CN111519491A - Construction method of sand-containing fog seal in highway maintenance - Google Patents

Construction method of sand-containing fog seal in highway maintenance Download PDF

Info

Publication number
CN111519491A
CN111519491A CN202010339530.4A CN202010339530A CN111519491A CN 111519491 A CN111519491 A CN 111519491A CN 202010339530 A CN202010339530 A CN 202010339530A CN 111519491 A CN111519491 A CN 111519491A
Authority
CN
China
Prior art keywords
crack
road surface
construction
sand
spraying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010339530.4A
Other languages
Chinese (zh)
Inventor
吴岳明
刘德朋
高稳成
张毅
孙义林
于庆民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Gaosu Load And Bridge Maintenance Co ltd
Original Assignee
Shandong Gaosu Load And Bridge Maintenance Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Gaosu Load And Bridge Maintenance Co ltd filed Critical Shandong Gaosu Load And Bridge Maintenance Co ltd
Priority to CN202010339530.4A priority Critical patent/CN111519491A/en
Publication of CN111519491A publication Critical patent/CN111519491A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/35Toppings or surface dressings; Methods of mixing, impregnating, or spreading them
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/35Toppings or surface dressings; Methods of mixing, impregnating, or spreading them
    • E01C7/356Toppings or surface dressings; Methods of mixing, impregnating, or spreading them with exclusively synthetic resin as a binder; Aggregate, fillers or other additives for application on or in the surface of toppings having exclusively synthetic resin as binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)

Abstract

The invention relates to the technical field of highway maintenance, and particularly discloses a construction method of a sand-containing fog seal in highway maintenance, which comprises the following steps: s1, entering a road section to be maintained, and shunting again on the lane in the road section to be maintained; s2, testing the road surface of the road section to be maintained; s3, cleaning the road surface; s4, protecting traffic facilities; s5, treating road surface diseases; s6, spraying a sand-containing fog seal layer; s7: secondary sealing; s8, repairing: repairing and sealing the road surface which is not sprayed by the equipment; s9, cleaning construction sundries and removing the yard; and S10, opening traffic. The invention has the beneficial effects that: before pavement repair, various coefficients of the pavement are measured, the component ratio of the spraying materials is determined according to the measurement data, the mixed coating is sprayed, the number of sprayed layers is also determined according to the measurement structure, and before spraying, the diseases of the pavement are treated first and then sealed, so that the uniformity and the stability of the sealed layer are improved.

Description

Construction method of sand-containing fog seal in highway maintenance
Technical Field
The invention relates to the technical field of highway maintenance, in particular to a construction method of a sand-containing fog seal layer in highway maintenance.
Background
As society develops, roads become arteries connecting cities. And a place or a city needs to be developed, and firstly, the road construction needs to be synchronous with the city development. After the road is used for a period of time, due to the fact that traffic flow is large, heavy trucks roll, the road surface can be damaged in different degrees, maintenance needs to be conducted on the road surface, when cracks, pits and the like appear on the road surface, large-scale repair is conducted in the traditional method, the cost is high, construction time is short, and urban development and traffic are not facilitated.
In the prior art relating to sand-containing fog sealing layer, for example, chinese published patent (application number: ZL 201711203757.0, patent name: low-adhesion asphalt pavement for automobile test and laying method thereof), includes the following steps: s1, closing traffic on the construction road section; s2, before the original pavement is cleaned, the original asphalt pavement is cleaned by a blower mechanism until no obvious sundries and dust exist; s3, spreading the bonding layer, spraying a bonding material on the pavement by using a spreader to form the bonding layer, forbidding rain after construction is finished, and airing for more than 3 hours until the pavement is completely dry; wherein the amount of the material is 0.1-0.3 kg/m2(ii) a S4, spreading the modified emulsified asphalt and fine aggregate mixed layer, mixing and stirring the modified emulsified asphalt material and 80-100 meshes of quartz sand, spraying the mixture onto the road surface by using a spreader, uniformly scraping the mixture to form the modified emulsified asphalt and fine aggregate mixed layer, after the construction is finished, prohibiting rain, and airing for more than 3 hours until the road surface is completely dry; wherein the amount of the material is 2.0-3.0 kg/m2(ii) a S5, spreading a sand-containing fog seal: mixing and stirring the fog sealing material and 80-100 meshes of quartz sand, spraying the mixture onto a road surface by using a spreader to form a sand-containing fog sealing layer, forbidding rain within 24 hours after construction is finished, and carrying out closed maintenance for more than 3 days to obtain the low-attachment asphalt road surface; wherein the amount of the material is 0.5-1.0 kg/m2(ii) a S6, performance test: and (5) inspecting the road surface adhesion coefficient, and transferring for use after the inspection is qualified.
In the technical scheme, only simple sand-containing fog sealing treatment is carried out on the paved road surface, spraying materials with different proportions are not adopted for spraying according to different road surface conditions, the number of sprayed layers is not determined according to the road surface conditions, and the method cannot completely solve the problem of complex road surfaces for the treatment of high-requirement road surfaces.
Therefore, it is necessary to provide a new road surface repairing method to solve the above technical problems.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a construction method of a sand-containing fog seal in highway maintenance, which comprises the steps of firstly measuring various coefficients of a pavement before repairing the pavement, determining the component ratio of a spraying material according to the measurement data, mixing the spraying material into a coating for spraying, determining the number of sprayed layers according to the measurement structure, and treating various diseases on the pavement before spraying and then sealing the coating, so that the uniformity and the stability of the seal are improved.
The above object of the present invention is achieved by the following technical solutions:
a construction method of a sand-containing fog seal in highway maintenance comprises the following steps:
s1, entering a road section to be maintained, and shunting again on the lane in the road section to be maintained;
s2, testing the road surface water seepage coefficient, the friction coefficient and the construction depth of the road section to be maintained, determining the precise proportion of the raw materials of the sand-containing fog sealing layer according to the tested water seepage coefficient, the tested friction coefficient and the construction depth, and preparing spraying liquid according to the proportion;
s3, road surface cleaning: cleaning particles and soil on the road surface through a blowing instrument, spraying a mixed solution of water and a cleaning agent by using a high-pressure water gun for a road section which is difficult to clean, and waiting for the water on the road surface to be completely evaporated after cleaning;
s4, traffic facility protection: covering the marked line by using a plastic adhesive tape or a rubber sheet for protection;
s5, treating road surface diseases: aiming at different types of pavement diseases, different means are adopted for repairing;
s6, spraying a sand-containing fog seal layer: adding fine sand into the spraying liquid prepared in the step S2, uniformly stirring, and spraying a layer of sealing layer by a high-pressure spraying vehicle, wherein the environmental temperature is not lower than 10 degrees;
s7, after the sealing layer is completely penetrated and dried in the step S6, testing the water seepage coefficient, the friction coefficient and the construction depth of the road surface again, and determining whether to spray a second sealing layer according to the test result;
s8, repairing: repairing and sealing the road surface which is not sprayed by the equipment;
s9, cleaning construction sundries and removing the yard;
and S10, opening traffic.
By adopting the technical scheme: before the spraying of the sand-containing fog layer is carried out, various diseases on the road surface are firstly treated, so that the disease positions are flush with the original road surface, the smoothness and stability of a subsequently coated coating layer are ensured, then the weight ratio of components in the coating is determined according to the road condition test coefficient to mix the coating, and the sprayed layer number is also determined according to the test result.
The present invention in a preferred example may be further configured to: the volume part mixture range of the raw materials of the spraying liquid in the step S2 is as follows:
MasterSeal concentrated sealing fabric 100L
20-25L of water
2-4L of TopTuff polymer additive;
according to the volume ratio of the raw materials of the spraying liquid, the adding amount of the fine sand in the step S6 is 30-55 kg.
By adopting the technical scheme: effectively improves the wear resistance and the water resistance of the road surface. The proportion of the materials is determined by tested road surface coefficients.
The present invention in a preferred example may be further configured to: the road surface disease type and the processing method in the step S5 are as follows:
a. when the width of the pavement crack is larger than 12mm, performing crack pouring by using hot patching sealant, cleaning the crack during crack pouring, and controlling the construction environment temperature to be more than 5 ℃;
b. when the width of a pavement crack is less than or equal to 12mm, a crack expanding machine is adopted for expanding the crack, the width after crack expansion is 12-15mm, then the crack is cleaned up, cold-patch crack pouring materials are adopted for pouring the crack, and the construction temperature is above 10 ℃;
c. adopting a crack repairing material to scrape and coat and strickly even the crack and the net crack road surface;
d. treating loose rough surface, and carrying out blade coating by using LiquidRoad;
e. pit and groove treatment, namely treating by adopting a pavement damage repairing material, and filling the pavement to be level;
by adopting the technical scheme: different treatment modes are adopted for various different pavement diseases, the pavement diseases are eliminated, the original pavement is basically level, and the flatness and the integrity of the coating are improved.
The present invention in a preferred example may be further configured to: when the crack and the net crack are treated, dust, scraps and intra-crack plants in the cracks of the road surface are cleaned and dried before construction, proper amount of 10-20 meshes of basalt is sprayed in a construction area, the cracks are filled up by using a scraper blade or a broom, the redundant basalt in the construction area is cleaned after the cracks are filled up, the crack repairing material is poured into the construction area, the repairing material is repeatedly scraped by using the scraper blade with rubber at the bottom, the dosage is based on the condition that the surface of the crack repairing agent is completely covered after the crack repairing material is scraped, the drying is carried out for 30-60 minutes, and the construction temperature is above 10 ℃.
By adopting the technical scheme: the method eliminates crack and network crack of the road surface, enables the disease to be basically level with the original road surface, and improves the flatness and integrity of the coating.
The present invention in a preferred example may be further configured to: when loose rough road surfaces are treated, the LiquidRoad is subjected to blade coating once or twice by using a glue scraping brush or a long hair brush, the road surfaces are clean and have no impurities during treatment, and the construction temperature is above 10 ℃.
By adopting the technical scheme: the method eliminates crack and network crack of the road surface, enables the disease to be basically level with the original road surface, and improves the flatness and integrity of the coating.
The present invention in a preferred example may be further configured to: when the pit slot on the road surface is treated, the pavement damage repairing material is filled into the pit slot, the pick, the leather hammer and the brush are used for tamping, the pit slot is clean, free of impurities and loose during construction, and the construction temperature is above 10 ℃.
By adopting the technical scheme: the pavement pit is filled with the filler and then tamped to be flush with the original pavement.
The present invention in a preferred example may be further configured to: the central line of the opening seam of the oil nozzle opening of the high-pressure spraying vehicle forms an included angle of 10-45 degrees with the axial direction of the oil spraying pipe.
By adopting the technical scheme: avoid the angle too big, cause the increase of injection lift, fan-shaped oil spout fog flies upward, causes the coating inhomogeneous.
The present invention in a preferred example may be further configured to: the height of the oil nozzle from the ground is 350-450mm and is fixed; the distance between the adjacent oil nozzles is 200-400mm, the spraying widths of the oil nozzles are overlapped with each other, and the oil nozzles receive the material layers sprayed by two or three oil nozzles at the same place.
By adopting the technical scheme: according to the tested road condition coefficient, the setting position of the oil nozzle and the spraying amount of the spraying material are determined, and the repairing time and the labor are saved.
In summary, the invention includes at least one of the following beneficial technical effects:
1. before pavement repair, various coefficients of the pavement are measured, the component ratio of the spraying materials is determined according to the measurement data, the mixed coating is sprayed, the number of sprayed layers is also determined according to the measurement structure, various diseases of the pavement are treated before spraying, and then sealing treatment is carried out, so that the uniformity and the stability of the sealing layer are improved.
2. The antiskid performance of the road surface is improved, the water seepage coefficient of the road surface is reduced, and the service life of the road is prolonged.
Detailed Description
The present invention will be described in further detail below.
Example one
The construction method of the sand-containing fog seal in the highway maintenance provided by the embodiment comprises the following steps:
and S1, entering the road section to be maintained, re-shunting lanes on the road section to be maintained, and controlling road traffic in a completely closed mode or a mode of reserving a flow guide lane according to the road condition so as to prevent vehicles from entering the repair road section under the condition that the coating or the coating is not dry.
S2, testing the road surface water seepage coefficient, the friction coefficient and the construction depth of the road section to be maintained, determining the precise proportion of the raw materials of the sand-containing fog sealing layer according to the tested water seepage coefficient, the tested friction coefficient and the construction depth, and preparing spraying liquid according to the proportion; the method comprises the following specific steps: the volume part mixture range of the raw materials of the spraying liquid is as follows:
MasterSeal concentrated sealing fabric 100L
25L of water
Toptiff polymer additive 4L;
according to the volume ratio of the raw materials of the spraying liquid, the adding amount of the fine sand in the step S6 is 50 kg. The details are as follows
Figure DEST_PATH_IMAGE001
Effectively improves the wear resistance and the water resistance of the road surface. The proportion of the materials is determined by tested road surface coefficients.
S3, road surface cleaning: cleaning particles and soil on the road surface through a blowing instrument, spraying a mixed liquid of water and a cleaning agent by using a high-pressure water gun for the road section which is difficult to clean, waiting for the complete evaporation of the moisture on the road surface after cleaning, and avoiding the influence on the coating effect due to the dilution of a coating liquid caused by the moisture;
s4, traffic facility protection: covering the marked line by using a plastic adhesive tape or a rubber sheet for protection, and removing the protective layer when the coating is finished;
s5, treating road surface diseases: different means are adopted for repairing different types of pavement diseases, and the pavement diseases are treated and refined, so that the service life of the highway can be greatly prolonged;
the specific pavement disease types and treatment methods are as follows:
a. when the width of the pavement crack is larger than 12mm, performing crack pouring by using hot patching sealant, cleaning the crack during crack pouring, and controlling the construction environment temperature to be more than 5 ℃;
b. when the width of a pavement crack is less than or equal to 12mm, a crack expanding machine is adopted for expanding the crack, the width after crack expansion is 12-15mm, then the crack is cleaned up, cold-patch crack pouring materials are adopted for pouring the crack, and the construction temperature is above 10 ℃;
c. adopting a crack repairing material to scrape and coat and strickly even the crack and the net crack road surface; when the crack and the net crack are treated, dust, scraps and intra-crack plants in the cracks of the road surface are cleaned and dried before construction, proper amount of 10-20 meshes of basalt is sprayed in a construction area, the cracks are filled up by using a scraper blade or a broom, the redundant basalt in the construction area is cleaned after the cracks are filled up, the crack repairing material is poured into the construction area, the repairing material is repeatedly scraped by using the scraper blade with rubber at the bottom, the dosage is based on the condition that the surface of the crack repairing agent is completely covered after the crack repairing material is scraped, the drying is carried out for 30-60 minutes, and the construction temperature is above 10 ℃.
The method eliminates crack and network crack of the road surface, enables the disease to be basically level with the original road surface, and improves the flatness and integrity of the coating.
d. Treating loose rough surface, and carrying out blade coating by using LiquidRoad; when loose rough road surfaces are treated, the LiquidRoad is subjected to blade coating once or twice by using a glue scraping brush or a long hair brush, the road surfaces are clean and have no impurities during treatment, and the construction temperature is above 10 ℃. The method eliminates crack and network crack of the road surface, enables the disease to be basically level with the original road surface, and improves the flatness and integrity of the coating.
e. Pit and groove treatment, namely treating by adopting a pavement damage repairing material, and filling the pavement to be level;
when the pit slot on the road surface is treated, the pavement damage repairing material is filled into the pit slot, the pick, the leather hammer and the brush are used for tamping, the pit slot is clean, free of impurities and loose during construction, and the construction temperature is above 10 ℃. The pavement pit is filled with the filler and then tamped to be flush with the original pavement.
S6, spraying a sand-containing fog seal layer: adding fine sand into the spraying liquid prepared in the step S2, uniformly stirring, and spraying a layer of sealing layer by a high-pressure spraying vehicle, wherein the environmental temperature is not lower than 10 degrees;
s7, after the sealing layer is completely penetrated and dried in the step S6, testing the water seepage coefficient, the friction coefficient and the construction depth of the road surface again, and determining whether to spray a second sealing layer according to the test result;
s8, repairing: repairing and sealing the road surface which is not sprayed by the equipment by adopting manual coating or small-sized hand-pushed equipment;
s9, cleaning construction sundries and removing the yard;
s10, opening traffic: after the construction is finished, the material can be opened for traffic within 2 hours under the condition of drying and solidifying at 25 ℃; when the air temperature does not meet the requirements, the delay is properly carried out until the coating material is determined to be dried and then the traffic time is opened.
Before the spraying of the sand-containing fog layer, the treatment method firstly treats various diseases on the road surface to enable the disease positions to be flush with the original road surface so as to ensure that the subsequently coated coating layer is smooth and stable, secondly determines the weight ratio of the components in the coating according to the test coefficient of the road condition so as to mix the coating, and also determines the sprayed layer number according to the test result.
In this embodiment, an included angle of 30 ° is formed between the central line of the opening seam of the nozzle opening of the high-pressure spraying vehicle and the axial direction of the oil spray pipe. Avoid the angle too big, cause the increase of injection lift, fan-shaped oil spout fog flies upward, causes the coating inhomogeneous.
In this embodiment, the height of the oil nozzle from the ground is 400mm and is fixed; the distance between adjacent oil nozzles is 300mm, the spraying widths of the oil nozzles are overlapped with each other, and the oil nozzles receive the material layers sprayed by two or three oil nozzles at the same place.
According to the tested road condition coefficient, the setting position of the oil nozzle and the spraying amount of the spraying material are determined, and the repairing time and the labor are saved.
Example two
The construction method of the fine anti-sliding seal layer of the embodiment is different from the construction method of the embodiment I in that;
s2, testing the road surface water seepage coefficient, the friction coefficient and the construction depth of the road section to be maintained, determining the precise proportion of the raw materials of the sand-containing fog sealing layer according to the tested water seepage coefficient, the tested friction coefficient and the construction depth, and preparing spraying liquid according to the proportion; the method comprises the following specific steps: the volume part mixture range of the raw materials of the spraying liquid is as follows:
MasterSeal concentrated sealing fabric 100L
25L of water
Toptiff polymer additive 4L;
according to the volume ratio of the raw materials of the spraying liquid, the adding amount of the fine sand in the step S6 is 50 kg. The details are as follows
Figure 580297DEST_PATH_IMAGE002
Through the test comparison of the road surface conditions before and after the repair, the method greatly improves various performances of the road surface.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. A construction method of a sand-containing fog seal in highway maintenance is characterized by comprising the following steps:
s1, entering a road section to be maintained, and shunting again on the lane in the road section to be maintained;
s2, testing the road surface water seepage coefficient, the friction coefficient and the construction depth of the road section to be maintained, determining the precise proportion of the raw materials of the sand-containing fog sealing layer according to the tested water seepage coefficient, the tested friction coefficient and the construction depth, and preparing spraying liquid according to the proportion;
s3, road surface cleaning: cleaning particles and soil on the road surface through a blowing instrument, spraying a mixed solution of water and a cleaning agent by using a high-pressure water gun for a road section which is difficult to clean, and waiting for the water on the road surface to be completely evaporated after cleaning;
s4, traffic facility protection: covering the marked line by using a plastic adhesive tape or a rubber sheet for protection;
s5, treating road surface diseases: aiming at different types of pavement diseases, different means are adopted for repairing;
s6, spraying a sand-containing fog seal layer: adding fine sand into the spraying liquid prepared in the step S2, uniformly stirring, and spraying a layer of sealing layer by a high-pressure spraying vehicle, wherein the environmental temperature is not lower than 10 degrees;
s7, after the sealing layer is completely penetrated and dried in the step S6, testing the water seepage coefficient, the friction coefficient and the construction depth of the road surface again, and determining whether to spray a second sealing layer according to the test result;
s8, repairing: repairing and sealing the road surface which is not sprayed by the equipment;
s9, cleaning construction sundries and removing the yard;
and S10, opening traffic.
2. The construction method of the sand-containing fog seal in highway maintenance according to claim 1, wherein the spraying liquid in step S2 comprises the following raw materials by volume:
MasterSeal concentrated sealing fabric 100L
20-25L of water
2-4L of TopTuff polymer additive;
according to the volume ratio of the raw materials of the spraying liquid, the adding amount of the fine sand in the step S6 is 30-55 kg.
3. The construction method of sand-containing fog seal in highway maintenance according to claim 1, wherein the type and treatment method of the road surface defect in step S5 are as follows:
a. when the width of the pavement crack is larger than 12mm, performing crack pouring by using hot patching sealant, cleaning the crack during crack pouring, and controlling the construction environment temperature to be more than 5 ℃;
b. when the width of a pavement crack is less than or equal to 12mm, a crack expanding machine is adopted for expanding the crack, the width after crack expansion is 12-15mm, then the crack is cleaned up, cold-patch crack pouring materials are adopted for pouring the crack, and the construction temperature is above 10 ℃;
c. adopting a crack repairing material to scrape and coat and strickly even the crack and the net crack road surface;
d. treating loose rough surface, and carrying out blade coating by using LiquidRoad;
e. and (4) pit treatment, namely treating by adopting a pavement damage repairing material, and filling the pavement into a level position.
4. The method of claim 3, wherein during the treatment of cracked and network-cracked road surface, dust, debris and intra-crack plants in the cracks of the road surface are cleaned and dried before the construction, 10-20 mesh basalt is sprayed in the construction area, the cracks are filled up with a scraper or a broom, the excess basalt in the construction area is cleaned up after the cracks are filled up, the crack repairing material is poured into the construction area, the repairing material is repeatedly scraped with a scraper with rubber at the bottom, the amount of the repairing material is determined by completely covering the surface of the crack repairing agent after the crack repairing material is scraped, the time is 30-60 minutes after the crack repairing agent is dried, and the construction temperature is above 10 ℃.
5. The method of claim 3, wherein the Liquidroad is coated with glue or brush hair for one or two times during the treatment of loose rough road surface, the road surface is clean and free of impurities during the treatment, and the construction temperature is above 10 ℃.
6. The construction method of the sand-containing fog seal in the road maintenance according to claim 3, characterized in that when the pavement pit is treated, the pavement damage repair material is filled into the pit, and is tamped down by using a pick, a leather hammer and a brush, the pit is clean, free of impurities and loose during construction, and the construction temperature is above 10 ℃.
7. The method of claim 1, wherein an angle of 10-45 ° is formed between a central line of an opening of an oil nozzle of the high pressure spray truck and an axial direction of an oil spray pipe.
8. The construction method of the fine anti-sliding seal layer according to claim 3, wherein the height of the oil nozzle from the ground is 350-450mm and fixed; the distance between the adjacent oil nozzles is 200-400mm, the spraying widths of the oil nozzles are overlapped with each other, and the oil nozzles receive the material layers sprayed by two or three oil nozzles at the same place.
CN202010339530.4A 2020-04-26 2020-04-26 Construction method of sand-containing fog seal in highway maintenance Pending CN111519491A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010339530.4A CN111519491A (en) 2020-04-26 2020-04-26 Construction method of sand-containing fog seal in highway maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010339530.4A CN111519491A (en) 2020-04-26 2020-04-26 Construction method of sand-containing fog seal in highway maintenance

Publications (1)

Publication Number Publication Date
CN111519491A true CN111519491A (en) 2020-08-11

Family

ID=71910619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010339530.4A Pending CN111519491A (en) 2020-04-26 2020-04-26 Construction method of sand-containing fog seal in highway maintenance

Country Status (1)

Country Link
CN (1) CN111519491A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095393A (en) * 2020-09-18 2020-12-18 泸州智同重交沥青砼有限公司 Construction process for road surface beyond surface

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997021769A2 (en) * 1995-12-12 1997-06-19 Rubber Resources, L.L.C. Rubber based asphalt emulsion additive
US20050265784A1 (en) * 2004-05-07 2005-12-01 Rashed Radi A Low-viscosity, silicone-modified penetrating asphalt sealer to eliminate water associated problems in asphalt pavements
CN103526666A (en) * 2013-10-30 2014-01-22 南京道润交通科技有限公司 Emulsified asphalt composition spraying method and equipment
CN108221540A (en) * 2018-02-27 2018-06-29 广东华起建设工程有限公司 A kind of extremely thin type asphalt wearing layer structure and its construction method
CN108914753A (en) * 2018-07-26 2018-11-30 江苏增光复合材料科技有限公司 A kind of airport asphalt concrete pavement preventive maintenance method
CN108914748A (en) * 2018-07-26 2018-11-30 江苏增光复合材料科技有限公司 A kind of road surface construction grout sealing technique

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997021769A2 (en) * 1995-12-12 1997-06-19 Rubber Resources, L.L.C. Rubber based asphalt emulsion additive
US20050265784A1 (en) * 2004-05-07 2005-12-01 Rashed Radi A Low-viscosity, silicone-modified penetrating asphalt sealer to eliminate water associated problems in asphalt pavements
CN103526666A (en) * 2013-10-30 2014-01-22 南京道润交通科技有限公司 Emulsified asphalt composition spraying method and equipment
CN108221540A (en) * 2018-02-27 2018-06-29 广东华起建设工程有限公司 A kind of extremely thin type asphalt wearing layer structure and its construction method
CN108914753A (en) * 2018-07-26 2018-11-30 江苏增光复合材料科技有限公司 A kind of airport asphalt concrete pavement preventive maintenance method
CN108914748A (en) * 2018-07-26 2018-11-30 江苏增光复合材料科技有限公司 A kind of road surface construction grout sealing technique

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095393A (en) * 2020-09-18 2020-12-18 泸州智同重交沥青砼有限公司 Construction process for road surface beyond surface

Similar Documents

Publication Publication Date Title
RU2386742C2 (en) Method for reconstruction of road with asphalt-concrete coating
CN105386382B (en) A kind of construction of semi-rigid asphalt pavement fiber reinforcement Sub-sealing Course
CN111809474A (en) Garden road color asphalt pervious concrete construction method
CN103469712A (en) Method for paving anti-rut anti-skid pavement coating
CN109082969A (en) A kind of construction technology of the anticoagulant ice thin overlay of snow melt
CN109083024A (en) A kind of construction technology of the modification coating for highway bridge floor
CN111519491A (en) Construction method of sand-containing fog seal in highway maintenance
CN107386111B (en) Composite high-modulus asphalt concrete bridge deck structure and setting method
CA2011725A1 (en) Method and composition for chip sealing a roadway
CN107905096A (en) A kind of road/wearing floor construction method
Wood et al. Rebirth of chip sealing in Minnesota
CN103233405A (en) Old-new bituminous pavement binder course and application thereof
US20100179251A1 (en) Polymer emulsion for pavement sealing
CN107386040B (en) A kind of cationic high molecular polymer pitch airfield pavement sealing maintenance process
CN113417182A (en) Asphalt pavement paving method capable of reducing air bubbles for highway engineering
US2101388A (en) Process of constructing pavements
CN111411557A (en) Epoxy anti-skid abrasive material and construction method thereof
CN109868699A (en) Road noise reduction antiskid process of surface treatment
Pundhir Construction of rural road with cationic bitumen emulsion based cold mix technology
CN116136071A (en) Asphalt double-surface construction process
CN115162090A (en) Compaction method for asphalt pavement
CN208455479U (en) Compound high-modulus asphalt concrete bridge deck structure
CN111519490A (en) Construction method of fine anti-sliding seal layer
CN117005261A (en) Reconstruction construction method based on novel fiber seal road
Li Discussion and Attempt on Construction Technology of Asphalt Road Pavement in Expressway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200811