CN111517621B - Construction method for constructing crown of oxy-fuel glass melting furnace - Google Patents
Construction method for constructing crown of oxy-fuel glass melting furnace Download PDFInfo
- Publication number
- CN111517621B CN111517621B CN202010419747.6A CN202010419747A CN111517621B CN 111517621 B CN111517621 B CN 111517621B CN 202010419747 A CN202010419747 A CN 202010419747A CN 111517621 B CN111517621 B CN 111517621B
- Authority
- CN
- China
- Prior art keywords
- arch
- steel
- brick
- tire
- bricks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000002844 melting Methods 0.000 title claims abstract description 64
- 230000008018 melting Effects 0.000 title claims abstract description 64
- 238000010276 construction Methods 0.000 title claims abstract description 54
- 239000011521 glass Substances 0.000 title claims abstract description 27
- 239000000446 fuel Substances 0.000 title claims abstract description 12
- 239000011449 brick Substances 0.000 claims abstract description 210
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 200
- 239000010959 steel Substances 0.000 claims abstract description 200
- 239000002893 slag Substances 0.000 claims abstract description 40
- 239000012528 membrane Substances 0.000 claims abstract description 24
- 239000001301 oxygen Substances 0.000 claims abstract description 13
- 229910052760 oxygen Inorganic materials 0.000 claims abstract description 13
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims abstract description 12
- 230000007246 mechanism Effects 0.000 claims description 36
- 238000009434 installation Methods 0.000 claims description 32
- 238000000034 method Methods 0.000 claims description 16
- 239000002023 wood Substances 0.000 claims description 12
- 230000008569 process Effects 0.000 claims description 9
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 210000000481 breast Anatomy 0.000 claims description 6
- 239000002390 adhesive tape Substances 0.000 claims description 3
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 239000000919 ceramic Substances 0.000 claims description 3
- 238000004140 cleaning Methods 0.000 claims description 3
- 239000000835 fiber Substances 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 239000000779 smoke Substances 0.000 claims description 3
- 238000001514 detection method Methods 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 229910052593 corundum Inorganic materials 0.000 description 2
- 239000010431 corundum Substances 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B5/00—Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
- C03B5/16—Special features of the melting process; Auxiliary means specially adapted for glass-melting furnaces
- C03B5/42—Details of construction of furnace walls, e.g. to prevent corrosion; Use of materials for furnace walls
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B5/00—Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
- C03B5/16—Special features of the melting process; Auxiliary means specially adapted for glass-melting furnaces
- C03B5/42—Details of construction of furnace walls, e.g. to prevent corrosion; Use of materials for furnace walls
- C03B5/425—Preventing corrosion or erosion
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P40/00—Technologies relating to the processing of minerals
- Y02P40/50—Glass production, e.g. reusing waste heat during processing or shaping
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
A construction method for constructing a main arch of a total oxygen glass melting furnace, which relates to the technical field of glass melting furnace construction, comprises the following steps: s1, checking and accepting arch slag beams, installing and paying off, S2, assembling and erecting a support frame, S3, assembling a steel membrane arch tire, S4, hoisting the steel mould arch tire in place, S5, installing and adjusting the arch slag bricks, S6, installing and adjusting the arch bricks, S7, tightening an arch, removing the steel mould arch tire, S8, moving the steel mould arch tire and the support frame, and S9, removing the steel mould arch tire and the support frame. The main crown masonry construction method improves the construction quality and the construction efficiency of the main crown of the oxy-fuel furnace and ensures the normal operation of the main crown of the oxy-fuel furnace.
Description
Technical Field
The invention relates to the technical field of glass melting furnace masonry, in particular to a construction method for masonry of a main crown of a full-oxygen glass melting furnace.
Background
The main arch of the melting furnace of the total oxygen kiln is a key part with the highest technical content and technical requirement of a glass production line of the total oxygen kiln, the main arch is composed of a plurality of sections of independent arches, arch bricks are made of electro-fused corundum bricks and electro-fused bricks, the size of the bricks is large, the weight of each brick is heavy, the weight of each brick reaches 400kg, the construction of the next ring can be carried out after the single-ring construction is finished until the construction of the whole main arch is finished, so that the construction quality of each ring directly influences the construction progress of the subsequent ring construction, and the construction quality of the main arch has great influence on the normal operation and the product quality of the production line;
the Chinese invention patent with the publication number of CN103466917A discloses a construction method of an electric melting AZS or an electric melting corundum brick arch of a full oxygen glass melting furnace, which more generally introduces the arch center as an integrated structure, and builds the arch brick process by moving a steel frame and the arch center one by one, but does not introduce the arch center brick installation and arch tightening process, and also lacks necessary building construction parameters and inspection standards, so that a plurality of irregular construction problems can occur, more importantly, in the current construction process, because the integrated arch center has larger span, the transportation and the hoisting are difficult, the construction efficiency is influenced, and the arch center structure is rarely used; in view of the importance and the particularity of the main arch of the total oxygen kiln, the traditional rough and outdated construction method can not meet the requirements of customers, and a brand-new construction technology is formed according to the accumulation of the masonry construction experience of a plurality of main arches of the total oxygen kiln in order to keep the leading position in the glass installation industry and obtain better economic benefit.
Disclosure of Invention
In order to overcome the defects in the background art, the invention discloses a crown masonry construction method of an oxy-fuel glass melting furnace, which improves the construction quality and the construction efficiency of a crown of the oxy-fuel glass melting furnace and ensures the normal operation of the crown of the melting furnace.
In order to achieve the purpose, the invention adopts the following technical scheme:
a construction method for constructing a main arch of a total oxygen glass melting furnace specifically comprises the following steps:
s1, checking and accepting arch ballast beams, installing and paying off: checking and accepting the steel structure of the arch ballast beam before construction, and ensuring that the span, the central line and the arch foot angle of the arch ballast beam meet the design requirements; wherein the span deviation of the arch ballast beams is less than or equal to +/-2 mm, the central line deviation is less than or equal to +/-3 mm, the angle deviation is less than or equal to +/-1 degree, and the slab staggering of two adjacent arch ballast beams is less than or equal to 1 mm; taking the longitudinal center of the melting furnace determined according to the design of the glass melting furnace as a reference, and releasing the longitudinal center line and the transverse center line of the main crown of the melting furnace on the bottom brick of the furnace tank by using a theodolite, wherein the transverse center line generally corresponds to the axis position of a smoke outlet of the melting furnace; determining the positioning center line of the steel membrane arch tire by taking the longitudinal center line and the transverse center line of the melting furnace as references, and determining the positioning center line of each ring arch brick by using a steel disc ruler;
s2, assembling and erecting a support frame: erecting a support frame of the steel mould arch tyre by using scaffold tubes, wherein the width of the support frame is the width of the steel mould arch tyre plus the widths of operating platforms at two sides, and the width of the operating platform is generally 1.8-2 m; a plurality of groups of moving wheels are additionally arranged at the bottom of the support frame according to the span of the main arch, and a guide rail along the longitudinal direction of the main arch of the melting furnace is laid below the moving wheels for supporting and moving; the supporting frame comprises a plurality of vertical steel pipes, a height adjusting jackscrew is mounted at the top end of each vertical steel pipe, and the height of the height adjusting jackscrew is adjusted to keep the top surface of the supporting frame horizontal and flat;
s3, assembling the steel membrane arch tire: the steel mould arch tire is divided into two sections of steel moulds convenient to transport along the radial center line of the steel mould arch tire, and the two sections of steel moulds are detachably and fixedly connected through a bolt assembly; when the steel moulds are assembled and connected on site, firstly, a wood board or a brick is laid on the bottom of the steel film to ensure that the wood board or the brick is flat and consistent in elevation, bolts are penetrated in bolt holes corresponding to the two sections of steel moulds, then, the radian surfaces of the radii of the upper parts of the two sections of steel moulds are adjusted to be tight by the radian clamping plates, and then bolt assemblies are screwed down;
s4, hoisting the steel die arch tire in place: the connected steel membrane arch tire is hung on the support frame by using a truck crane, and the position, elevation and levelness of the top surface of the steel membrane arch tire are adjusted to meet the design requirements; the acceptance standard of the installation quality of the steel mould arch tire is as follows: the allowable deviation between the longitudinal central line of the steel die arch tire and the longitudinal central line of the melting furnace is +/-3.0 mm, the allowable deviation of the elevation is 0-5 mm, the arch height of the steel die arch tire is about 2mm higher than the design requirement, and the arch brick is prevented from sinking; after the adjustment is qualified, limiting and fixing the arch tire of the steel mould by using a steel pipe, and bundling the arch tire on the support frame by using an iron wire for fixing;
s5, installing and adjusting arch slag bricks: before building, the support frame is firstly cushioned, so that the movable wheels are not stressed; hoisting the skewer bricks in place according to the determined skewer brick center line, and checking and accepting the installation quality of the skewer bricks; placing ceramic fiber paper between arch slag bricks and arch slag beams, adjusting the centers of the bricks to be aligned, adjusting a backing plate under the arch slag bricks to enable the gap between the arch slag bricks and a breast wall to be 16-18 mm, adjusting a jackscrew mechanism on the arch slag beams to enable the inclined plane inclination angle of the arch slag bricks to reach a design angle, and after the arch slag bricks are adjusted to be qualified, using a wood wedge to pad the arch slag bricks on the breast wall, wherein at least two points are padded under each arch slag brick;
s6, installing and adjusting arch bricks: after the arch ballast bricks are installed, the arch bricks of the same ring are built; the first arch brick of each ring needs to be accurately positioned, and the side surface of each ring needs to be parallel to the transverse central line of the melting furnace and is vertical to the longitudinal central line; the masonry construction of the arch bricks is carried out according to the serial numbers of the arch bricks, and the arch bricks cannot be misplaced; after the arch brick is firmly fixed by a flexible hoisting belt, the arch brick is slowly hoisted on a steel mould arch tire by a truck crane; after the steel mould arch support is adjusted to be stable, the hoisting belt is removed, arch support wires on the steel mould arch support are adjusted, so that the contact between arch bricks is tight, and the installation quality of the arch bricks is checked; checking that the dislocation of the lower surface of the arch brick is less than 2mm, detecting the levelness of the top surface and the verticality of the side surface of the arch brick by using a horizontal ruler, wherein the deviation of the verticality and the levelness is less than 1mm, if the deviation exists, adjusting a top wire of the arch tire to ensure that the arch brick is correctly installed, and installing the next arch brick after the adjustment is qualified until the installation of one ring of arch bricks is completed;
s7, tightening and removing the steel die arch: a. after the installation of the ring brick is finished, the integral quality of the single-ring arch brick is checked, and the arch is tightened after the flatness and the brick joints of the integral ring brick are checked to meet the requirements; b. before the wire jacking mechanism and the brace mechanism are tightened, a scale is placed on the arch brick, and the elevation value of the arch brick is measured by a level gauge and recorded; c. before the wire-jacking mechanism and the brace mechanism are tightened, a backing plate under arch slag bricks is removed, and the inclined strut outside the upright post is cut; d. before the wire jacking mechanism is tightened, the brace mechanism is firstly tightened, and then the wire jacking mechanism is tightened; c. when the jack screw mechanism is tightened, two sides are alternately performed to prevent jack deviation; d. in the process of tightening the jackscrew mechanism, the changes of the brick joints, the end surfaces, the elevations and the stand column spacing need to be observed in time and adjusted in time, if the design requirements cannot be met, the jackscrew mechanism needs to be loosened and then the arch brick needs to be adjusted, and then the jackscrew is tightened after the requirements are met; e. the jacking wire mechanism enables the arch height of the arch brick to rise by 2-3 mm, the arch brick stops tightly after leaving the arch brick jacking wire on the arch tire of the steel mold, whether the arch brick has the phenomena of sinking, deformation, local sinking and the like is checked, the span, the arch height and the elevation of the arch brick are measured after the arch brick is qualified, and after the design requirement is met, the arch brick joint is sealed by using an adhesive tape;
s8, moving the steel die arch tire and the support frame: after the masonry of one ring of arch bricks is finished, moving the steel mould arch tire and the support frame to the position of the next ring of arch bricks together to prepare for masonry of the next ring of arch bricks; firstly, loosening a crown tire top thread on a steel mold crown tire downwards to be far away from a crown brick, slightly lifting a support frame of the steel mold crown tire by using a manual hydraulic forklift, removing a fixed backing plate at the bottom end of the support frame, then dropping the support frame on a guide rail, stressing a moving wheel, cleaning barriers such as bricks, backing plates and the like on site, and moving the steel mold support frame; when the steel mould supporting frame is moved, a constructor pushes the steel mould supporting frame at the inner side to enable the steel mould supporting frame to slowly move along the guide rail, and the force of two ends is uniform, so that the steel mould supporting deflection is prevented; adjusting the steel mould arch tire in place according to the position of the next ring of arch slag bricks, checking that the elevation, the levelness of the arch top surface and the like meet the requirements, then backing up and fixing the support frame to ensure that the movable wheel is not stressed, and then carrying out masonry construction of the arch bricks;
s9, removing the steel mould arch tyre and the support frame: after the whole glass melting furnace main arch is built, the steel mould arch tire and the support frame are sequentially removed, and the installation quality of the melting furnace main arch is checked according to the checking standard.
Further, in the step of checking, accepting, installing and paying off the S1 arch ballast beam, the determined longitudinal and transverse center reference lines for main arch masonry installation are thrown to proper positions of workshops at two ends and on the side face of the melting furnace by using a theodolite, and permanent marks are made.
Further, in the steps of assembling and erecting the S2 support frame and assembling the S3 steel membrane arch tire, bracing wires are symmetrically arranged on two sides of the support frame and the steel membrane arch tire after the support frame and the steel membrane arch tire are assembled and positioned, so that the support frame and the steel membrane arch tire are prevented from toppling over.
Further, the first ring brick of the whole melting furnace main arch is installed and is used as a reference for assembling and setting up the support frame and hoisting a steel mould arch tire in place before the step of assembling and setting up the support frame at S2, and the installation method is consistent with that in the step of installing and adjusting the S5 arch bricks; in the step of assembling and setting up the support frame S2, the top surface of the support frame is lower than the bottom surface of the first arch ballast brick by adjusting the height adjusting jackscrew; in the step of hoisting the steel mould arch tire in place of S4, the position and elevation of the steel mould arch tire need to be aligned and matched with the first arch ballast brick.
Further, the steel mould arch tyre mainly comprises top arc steel and a bottom steel base to form an arch structure, a support steel bar is arranged between the arc steel and the steel base, flat steel for placing arch bricks is arranged in the radial middle of the upper arc surface of the arc steel, and a plurality of arch tyre jackscrews are uniformly arranged at positions of the upper arc surface corresponding to two sides of the flat steel.
Further, the radian clamping plate used in the assembly of the S3 steel die arch tire is a wood plate or a steel plate manufactured according to the design radian of the steel film arch tire.
Further, in the step of installing and adjusting the S6 arch bricks, the installation of the arch bricks on two sides of the same ring of the main arch is carried out synchronously so as to ensure the balance of the steel mould arch tyre, and the deviation of the masonry progress on two sides does not exceed three.
Due to the adoption of the technical scheme, the invention has the following beneficial effects:
the invention discloses a main arch masonry construction method of a total oxygen glass melting furnace, aiming at the construction characteristics of the main arch independent single ring arch masonry of the total oxygen glass melting furnace, scientifically adopting a movable and adjustable steel mould arch tire and a main arch masonry and detection process according to the principles of mounting science and measurement science, reducing the accumulated error of arch bricks and ensuring the installation quality of each ring of arch bricks; the correct displacement of the steel mould arch tire is carried out to complete the masonry of each ring arch brick, thereby improving the construction quality of the main arch of the total oxygen kiln, ensuring the normal operation of the main arch of the kiln and gaining the favorable comment of construction units; effectively shortens the construction period of the main arch of the total oxygen kiln, reduces labor cost, mechanical cost and management cost, and reduces the construction cost by about 6 percent compared with the traditional construction method. Meanwhile, the investment of construction units can bring benefits into play as early as possible, the normal operation of the melting furnace is ensured, and the maintenance cost is reduced.
Drawings
FIG. 1 is a schematic view of the construction process of the present invention;
FIG. 2 is a schematic plan view of a steel arch form of a main arch;
FIG. 3 is a schematic elevation view of a steel arch form for constructing a main arch;
figure 4 is a schematic view of the radian card structure.
Detailed Description
The present invention will be explained in detail by the following examples, which are intended to protect all technical improvements within the scope of the present invention and are not limited to the following examples; in the description of the present invention, it should be understood that, if there is an orientation or positional relationship indicated by the terms "upper", "lower", "front", "rear", "left", "right", etc., which corresponds to the drawings of the present application, the present invention is described for convenience, but does not indicate or imply that the indicated device or element must have a particular orientation:
the main crown masonry construction method of the oxy-fuel glass melting furnace described in the attached figures 1-4 specifically comprises the following steps:
s1, checking and accepting arch ballast beams, installing and paying off: checking and accepting the steel structure of the arch ballast beam before construction, and ensuring that the span, the central line and the arch foot angle of the arch ballast beam meet the design requirements; wherein the span deviation of the arch ballast beams is less than or equal to +/-2 mm, the center line deviation is less than or equal to +/-3 mm, the angle deviation is less than or equal to +/-1 degree, and the staggering of two adjacent arch ballast beams is less than or equal to 1 mm; taking the longitudinal center of the melting furnace determined according to the design of the glass melting furnace as a reference, and releasing the longitudinal center line and the transverse center line of the main crown of the melting furnace on the bottom brick of the furnace tank by using a theodolite, wherein the transverse center line generally corresponds to the axis position of a smoke outlet of the melting furnace; determining the positioning center line of the steel membrane arch tire by taking the longitudinal center line and the transverse center line of the melting furnace as references, and determining the positioning center line of each ring arch brick by using a steel disc ruler; according to the requirement, in the steps of checking, accepting, installing and paying off the S1 arch slag beam, throwing the determined longitudinal and transverse center datum line for the main arch masonry installation to the proper positions of workshops at two ends and on the side surface of the melting furnace by using a theodolite, and making a permanent mark;
s2, assembling and erecting a support frame: erecting a support frame of the steel mould arch tire by using scaffold tubes, wherein the width of the support frame is the sum of the width of the steel mould arch tire and the width of operating platforms at two sides, and the width of the operating platform is generally 1.8-2 m; a plurality of groups of moving wheels are additionally arranged at the bottom of the support frame according to the span of the main crown, and guide rails along the longitudinal direction of the main crown of the melting furnace are laid below the moving wheels for supporting and moving; the supporting frame comprises a plurality of vertical steel pipes, a height adjusting jackscrew is mounted at the top end of each vertical steel pipe, and the height of the height adjusting jackscrew is adjusted to keep the top surface of the supporting frame horizontal and flat;
s3, assembling the steel membrane arch tire: the steel mould arch tire is divided into two sections of steel moulds convenient to transport along the radial central line of the steel mould arch tire, the two sections of steel moulds are detachably and fixedly connected through a bolt assembly, in addition, the steel mould arch tire mainly forms an arch structure by top arc steel and a bottom steel seat, a supporting steel bar is arranged between the arc steel and the steel seat, flat steel used for placing arch bricks is arranged in the radial middle of the upper arc surface of the arc steel, a plurality of arch tire top wires are uniformly arranged at positions of the upper arc surface corresponding to the two sides of the flat steel, the flat steel is used for supporting the arch bricks, and the arch tire top wires at the two sides can be conveniently adjusted; when the steel moulds are assembled and connected on site, firstly, a wood board or a brick is laid on the bottom of the steel film to ensure that the wood board or the brick is flat and consistent in elevation, bolts are penetrated in bolt holes corresponding to the two sections of steel moulds, then, the radian surfaces of the radii of the upper parts of the two sections of steel moulds are adjusted to be tight by the radian clamping plates, and then bolt assemblies are screwed down; in addition, the radian clamping plate is a wood plate or a steel plate which is manufactured in advance according to the design radian of the steel membrane arch tire; according to requirements, in the steps of assembling and erecting the S2 support frame and assembling the S3 steel membrane arch tire, bracing wires are symmetrically arranged on two sides of the assembled and positioned support frame and the steel membrane arch tire to prevent the support frame and the steel membrane arch tire from toppling;
s4, hoisting a steel mould arch tire in place: the connected steel membrane arch tire is hung on the support frame by using a truck crane, and the position, elevation and levelness of the top surface of the steel membrane arch tire are adjusted to meet the design requirements; the acceptance standard of the installation quality of the steel mould arch tire is as follows: the allowable deviation between the longitudinal central line of the steel die arch tire and the longitudinal central line of the melting furnace is +/-3.0 mm, the allowable deviation of the elevation is 0-5 mm, the arch height of the steel die arch tire is about 2mm higher than the design requirement, and the arch brick is prevented from sinking; after the adjustment is qualified, limiting and fixing the arch tire of the steel die by using a steel pipe, and bundling the arch tire on a support frame by using an iron wire for fixing;
s5, installing and adjusting arch slag bricks: before building, the support frame is firstly cushioned, so that the movable wheels are not stressed; hoisting the arch ballast bricks in place according to the determined arch brick center line, and checking and accepting the installation quality of the arch ballast bricks; placing ceramic fiber paper between arch slag bricks and arch slag beams, adjusting the centers of the bricks to be aligned, adjusting a backing plate under the arch slag bricks to enable the gap between the arch slag bricks and a breast wall to be 16-18 mm, adjusting a jackscrew mechanism on the arch slag beams to enable the inclined plane inclination angle of the arch slag bricks to reach a design angle, and after the arch slag bricks are adjusted to be qualified, using a wood wedge to pad the arch slag bricks on the breast wall, wherein at least two points are padded under each arch slag brick; according to the requirement, the first ring brick of the whole melting furnace main arch is installed and is used as a reference for assembling and setting up the support frame and hoisting a steel mould arch tire in place before the step of assembling and setting up the support frame of S2, and the installation method is consistent with the method in the step of installing and adjusting the S5 arch bricks; in the step of assembling and setting up the support frame S2, the top surface of the support frame is lower than the bottom surface of the first arch ballast brick by adjusting the height adjusting jackscrew; in the step of hoisting the steel mould arch tire in place of S4, the position and elevation of the steel mould arch tire need to be aligned and matched with the first arch ballast brick;
s6, installing and adjusting arch bricks: after the arch ballast bricks are installed, the arch bricks of the same ring are built; the first arch brick of each ring needs to be accurately positioned, and the side surface of each ring needs to be parallel to the transverse central line of the melting furnace and is vertical to the longitudinal central line; the construction of the arch bricks is carried out according to the serial numbers of the arch bricks, and the arch bricks cannot be misplaced; after the arch brick is firmly fixed by a flexible hoisting belt, the arch brick is slowly hoisted on a steel mould arch tire by a truck crane; after the steel mould arch support is adjusted to be placed stably, the hoisting belt is removed, arch support wires on the steel mould arch supports are adjusted, so that the contact between arch bricks is tight, and the installation quality of the arch bricks is checked and accepted; checking that the dislocation of the lower surface of the arch brick is less than 2mm, detecting the levelness of the top surface and the verticality of the side surface of the arch brick by using a horizontal ruler, wherein the deviation of the verticality and the levelness is less than 1mm, if the deviation exists, adjusting the jackscrew of the arch tire to ensure that the arch brick is correctly installed, and installing the next arch brick after the adjustment is qualified until the installation of one ring of arch bricks is finished; according to the requirement, in the step of installing and adjusting the arch bricks of S6, the installation of the arch bricks on two sides of the same ring of the main arch is carried out synchronously so as to ensure the balance of the arch tires of the steel mould, and the deviation of the masonry progress on two sides does not exceed three;
s7, tightening and removing the steel die arch: a. after the installation of the first ring brick is finished, carrying out overall quality check of the single ring arch brick, checking the flatness of the whole ring brick and carrying out arch tightening after the brick joint meets the requirements; b. before the wire jacking mechanism and the brace mechanism are tightened, a scale is placed on the arch brick, the elevation value of the arch brick is measured by a level gauge, and the record is made; c. before the wire-jacking mechanism and the brace mechanism are tightened, a backing plate under arch slag bricks is removed, and the inclined strut outside the upright post is cut; d. before the wire jacking mechanism is tightened, the brace mechanism is firstly tightened, and then the wire jacking mechanism is tightened; c. when the jack screw mechanism is tightened, two sides are alternately performed to prevent jack deviation; d. in the process of tightening the jackscrew mechanism, the changes of the brick joints, the end surfaces, the elevations and the stand column spacing need to be observed in time and adjusted in time, if the design requirements cannot be met, the jackscrew mechanism needs to be loosened and then the arch brick needs to be adjusted, and then the jackscrew is tightened after the requirements are met; e. the arch height of the arch brick is raised by 2-3 mm through the jack screw tightening mechanism, the arch brick stops tightening after leaving the arch tyre jack screw on the steel mould arch tyre, whether the arch brick sinks, deforms, partially sinks and the like is checked, the span, the arch height and the elevation of the arch brick are measured after the arch brick is qualified, and after the arch brick reaches the design requirement, the arch brick seam is sealed by using an adhesive tape;
s8, moving the steel die arch tire and the support frame: after the masonry of one ring of arch bricks is finished, moving the steel mould arch tire and the support frame to the position of the next ring of arch bricks together to prepare for masonry of the next ring of arch bricks; firstly, loosening a crown tire top thread on a steel mold crown tire downwards to be far away from a crown brick, slightly lifting a support frame of the steel mold crown tire by using a manual hydraulic forklift, removing a fixed backing plate at the bottom end of the support frame, then dropping the support frame on a guide rail, stressing a moving wheel, cleaning barriers such as bricks, backing plates and the like on site, and moving the steel mold support frame; when the steel mould supporting frame is moved, a constructor pushes the steel mould supporting frame at the inner side to enable the steel mould supporting frame to slowly move along the guide rail, and the force of two ends is uniform, so that the steel mould supporting deflection is prevented; adjusting the steel mould arch tire in place according to the position of the next ring of arch slag bricks, checking that the elevation, the levelness of the arch top surface and the like meet the requirements, then backing up and fixing the support frame to ensure that the movable wheel is not stressed, and then carrying out masonry construction of the arch bricks;
s9, removing the steel die arch tire and the support frame: after the whole glass melting furnace main arch is built, sequentially removing a steel die arch tire and a support frame, and checking and accepting the installation quality of the melting furnace main arch according to a checking and accepting standard, wherein the mounting quality of the melting furnace main arch meets the industrial furnace building engineering construction and checking and accepting specification GB 50211-2014 and the industrial furnace building engineering quality checking and accepting specification GB 50309-2007.
Attached table 1: main construction machine equipment meter
Serial number | Name (R) | Model number | Number of | For construction site |
1 | Truck crane | 5~8t | 1 vehicle | Hoisting of steel mould arch tire, arch brick and the like |
2 | Forklift truck | 2t | 1 table | Skewback transport |
3 | Hand hydraulic fork-lift | 2~3t | 2 table | Skewback transport and steel mould movement |
4 | Level gauge | S1 | 1 table | Steel mould arch tire and arch brick installation measurement |
5 | Theodolite | 2-JD | 1 table | Central line paying-off for melting furnace |
6 | Steel disc ruler | 30m | 1 handle | Measuring and paying off |
7 | Horizon rule | 600mm | 4 handles | Skewback detection |
8 | Steel plate ruler | 500mm | 2 handle | Measuring |
9 | Line pendant | 2 are provided with | Center detection | |
10 | Plug gauge | 150mm | 2 handle | Brickwork joint measurement |
11 | Big wooden hammer | 2 handle | Arch brick installation alignment | |
12 | Spanner | 200~300 | 6 handles | Skewback crown screw adjustment |
13 | Pipe wrench | 2 handle | Brace fastening | |
14 | Gas cutting tool | 1 set of | Temporary support cutting device for steel structure |
Attached table 2: key part and key process quality control point table
Serial number | Examination item | Tolerance deviation (mm) | Inspection method and inspection device used therefor |
1 | Arch tyre longitudinal central line and melting furnace longitudinal central line | ±3.0 | Surveying with theodolite and suspension wire |
2 | Arch tyre elevation | 0~5 | Measuring with a level |
3 | Elevation of arch ballast beam | ±1.5 | Measured by a level |
4 | Distance between inner side of upright post and longitudinal central line of melting furnace | ±3.0 | Measured with steel disc ruler |
5 | Arch ballast brick masonry brick joint | 1.5 | Measuring with feeler gauge and steel plate gauge |
6 | Elevation of arch ballast brick | ±1 | Level gauge for measuring level at fixed point |
7 | Span of arch ballast bricks | ±3.0 | Measured with steel disc ruler |
8 | Verticality of arch brick | ±0.5 | Measuring with a horizontal ruler |
9 | Flatness of arch tile end face | 1 | Measuring with a level |
10 | Arch brick joint | 1.5 | Measuring with feelers |
11 | Arch height of each ring arch | ±10 | Measured by a level |
12 | The gap between two adjacent ring arches | +1 | Measuring with special graduated scales |
The present invention is not described in detail in the prior art.
Claims (6)
1. A construction method for constructing a main crown of a total oxygen glass melting furnace is characterized by comprising the following steps: the method specifically comprises the following steps:
s1, checking and accepting arch ballast beams, installing and paying off: checking and accepting the steel structure of the arch ballast beam before construction, and ensuring that the span, the central line and the arch foot angle of the arch ballast beam meet the design requirements; wherein the span deviation of the arch ballast beams is less than or equal to +/-2 mm, the center line deviation is less than or equal to +/-3 mm, the angle deviation is less than or equal to +/-1 degree, and the staggering of two adjacent arch ballast beams is less than or equal to 1 mm;
taking the longitudinal center of the melting furnace determined according to the design of the glass melting furnace as a reference, and releasing the longitudinal center line and the transverse center line of a main crown of the melting furnace on a bottom brick of a furnace tank by using a theodolite, wherein the transverse center line corresponds to the axial position of a smoke outlet of the melting furnace; determining the positioning center line of the steel membrane arch tire by taking the longitudinal center line and the transverse center line of the melting furnace as references, and determining the positioning center line of each ring arch brick by using a steel disc ruler;
s2, assembling and erecting a support frame: erecting a support frame of the steel mould arch tire by using scaffold tubes, wherein the width of the support frame is the sum of the width of the steel mould arch tire and the width of the operating platforms at two sides, and the width of the operating platform is 1.8-2 m; a plurality of groups of moving wheels are additionally arranged at the bottom of the support frame according to the span of the main arch, and a guide rail along the longitudinal direction of the main arch of the melting furnace is paved below the moving wheels; the supporting frame comprises a plurality of vertical steel pipes, a height adjusting jackscrew is mounted at the top end of each vertical steel pipe, and the height of the height adjusting jackscrew is adjusted to keep the top surface of the supporting frame horizontal and flat;
s3, assembling the steel membrane arch tire: the steel mould arch tire is divided into two sections of steel moulds convenient to transport along the radial center line of the steel mould arch tire, and the two sections of steel moulds are detachably and fixedly connected through a bolt assembly; when the steel moulds are assembled and connected on site, firstly, a wood board or a brick is laid on the bottom of the steel film to ensure that the wood board or the brick is flat and consistent in elevation, bolts are penetrated in bolt holes corresponding to the two sections of steel moulds, then, the radian surfaces of the radii of the upper parts of the two sections of steel moulds are adjusted to be tight by the radian clamping plates, and then bolt assemblies are screwed down;
s4, hoisting the steel die arch tire in place: the connected steel membrane arch tire is hung on the support frame by using a truck crane, and the position, elevation and levelness of the top surface of the steel membrane arch tire are adjusted to meet the design requirements; the acceptance standard of the installation quality of the steel mould arch tire is as follows: the allowable deviation between the longitudinal central line of the steel die arch tire and the longitudinal central line of the melting furnace is +/-3.0 mm, the allowable deviation of the elevation is 0-5 mm, the arch height of the steel die arch tire is 2mm higher than the design requirement, and the arch brick is prevented from sinking; after the adjustment is qualified, limiting and fixing the arch tire of the steel die by using a steel pipe, and bundling the arch tire on a support frame by using an iron wire for fixing;
s5, installing and adjusting arch slag bricks: before building, the support frame is firstly cushioned, so that the movable wheels are not stressed; hoisting the arch ballast bricks in place according to the determined arch brick center line, and checking and accepting the installation quality of the arch ballast bricks; placing ceramic fiber paper between arch slag bricks and arch slag beams, adjusting the centers of the bricks to be aligned, adjusting a backing plate under the arch slag bricks to enable the gap between the arch slag bricks and a breast wall to be 16-18 mm, adjusting a jackscrew mechanism on the arch slag beams to enable the inclined plane inclination angle of the arch slag bricks to reach a design angle, and after the arch slag bricks are adjusted to be qualified, using a wood wedge to pad the arch slag bricks on the breast wall, wherein at least two points are padded under each arch slag brick;
it should be noted that the first ring brick of the whole melting furnace main arch is installed and needs to be placed before the step of assembling and setting the support frame of S2, and the installation method is the same as the method in the step of installing and adjusting the S5 arch bricks as the reference for assembling and setting the support frame and hoisting the steel mould arch tire in place; in the step of assembling and setting up the support frame S2, the top surface of the support frame is lower than the bottom surface of the first arch ballast brick by adjusting the height adjusting jackscrew; in the step of hoisting the steel mould arch tire in place of S4, the position and elevation of the steel mould arch tire need to be aligned and matched with the first arch ballast brick;
s6, installing and adjusting arch bricks: after the arch ballast bricks are installed, the arch bricks of the same ring are built; the first arch brick of each ring needs to be accurately positioned, and the side surface of each ring needs to be parallel to the transverse central line of the melting furnace and is vertical to the longitudinal central line; the masonry construction of the arch bricks is carried out according to the serial numbers of the arch bricks, and the arch bricks cannot be misplaced; after the arch brick is firmly fixed by a flexible hoisting belt, the arch brick is slowly hoisted on a steel mould arch tire by a truck crane; after the steel mould arch support is adjusted to be stable, the hoisting belt is removed, arch support wires on the steel mould arch support are adjusted, so that the contact between arch bricks is tight, and the installation quality of the arch bricks is checked; checking that the dislocation of the lower surface of the arch brick is less than 2mm, detecting the levelness of the top surface and the verticality of the side surface of the arch brick by using a horizontal ruler, wherein the deviation of the verticality and the levelness is less than 1mm, if the deviation exists, adjusting the jackscrew of the arch tire to ensure that the arch brick is correctly installed, and installing the next arch brick after the adjustment is qualified until the installation of one ring of arch bricks is finished;
s7, tightening and removing the steel die arch: a. after the installation of the ring brick is finished, the integral quality of the single-ring arch brick is checked, and the arch is tightened after the flatness and the brick joints of the integral ring brick are checked to meet the requirements; b. before the wire jacking mechanism and the brace mechanism are tightened, a scale is placed on the arch brick, the elevation value of the arch brick is measured by a level gauge, and the record is made; c. before the wire-jacking mechanism and the brace mechanism are tightened, a backing plate under arch slag bricks is removed, and the inclined strut outside the upright post is cut; d. before the wire jacking mechanism is tightened, the brace mechanism is firstly tightened, and then the wire jacking mechanism is tightened; c. when the jack screw mechanism is tightened, two sides are alternately performed to prevent jack deviation; d. in the process of tightening the jackscrew mechanism, the changes of the brick joints, the end surfaces, the elevations and the stand column spacing need to be observed in time and adjusted in time, if the design requirements cannot be met, the jackscrew mechanism needs to be loosened and then the arch brick needs to be adjusted, and then the jackscrew is tightened after the requirements are met; e. the arch height of the arch brick is raised by 2-3 mm through the jack screw tightening mechanism, the arch brick stops tightening after leaving the arch tyre jack screw on the steel mould arch tyre, whether the arch brick sinks, deforms and partially sinks or not is checked, the span, arch height and elevation of the arch brick are measured after the arch brick is qualified, and after the design requirement is met, the arch brick seam of the arch brick is sealed by using an adhesive tape;
s8, moving the steel die arch tire and the support frame: after the masonry of one ring of arch bricks is finished, moving one steel mould arch tire and the support frame to the position of the next ring of arch bricks to carry out masonry preparation of the next ring of arch bricks; firstly, loosening a crown tire top thread on a steel mold crown tire downwards to be far away from an arch brick, slightly lifting a support frame of the steel mold crown tire by using a manual hydraulic forklift, removing a fixed base plate at the bottom end of the support frame, then dropping the support frame on a guide rail, stressing a moving wheel, cleaning bricks and a base plate on site, and moving the steel mold support frame; when the steel mould supporting frame is moved, a constructor pushes the steel mould supporting frame at the inner side to enable the steel mould supporting frame to slowly move along the guide rail, and the force of two ends is uniform, so that the steel mould supporting deflection is prevented; adjusting the steel mould arch tire in place according to the position of the next ring of arch slag bricks, checking that the elevation and the levelness of the arch top surface meet the requirements, then backing up and fixing the support frame to ensure that the moving wheel is not stressed, and then carrying out masonry construction of the arch bricks;
s9, removing the steel die arch tire and the support frame: after the whole glass melting furnace main arch is built, the steel mould arch tire and the support frame are sequentially removed, and the installation quality of the melting furnace main arch is checked according to the checking standard.
2. The crown masonry construction method for a oxy-fuel glass melting furnace as set forth in claim 1, wherein: in the step of checking, accepting, installing and paying off the arch slag beam of S1, the determined longitudinal and transverse center reference lines for the masonry and installation of the main arch are thrown to proper positions of workshops at two ends and on the side surface of the melting furnace by using a theodolite, and permanent marks are made.
3. The crown masonry construction method for the oxy-fuel glass melting furnace as set forth in claim 1, wherein: in the steps of assembling and erecting the S2 support frame and assembling the S3 steel membrane arch tire, bracing wires are symmetrically arranged on two sides of the assembled and positioned support frame and the steel membrane arch tire to prevent the support frame and the steel membrane arch tire from toppling over.
4. The crown masonry construction method for the oxy-fuel glass melting furnace as set forth in claim 1, wherein: the steel mould arch tire mainly forms an arch structure by top arc steel and a bottom steel seat, a support steel bar is arranged between the arc steel and the steel seat, flat steel for placing arch bricks is arranged in the radial middle of the upper arc surface of the arc steel, and a plurality of arch tire jackscrews are uniformly arranged at positions of the upper arc surface corresponding to the two sides of the flat steel.
5. The crown masonry construction method for a oxy-fuel glass melting furnace as set forth in claim 1, wherein: the radian clamping plate used in the assembly of the S3 steel die arch tire is a wood plate or a steel plate manufactured according to the design radian of the steel film arch tire.
6. The crown masonry construction method for the oxy-fuel glass melting furnace as set forth in claim 1, wherein: in the step of installing and adjusting the S6 arch bricks, the installation of the arch bricks on two sides of the same ring of the main arch is carried out synchronously so as to ensure the balance of the steel mould arch tyre, and the deviation of the masonry progress on two sides does not exceed three.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010419747.6A CN111517621B (en) | 2020-05-18 | 2020-05-18 | Construction method for constructing crown of oxy-fuel glass melting furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010419747.6A CN111517621B (en) | 2020-05-18 | 2020-05-18 | Construction method for constructing crown of oxy-fuel glass melting furnace |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111517621A CN111517621A (en) | 2020-08-11 |
CN111517621B true CN111517621B (en) | 2022-06-03 |
Family
ID=71912399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010419747.6A Active CN111517621B (en) | 2020-05-18 | 2020-05-18 | Construction method for constructing crown of oxy-fuel glass melting furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111517621B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112159078B (en) * | 2020-09-24 | 2023-02-03 | 彩虹集团有限公司 | Method for building liquid crystal substrate glass muffle furnace heater installation bricks |
CN115367996B (en) * | 2022-07-28 | 2023-07-25 | 陕西彩虹工业智能科技有限公司 | Production equipment for manufacturing flexible glass hot end and installation construction paying-off method |
CN116102236A (en) * | 2023-02-03 | 2023-05-12 | 广西南玻新能源材料科技有限公司 | Glass kiln building method and glass kiln |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101913753A (en) * | 2010-07-31 | 2010-12-15 | 中国洛阳浮法玻璃集团有限责任公司 | Supporting method of large arch tyre of large and medium-size glass furnace |
CN103466917A (en) * | 2013-08-29 | 2013-12-25 | 上海宝冶建设工业炉工程技术有限公司 | Construction method of electric melting AZS or electro melting corundum brick crowns of full-oxygen glass melting furnace |
EP3447423A1 (en) * | 2017-08-24 | 2019-02-27 | Refractory Intellectual Property GmbH & Co. KG | Industrial furnace with support construction |
CN209721914U (en) * | 2019-04-15 | 2019-12-03 | 河南省安装集团有限责任公司 | A kind of big arch of movable type total oxygen kiln, which is built, uses structure of steel die |
CN209721915U (en) * | 2019-04-15 | 2019-12-03 | 河南省安装集团有限责任公司 | A kind of total oxygen furnace crown roof construction |
CN110986592A (en) * | 2019-12-27 | 2020-04-10 | 蚌埠中光电科技有限公司 | Modular arch tire for glass kiln masonry |
-
2020
- 2020-05-18 CN CN202010419747.6A patent/CN111517621B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101913753A (en) * | 2010-07-31 | 2010-12-15 | 中国洛阳浮法玻璃集团有限责任公司 | Supporting method of large arch tyre of large and medium-size glass furnace |
CN103466917A (en) * | 2013-08-29 | 2013-12-25 | 上海宝冶建设工业炉工程技术有限公司 | Construction method of electric melting AZS or electro melting corundum brick crowns of full-oxygen glass melting furnace |
EP3447423A1 (en) * | 2017-08-24 | 2019-02-27 | Refractory Intellectual Property GmbH & Co. KG | Industrial furnace with support construction |
CN209721914U (en) * | 2019-04-15 | 2019-12-03 | 河南省安装集团有限责任公司 | A kind of big arch of movable type total oxygen kiln, which is built, uses structure of steel die |
CN209721915U (en) * | 2019-04-15 | 2019-12-03 | 河南省安装集团有限责任公司 | A kind of total oxygen furnace crown roof construction |
CN110986592A (en) * | 2019-12-27 | 2020-04-10 | 蚌埠中光电科技有限公司 | Modular arch tire for glass kiln masonry |
Non-Patent Citations (2)
Title |
---|
浮法玻璃熔窑大拱砌筑施工工艺;沈项平;《安装》;20150315(第3期);第61-64页 * |
浮法玻璃生产线熔池大碹施工工艺;付保明等;《山西建筑》;20100430;第36卷(第11期);第136-137页 * |
Also Published As
Publication number | Publication date |
---|---|
CN111517621A (en) | 2020-08-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111517621B (en) | Construction method for constructing crown of oxy-fuel glass melting furnace | |
CN111851565B (en) | Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof | |
CN112376606A (en) | Equipment foundation bolt mounting die and construction method thereof | |
CN103087731A (en) | Laser measurement installation method for dry coke quenching furnace shell | |
CN216283541U (en) | Quick and accurate measuring device for verticality in mounting of assembled building column | |
CN110185060B (en) | Positioning construction method for foundation slab of ultra-long and ultra-wide drying unit | |
CN110295620B (en) | Rapid and accurate positioning method for integral skid-mounted cold box of large air separation device | |
CN216006947U (en) | Fabricated verticality adjusting operation frame for one-pile one-column steel pipe column by reverse construction method | |
CN213267523U (en) | Temporary bridge support | |
CN102134855A (en) | Method for installing and constructing supporting wheel set system of coal moisture control dryer | |
CN115743460B (en) | Construction method of offshore floating wind power platform | |
CN112502047B (en) | Simply supported PC track beam erection method and linear debugging device | |
CN110315035B (en) | Measuring device for mounting sector section base of slab caster and construction method thereof | |
CN112049440A (en) | Vertical butt joint correcting unit of large-scale steel-pipe column | |
CN107401179B (en) | Method for installing pre-buried bolts of paper machine girder in paper making workshop | |
CN111663779A (en) | Closed construction method for metallurgical industry factory building | |
CN217579798U (en) | Prefabricated bent cap high accuracy mounting structure | |
CN115288287B (en) | Inclined installation system and installation method for oversized fusiform column | |
CN217174896U (en) | Bolt mounting distance support | |
CN115555844B (en) | On-site assembly construction method for gasifier | |
CN113802479B (en) | Combined type unit support structure for dismantling tied arch bridge arch rib | |
CN117431856A (en) | Integral falling frame process for steel pipe column Bailey beam column type support | |
CN218323195U (en) | Ultra-precision equipment built-in fitting installation levelling device | |
CN213926347U (en) | Equipment foundation bolt installation die | |
CN212389029U (en) | Vertical butt joint correcting unit of large-scale steel-pipe column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Construction method of large arch masonry for a fully oxygen glass melting furnace Granted publication date: 20220603 Pledgee: Bank of China Limited by Share Ltd. Luoyang branch Pledgor: HENAN INSTALLATION GROUP Co.,Ltd. Registration number: Y2024980026686 |