CN111444637A - 一种页岩气长段水平井套管下入的安全性评估方法及系统 - Google Patents
一种页岩气长段水平井套管下入的安全性评估方法及系统 Download PDFInfo
- Publication number
- CN111444637A CN111444637A CN202010467593.8A CN202010467593A CN111444637A CN 111444637 A CN111444637 A CN 111444637A CN 202010467593 A CN202010467593 A CN 202010467593A CN 111444637 A CN111444637 A CN 111444637A
- Authority
- CN
- China
- Prior art keywords
- well
- coefficient
- casing running
- casing
- predicted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000011156 evaluation Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 claims abstract description 34
- 238000010206 sensitivity analysis Methods 0.000 claims abstract description 20
- 238000005259 measurement Methods 0.000 claims abstract description 15
- 238000005553 drilling Methods 0.000 claims abstract description 11
- 238000004140 cleaning Methods 0.000 claims description 31
- 238000004364 calculation method Methods 0.000 claims description 22
- 238000004590 computer program Methods 0.000 claims description 18
- 238000003860 storage Methods 0.000 claims description 8
- 238000007619 statistical method Methods 0.000 claims description 5
- 239000000126 substance Substances 0.000 claims description 5
- 230000003749 cleanliness Effects 0.000 claims 2
- 230000001186 cumulative effect Effects 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 19
- 238000010276 construction Methods 0.000 description 14
- 238000004458 analytical method Methods 0.000 description 9
- 230000006870 function Effects 0.000 description 6
- 238000004088 simulation Methods 0.000 description 5
- 238000009826 distribution Methods 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000035945 sensitivity Effects 0.000 description 4
- 238000011161 development Methods 0.000 description 2
- 230000001788 irregular Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000000638 solvent extraction Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims (12)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010467593.8A CN111444637B (zh) | 2020-05-28 | 2020-05-28 | 一种页岩气长段水平井套管下入的安全性评估方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010467593.8A CN111444637B (zh) | 2020-05-28 | 2020-05-28 | 一种页岩气长段水平井套管下入的安全性评估方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111444637A true CN111444637A (zh) | 2020-07-24 |
CN111444637B CN111444637B (zh) | 2023-04-25 |
Family
ID=71655453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010467593.8A Active CN111444637B (zh) | 2020-05-28 | 2020-05-28 | 一种页岩气长段水平井套管下入的安全性评估方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111444637B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112818609A (zh) * | 2021-01-05 | 2021-05-18 | 中国石油天然气股份有限公司 | 一种长水平段水平井冲砂作业组合管柱的下入能力评价方法 |
CN113530525A (zh) * | 2021-07-20 | 2021-10-22 | 北京蓝海智信能源技术有限公司 | 一种井眼清洁状况分析方法、装置及计算机存储介质 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050228905A1 (en) * | 2004-03-17 | 2005-10-13 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assesssment based on technical wellbore design and earth properties |
CN105545260A (zh) * | 2015-12-30 | 2016-05-04 | 中国石油天然气股份有限公司 | 一种套管柱下入方法及装置 |
US20170058651A1 (en) * | 2015-08-25 | 2017-03-02 | Eog Resources, Inc. | Plunger Lift Systems and Methods |
CN106845043A (zh) * | 2017-04-07 | 2017-06-13 | 东方宝麟科技发展(北京)有限公司 | 一种页岩气水平井重复压裂工艺流程及设计方法 |
CN108487905A (zh) * | 2018-03-14 | 2018-09-04 | 中国石油大学(北京) | 一种页岩气水平井压裂参数的优化方法 |
CN109162643A (zh) * | 2018-10-19 | 2019-01-08 | 成都科盛石油科技有限公司 | 用于连续型页岩储层的完钻方法 |
CN109322618A (zh) * | 2018-10-19 | 2019-02-12 | 成都科盛石油科技有限公司 | 非均质页岩气井储层段完钻方法 |
CN109826593A (zh) * | 2018-12-25 | 2019-05-31 | 内江师范学院 | 基于bp神经网络的储层气体钻井安全风险分析系统 |
CN109931048A (zh) * | 2019-03-27 | 2019-06-25 | 南智(重庆)能源技术有限公司 | 油气井油套管完整性检测方法及评价系统 |
US20200063553A1 (en) * | 2018-08-21 | 2020-02-27 | Dynaenergetics Gmbh & Co. Kg | System and method for navigating a wellbore and determining location in a wellbore |
US20200157401A1 (en) * | 2018-11-15 | 2020-05-21 | Yangtze University | Composition for preparing anti-wear lubricant for drilling fluid and preparation method of anti-wear lubricant for drilling fluid and drilling fluid |
-
2020
- 2020-05-28 CN CN202010467593.8A patent/CN111444637B/zh active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050228905A1 (en) * | 2004-03-17 | 2005-10-13 | Schlumberger Technology Corporation | Method and apparatus and program storage device adapted for automatic qualitative and quantitative risk assesssment based on technical wellbore design and earth properties |
US20170058651A1 (en) * | 2015-08-25 | 2017-03-02 | Eog Resources, Inc. | Plunger Lift Systems and Methods |
CN105545260A (zh) * | 2015-12-30 | 2016-05-04 | 中国石油天然气股份有限公司 | 一种套管柱下入方法及装置 |
CN106845043A (zh) * | 2017-04-07 | 2017-06-13 | 东方宝麟科技发展(北京)有限公司 | 一种页岩气水平井重复压裂工艺流程及设计方法 |
CN108487905A (zh) * | 2018-03-14 | 2018-09-04 | 中国石油大学(北京) | 一种页岩气水平井压裂参数的优化方法 |
US20200063553A1 (en) * | 2018-08-21 | 2020-02-27 | Dynaenergetics Gmbh & Co. Kg | System and method for navigating a wellbore and determining location in a wellbore |
CN109162643A (zh) * | 2018-10-19 | 2019-01-08 | 成都科盛石油科技有限公司 | 用于连续型页岩储层的完钻方法 |
CN109322618A (zh) * | 2018-10-19 | 2019-02-12 | 成都科盛石油科技有限公司 | 非均质页岩气井储层段完钻方法 |
US20200157401A1 (en) * | 2018-11-15 | 2020-05-21 | Yangtze University | Composition for preparing anti-wear lubricant for drilling fluid and preparation method of anti-wear lubricant for drilling fluid and drilling fluid |
CN109826593A (zh) * | 2018-12-25 | 2019-05-31 | 内江师范学院 | 基于bp神经网络的储层气体钻井安全风险分析系统 |
CN109931048A (zh) * | 2019-03-27 | 2019-06-25 | 南智(重庆)能源技术有限公司 | 油气井油套管完整性检测方法及评价系统 |
Non-Patent Citations (3)
Title |
---|
何树山;岳发辉;周明信;: "大港油田大位移钻井技术研究与实践" * |
刘晓坡;廖前华;李刚;: "软件预测摩阻-随钻校正摩阻系数方法及其在BZ34-1-D6大位移井钻井中的应用" * |
杨决算,梁勇等: "鲁迈拉定向井钻井设计优化与应用" * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112818609A (zh) * | 2021-01-05 | 2021-05-18 | 中国石油天然气股份有限公司 | 一种长水平段水平井冲砂作业组合管柱的下入能力评价方法 |
CN113530525A (zh) * | 2021-07-20 | 2021-10-22 | 北京蓝海智信能源技术有限公司 | 一种井眼清洁状况分析方法、装置及计算机存储介质 |
Also Published As
Publication number | Publication date |
---|---|
CN111444637B (zh) | 2023-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2334905B1 (en) | Method of determining borehole conditions from distributed measurement data | |
CN109538185B (zh) | 一种耦合温度场条件下的多层套管井井筒完整性分析模型 | |
EA031769B1 (ru) | Моделирование скважины, связанное с добычей углеводородов из подземных формаций | |
CN103015967A (zh) | 为滑动钻井控制井底钻具组合的工具面方向的方法 | |
US20140131101A1 (en) | Systems and methods for determining enhanced equivalent circulating density and interval solids concentration in a well system using multiple sensors | |
CN109033504B (zh) | 一种油水井套管损坏预测方法 | |
CN111444637A (zh) | 一种页岩气长段水平井套管下入的安全性评估方法及系统 | |
US20180128095A1 (en) | Estimating deformation of a completion string caused by an eccentric tool coupled thereto | |
WO2014099832A1 (en) | Methods and systems for analyzing the quality of a wellbore | |
RU2564423C2 (ru) | Система и способ моделирования взаимодействия расширителя и долота | |
CN113392483B (zh) | 井筒摩擦系数确定方法和装置、井筒摩阻确定方法和装置 | |
CN115586086A (zh) | 一种基于大数据的井壁失稳分析方法 | |
Zhang et al. | Prediction model of casing wear shape and residual strength under compound modes | |
Arnaout et al. | Intelligent real-time drilling operations classification using trend analysis of drilling rig sensors data | |
WO2016179767A1 (en) | Fatigue analysis procedure for drill string | |
EP3821107A1 (en) | Systems and methods to identify and inhibit spider web borehole failure in hydrocarbon wells | |
CN109869132B (zh) | 一种下套管摩阻系数计算方法 | |
CN114776286A (zh) | 井壁稳定评价方法、装置、设备和钻井液处理剂优选方法 | |
CN114611740A (zh) | 一种岩石的可钻性级值的预测方法 | |
Paliichuk et al. | FORCEFUL INTERACTION OF THE CASING STRING WITH THE WALLS OF A CURVILINEAR WELL. | |
Wu et al. | A new method of calculating rig parameters and its application in downhole weight on bit automation in horizontal drilling | |
CN115749730B (zh) | 一种随钻岩石力学参数预测方法和系统 | |
Cordoso et al. | Problem detection during tripping operations in horizontal and directional wells | |
CN118091786B (zh) | 基于井下测井资料的裂缝线密度校正方法和装置 | |
CN113530525B (zh) | 一种井眼清洁状况分析方法、装置及计算机存储介质 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230105 Address after: No. 1706, Shimao Building, No. 99, Mengzhuiwan Cross Street, Chenghua District, Chengdu, Sichuan 610000 Applicant after: ZHOUJI STRAIT ENERGY TECHNOLOGY Co.,Ltd. Applicant after: Intercontinental Strait Energy Technology (Beijing) Co.,Ltd. Applicant after: Intercontinental Strait Energy Technology (Wuhan) Co.,Ltd. Address before: 610051 no.1706, Shimao building, 99 mengzhuiwan Hengjie, Chenghua District, Chengdu, Sichuan Province Applicant before: ZHOUJI STRAIT ENERGY TECHNOLOGY Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231022 Address after: No. 1706, Shimao Building, No. 99, Mengzhuiwan Cross Street, Chenghua District, Chengdu, Sichuan 610000 Patentee after: ZHOUJI STRAIT ENERGY TECHNOLOGY Co.,Ltd. Patentee after: Intercontinental Strait Energy Technology (Beijing) Co.,Ltd. Address before: No. 1706, Shimao Building, No. 99, Mengzhuiwan Cross Street, Chenghua District, Chengdu, Sichuan 610000 Patentee before: ZHOUJI STRAIT ENERGY TECHNOLOGY Co.,Ltd. Patentee before: Intercontinental Strait Energy Technology (Beijing) Co.,Ltd. Patentee before: Intercontinental Strait Energy Technology (Wuhan) Co.,Ltd. |
|
TR01 | Transfer of patent right |