0m, and starting the next working procedure;
if the measured sand setting height of the production well is less than 1.0m, directly starting the next working procedure;
step two: a well washing pipe is put into the well, and the specification of the well washing pipe is as follows
Figure BDA0002465639680000032
The pressure resistance is not less than 4.0MPa, and the distance from the bottom end of the well washing pipe to the lower end of the filter of the production well is 1.5-2.5 m;
step three: preparing a mixed acid well-flushing agent, pumping the mixed acid well-flushing agent into a production well through a pressure pump, wherein the addition amount of the mixed acid is in direct proportion to the length of a filter, and the mixed acid is added into the filter by 0.6-1.0 m per meter3
The formula I of the mixed acid is as follows: 2-5% of dihydrazine hydrochloride by mass; 0.5-1% of triethanolamine by mass; 1-3% of EDTA sodium salt by mass;
the formula II of the mixed acid is as follows: 3-5% of sulfamic acid by mass; 0.2-0.5% of citric acid by mass; 0.2-0.4% of acid ammonium fluoride by mass;
step four: sealing the production well by using a wellhead device, and filling compressed air into the production well until a pressure gauge on the wellhead device is 1.5-3.0 MPa, and keeping the pressure for 2-16 h;
step five: and opening the wellhead device to release pressure, starting the air compressor to wash the well until the pH value of the well washing water is not less than 5.5, and finishing well washing.
Example 1
The thickness of an ore-bearing aquifer of a certain uranium deposit is 4.9-11.8 m, the average thickness is 8.6m, the unit water burst permeability coefficient is 0.14-0.52 m/d.SC-01, the liquid pumping well adopts a gravel-packed structure, the well depth is 297.5m, the specification of a sleeve pipe is phi 148 × 10mm, the length of a filter is 8.2m, the position of the filter is 286.3-294.5m, the length of a sand setting pipe is 3.0m, the liquid pumping amount is reduced by 42 percent after the liquid pumping well is put into operation for 2 years, the obvious blocking phenomenon is generated, and the liquid pumping amount is 2.2m3H is used as the reference value. The method for washing the well comprises the following steps:
the method comprises the following steps: measuring the sand setting height of an SC-01 liquid extraction well by using a logging probe, wherein the sand setting height of the liquid extraction well is 1.5m, washing the well by using an air compressor, measuring the sand setting height after washing the well again to be 0.2m, and starting the next working procedure;
step two: a well washing pipe is put into the SC-01 liquid pumping well, and the specification of the well washing pipe is as follows
Figure BDA0002465639680000041
The pressure resistance is not less than 4.0MPa, the bottom position of the well washing pipe is 296.2m, and the distance from the bottom end of the production well filter is 1.7 m;
step three: preparing a mixed acid well-flushing agent, wherein the formula of the mixed acid well-flushing agent comprises 3% of dihydrazine hydrochloride, 0.6% of triethanolamine, 1.2% of EDTA sodium salt and the balance of water. Pumping into SC-01 liquid-pumping well by pressurizing pump, wherein the adding amount of the mixed acid is 0.75m3Per meter of filter, total addition of 6.15m3
Step four: sealing the SC-01 liquid pumping well by using a well head device, filling compressed air into the well until a pressure gauge on the well head device is 1.8MPa, and keeping the pressure for 6 h;
step five: and opening the wellhead device of the SC-01 liquid extraction well to release pressure, starting the air compressor to wash the well when the pressure gauge on the wellhead device is 0.0MPa, and completing the well washing until the pH value of the well washing water reaches 6.2.
After the well washing is finished, the liquid pumping amount of the SC-01 liquid pumping well is 2.85m3H, after 7 days of operation, the liquid suction amount is stabilized at 2.63m3And/h, 19.6 percent higher than that before well washing.
Example 2
The thickness of a uranium deposit ore layer is 3.7-9.2 m, the average thickness is 5.8m, the permeability coefficient is 0.34-0.63 m/d.SYZ-06 liquid injection well adopts a gravel-packed structure, the well depth is 220.6m, the specification of a casing pipe is phi 100 × 10mm, the length of a filter is 6.3m, the position of the filter is 210.3-216.6m, the length of a sand setting pipe is 4.0m, after the uranium deposit ore layer is put into operation, the obvious blocking phenomenon is generated, and the liquid injection amount is 1.6m3H is used as the reference value. The method for washing the well comprises the following steps:
the method comprises the following steps: measuring the sand setting height of the SYZ-06 injection well by using a logging probe, wherein the sand setting height of the SYZ-06 injection well is 0.6m, and directly starting the next working procedure;
step two: putting a well washing pipe into the SYZ-06 injection well and washing the wellThe pipe specification is
Figure BDA0002465639680000051
The pressure resistance is not less than 4.0MPa, the bottom position of the well washing pipe is 223.2m, and the distance between the bottom position and the bottom end of the SYZ-06 liquid injection well filter is 1.6 m;
step three: preparing a mixed acid well-flushing agent, wherein the formula of the mixed acid well-flushing agent comprises 2.4% of sulfamic acid, 0.5% of citric acid, 0.4% of acid ammonium fluoride and the balance of water. Pumping into SYZ-06 injection well by pressurizing pump, wherein the adding amount of mixed acid is 0.80m3Per meter of filter, the total addition is 5.12m3
Step four: sealing the SYZ-06 liquid injection well by using a well head device, filling compressed air into the well until a pressure gauge on the well head device is 1.3MPa, and keeping the pressure for 10 h;
step five: and opening a wellhead device of the SYZ-06 injection well to release pressure, starting the air compressor to wash the well when a pressure gauge on the wellhead device is 0.0MPa, and completing the well washing until the pH value of the well washing water reaches 6.5.
After the well washing is finished, the injection amount of the SYZ-06 injection well is 2.36m3H, after 7 days of operation, the injection quantity is stabilized at 2.17m3And/h, the injection amount is improved by 35.6 percent compared with the injection amount before well washing.

Claims (9)

1. A well washing process for an in-situ leaching uranium production well is characterized by comprising the following steps: the method comprises the following steps:
the method comprises the following steps: measuring the sand setting height of the production well by using a logging probe;
step two: a well washing pipe is put into the well;
step three: preparing a mixed acid well-flushing agent, and pumping the mixed acid well-flushing agent into a production well through a pressurizing pump;
step four: sealing the production well by using a wellhead device, and filling compressed air into the production well until a pressure gauge on the wellhead device is 1.5-3.0 MPa, and keeping the pressure for 2-16 h;
step five: and opening the wellhead device to release pressure, starting the air compressor to wash the well until the pH value of the well washing water is not less than 5.5, and finishing well washing.
2. The well flushing process for the in-situ leaching uranium production well according to claim 1, wherein: in the first step, if the sand setting height of the production well is measured to be larger than or equal to 1.0m, pretreating the production well by using an air compressor, reducing the sand setting height of the production well to be less than 1.0m, and then performing the second step; and if the measured sand setting height of the production well is less than 1.0m, directly performing the step two.
3. The well flushing process for the in-situ leaching uranium production well according to claim 2, wherein: in the third step, the formula of the mixed acid is as follows: 2-5% of dihydrazine hydrochloride by mass; 0.5-1% of triethanolamine by mass; 1-3% of EDTA sodium salt by mass.
4. The well flushing process for the in-situ leaching uranium production well according to claim 2, wherein: in the third step, the formula of the mixed acid is as follows: 3-5% of sulfamic acid by mass; 0.2-0.5% of citric acid by mass; 0.2-0.4% of acid ammonium fluoride by mass.
5. A process as claimed in claim 3 or claim 4, wherein the flushing process comprises the following steps: in the third step, the addition amount of the mixed acid is in direct proportion to the length of the filter.
6. The well flushing process for the in-situ leaching uranium production well according to claim 5, wherein: in the third step, 0.6-1.0 m of mixed acid is added into each meter of filter3
7. The well flushing process for the in-situ leaching uranium production well according to claim 6, wherein: in the second step, the distance between the bottom end of the lower well washing pipe and the lower end of the filter of the production well is 1.5-2.5 m.
8. The well flushing process for the in-situ leaching uranium production well according to claim 7, wherein: in the second step, the pressure resistance of the well washing pipe is not less than 4.0 MPa.
9. The in-situ leaching uranium production method of claim 8The well-producing and well-washing process is characterized in that: in the second step, the specification of the well washing pipe is
Figure FDA0002465639670000021
CN202010332979.8A 2020-04-24 2020-04-24 Well flushing process for in-situ leaching uranium mining production well Active CN111520107B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010332979.8A CN111520107B (en) 2020-04-24 2020-04-24 Well flushing process for in-situ leaching uranium mining production well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010332979.8A CN111520107B (en) 2020-04-24 2020-04-24 Well flushing process for in-situ leaching uranium mining production well

Publications (2)

Publication Number Publication Date
CN111520107A true CN111520107A (en) 2020-08-11
CN111520107B CN111520107B (en) 2022-08-19

Family

ID=71903880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010332979.8A Active CN111520107B (en) 2020-04-24 2020-04-24 Well flushing process for in-situ leaching uranium mining production well

Country Status (1)

Country Link
CN (1) CN111520107B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943126A (en) * 2021-03-17 2021-06-11 南华大学 Auxiliary discharge device for washing waste liquid of in-situ leaching uranium mine based on liquid level pressurization
CN114737900A (en) * 2021-12-27 2022-07-12 核工业北京化工冶金研究院 Static rotational flow well washing device and method for cleaning ground immersed borehole
CN117188999A (en) * 2023-11-07 2023-12-08 核工业北京化工冶金研究院 Efficient well flushing method for U-shaped well for in-situ leaching uranium mining

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060124302A1 (en) * 2004-12-15 2006-06-15 Bj Services Company Well treating compositions for slow release of treatment agents and methods of using the same
CN102720467A (en) * 2012-05-18 2012-10-10 核工业北京化工冶金研究院 Residual acid flowback method after acid method hole-flushing in-situ leach of uranium
CN106507863B (en) * 2009-11-27 2013-05-29 核工业北京化工冶金研究院 In in-situ leaching uranium, augmented injection method is taken out in the increasing of wellhole
CN104533346A (en) * 2014-12-22 2015-04-22 核工业北京化工冶金研究院 Method for preparing hole flushing agent through citric acid in in-situ leaching uranium mining process
CN109913670A (en) * 2019-03-05 2019-06-21 核工业北京化工冶金研究院 A kind of method of in-situ acid uranium leaching prevention ore bed electroless Ni-P-C-O plating
CN109989727A (en) * 2017-12-29 2019-07-09 新疆中核天山铀业有限公司 A kind of ground-dipping uranium extraction drilling de-plugging anatonosis technique

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060124302A1 (en) * 2004-12-15 2006-06-15 Bj Services Company Well treating compositions for slow release of treatment agents and methods of using the same
CN106507863B (en) * 2009-11-27 2013-05-29 核工业北京化工冶金研究院 In in-situ leaching uranium, augmented injection method is taken out in the increasing of wellhole
CN102720467A (en) * 2012-05-18 2012-10-10 核工业北京化工冶金研究院 Residual acid flowback method after acid method hole-flushing in-situ leach of uranium
CN104533346A (en) * 2014-12-22 2015-04-22 核工业北京化工冶金研究院 Method for preparing hole flushing agent through citric acid in in-situ leaching uranium mining process
CN109989727A (en) * 2017-12-29 2019-07-09 新疆中核天山铀业有限公司 A kind of ground-dipping uranium extraction drilling de-plugging anatonosis technique
CN109913670A (en) * 2019-03-05 2019-06-21 核工业北京化工冶金研究院 A kind of method of in-situ acid uranium leaching prevention ore bed electroless Ni-P-C-O plating

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943126A (en) * 2021-03-17 2021-06-11 南华大学 Auxiliary discharge device for washing waste liquid of in-situ leaching uranium mine based on liquid level pressurization
CN112943126B (en) * 2021-03-17 2022-06-07 南华大学 Auxiliary discharge device for washing waste liquid of in-situ leaching uranium mine based on liquid level pressurization
CN114737900A (en) * 2021-12-27 2022-07-12 核工业北京化工冶金研究院 Static rotational flow well washing device and method for cleaning ground immersed borehole
CN117188999A (en) * 2023-11-07 2023-12-08 核工业北京化工冶金研究院 Efficient well flushing method for U-shaped well for in-situ leaching uranium mining
CN117188999B (en) * 2023-11-07 2024-02-09 核工业北京化工冶金研究院 Efficient well flushing method for U-shaped well for in-situ leaching uranium mining

Also Published As

Publication number Publication date
CN111520107B (en) 2022-08-19

Similar Documents

Publication Publication Date Title
CN111520107B (en) Well flushing process for in-situ leaching uranium mining production well
CN102828734B (en) Offshore oilfield water injection well online one-step-process acidification technology
CN106014330B (en) A method of improving leakage casing damaged well chemical plugging success rate
CN109337660B (en) Low-pressure carbonate reservoir gas well temporary plugging workover fluid and preparation and application methods thereof
US11174425B2 (en) Carbonate reservoir filtration-loss self-reducing acid
CN108865092B (en) Slow-release chelating acid for water injection well plugging removal and injection increase, preparation method and plugging removal and injection increase method
CN111878039A (en) Well washing method for in-situ leaching uranium mining
CN108559480B (en) Chelating agent for acidizing and injection-increasing construction of reservoir stratum and preparation method and application thereof
US20190276730A1 (en) On-Line Diverting Acid For Continuous Injection Into Water Injection Wells And A Preparation Method Thereof
CN108865093B (en) Infiltration-increasing blockage removing fluid for uranium mine and using method and application thereof
CN109989727A (en) A kind of ground-dipping uranium extraction drilling de-plugging anatonosis technique
CN111058824A (en) Temporary plugging and shunting acidification method for strong heterogeneous sandstone reservoir through sieve tube
CN113356826B (en) Moderate sand adding and pressure increasing acid fracturing method for improving fracture-cavity reservoir transformation effect
CN112796728A (en) Acid fracturing method for improving water yield of limestone reservoir geothermal well
CN111379541A (en) Acid method underground leaching mountain land layer blockage removing method
CN112324413B (en) Chemical construction method for improving injection amount of injection well
CN114991738B (en) Sandstone reservoir composite reconstruction method
CN107893645A (en) A kind of chemical plugging removal method
CN110272725B (en) Acid-soluble plugging agent for staged fracturing of sidetracking slim hole and preparation method thereof
CN109958406B (en) Acidizing and hole-washing method for in-situ leaching uranium mining
CN117778770A (en) Mineral seam dredging method in-situ leaching uranium mining process
CN113122221A (en) Acid liquor system for online acidification of water injection well for oil exploitation and preparation process thereof
CN114854384A (en) Blocking remover system and blocking removing method
CN110938418B (en) Deep well foam oil increasing agent and preparation method thereof
CN110714131B (en) Air pre-oxidation method for in-situ leaching uranium mining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant