CN111503417A CN202010327325.6A CN202010327325A CN111503417A CN 111503417 A CN111503417 A CN 111503417A CN 202010327325 A CN202010327325 A CN 202010327325A CN 111503417 A CN111503417 A CN 111503417A
Authority
CN
China
Prior art keywords
pipe
butt joint
main pipe
pipeline
standby
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010327325.6A
Other languages
Chinese (zh)
Other versions
CN111503417B (en
Inventor
胡惠琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yiwu Shengtao Decoration Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010327325.6A priority Critical patent/CN111503417B/en
Publication of CN111503417A publication Critical patent/CN111503417A/en
Application granted granted Critical
Publication of CN111503417B publication Critical patent/CN111503417B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/1608Devices for covering leaks in pipes or hoses, e.g. hose-menders by replacement of the damaged part of the pipe

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)

Abstract

The invention discloses a pipeline, which comprises a pipeline main body which is installed in a hanging way, wherein one section or more than one section of self-repairing section is arranged on the pipeline main body, the self-repairing section comprises at least one main pipe and one spare pipe, butt-joint pipes are arranged on two sides of the self-repairing section, and the butt-joint pipes and the self-repairing section form the pipeline main body; the main pipe is positioned at the bottom of the standby pipe, the main pipe is in butt joint with the butt joint pipes on two sides for drainage, and the lower end face of the standby pipe is in contact extrusion with the upper end face of the main pipe; the pipeline can effectively collect the water leakage of the pipeline, the gravity of the standby pipe is increased by utilizing the water leakage of the pipeline, the position replacement between the main water leakage pipe and the standby pipe is further realized, the standby pipe is automatically butted with the butt joint pipe, the self-repairing of the pipeline is realized, the manual maintenance is not needed, and the integral service life of the pipeline is prolonged.

Description

Pipeline
Technical Field
The invention relates to the field of pipelines, in particular to a pipeline.
Background
In the prior art, a plurality of pipelines are arranged on a ceiling, then a gypsum suspended ceiling or an integrated suspended ceiling is arranged on the ceiling to cover the pipelines for the sake of aesthetic property, therefore, these pipes are not usually visible, and can be repaired only by disassembling the ceiling, so that, in case of leakage of the pipes, water leaked from the pipes may penetrate the ceiling in a large amount, fall on the floor of a room, and cause damage to furniture and electric appliances, and if the repair is desired, the ceiling must be removed, and thus the workload is enormous, because the missing points are not known, the interior decoration can only be removed in a large area, the cost is increased, the interior decoration is seriously damaged, water leakage from the pipe is a very troublesome thing, although the sealing and strength of the pipe are ensured at the time of installation, but the pipeline is aged, which is inevitable, and how to prevent the water leakage of the pipeline at the later stage is urgently needed to be solved.
Disclosure of Invention
The invention aims to solve the technical problem of providing a pipeline, which can effectively collect water leakage when the pipeline leaks, collect the water leakage, extrude out a main pipe with the water leakage by using gravity, replace the position of the main pipe by using a spare pipe, realize the re-butt joint, prevent the continuous water leakage, realize the automatic repair, save the manual maintenance, and better protect the integrity of indoor decoration without detaching a suspended ceiling.
The invention is realized by the following technical scheme: a pipeline comprises a pipeline main body which is installed in a hanging mode, wherein one or more self-repairing sections are arranged on the pipeline main body and comprise at least one main pipe and one spare pipe, butt-joint pipes are arranged on two sides of each self-repairing section, and the butt-joint pipes and the self-repairing sections form the pipeline main body;
the main pipe is positioned at the bottom of the standby pipe, the main pipe is in butt joint with the butt joint pipes on two sides for draining water, the lower end face of the standby pipe is in contact with and extruded with the upper end face of the main pipe, the standby pipe is connected with a counterweight device through more than one hanger rod, and the weight of the standby pipe is increased through the counterweight device to extrude the main pipe;
the main pipe and the standby pipe are arranged between the two fixing rods, the fixing rods are arranged on a ceiling, a penetrating butt joint hole is formed in each fixing rod, one end of each butt joint pipe is inserted into and fixed in each butt joint hole, and the opening ends of the two sides of the main pipe face the butt joint pipes and are in butt joint conduction.
According to a preferable technical scheme, the opposite surfaces of the fixing rods are provided with longitudinal limiting grooves, two longitudinal sliding rails are respectively arranged on two sides of the bottom surfaces of the longitudinal limiting grooves, two sides of the main pipe and the standby pipe are respectively provided with a butting ring, two sides of the main pipe and the standby pipe are respectively arranged in the longitudinal limiting grooves in a sliding mode, and the butting rings are buckled in the longitudinal sliding rails.
As the preferred technical scheme, a section of yielding section is formed between the bottom of the main pipe and the bottom surface of the longitudinal limiting groove, and when the standby pipe is located at the position of the main pipe, the main pipe is extruded into the yielding section through the standby pipe and is used for supporting the bottom of the standby pipe at the top.
As the preferred technical scheme, the opposite surfaces of the bottom of the fixed rod are respectively provided with a supporting convex part, the upper end surface of the supporting convex part is an arc concave surface, and when the main pipe is displaced to the bottom, the main pipe is contacted with the supporting convex part and is partially buckled in the arc concave surface.
Preferably, the main pipe, the spare pipe and the butt joint pipe have the same outer diameter, and a discharge channel with the same hole diameter is arranged inside the spare pipe and the butt joint pipe.
As a preferred technical scheme, a supporting elastic buckle is arranged on the bottom surface of the longitudinal limiting groove, the supporting elastic buckle is arranged at the bottom of the main pipe and used for supporting the main pipe at the upper end, and a supporting spring is arranged at the inner side end of the supporting elastic buckle.
According to the preferable technical scheme, a sealing rubber ring is arranged on the end face, located on the outer side of the fixing rod, of the butt joint pipe, a first O-shaped sealing ring is embedded into the end face, located on one side of the butt joint pipe, of the main pipe and the spare pipe, a second O-shaped sealing ring is arranged on the main pipe and the spare pipe, located on the side of the butt joint pipe, opposite to the first O-shaped sealing ring, and when the butt joint pipe is in butt joint conduction with the spare pipe and the main pipe, the first O-shaped sealing ring and.
As the preferred technical scheme, an installation plate is welded at the top of each fixed rod and fixedly installed on a ceiling through screws, the fixed rods are elastic metal rods, and a spare pipe and a main pipe in the middle of each fixed rod are clamped between the two fixed rods.
According to a preferable technical scheme, the counterweight device comprises a water collecting box, a water collecting cavity with an opening at the upper end surface is formed in the top of the water collecting box, a water collecting bag with elastic expansion is arranged at the bottom of the water collecting box and communicated with the water collecting cavity, one end of a hanging rod is hung on a standby pipe, and the other end of the hanging rod is locked and fixed with a screw hole in the outer wall surface of the water collecting box through a screw.
The invention has the beneficial effects that: the invention can effectively collect the water leakage of the pipeline, the water cannot fall on the suspended ceiling, the weight of the water is utilized to increase the weight of the standby pipe, the main pipe with the water leakage is further squeezed away, the standby pipe is shifted to the position of the main pipe, the butt joint is realized again, the automatic conduction is completed, the manual maintenance is not needed, and the integral service life of the pipeline is prolonged.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side view of the fixation rod of the present invention;
FIG. 3 is an assembled structure view of the fixing rod of the present invention with a main pipe and a spare pipe;
FIG. 4 is a schematic end view of a docking ring of the present invention;
FIG. 5 is a schematic structural view of the present invention after displacement of the main pipe and the standby pipe after water leakage;
fig. 6 is an assembly structure view of the fixing rod of the present invention after displacement with the main tube and the spare tube.
Detailed Description
As shown in fig. 1, a pipeline comprises a pipeline main body which is installed in a hanging manner, wherein one or more self-repairing sections are arranged on the pipeline main body, each self-repairing section comprises at least one main pipe 4 and one spare pipe 3, butt-joint pipes 2 are arranged on two sides of each self-repairing section, and the butt-joint pipes 2 and the self-repairing sections form the pipeline main body;
the main pipe 4 is positioned at the bottom of the standby pipe 3, the main pipe 4 is in butt joint with the butt joint pipes 2 at two sides for draining water, the lower end surface of the standby pipe 3 is in contact extrusion with the upper end surface of the main pipe 4, the standby pipe 3 is connected with a counterweight device through more than one hanger rod 5, and the weight of the standby pipe 3 is increased through the counterweight device to extrude the main pipe;
the main pipe 4 and the standby pipe 3 are arranged between the two fixing rods 1, the fixing rods 1 are arranged on a ceiling, a penetrating butt joint hole is formed in each fixing rod 1, one end of each butt joint pipe 2 is inserted into and fixed in each butt joint hole, and the opening ends of the two sides of the main pipe 4 face the butt joint pipes 2 to be in butt joint conduction.
As shown in fig. 2, the opposite surfaces of the fixing rod 1 are respectively provided with a longitudinal limiting groove 8, two sides of the bottom surface of the longitudinal limiting groove 8 are respectively provided with a longitudinal sliding rail 81, two sides of the main tube 4 and the spare tube 3 are respectively provided with a docking ring 7, two sides of the main tube 4 and the spare tube 3 are respectively slidably installed in the longitudinal limiting groove 8, and the docking rings 7 are buckled in the longitudinal sliding rails 81.
As shown in fig. 3, a yielding section 82 is formed between the bottom of the main pipe 4 and the bottom surface of the longitudinal limiting groove, and when the standby pipe 3 is located at the position of the main pipe 4, the main pipe 4 is extruded into the yielding section 82 through the standby pipe 3 for supporting the bottom of the top standby pipe 3.
Wherein, the bottom opposite surface of dead lever 1 all forms a support convex part 6, supports the convex part 6 up end and is an arc concave surface 61, when being responsible for 4 displacements to the bottom, is responsible for 4 and supports convex part 6 contact and partly detains in arc concave surface 61, and the external diameter of being responsible for 4, reserve pipe 3 and butt joint pipe 2 all is the same, and its inside all has the same discharge passage of aperture (not shown).
The bottom surface of the longitudinal limiting groove 8 is provided with a supporting elastic buckle 9, the supporting elastic buckle 9 is arranged at the bottom position of the main pipe 4 and is used for supporting the main pipe 4 at the upper end, a supporting spring is arranged at the inner side end of the supporting elastic buckle 9, and the supporting force of the bottom of the main pipe 4 and the butt joint pipe 2 is increased through the supporting elastic buckle 9, so that the supporting spring can sufficiently support the main pipe at the top as long as the spare pipe does not apply pressure to the main pipe.
As shown in fig. 3 and 4, a sealing rubber ring 10 is disposed on an end surface of the butt joint pipe 2 located at the outer side of the fixing rod 1, a first O-ring (not shown) is embedded into an end surface of the butt joint pipe 2 facing the main pipe 4 and the spare pipe 3, a second O-ring 71 is disposed on the main pipe facing the first O-ring and the spare pipe, and when the butt joint pipe 2 is in butt joint with the spare pipe 3 and the main pipe 4, the first O-ring and the second O-ring are in contact sealing with each other, so as to increase the sealing performance after butt joint.
Wherein, a mounting panel is welded at the top of the fixed rod 1, the mounting panel is fixedly mounted on a ceiling through screws, the fixed rod 1 adopts an elastic metal rod, the spare pipe 4 in the middle and the main pipe 3 are clamped between the two fixed rods 1, the main pipe 3 and the spare pipe 4 are clamped through the elastic fixed rod 1, so that the two sides of the assembled spare pipe are clamped, and water leakage after the pipelines are butted is prevented.
Wherein, the counter weight device includes a water collecting box 11, the top of water collecting box 11 has a water collecting cavity with an opening on the upper end face, the bottom of water collecting box 11 is provided with a water collecting bag 12 with elastic expansion, water collecting bag 12 is communicated with water collecting cavity, one end of suspender 5 is hung on standby pipe 3, and the other end is locked and fixed with the screw hole on the outer wall surface of water collecting box 11 through the screw.
When the main pipe leaks water, the leaked water in the main pipe can enter the water collecting cavity, and the water in the water collecting cavity enters the water collecting bag, so that the leaked water can be effectively collected and prevented from contacting with a suspended ceiling; when counter weight device's weight is big enough, its weight can make the weight increase of reserve pipe, the person in charge of reserve pipe extrusion bottom, be responsible for and will support the bullet knot to buckle the back, be responsible for the displacement to the bottommost of vertical spacing groove, and reserve pipe then the displacement is to being responsible for the position, reserve pipe both sides switch on with the butt joint pipe butt joint this moment, and the bottom of reserve pipe is then through butt joint ring contact with the butt joint ring on being responsible for, the person in charge who utilizes the bottom supports as reserve pipe, make reserve pipe can not continue down to move even the atress yet, that is to say, reserve pipe can switch on with the butt joint pipe butt joint of both sides all the time, as shown in fig. 5 and fig. 6, with this change butt joint that realizes the pipeline, utilize new reserve pipe to continue the drainage as the pipeline to use, greatly increased life.
The invention has the beneficial effects that: the invention can effectively collect the water leakage of the pipeline, the water cannot fall on the suspended ceiling, the weight of the water is utilized to increase the weight of the standby pipe, the main pipe with the water leakage is further squeezed away, the standby pipe is shifted to the position of the main pipe, the butt joint is realized again, the automatic conduction is completed, the manual maintenance is not needed, and the integral service life of the pipeline is prolonged.
The above description is only an embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the inventive work should be included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope defined by the claims.

Claims (9)

1. A duct, characterized by: the pipeline comprises a pipeline main body which is installed in a hanging mode, wherein one or more self-repairing sections are arranged on the pipeline main body and comprise at least one main pipe and one spare pipe, butt-joint pipes are arranged on two sides of each self-repairing section, and the butt-joint pipes and the self-repairing sections form the pipeline main body;
the main pipe is positioned at the bottom of the standby pipe, the main pipe is in butt joint with the butt joint pipes on two sides for draining water, the lower end face of the standby pipe is in contact with and extruded with the upper end face of the main pipe, the standby pipe is connected with a counterweight device through more than one hanger rod, and the weight of the standby pipe is increased through the counterweight device to extrude the main pipe;
the main pipe and the standby pipe are arranged between the two fixing rods, the fixing rods are arranged on a ceiling, a penetrating butt joint hole is formed in each fixing rod, one end of each butt joint pipe is inserted into and fixed in each butt joint hole, and the opening ends of the two sides of the main pipe face the butt joint pipes and are in butt joint conduction.
2. A duct according to claim 1, wherein: the opposite surfaces of the fixed rods are provided with longitudinal limiting grooves, two longitudinal sliding rails are respectively arranged on two sides of the bottom surfaces of the longitudinal limiting grooves, two sides of the main pipe and the standby pipe are respectively provided with a butt-joint ring, two sides of the main pipe and the standby pipe are respectively arranged in the longitudinal limiting grooves in a sliding mode, and the butt-joint rings are buckled in the longitudinal sliding rails.
3. A duct according to claim 2, wherein: be responsible for and form one section between the vertical spacing tank bottom surface of distance and give way the section, when the stand-by pipe was located the position of being responsible for, be responsible for and extrude to giving way the section in through the stand-by pipe for the bottom sprag of top stand-by pipe.
4. A duct according to claim 1, wherein: the bottom opposite surface of dead lever all forms a support convex part, supports the convex part up end and is an arc concave surface, when being responsible for the displacement to the bottom, is responsible for and supports the convex part contact and partly detains in the arc concave surface.
5. A duct according to claim 1, wherein: the outer diameters of the main pipe, the spare pipe and the butt joint pipe are the same, and the inner parts of the main pipe, the spare pipe and the butt joint pipe are provided with a discharge channel with the same aperture.
6. A duct according to claim 2, wherein: the bottom surface of the longitudinal limiting groove is provided with a supporting elastic buckle which is arranged at the bottom of the main pipe and used for supporting the main pipe at the upper end, and the inner side end of the supporting elastic buckle is provided with a supporting spring.
7. A duct according to claim 1, wherein: the butt joint pipe is provided with a sealing rubber ring at the end face of the outer side of the fixed rod, a first O-shaped sealing ring is embedded into the end face of the butt joint pipe, which faces the main pipe and the spare pipe, a second O-shaped sealing ring is arranged on the main pipe and the spare pipe, which face the first O-shaped sealing ring, and when the butt joint pipe is in butt joint conduction with the spare pipe and the main pipe, the first O-shaped sealing ring and the second O-shaped sealing ring are in contact sealing with each other.
8. A duct according to claim 1, wherein: the utility model discloses a safe and reliable fixing device, including dead lever, mounting panel, dead lever, spare pipe and the person in charge in the middle of the dead lever top welding, the mounting panel passes through screw fixed mounting on the ceiling, the dead lever adopts elastic metal pole, presss from both sides tight spare pipe in the middle of two dead levers and is responsible for.
9. A duct according to claim 1, wherein: the counterweight device comprises a water collecting box, the top of the water collecting box is provided with a water collecting cavity with an opening on the upper end surface, the bottom of the water collecting box is provided with a water collecting bag with elastic expansion, the water collecting bag is communicated with the water collecting cavity, one end of a suspender is hung on the standby pipe, and the other end of the suspender is locked and fixed with a screw hole on the outer wall surface of the water collecting box through a screw.
CN202010327325.6A 2020-04-23 2020-04-23 Pipeline Active CN111503417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010327325.6A CN111503417B (en) 2020-04-23 2020-04-23 Pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010327325.6A CN111503417B (en) 2020-04-23 2020-04-23 Pipeline

Publications (2)

Publication Number Publication Date
CN111503417A true CN111503417A (en) 2020-08-07
CN111503417B CN111503417B (en) 2022-09-23

Family

ID=71870159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010327325.6A Active CN111503417B (en) 2020-04-23 2020-04-23 Pipeline

Country Status (1)

Country Link
CN (1) CN111503417B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232088A (en) * 2021-11-01 2022-03-25 上海三盼半导体设备有限公司 Large-capacity CVD equipment equipped with gas injection module unit

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1040259A (en) * 1989-05-17 1990-03-07 扬州自来水公司 Method for quick and easy repairing burst of submerged steel pipe
JPH10299948A (en) * 1997-04-21 1998-11-13 Taisei Corp Pipe body suspension structure
CN1448596A (en) * 2002-11-13 2003-10-15 兰新民 A method for renovation water leakage of construction and pipe orifice
CN201212152Y (en) * 2008-06-24 2009-03-25 朱邃科 Upstand beam structure of top board of basement engineering
CN102425227A (en) * 2011-08-25 2012-04-25 中铁四局集团第二工程有限公司 Hanging system for large-diameter sewage pipeline
CN103382771A (en) * 2013-07-25 2013-11-06 中国建筑第八工程局有限公司 Leakage proof mould hoisting tool at root of residence pipeline and construction method thereof
KR101994482B1 (en) * 2018-12-10 2019-06-28 이정우 Water and sewage pipe installation structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1040259A (en) * 1989-05-17 1990-03-07 扬州自来水公司 Method for quick and easy repairing burst of submerged steel pipe
JPH10299948A (en) * 1997-04-21 1998-11-13 Taisei Corp Pipe body suspension structure
CN1448596A (en) * 2002-11-13 2003-10-15 兰新民 A method for renovation water leakage of construction and pipe orifice
CN201212152Y (en) * 2008-06-24 2009-03-25 朱邃科 Upstand beam structure of top board of basement engineering
CN102425227A (en) * 2011-08-25 2012-04-25 中铁四局集团第二工程有限公司 Hanging system for large-diameter sewage pipeline
CN103382771A (en) * 2013-07-25 2013-11-06 中国建筑第八工程局有限公司 Leakage proof mould hoisting tool at root of residence pipeline and construction method thereof
KR101994482B1 (en) * 2018-12-10 2019-06-28 이정우 Water and sewage pipe installation structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232088A (en) * 2021-11-01 2022-03-25 上海三盼半导体设备有限公司 Large-capacity CVD equipment equipped with gas injection module unit
CN114232088B (en) * 2021-11-01 2023-09-15 上海鑫华夏半导体设备有限公司 High capacity CVD apparatus equipped with gas injection module unit

Also Published As

Publication number Publication date
CN111503417B (en) 2022-09-23

Similar Documents

Publication Publication Date Title
CN111692441B (en) Warm construction pipeline connection structure that leads to
CN111503417B (en) Pipeline
CN214093452U (en) Split flange plate
CN214466687U (en) Special-shaped pipeline penetrating and separating sealing element
CN212360163U (en) Pressure switch for regulating water pressure
CN214534814U (en) Pre-buried channel assembly for pipe gallery
CN218582470U (en) Shock insulation seam mounting structure is worn to pressure pipeline of earthquake seepage prevention
CN213789740U (en) Building fire control pipeline fixing device
CN209570063U (en) A kind of heat exchanger copper pipe fixing device
CN211646258U (en) Water-stopping and seepage-proofing structure for hydraulic engineering construction
CN216041504U (en) Antiseep fire control drainage shaft
CN210624850U (en) Built-in heat preservation drain pipe of filter screen
CN212584474U (en) Sewage pipes for building be convenient for concatenation
CN220470992U (en) Pipeline leakage repairing device
CN220813990U (en) Anti-seismic support structure for comprehensive pipe rack
CN219282715U (en) Plastic pipe capable of being rapidly installed
CN217381170U (en) Corner connecting device for assembled anti-seismic support
CN217899183U (en) Three-way pipe convenient to installation
CN219827836U (en) Pressure reducing device for water pipe node of mountain top water tank
CN218719488U (en) Water pipe mounting structure
CN215633037U (en) Water stop ring device for pipe jacking construction
CN219327869U (en) Novel spliced drain pipe for building water supply and drainage construction
CN212691043U (en) Mounting and fixing device for building drain pipe
CN214838923U (en) Shower water pipe installation fixing device
CN216009869U (en) Water supply and drainage engineering is with arranging water piping connection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220907

Address after: 322000 4th floor, unit 1, building 21, District 6, Hushan new village, Fotang Town, Yiwu City, Jinhua City, Zhejiang Province

Applicant after: Yiwu Shengtao Decoration Co.,Ltd.

Address before: 322100 room 402, unit 2, building 3, Xibao Plaza, No. 2, Dongyi Road, Dongyang City, Jinhua City, Zhejiang Province

Applicant before: Hu Huiqin

GR01 Patent grant
GR01 Patent grant