CN111441608A - Method for repairing bottom of swimming pool - Google Patents

Method for repairing bottom of swimming pool Download PDF

Info

Publication number
CN111441608A
CN111441608A CN202010469573.4A CN202010469573A CN111441608A CN 111441608 A CN111441608 A CN 111441608A CN 202010469573 A CN202010469573 A CN 202010469573A CN 111441608 A CN111441608 A CN 111441608A
Authority
CN
China
Prior art keywords
maintained
adhesive
swimming pool
repaired
ceramic tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010469573.4A
Other languages
Chinese (zh)
Inventor
郭永达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianxiu Technology Co ltd
Original Assignee
Jianxiu Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianxiu Technology Co ltd filed Critical Jianxiu Technology Co ltd
Priority to CN202010469573.4A priority Critical patent/CN111441608A/en
Publication of CN111441608A publication Critical patent/CN111441608A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0285Repairing or restoring flooring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H4/00Swimming or splash baths or pools
    • E04H4/14Parts, details or accessories not otherwise provided for

Abstract

The invention discloses a method for repairing the bottom of a swimming pool, which comprises the following steps: a maintainer submerges into the swimming pool, searches for a position to be repaired, and knocks the position to be repaired to determine whether the part to be repaired is peeled off or aged; when the brick falls off at the position to be maintained, setting a mark at the position to be maintained; stripping bricks and sand stones at the position to be maintained, and cleaning the stripped bricks, broken stones, fragments and sand stones; sawing and cutting the edge of the position to be maintained; measuring the size of the position to be maintained, preparing the amount of the adhesive, coating the adhesive on the edge and the bottom of the position to be maintained, pasting the ceramic tile on the surface of the adhesive, and knocking and polishing the ceramic tile to enable the ceramic tile to be flush with the surrounding ceramic tiles; the pumping filter is used for purifying a small amount of sand dust generated during repair. Its advantage is that the water in the swimming pool need not to discharge, alright in order to maintain, practices thrift the water source, and the environmental protection saves time, need not to build the cofferdam.

Description

Method for repairing bottom of swimming pool
Technical Field
The invention relates to the technical field of underwater construction, in particular to a method for repairing the bottom of a swimming pool.
Background
Swimming pool water bottom structures, similar to land based structures, are subject to various types of damage from different sources, such as concrete spalling and spalling due to aging, structural defects and other various deterioration factors. The traditional underwater maintenance method of the swimming pool has to drain the swimming pool, completely drain the water in the swimming pool, then maintain the swimming pool, inject the water into the swimming pool after about 7 to 28 days after the maintenance is finished, then test the swimming pool, if the test result is not ideal, drain the swimming pool again, and then maintain the swimming pool for the second time. The cost of swimming pool drainage is very high and water is wasted. If the required maintenance area is small, time is consumed except for high cost, and if the repair area is large, a cofferdam needs to be built, so that the traditional maintenance method is time-consuming and labor-consuming.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a method for repairing the bottom of a swimming pool.
The invention has a technical scheme that:
a method of repairing a swimming pool bottom, comprising the steps of:
the first step, one or more maintenance personnel equipped with oxygen goblet dives into swimming pool, find the position to be repaired in swimming pool, after examining the position to be repaired, knock the position to be repaired with the tool to confirm whether the part to be repaired is peeled or aged by sound;
secondly, after the position to be maintained is knocked, if bricks at the position to be maintained fall off or hollow sound exists, the position to be maintained is damaged or has danger of damage, at the moment, a maintainer sets a mark at the position to be maintained, and a buoy is arranged on the water surface of the position;
completely stripping bricks and sand and stones at the position to be maintained, and cleaning the stripped bricks, broken stones, fragments and sand and stones;
fourthly, sawing and cutting the edge of the position to be repaired by a maintainer through a cutter so as to put in the repairing adhesive and the bricks;
fifthly, measuring the size of the position to be maintained, blending the amount of the adhesive according to the size of the position to be maintained, then coating the adhesive on the edge and the bottom of the position to be maintained, sticking the cut ceramic tile on the surface of the adhesive to ensure that the ceramic tile is stuck on the position to be maintained, knocking and polishing the ceramic tile to ensure that the ceramic tile is flush with the surrounding ceramic tiles;
and sixthly, purifying a small amount of sand and dust generated during repair by using a water pumping filter.
One preferred embodiment is where the binder is an epoxy resin.
One preferable scheme is that the waterproof awning cloth also comprises a waterproof awning cloth, in the fifth step, the adhesive is firstly kneaded on the water surface, and then the adhesive and the waterproof awning cloth are coated on the edge and the bottom of the position to be maintained.
By combining the technical scheme, the invention has the beneficial effects that: the water in the swimming pool can be maintained without being discharged, so that the water source is saved, the environment is protected, the time is saved, a cofferdam is not required to be built, the labor is simplified, the danger is reduced, and the maintenance can be carried out at any time; the method is not limited by environment and weather, and drainage or cofferdam construction is not needed, so that the cost is low, and the working procedure time is very short.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood, the present invention may be implemented in accordance with the content of the description, and in order to make the above and other objects, features, and advantages of the present invention more clearly understood, the following preferred embodiments are described in detail with reference to the accompanying drawings.
Drawings
FIG. 1 is a flow diagram of a remedial swimming pool according to the present invention;
figure 2 is a schematic view of a swimming pool according to the invention.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The invention is further described below with reference to the accompanying drawings.
As shown in fig. 1 and 2, a method of repairing the bottom of a swimming pool 10 includes the steps of:
a first step of diving one or more maintenance personnel equipped with oxygen goblet into the swimming pool 10, searching the position 11 to be repaired in the swimming pool 10, and knocking the position to be repaired with a tool to determine whether the part to be repaired is peeled or aged by sound after visually observing the position to be repaired; the location to be repaired 11 includes a damaged or leaking location, and since the swimming pool 10 has a certain weight and pressure at the bottom of the water, it is also possible to test a location for potential stripping or aging through a tapping test.
And secondly, after the position to be maintained is knocked, the brick block at the position to be maintained is fallen off or hollow sound exists, the position to be maintained is damaged or has damage danger, at the moment, a maintenance worker sets a mark at the position to be maintained, and a buoy 12 is arranged on the water surface of the position.
And thirdly, completely stripping bricks and sand and stones at the position to be maintained, and cleaning the stripped bricks, broken stones, fragments and sand and stones.
Fourthly, sawing and cutting the edge of the position to be repaired by a maintainer through a cutter so as to put in the repairing adhesive and the bricks; the cutter is a compressed air cutter.
Fifthly, measuring the size of the position to be maintained, blending the amount of the adhesive according to the size of the position to be maintained, then coating the adhesive on the edge and the bottom of the position to be maintained, pasting the cut ceramic tile on the surface of the adhesive to enable the ceramic tile to be fully pasted on the position to be maintained, knocking and polishing the ceramic tile to enable the ceramic tile to be flush with the surrounding ceramic tile.
And sixthly, purifying a small amount of sand and dust generated during repair by using a water pumping filter.
As shown in fig. 1 and 2, preferably, the adhesive is an epoxy resin.
As shown in fig. 1 and 2, the waterproof tarpaulin is further included, and in the fifth step, the adhesive is firstly kneaded on the water surface, and then the adhesive and the waterproof tarpaulin are coated on the edge and the bottom of the position to be repaired.
As shown in fig. 1 and 2, the water in the swimming pool 10 can be maintained without being discharged, so that water sources are saved, the environment is protected, the time is saved, a cofferdam is not required to be built, the manpower is simplified, the danger is reduced, and the maintenance can be carried out at any time; the method is not limited by environment and weather, and drainage or cofferdam construction is not needed, so that the cost is low, and the working procedure time is very short.
The foregoing is a detailed description of the invention, and it should be noted that modifications and adaptations can be made by those skilled in the art without departing from the principle of the invention, and are intended to be within the scope of the invention.

Claims (3)

1. A method of repairing a swimming pool bottom, comprising the steps of:
firstly, a maintainer or a plurality of maintainers equipped with oxygen goblets dives into a swimming pool to find a position to be repaired in the swimming pool, and after the position to be repaired is visually observed, the position to be repaired is knocked by a tool to determine whether a part to be repaired is peeled off or aged or not through sound;
secondly, after the position to be maintained is knocked, if bricks at the position to be maintained fall off or hollow sound exists, the position to be maintained is damaged or has danger of damage, at the moment, a maintainer sets a mark at the position to be maintained, and a buoy is arranged on the water surface of the position;
completely stripping bricks and sand and stones at the position to be maintained, and cleaning the stripped bricks, broken stones, fragments and sand and stones;
fourthly, sawing and cutting the edge of the position to be repaired by a maintainer through a cutter so as to put in the repairing adhesive and the bricks;
fifthly, measuring the size of the position to be maintained, blending the amount of the adhesive according to the size of the position to be maintained, then coating the adhesive on the edge and the bottom of the position to be maintained, sticking the cut ceramic tile on the surface of the adhesive to ensure that the ceramic tile is stuck on the position to be maintained, knocking and polishing the ceramic tile to ensure that the ceramic tile is flush with the surrounding ceramic tiles;
and sixthly, purifying a small amount of sand and dust generated during repair by using a water pumping filter.
2. The method of repairing a swimming pool underwater bottom according to claim 1, wherein the adhesive is an epoxy.
3. A method of repairing a swimming pool underwater bottom according to claim 1, further comprising a waterproof tarpaulin, wherein in the fifth step the adhesive is first kneaded on the water surface, and thereafter the adhesive and the waterproof tarpaulin are spread over the edges and bottom of the location to be repaired.
CN202010469573.4A 2020-05-28 2020-05-28 Method for repairing bottom of swimming pool Pending CN111441608A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010469573.4A CN111441608A (en) 2020-05-28 2020-05-28 Method for repairing bottom of swimming pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010469573.4A CN111441608A (en) 2020-05-28 2020-05-28 Method for repairing bottom of swimming pool

Publications (1)

Publication Number Publication Date
CN111441608A true CN111441608A (en) 2020-07-24

Family

ID=71653611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010469573.4A Pending CN111441608A (en) 2020-05-28 2020-05-28 Method for repairing bottom of swimming pool

Country Status (1)

Country Link
CN (1) CN111441608A (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2808827A1 (en) * 2000-05-10 2001-11-16 R E T I METHOD AND DEVICE FOR REHABILITATION OF A COATING
US20020197429A1 (en) * 2001-06-20 2002-12-26 Dehn Gerald D. Vehicle drip mat
US20080185089A1 (en) * 2007-02-02 2008-08-07 Willcott Robert T System and method for patching pool liner
CN101538918A (en) * 2008-03-21 2009-09-23 沈阳 Method for refreshing ceramic tiles of exterior wall finish of building
JP2009270401A (en) * 2008-05-12 2009-11-19 Konishi Co Ltd Reinforcing method of metallic hollow column
CN101885941A (en) * 2010-08-20 2010-11-17 湖南先悦科技有限公司 Underwater epoxy resin coating and preparation method thereof
CN102303982A (en) * 2011-06-21 2012-01-04 汤振华 Tile manufacturing method and equipment
CN204386215U (en) * 2014-12-15 2015-06-10 浙江水利水电学院 Swimming pool delivery port duty prosthetic device
CN105672684A (en) * 2016-01-18 2016-06-15 曹颖 Construction methods for repairing ground stone hollowing
CN108060795A (en) * 2017-12-27 2018-05-22 东易日盛家居装饰集团股份有限公司 A kind of concrete wall repair technology
CN108868176A (en) * 2018-06-14 2018-11-23 厦门防水博士建筑工程有限公司 A kind of kitchen and toilet percolating water repairerment system
CN208184308U (en) * 2018-03-01 2018-12-04 山西聚脲防护材料有限公司 A kind of mosaic swimming pool polyureas repairing waterproof pre-processing structure
CN109025343A (en) * 2018-05-28 2018-12-18 上海天补材料科技有限公司 A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile
CN109235919A (en) * 2018-10-12 2019-01-18 广州市第二装修有限公司 A kind of method for maintaining of hollowing exterior wall

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2808827A1 (en) * 2000-05-10 2001-11-16 R E T I METHOD AND DEVICE FOR REHABILITATION OF A COATING
US20020197429A1 (en) * 2001-06-20 2002-12-26 Dehn Gerald D. Vehicle drip mat
US20080185089A1 (en) * 2007-02-02 2008-08-07 Willcott Robert T System and method for patching pool liner
CN101538918A (en) * 2008-03-21 2009-09-23 沈阳 Method for refreshing ceramic tiles of exterior wall finish of building
JP2009270401A (en) * 2008-05-12 2009-11-19 Konishi Co Ltd Reinforcing method of metallic hollow column
CN101885941A (en) * 2010-08-20 2010-11-17 湖南先悦科技有限公司 Underwater epoxy resin coating and preparation method thereof
CN102303982A (en) * 2011-06-21 2012-01-04 汤振华 Tile manufacturing method and equipment
CN204386215U (en) * 2014-12-15 2015-06-10 浙江水利水电学院 Swimming pool delivery port duty prosthetic device
CN105672684A (en) * 2016-01-18 2016-06-15 曹颖 Construction methods for repairing ground stone hollowing
CN108060795A (en) * 2017-12-27 2018-05-22 东易日盛家居装饰集团股份有限公司 A kind of concrete wall repair technology
CN208184308U (en) * 2018-03-01 2018-12-04 山西聚脲防护材料有限公司 A kind of mosaic swimming pool polyureas repairing waterproof pre-processing structure
CN109025343A (en) * 2018-05-28 2018-12-18 上海天补材料科技有限公司 A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile
CN108868176A (en) * 2018-06-14 2018-11-23 厦门防水博士建筑工程有限公司 A kind of kitchen and toilet percolating water repairerment system
CN109235919A (en) * 2018-10-12 2019-01-18 广州市第二装修有限公司 A kind of method for maintaining of hollowing exterior wall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PAT MAIO: "干旱使得在水下工作的加州游泳池修理工供不应求", 《HTTPS://WWW.LATIMES.COM/LOCAL/CALIFORNIA/LA-ME-POOL-REPAIRMAN-20150706-STORY.HTML》 *
凌绍森: "《游泳池场的管理与保养》", 30 June 1993, 人民体育出版社 *

Similar Documents

Publication Publication Date Title
CN108104502A (en) Ancient building brick wall surface protection and crack repairing method based on structural integrity
CN111042570B (en) Repairing construction method for fresh water brick wall of ancient building
CN104453085B (en) A kind of line box installation method of light aggregate concrete hollow partition board
CN103790290A (en) Construction method of roof foam concrete sloping layer
CN110820742A (en) Construction method for breaking underwater cast-in-place pile head
CN111441608A (en) Method for repairing bottom of swimming pool
CN108301320A (en) The method for paving of water-protected enclosure layer based on C40 microlith fiber concretes
CN109555329A (en) Reinforcing construction process is transformed in building
CN109235919A (en) A kind of method for maintaining of hollowing exterior wall
CN104675135B (en) Repairing method of carved stone cave eaves of stone cave temple
CN112195970A (en) River-crossing tunnel engineering waterproof construction method
CN209508958U (en) A kind of application static(al) abolishes pile crown system
CN110482935B (en) Preparation of recyclable cement-based repair material and method for dismantling original concrete structure without damage
CN103967313B (en) A kind of water-proof repairing method of steel concrete squat silo roof
KR100396006B1 (en) Sheet waterproof repair construction method of concrete build or slab and its injecter
CN106150020A (en) A kind of construction technology utilizing flowing mortar adhesively face brick
CN109914801A (en) A kind of vertical entire body Slate hanging construction method of alien invasion
Zambrzycki et al. Conservation in Marina el-Alamein in 2017 (Polish–Egyptian Conservation Mission)
CN102650159B (en) Construction technology for fair-faced concrete wall with rope rib mark-texturized surface
JP2009079364A (en) Repair method of degraded sprayed mortar covered surface
CN220080006U (en) Static force breaking device for pile head of filling pile by embedded expansion rod method
CN116892298A (en) Method for dismantling and repairing mosaic tiles of building wall surface
CN214246462U (en) Secondary drainage stone decorative floor of shower room
CN217897355U (en) Double-face usable cleaver
CN106121138A (en) The preparation method of the roofing concrete protective layer that a kind of secondary joint-cutting, dividing joint are rearmounted

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 40031237

Country of ref document: HK

WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200724

WD01 Invention patent application deemed withdrawn after publication