CN111505416A - 一种变电站综合自动化测试系统 - Google Patents
一种变电站综合自动化测试系统 Download PDFInfo
- Publication number
- CN111505416A CN111505416A CN202010338624.XA CN202010338624A CN111505416A CN 111505416 A CN111505416 A CN 111505416A CN 202010338624 A CN202010338624 A CN 202010338624A CN 111505416 A CN111505416 A CN 111505416A
- Authority
- CN
- China
- Prior art keywords
- module
- signal
- output end
- input
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Testing Relating To Insulation (AREA)
Abstract
本发明公开了一种变电站综合自动化测试系统,包括自动化测试单元、测试周期模块和周期间长调节模块,所述自动化测试单元的输出端与检测信号导入模块的输入端连接,所述检测信号导入模块的输出端与信号分析模组单元的输入端连接,所述信号分析模组单元包括有模拟信号生成模块和信号接收模块,所述模拟信号生成模块和信号接收模块的输出端均与对比模块和综合分析模块的输入端连接,本发明涉及变电站技术领域。该变电站综合自动化测试系统,利用检测信号导入模块、模拟信号生成模块、对比模块和综合分析模块之间的配合可以实现对变电站进行自动测试,并能将测试的结果自动显示在数据显示模块上,大大提高了测试的效率。
Description
技术领域
本发明涉及变电站技术领域,具体为一种变电站综合自动化测试系统。
背景技术
变电站,顾名思义,就是改变电压的场所与地方。是电力系统中对电能的电压和电流进行变换、集中和分配的场所。为保证电能的质量以及设备的安全,在变电站中还需进行电压调整、潮流(电力系统中各节点和支路中的电压、电流和功率的流向及分布)控制以及输配电线路和主要电工设备的保护。按用途可分为电力变电站和牵引变电站(电气铁路和电车用)。在国家标准GB 50053-94《10kv及以下变电站设计规范》里面规定的术语定义是"10千伏及以下交流电源经电力变压器变压后对用电设备供电",符合这个的就是变电站。
变电站是电网中非常重要的部分,也是电力组成的核心,当然变电站也易出现安全隐患,现有的变电站测试系统,测试的效率比较低下,不能够对变电站进行自动化检测,而是通过人工采用机器进行检测,并且测试的范围比较小,不能够完全保证该变电站测试完后是否完全安全。
发明内容
(一)解决的技术问题
针对现有技术的不足,本发明提供了一种变电站综合自动化测试系统,解决了现有的变电站测试系统,测试的效率比较低下,不能够对变电站进行自动化检测,而是通过人工采用机器进行检测,并且测试的范围比较小,不能够完全保证该变电站测试完后是否完全安全的问题。
(二)技术方案
为实现以上目的,本发明通过以下技术方案予以实现:一种变电站综合自动化测试系统,包括自动化测试单元、测试周期模块和周期间长调节模块,所述自动化测试单元的输出端与检测信号导入模块的输入端连接,所述检测信号导入模块的输出端与信号分析模组单元的输入端连接,所述信号分析模组单元包括有模拟信号生成模块和信号接收模块,所述模拟信号生成模块和信号接收模块的输出端均与对比模块和综合分析模块的输入端连接,所述对比模块与综合分析模块实现双向连接,所述信号分析模组单元的输出端与A/D转换模块的输入端连接,所述A/D转换模块的输出端分别与储存模块和数据显示模块的输入端连接。
优选的,所述储存模块的输出端与数据库的输入端连接,所述数据库的输出端分别与数据显示模块和D/A转换模块的输入端连接。
优选的,所述D/A转换模块的输出端与信号配对模块的输入端连接,所述信号配对模块的输出端与反馈模块的输入端连接,所述反馈模块的输出端与数据库的输入端连接。
优选的,所述检测信号导入模块的输出端与信号配对模块的输入端连接。
优选的,所述信号分析模组单元的输出端与安全信号匹配模块的输入端连接,所述安全信号匹配模块的输出端分别与报警模块和自动防护单元的输入端连接。
优选的,所述测试周期模块和周期间长调节模块的输出端均与时间对比模块的输入端连接。
优选的,所述时间对比模块的输出端与判断模块的输入端连接。
优选的,所述判断模块的输出端与测试启动单元的输入端连接,所述测试启动单元的输出端与自动化测试单元的输入端连接。
(三)有益效果
本发明提供了一种变电站综合自动化测试系统。具备以下有益效果:
(1)、该变电站综合自动化测试系统,通过信号分析模组单元包括有模拟信号生成模块和信号接收模块,模拟信号生成模块和信号接收模块的输出端均与对比模块和综合分析模块的输入端连接,对比模块与综合分析模块实现双向连接,信号分析模组单元的输出端与A/D转换模块的输入端连接,A/D转换模块的输出端分别与储存模块和数据显示模块的输入端连接,利用检测信号导入模块、模拟信号生成模块、对比模块和综合分析模块之间的配合可以实现对变电站进行自动测试,并能将测试的结果自动显示在数据显示模块上,大大提高了测试的效率。
(2)、该变电站综合自动化测试系统,通过储存模块的输出端与数据库的输入端连接,数据库的输出端分别与数据显示模块和D/A转换模块的输入端连接,利用储存模块、数据库、D/A转换模块和信号配对模块之间的配合可以一步一步扩大自动测试的精度和测试范围,使该检测系统自动测试的能力越来越高。
(3)、该变电站综合自动化测试系统,通过信号分析模组单元的输出端与安全信号匹配模块的输入端连接,安全信号匹配模块的输出端分别与报警模块和自动防护单元的输入端连接,利用安全信号匹配模块、报警模块和自动防护单元之间的配合可以提高变电站的安全性,一旦发生危险性故障,便能自动防护,且发出警报。
(4)、该变电站综合自动化测试系统,通过测试周期模块和周期间长调节模块的输出端均与时间对比模块的输入端连接,时间对比模块的输出端与判断模块的输入端连接,利用测试周期模块、周期间长调节模块和时间对比模块之间的配合可以使该测试系统能周期性的对变电站进行周期性检测,大大提高了变电站的安全性。
附图说明
图1为本发明测试的系统原理框图;
图2为本发明安全保障系统原理框图;
图3为本发明测试周期的系统原理框图。
图中,1-自动化测试单元、2-测试周期模块、3-周期间长调节模块、4-检测信号导入模块、5-信号分析模组单元、6-模拟信号生成模块、7-信号接收模块、8-对比模块、9-综合分析模块、10-A/D转换模块、11-储存模块、12-数据显示模块、13-数据库、14-D/A转换模块、15-信号配对模块、16-反馈模块、17-安全信号匹配模块、18-报警模块、19-自动防护单元、20-判断模块、21-测试启动单元、22-时间对比模块。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-3,本发明实施例提供一种技术方案:一种变电站综合自动化测试系统,包括自动化测试单元1、测试周期模块2和周期间长调节模块3,利用测试周期模块2、周期间长调节模块3和时间对比模块22之间的配合可以使该测试系统能周期性的对变电站进行周期性检测,大大提高了变电站的安全性,周期间长调节模块3可以调节测试的周期,可以通过人工确定测试的周期,测试周期模块2和周期间长调节模块3的输出端均与时间对比模块22的输入端连接,时间对比模块22的输出端与判断模块20的输入端连接,判断模块20的输出端与测试启动单元21的输入端连接,测试启动单元21的输出端与自动化测试单元1的输入端连接,自动化测试单元1的输出端与检测信号导入模块4的输入端连接,利用检测信号导入模块4、模拟信号生成模块6、对比模块8和综合分析模块9之间的配合可以实现对变电站进行自动测试,并能将测试的结果自动显示在数据显示模块12上,大大提高了测试的效率,检测信号导入模块4的输出端与信号配对模块15的输入端连接,检测信号导入模块4的输出端与信号分析模组单元5的输入端连接,信号分析模组单元5的输出端与安全信号匹配模块17的输入端连接,利用安全信号匹配模块17、报警模块18和自动防护单元19之间的配合可以提高变电站的安全性,一旦发生危险性故障,便能自动防护,且发出警报,安全信号匹配模块17的输出端分别与报警模块18和自动防护单元19的输入端连接,信号分析模组单元5包括有模拟信号生成模块6和信号接收模块7,模拟信号生成模块6和信号接收模块7的输出端均与对比模块8和综合分析模块9的输入端连接,对比模块8与综合分析模块9实现双向连接,信号分析模组单元5的输出端与A/D转换模块10的输入端连接,A/D转换模块10的输出端分别与储存模块11和数据显示模块12的输入端连接,利用储存模块11、数据库13、D/A转换模块14和信号配对模块15之间的配合可以一步一步扩大自动测试的精度和测试范围,使该检测系统自动测试的能力越来越高,储存模块11的输出端与数据库13的输入端连接,数据库13的输出端分别与数据显示模块12和D/A转换模块14的输入端连接,D/A转换模块14的输出端与信号配对模块15的输入端连接,信号配对模块15的输出端与反馈模块16的输入端连接,反馈模块16的输出端与数据库13的输入端连接。
使用时,自动化测试单元1对变电站进行测试,并将检测的电信号,通过检测信号导入模块4分别导入在信号分析模组单元5和信号配对模块15,当信号配对模块15与D/A转换模块14转换的电信号匹配完成时,通过反馈模块16反馈给数据库13,数据库13接到反馈信息后,从数据库13调出与之信号配对的测试数据值通过数据显示模块12显示,若信号配对模块15没有匹配到与之相应的信号,模拟信号生成模块6会与信号接收模块7接收的电信号通过对比模块8进行对比,直到模拟信号匹配的信号与接收的信号相似,便通过综合分析模块9对其进行分析,并将分析的结果通过A/D转换模块10转换成数据的形式,并通过数据显示模块12进行显示,同时信号分析模组单元5会与安全信号匹配模块17进行匹配,若匹配成功,便启动自动防护单元19对其进行保护,且发出报警信号。
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (8)
1.一种变电站综合自动化测试系统,包括自动化测试单元(1)、测试周期模块(2)和周期间长调节模块(3),所述自动化测试单元(1)的输出端与检测信号导入模块(4)的输入端连接,所述检测信号导入模块(4)的输出端与信号分析模组单元(5)的输入端连接,其特征在于:所述信号分析模组单元(5)包括有模拟信号生成模块(6)和信号接收模块(7),所述模拟信号生成模块(6)和信号接收模块(7)的输出端均与对比模块(8)和综合分析模块(9)的输入端连接,所述对比模块(8)与综合分析模块(9)实现双向连接,所述信号分析模组单元(5)的输出端与A/D转换模块(10)的输入端连接,所述A/D转换模块(10)的输出端分别与储存模块(11)和数据显示模块(12)的输入端连接。
2.根据权利要求1所述的一种变电站综合自动化测试系统,其特征在于:所述储存模块(11)的输出端与数据库(13)的输入端连接,所述数据库(13)的输出端分别与数据显示模块(12)和D/A转换模块(14)的输入端连接。
3.根据权利要求2所述的一种变电站综合自动化测试系统,其特征在于:所述D/A转换模块(14)的输出端与信号配对模块(15)的输入端连接,所述信号配对模块(15)的输出端与反馈模块(16)的输入端连接,所述反馈模块(16)的输出端与数据库(13)的输入端连接。
4.根据权利要求1所述的一种变电站综合自动化测试系统,其特征在于:所述检测信号导入模块(4)的输出端与信号配对模块(15)的输入端连接。
5.根据权利要求1所述的一种变电站综合自动化测试系统,其特征在于:所述信号分析模组单元(5)的输出端与安全信号匹配模块(17)的输入端连接,所述安全信号匹配模块(17)的输出端分别与报警模块(18)和自动防护单元(19)的输入端连接。
6.根据权利要求1所述的一种变电站综合自动化测试系统,其特征在于:所述测试周期模块(2)和周期间长调节模块(3)的输出端均与时间对比模块(22)的输入端连接。
7.根据权利要求6所述的一种变电站综合自动化测试系统,其特征在于:所述时间对比模块(22)的输出端与判断模块(20)的输入端连接。
8.根据权利要求7所述的一种变电站综合自动化测试系统,其特征在于:所述判断模块(20)的输出端与测试启动单元(21)的输入端连接,所述测试启动单元(21)的输出端与自动化测试单元(1)的输入端连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010338624.XA CN111505416B (zh) | 2020-04-26 | 2020-04-26 | 一种变电站综合自动化测试系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010338624.XA CN111505416B (zh) | 2020-04-26 | 2020-04-26 | 一种变电站综合自动化测试系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111505416A true CN111505416A (zh) | 2020-08-07 |
CN111505416B CN111505416B (zh) | 2023-02-28 |
Family
ID=71876396
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010338624.XA Active CN111505416B (zh) | 2020-04-26 | 2020-04-26 | 一种变电站综合自动化测试系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111505416B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114264903A (zh) * | 2021-12-14 | 2022-04-01 | 昆明学院 | 电力远动终端装置自动化闭环测试系统 |
Citations (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB435564A (en) * | 1934-03-24 | 1935-09-24 | Automatic Electric Co Ltd | Improvements in or relating to electrical signalling systems |
US4855671A (en) * | 1983-04-13 | 1989-08-08 | Fernandes Roosevelt A | Electrical power line and substation monitoring apparatus |
KR980010771A (ko) * | 1996-07-29 | 1998-04-30 | 배순훈 | 프린트 기판 검사 기능을 구비한 자삽기용 장착 좌표 입력장치 및 그 제어방법 |
WO2008002076A1 (en) * | 2006-06-28 | 2008-01-03 | Industry-University Cooperation Foundation Hanyang University | Battery test apparatus and battery test method |
WO2010069739A1 (en) * | 2008-12-18 | 2010-06-24 | Abb Research Ltd | A system for ground fault detection in a generator |
WO2010101522A1 (en) * | 2009-03-03 | 2010-09-10 | Megger Sweden Ab | Method for detecting errors in an electrical power substation network |
CN101842713A (zh) * | 2007-10-25 | 2010-09-22 | Abb研究有限公司 | 用于变电站自动化系统的系统级测试 |
CN101902336A (zh) * | 2009-05-27 | 2010-12-01 | 北京启明星辰信息技术股份有限公司 | 一种基于规则模型的安全事件关联分析系统及方法 |
CN102570607A (zh) * | 2011-12-30 | 2012-07-11 | 长园深瑞继保自动化有限公司 | 智能变电站冗余数据处理系统 |
US20140375327A1 (en) * | 2011-12-22 | 2014-12-25 | Falko Sievers | Device and method for monitoring a voltage supply for a vehicle system |
CN104377816A (zh) * | 2014-11-07 | 2015-02-25 | 浙江正泰电器股份有限公司 | 一种智能化的重合闸断路器及其自动重合的控制方法 |
CN104426757A (zh) * | 2013-09-09 | 2015-03-18 | 贵州电网公司六盘水供电局 | 一种智能变电站专用数据交互方法及装置 |
CN105137240A (zh) * | 2015-09-01 | 2015-12-09 | 国家电网公司 | 一种智能变电站合并单元量测量仿真系统及闭环测试方法 |
CN105446336A (zh) * | 2015-12-08 | 2016-03-30 | 哈尔滨工业大学 | 一种用于寒地变电站的机器人巡检系统及巡检方法 |
US20160209450A1 (en) * | 2013-09-27 | 2016-07-21 | Abb Technology Ag | Testing of a substation automation system |
CN205583839U (zh) * | 2015-12-24 | 2016-09-14 | 安徽中电兴发与鑫龙科技股份有限公司 | 一种变电站微机综合保护测控装置 |
RU168605U1 (ru) * | 2016-06-21 | 2017-02-13 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Кубанский государственный аграрный университет" | Трансформаторная подстанция |
CN106505731A (zh) * | 2016-10-26 | 2017-03-15 | 南京能云电力科技有限公司 | 一种智能变电站与调度对点测试用例智能生成系统及方法 |
CN206096372U (zh) * | 2016-07-28 | 2017-04-12 | 国网江苏省电力公司常州供电公司 | 一种gis设备隔离开关异常振动在线监测系统 |
CN106774051A (zh) * | 2016-11-16 | 2017-05-31 | 合肥普望电子有限责任公司 | 一种变电站智能检测方法 |
RU2628752C1 (ru) * | 2016-10-03 | 2017-08-22 | Олег Фёдорович Меньших | Электронно-управляемый силовой трансформатор (ЭУСТ) для линии электропередачи к потребителю с переменной нагрузкой |
CN207440129U (zh) * | 2017-11-07 | 2018-06-01 | 福建北峰通信科技股份有限公司 | 一种ate自动化测试系统 |
CN108333449A (zh) * | 2018-01-12 | 2018-07-27 | 国家电网公司 | 变电站设备在线监测方法及装置 |
CN108896847A (zh) * | 2018-06-21 | 2018-11-27 | 江苏中房电力安装工程有限公司 | 一种变电站综合自动化检测系统 |
CN109596949A (zh) * | 2018-12-13 | 2019-04-09 | 江苏凌创电气自动化股份有限公司 | 一种智能变电站数字化采样同步转换方法及装置 |
CN109980781A (zh) * | 2019-03-26 | 2019-07-05 | 惠州学院 | 一种变电站智能监控系统 |
CN110133412A (zh) * | 2019-05-31 | 2019-08-16 | 杭州元朗智能科技有限公司 | 一种带有温度检测功能的充电器测试系统 |
CN110417834A (zh) * | 2018-04-28 | 2019-11-05 | 中国电力科学研究院有限公司 | 一种多变电站带时标量测数据断面传输方法及系统 |
CN110412473A (zh) * | 2019-08-02 | 2019-11-05 | 上海安趋信息科技有限公司 | 可变巡检周期的电池数据巡检仪及巡检方法 |
CN210327638U (zh) * | 2019-08-31 | 2020-04-14 | 南京悠阔电气科技有限公司 | 一种变电站远动信息验收装置 |
CN111030301A (zh) * | 2019-12-18 | 2020-04-17 | 广东电网有限责任公司 | 一种调度自动化信息点关联校验的方法 |
-
2020
- 2020-04-26 CN CN202010338624.XA patent/CN111505416B/zh active Active
Patent Citations (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB435564A (en) * | 1934-03-24 | 1935-09-24 | Automatic Electric Co Ltd | Improvements in or relating to electrical signalling systems |
US4855671A (en) * | 1983-04-13 | 1989-08-08 | Fernandes Roosevelt A | Electrical power line and substation monitoring apparatus |
KR980010771A (ko) * | 1996-07-29 | 1998-04-30 | 배순훈 | 프린트 기판 검사 기능을 구비한 자삽기용 장착 좌표 입력장치 및 그 제어방법 |
WO2008002076A1 (en) * | 2006-06-28 | 2008-01-03 | Industry-University Cooperation Foundation Hanyang University | Battery test apparatus and battery test method |
CN101842713A (zh) * | 2007-10-25 | 2010-09-22 | Abb研究有限公司 | 用于变电站自动化系统的系统级测试 |
WO2010069739A1 (en) * | 2008-12-18 | 2010-06-24 | Abb Research Ltd | A system for ground fault detection in a generator |
WO2010101522A1 (en) * | 2009-03-03 | 2010-09-10 | Megger Sweden Ab | Method for detecting errors in an electrical power substation network |
CN101902336A (zh) * | 2009-05-27 | 2010-12-01 | 北京启明星辰信息技术股份有限公司 | 一种基于规则模型的安全事件关联分析系统及方法 |
US20140375327A1 (en) * | 2011-12-22 | 2014-12-25 | Falko Sievers | Device and method for monitoring a voltage supply for a vehicle system |
CN102570607A (zh) * | 2011-12-30 | 2012-07-11 | 长园深瑞继保自动化有限公司 | 智能变电站冗余数据处理系统 |
CN104426757A (zh) * | 2013-09-09 | 2015-03-18 | 贵州电网公司六盘水供电局 | 一种智能变电站专用数据交互方法及装置 |
US20160209450A1 (en) * | 2013-09-27 | 2016-07-21 | Abb Technology Ag | Testing of a substation automation system |
CN104377816A (zh) * | 2014-11-07 | 2015-02-25 | 浙江正泰电器股份有限公司 | 一种智能化的重合闸断路器及其自动重合的控制方法 |
CN105137240A (zh) * | 2015-09-01 | 2015-12-09 | 国家电网公司 | 一种智能变电站合并单元量测量仿真系统及闭环测试方法 |
CN105446336A (zh) * | 2015-12-08 | 2016-03-30 | 哈尔滨工业大学 | 一种用于寒地变电站的机器人巡检系统及巡检方法 |
CN205583839U (zh) * | 2015-12-24 | 2016-09-14 | 安徽中电兴发与鑫龙科技股份有限公司 | 一种变电站微机综合保护测控装置 |
RU168605U1 (ru) * | 2016-06-21 | 2017-02-13 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Кубанский государственный аграрный университет" | Трансформаторная подстанция |
CN206096372U (zh) * | 2016-07-28 | 2017-04-12 | 国网江苏省电力公司常州供电公司 | 一种gis设备隔离开关异常振动在线监测系统 |
RU2628752C1 (ru) * | 2016-10-03 | 2017-08-22 | Олег Фёдорович Меньших | Электронно-управляемый силовой трансформатор (ЭУСТ) для линии электропередачи к потребителю с переменной нагрузкой |
CN106505731A (zh) * | 2016-10-26 | 2017-03-15 | 南京能云电力科技有限公司 | 一种智能变电站与调度对点测试用例智能生成系统及方法 |
CN106774051A (zh) * | 2016-11-16 | 2017-05-31 | 合肥普望电子有限责任公司 | 一种变电站智能检测方法 |
CN207440129U (zh) * | 2017-11-07 | 2018-06-01 | 福建北峰通信科技股份有限公司 | 一种ate自动化测试系统 |
CN108333449A (zh) * | 2018-01-12 | 2018-07-27 | 国家电网公司 | 变电站设备在线监测方法及装置 |
CN110417834A (zh) * | 2018-04-28 | 2019-11-05 | 中国电力科学研究院有限公司 | 一种多变电站带时标量测数据断面传输方法及系统 |
CN108896847A (zh) * | 2018-06-21 | 2018-11-27 | 江苏中房电力安装工程有限公司 | 一种变电站综合自动化检测系统 |
CN109596949A (zh) * | 2018-12-13 | 2019-04-09 | 江苏凌创电气自动化股份有限公司 | 一种智能变电站数字化采样同步转换方法及装置 |
CN109980781A (zh) * | 2019-03-26 | 2019-07-05 | 惠州学院 | 一种变电站智能监控系统 |
CN110133412A (zh) * | 2019-05-31 | 2019-08-16 | 杭州元朗智能科技有限公司 | 一种带有温度检测功能的充电器测试系统 |
CN110412473A (zh) * | 2019-08-02 | 2019-11-05 | 上海安趋信息科技有限公司 | 可变巡检周期的电池数据巡检仪及巡检方法 |
CN210327638U (zh) * | 2019-08-31 | 2020-04-14 | 南京悠阔电气科技有限公司 | 一种变电站远动信息验收装置 |
CN111030301A (zh) * | 2019-12-18 | 2020-04-17 | 广东电网有限责任公司 | 一种调度自动化信息点关联校验的方法 |
Non-Patent Citations (3)
Title |
---|
ZHE LI等: "Real Time Evaluation Algorithm for Measurement Performance of Substation Voltage Transformer Based on Artificial Neural Network", 《2018 2ND IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2)》 * |
耿治等: "智能变电站保护装置自动测试系统分析与设计", 《电力系统保护与控制》 * |
韩伟: "智能变电站二次仿真自动测试系统设计与实现", 《电力系统及其自动化学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114264903A (zh) * | 2021-12-14 | 2022-04-01 | 昆明学院 | 电力远动终端装置自动化闭环测试系统 |
CN114264903B (zh) * | 2021-12-14 | 2023-07-04 | 昆明学院 | 电力远动终端装置自动化闭环测试系统 |
Also Published As
Publication number | Publication date |
---|---|
CN111505416B (zh) | 2023-02-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102073029B (zh) | 电子式互感器测试系统的测试方法 | |
CN106597142B (zh) | 一种svg功率模块的自动测试装置 | |
CN106226603B (zh) | 一种高压交流输电线路的电晕损耗测量系统及方法 | |
CN202583367U (zh) | 一种电能质量综合测试平台 | |
CN109490635B (zh) | 杆塔接地电阻在线监测系统及在线监测方法 | |
CN103592554A (zh) | 一种35kV高压并联电容器在线监测系统及方法 | |
CN111505416B (zh) | 一种变电站综合自动化测试系统 | |
CN208384025U (zh) | 一种直流充电桩的测试系统 | |
CN106646271A (zh) | 一种岸电电源测试系统 | |
CN102866378B (zh) | 一种电压或电流互感器在线测试装置及方法 | |
CN202886585U (zh) | 一种电压或电流互感器在线测试装置 | |
CN112505610A (zh) | 一种35kV及以下计量用电压互感器绝缘及计量性能一体化试验装置及方法 | |
CN103869114A (zh) | 高电压大功率可调模拟变电站的制造技术及装置 | |
CN105203886A (zh) | 一种电容型电流互感器在线检测装置及方法 | |
CN205176158U (zh) | 一种电容型电流互感器在线检测装置 | |
CN205139323U (zh) | 智能变电站继电保护遥试试验系统 | |
CN209215483U (zh) | 一种变电站跨间隔多方式核相装置 | |
CN202260624U (zh) | 一种用于电力系统的综合信息数据处理系统 | |
CN108279345B (zh) | 一种变电所送电检验装置 | |
CN203950010U (zh) | 电缆局部放电检测装置 | |
CN207882332U (zh) | 用于检测变压器铁芯接地电流的系统 | |
Haitao et al. | Usage and Application of Power Quality Monitor on Harmonic Measurement | |
CN207199074U (zh) | 用于调试电力计量终端的便携终端及电力计量终端系统 | |
CN205038275U (zh) | 一种制动单元检测试验装置 | |
CN206411225U (zh) | 一种具备缺陷定位功能的电缆串谐耐压装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |